CN205349398U - Air supply system in large and long tunnels hole of supplementary construction of many inclined shafts - Google Patents

Air supply system in large and long tunnels hole of supplementary construction of many inclined shafts Download PDF

Info

Publication number
CN205349398U
CN205349398U CN201620057380.7U CN201620057380U CN205349398U CN 205349398 U CN205349398 U CN 205349398U CN 201620057380 U CN201620057380 U CN 201620057380U CN 205349398 U CN205349398 U CN 205349398U
Authority
CN
China
Prior art keywords
tunnel
air
high pressure
supply system
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620057380.7U
Other languages
Chinese (zh)
Inventor
王建伟
徐海
李瑛�
薛永庆
尚高磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority to CN201620057380.7U priority Critical patent/CN205349398U/en
Application granted granted Critical
Publication of CN205349398U publication Critical patent/CN205349398U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The utility model discloses an air supply system in large and long tunnels hole of supplementary construction of many inclined shafts, including tunnel (1), the one end of tunnel (1) is construction operation face (2) be provided with adjacent tunnel inclined shaft A (3) and tunnel inclined shaft B (4) in tunnel (1), in tunnel (1) and lean on construction operation face (2) to be provided with high -pressure gas supply system and fresh air gas supply system high pressure gas supply system and fresh air gas supply system's air feed end is provided with air door (5) that are used for keeping apart tunnel inclined shaft A (3) and tunnel inclined shaft B (4) intercommunication passageway. The utility model has the advantages of simple structure, reliable operation, adopt it to shorten the ventilation distance in the tunnel of growing up, not only can be effectual carry out high -pressure gas and fresh air's supply to high -tension apparatus and constructor, simultaneously, still practiced thrift the operating expenses greatly, reduced the maintenance degree of difficulty.

Description

Air feed system in the long and large tunnel of a kind of many inclined shafts auxiliary construction
Technical field
This utility model relates in a kind of Tunnel air feed system in air feed system, the particularly long and large tunnel of a kind of many inclined shafts auxiliary construction.
Background technology
At present, in constructing tunnel, based on the air feed of the major long tunnel of many inclined shafts auxiliary construction, high-pressure air feed and operation side by closest inclined shaft hole to intrinsic pressure wind.Wherein, inner high voltage supply in hole is relied primarily on the gases at high pressure equipment station built at the nearest inclined shaft hole of the distance construction scope of operation and is inwardly supplied by pipeline;The blower fan that the hole place that personnel's air feed of operation side then relies on the distance construction scope of operation nearest installs, is inwardly independently pressed into fresh air by air duct, to solve oxygen needed for personnel and plant equipment.Although this mode is feasible, but: this mode still suffers from following deficiency: 1. operating expenses is bigger: mainly air duct and steam line length are oversize, and construction puts into bigger;And personnel responsible for maintenance's cost increases therewith.2. maintenance difficulty is big: owing to length is relatively big, the point broken down individually is not easily found, impact construction.
Utility model content
The purpose of this utility model is just to provide air feed system in the long and large tunnel of a kind of many inclined shafts that operating expenses is little, maintenance difficulty is low auxiliary construction.
The purpose of this utility model is realized by such technical scheme, air feed system in the long and large tunnel of a kind of many inclined shafts auxiliary construction, including tunnel, the one end in tunnel is operation side, adjacent tunnel slope A and tunnel slope B it is provided with in described tunnel, being provided with high pressure air feed system and fresh air air supply system in described tunnel and by operation side, the supply end at described high pressure air feed system and fresh air air supply system is provided with for isolating tunnel slope A and the air door of tunnel slope B communicating passage.
Wherein, described high pressure air feed system includes high-pressure gas pipelines and gases at high pressure equipment station, and one end of described high-pressure gas pipelines is connected with described gases at high pressure equipment station, and the other end is connected with the high pressure equipment of operation side;Described fresh air air supply system includes air duct and axial flow blower, and one end of described air duct is towards operation side, and the other end is connected with axial flow blower, and described air door is arranged on described gases at high pressure equipment station and axial flow blower end.
Further describing, described high-pressure gas pipelines and air duct are yi word pattern, and described tunnel slope A is isolated by described air door with gases at high pressure equipment station and axial flow blower.
Further describing, described high-pressure gas pipelines and air duct are L-type, and described gases at high pressure equipment station and axial flow blower are arranged in described tunnel slope A, and described air door is positioned at the crossing of tunnel slope A and tunnel.
In order to accelerate ventilation speed, in described tunnel slope A or tunnel slope B, it is provided with jet blower.
Owing to the factors such as each inclined shaft hole elevation, air pressure, temperature and wind speed are each variant, under each factors, define thermal head and draught head, make between inclined shaft and tunnel, to form gravity flow wind, in major long tunnel work progress, this gravity flow wind available carries out fresh air needed for operation side offer gases at high pressure and workmen.
Owing to have employed technique scheme, the advantage that this utility model has simple in construction, reliable operation, it is adopted to shorten the ventilation distance of major long tunnel, it is not only able to the effective supply that high pressure equipment and workmen are carried out gases at high pressure and fresh air, simultaneously, also it is greatly saved operating expenses, reduces maintenance difficulty.
Accompanying drawing explanation
Accompanying drawing of the present utility model illustrates as follows:
Fig. 1 is the first structural representation of the present utility model;
Fig. 2 is the second structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail; but utility model of the present invention is not limited to these embodiments; any improvement on the present embodiment essence spirit or replacement, still fall within utility model right of the present invention and require scope required for protection.
Embodiment 1: as shown in Figure 1, air feed system in the long and large tunnel of a kind of many inclined shafts auxiliary construction, including tunnel 1, the one end in tunnel 1 is operation side 2, adjacent tunnel slope A3 and tunnel slope B4 it is provided with in described tunnel 1, being provided with high pressure air feed system and fresh air air supply system in described tunnel 1 and by operation side 2, the supply end at described high pressure air feed system and fresh air air supply system is provided with for isolating tunnel slope A3 and the air door 5 of tunnel slope B4 communicating passage.
Wherein, described high pressure air feed system includes high-pressure gas pipelines 6 and gases at high pressure equipment station 7, and one end of described high-pressure gas pipelines 6 is connected with described gases at high pressure equipment station 7, and the other end is connected with the high pressure equipment of operation side 2;Described fresh air air supply system includes air duct 8 and axial flow blower 9, and one end of described air duct 8 is towards operation side 2, and the other end is connected with axial flow blower 9, and described air door 5 is arranged on described gases at high pressure equipment station 7 and axial flow blower 9 end.
Further describing, above-mentioned high-pressure gas pipelines 6 and air duct 8 are yi word pattern, and described tunnel slope A3 is isolated by described air door 5 with gases at high pressure equipment station 7 and axial flow blower 9.
In the present embodiment, fresh wind is to flow automatically from inclined shaft B4 to inclined shaft A3, the reason forming gravity flow is the elevation difference at two inclined shaft holes, air pressure also has temperature different, the wind of the natural flow of two hole oneself formation, in major long tunnel work progress, this gravity flow wind available carries out fresh air needed for operation side offer gases at high pressure and workmen.
Embodiment 2: as in figure 2 it is shown, described high pressure air feed system includes high-pressure gas pipelines 6 and gases at high pressure equipment station 7, one end of described high-pressure gas pipelines 6 is connected with described gases at high pressure equipment station 7, and the other end is connected with the high pressure equipment of operation side 2;Described fresh air air supply system includes air duct 8 and axial flow blower 9, and one end of described air duct 8 is towards operation side 2, and the other end is connected with axial flow blower 9, and described air door 5 is arranged on described gases at high pressure equipment station 7 and axial flow blower 9 end;Described high-pressure gas pipelines 6 and air duct 8 are L-type, and described gases at high pressure equipment station 7 and axial flow blower 9 are arranged in described tunnel slope A3, and described air door 5 is positioned at the crossing of tunnel slope A3 and tunnel 1.
In order to accelerate the discharge of air pollution, in described tunnel slope A3 or tunnel slope B4, it is provided with jet blower 10.
In the present embodiment, fresh wind is to flow automatically from inclined shaft A3 to inclined shaft B4, the reason forming gravity flow is the elevation difference at two inclined shaft holes, air pressure also has temperature different, the wind of the natural flow of two hole oneself formation, in major long tunnel work progress, this gravity flow wind available carries out fresh air needed for operation side offer gases at high pressure and workmen.
In this utility model, no matter fresh wind flows from inclined shaft A3 to inclined shaft B4 or flows from inclined shaft B5 to inclined shaft A6, fresh wind is forced through air duct 8 and is sent to operation side by axial flow blower 9, fresh air is provided to operation side 2, then air pollution is extruded operation side 2, relies on jet blower 10 quickly to discharge outside hole in inclined shaft A3 or inclined shaft B4;It is then compressed by gases at high pressure equipment station 7 by fresh air by air compressor machine, then passes through gases at high pressure 6 pipeline and delivers to the high pressure equipment of operation side 2.
In this utility model, the setting of air door 5, it not totally enclosed, arranging it, to be primarily to the air quantity preventing taking out at high-pressure air feed equipment and axial flow blower too big, cause neighbouring pressure initiation negative pressure, face is returned the wind come and is drawn onto face to again, and for the wind speed of the wind that controls to flow automatically between tunnel slope A3 and tunnel slope A4 and air quantity.

Claims (5)

1. air feed system in the long and large tunnel of inclined shaft auxiliary construction more than a kind, including tunnel (1), the one end in tunnel (1) is operation side (2), adjacent tunnel slope A(3 it is provided with in described tunnel (1)) and tunnel slope B(4), it is characterized in that: being provided with high pressure air feed system and fresh air air supply system in described tunnel (1) and by operation side (2), the supply end at described high pressure air feed system and fresh air air supply system is provided with for isolating tunnel slope A(3) and tunnel slope B(4) air door (5) of communicating passage.
2. air feed system in the long and large tunnel of many inclined shafts auxiliary construction as claimed in claim 1, it is characterized in that: described high pressure air feed system includes high-pressure gas pipelines (6) and gases at high pressure equipment station (7), one end of described high-pressure gas pipelines (6) is connected with described gases at high pressure equipment station (7), and the other end is connected with the high pressure equipment of operation side (2);Described fresh air air supply system includes air duct (8) and axial flow blower (9), one end of described air duct (8) is towards operation side (2), the other end is connected with axial flow blower (9), and described air door (5) is arranged on described gases at high pressure equipment station (7) and axial flow blower (9) end.
3. air feed system in the long and large tunnel of many inclined shafts auxiliary construction as claimed in claim 2, it is characterized in that: described high-pressure gas pipelines (6) and air duct (8) are yi word pattern, and described air door (5) is by described tunnel slope A(3) isolate with gases at high pressure equipment station (7) and axial flow blower (9).
4. air feed system in the long and large tunnel of many inclined shafts auxiliary construction as claimed in claim 2, it is characterized in that: described high-pressure gas pipelines (6) and air duct (8) are L-type, described gases at high pressure equipment station (7) and axial flow blower (9) are arranged in described tunnel slope A(3), described air door (5) is positioned at tunnel slope A(3) with the crossing in tunnel (1).
5. air feed system in the long and large tunnel of the many inclined shafts auxiliary construction as described in claim 3 or 4, is characterized in that: at described tunnel slope A(3) or tunnel slope B(4) in be provided with jet blower (10).
CN201620057380.7U 2016-01-21 2016-01-21 Air supply system in large and long tunnels hole of supplementary construction of many inclined shafts Expired - Fee Related CN205349398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620057380.7U CN205349398U (en) 2016-01-21 2016-01-21 Air supply system in large and long tunnels hole of supplementary construction of many inclined shafts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620057380.7U CN205349398U (en) 2016-01-21 2016-01-21 Air supply system in large and long tunnels hole of supplementary construction of many inclined shafts

Publications (1)

Publication Number Publication Date
CN205349398U true CN205349398U (en) 2016-06-29

Family

ID=56176934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620057380.7U Expired - Fee Related CN205349398U (en) 2016-01-21 2016-01-21 Air supply system in large and long tunnels hole of supplementary construction of many inclined shafts

Country Status (1)

Country Link
CN (1) CN205349398U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108087012A (en) * 2017-12-25 2018-05-29 中矿金业股份有限公司 A kind of mine skip shaft outgoing airflow shuts off partition apparatus
CN108301859A (en) * 2018-03-23 2018-07-20 西南交通大学 A kind of Large Underground water seal cave depot group push-pull type construction ventilation method and its system
CN109139081A (en) * 2018-09-20 2019-01-04 中铁局集团第五工程有限公司 A kind of high methane Extra Long Tunnel Construction method of ventilation
US20210207481A1 (en) * 2020-12-16 2021-07-08 China Railway Beijing Engineering Group Co.,Ltd Split air cabin ventilation system for construction of tunnel inclined shaft and ventilation method using same
CN115726829A (en) * 2022-11-02 2023-03-03 中铁十八局集团有限公司 Ventilation structure that branch tunnel wind regime moves inwards

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108087012A (en) * 2017-12-25 2018-05-29 中矿金业股份有限公司 A kind of mine skip shaft outgoing airflow shuts off partition apparatus
CN108301859A (en) * 2018-03-23 2018-07-20 西南交通大学 A kind of Large Underground water seal cave depot group push-pull type construction ventilation method and its system
CN109139081A (en) * 2018-09-20 2019-01-04 中铁局集团第五工程有限公司 A kind of high methane Extra Long Tunnel Construction method of ventilation
US20210207481A1 (en) * 2020-12-16 2021-07-08 China Railway Beijing Engineering Group Co.,Ltd Split air cabin ventilation system for construction of tunnel inclined shaft and ventilation method using same
US11674392B2 (en) * 2020-12-16 2023-06-13 China Railway Beijing Engineering Group Co., Ltd Split air cabin ventilation system for construction of tunnel inclined shaft and ventilation method using same
CN115726829A (en) * 2022-11-02 2023-03-03 中铁十八局集团有限公司 Ventilation structure that branch tunnel wind regime moves inwards

Similar Documents

Publication Publication Date Title
CN205349398U (en) Air supply system in large and long tunnels hole of supplementary construction of many inclined shafts
CN100595420C (en) Pressure regulating and distributing chamber ventilation construction method inside tunnel assist drift heading hole
CN104314600B (en) Article three, the construction ventilation method of Parallel Tunnel
CN202768046U (en) Jet ventilation structure for tunnel construction of single inclined shaft and double main tunnels
CN104675424A (en) Underwater tunnel ventilation system and ventilation method
CN202483606U (en) Double-track tunnel based on sharing air-exhausting contacting air flues and airshaft
CN104806281B (en) Inclined shaft ventilation based high pressure air supply system in long tunnel hole
CN202937292U (en) Tunnel construction ventilating system
CN105240040A (en) Ventilation method of inclined shaft assisted double-hole construction
De Souza Cost saving strategies in mine ventilation
CN102536293A (en) Two-line tunnel based on sharing of exhaust communication air passage and ventilation vertical shaft
CN105134278A (en) Ventilation heating system for tunnels in high-altitude and cold regions as well as ventilation heating construction method
CN206377807U (en) Air-supply, exhaust system for underground garage
CN202991094U (en) Integrated monitoring system of tunnel ventilating device
CN201016549Y (en) Cold pressing pellet drying furnace
CN103939927A (en) Smoke duct and three-in-one collecting pipe thereof
CN102121391A (en) Construction method for ventilation in construction of small-radius spiral tunnel
CN201302252Y (en) Fresh air conveying device
CN204591329U (en) A kind of wind storehouse ventilation installation for tunnel
CN213269952U (en) Fire smoke exhaust system with limited tunnel interval arranged in smoke exhaust duct
CN211405425U (en) Be used for secret cable pit cooling system
CN208431762U (en) A kind of gas fired-boiler low NO
CN208130822U (en) Flue gas recycled system and its material uniforming device
CN105256775A (en) Ventilation system arrangement structure during construction period of underground cavern of hydropower station
CN103835744A (en) Integrated supervision and control system of tunnel ventilation equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161009

Address after: 300222 Hexi District Liulin East China Railway Bureau of the eighteen Tianjin

Patentee after: CHINA RAILWAY 18 BUREAU GROUP Co.,Ltd.

Patentee after: China Railway 18th Bureau Group Tunnel Engineering Co.,Ltd.

Address before: Feng Qi Zhen Caijiaying road 400700 Chongqing city Beibei District No. 6

Patentee before: China Railway 18th Bureau Group Tunnel Engineering Co.,Ltd.