CN205349357U - Tunnel construction is with central ditch template - Google Patents
Tunnel construction is with central ditch template Download PDFInfo
- Publication number
- CN205349357U CN205349357U CN201521084440.6U CN201521084440U CN205349357U CN 205349357 U CN205349357 U CN 205349357U CN 201521084440 U CN201521084440 U CN 201521084440U CN 205349357 U CN205349357 U CN 205349357U
- Authority
- CN
- China
- Prior art keywords
- template
- body frame
- master module
- sliding beam
- central trench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to a tunnel construction is with central ditch template, it includes sliding beam (1), template body frame (2), template lift cylinder (3) and stencil assembly, template lift cylinder (3) is installed respectively at the both ends of sliding beam (1), template body frame (2) set up in the below of sliding beam (1), the both ends of sliding beam (1) are connected with a template lift steel cable (5) respectively, pulley (4) of homonymy are walked around to template lift steel cable (5), and with the end connection of template body frame (2), stencil assembly installs in the below of template body frame (2), and stencil assembly includes connecting piece (6), master module (7) and paratype board (9), when the telescopic shaft of paratype board lift hydraulic pressure (8) stretches out, and master module (7) and paratype board (9) cooperation centralize ditch structure. The utility model has the advantages of: construction method is nimble changeable, and maneuverability is strong, simple structure, equipment cost is low, the form removal is convenient simple.
Description
Technical field
This utility model relates to technical field of tunnel construction, particularly constructing tunnel central trench template.
Background technology
In excavation construction in tunnel, first excavation section is excavated, with cement at an excavation place construction just layer after excavation, thickness ratio owing to just propping up the mixed earth of layer is relatively thin, its insufficient strength, therefore, intensity for ensureing whole engineering also needs at a just layer surface construction inverted arch layer, also constructing on inverted arch layer subsequently packed layer, finally just can complete the construction in tunnel, wherein just cement model used in a layer, inverted arch layer and packed layer differs.Being partially filled with on layer and offer central trench, central trench is constructed according to design requirement, its effect mainly draining.
Central trench template-setup is in the lower section of trestle, according to different duty requirements, the position of central trench template moves forward along with the needs that carry out of construction, but trestle is completely covered on the top of central trench template, mobile difficulty, causes that construction motility reduces, and operability is relatively low, and central trench template is steel part structure, Mobility Center ditch template needs to expend substantial amounts of manpower and materials.
Traditional central trench template is after casting central trench molding, and form removal is difficult, needs also exist for expending substantial amounts of manpower and materials, causes construction cost to increase.
Utility model content
The purpose of this utility model is in that to overcome the shortcoming of prior art, it is provided that a kind of form of construction work is flexible and changeable, workable, simple in construction, equipment cost are low and the convenient constructing tunnel central trench template of form removal.
The purpose of this utility model is achieved through the following technical solutions: constructing tunnel central trench template, it includes sliding beam, template body frame, template lift cylinder and template assembly, sliding beam is arranged on trestle, and can slide along the length direction of trestle, the two ends of sliding beam are respectively mounted template lift cylinder, the telescopic shaft of template lift cylinder is rotatablely equipped with pulley, template body frame is arranged at the lower section of sliding beam, the two ends of sliding beam are connected to a template lifting steel cable, the pulley of homonymy walked around by template lifting steel cable, and be connected with the end of template body frame, described template assembly is arranged on the lower section of template body frame, template assembly includes connector, master module and secondary template, the lower surface both sides of template body frame are respectively fixed with connector, the lower end of two connectors has been respectively articulated with a master module, secondary template raise-lower hydraulic is installed in the middle part of the lower surface of template body frame, secondary model sheetinstallat is on the telescopic shaft of secondary template raise-lower hydraulic, when the telescopic shaft of secondary template raise-lower hydraulic stretches out, master module cooperatively forms central trench structure with secondary template.
It is additionally provided with master module traction steel rope of cable between bottom and the sidewall of secondary template of described master module.
Described template assembly also includes positioning screw rod, and the two ends of positioning screw rod are pushed up in the middle part of the medial wall being pressed in two master modules respectively.
This utility model has the advantage that
1, central trench template can move together with trestle, it is possible to individually moves, and operator according to duty requirements, can select the move mode of central trench template, and form of construction work is flexible and changeable.
2, simple in construction of the present utility model, practicality is high, and equipment cost is low, has saved substantial amounts of manpower and materials for operator.
3, template assembly adopts split-type structural, when building, master module coordinates with secondary template, and is positioned by positioning screw rod, form central trench structure, during form removal, first pull down positioning screw rod, then pair template is promoted, what make master module and secondary template coordinates inefficacy, again through master module traction steel rope of cable by master module to traction in the middle of central trench, it is achieved master module and central trench inwall depart from, thus can form removal assembly easily and fast.
Accompanying drawing explanation
Fig. 1 is the structural representation that this utility model is in formwork erection state;
Fig. 2 is the first structural representation that this utility model is in form removal state;
Fig. 3 is the second structural representation that this utility model is in formwork erection state;
In figure: 1-sliding beam, 2-template body frame, 3-template lift cylinder, 4-pulley, 5-template lifting steel cable, 6-connector, 7-master module, 8-pair template raise-lower hydraulic, 9-pair template, 10-master module traction steel rope of cable, 11-positioning screw rod.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is further described, but protection domain of the present utility model is not limited to the following stated.
As shown in Figure 1, constructing tunnel central trench template, it includes sliding beam 1, template body frame 2, template lift cylinder 3 and template assembly, sliding beam 1 is arranged on trestle, and can slide along the length direction of trestle, the two ends of sliding beam 1 are respectively mounted template lift cylinder 3, the telescopic shaft of template lift cylinder 3 is rotatablely equipped with pulley 4, template body frame 2 is arranged at the lower section of sliding beam 1, the two ends of sliding beam 1 are connected to a template lifting steel cable 5, the pulley 4 of homonymy walked around by template lifting steel cable 5, and be connected with the end of template body frame 2, described template assembly is arranged on the lower section of template body frame 2, template assembly includes connector 6, master module 7 and secondary template 9, the lower surface both sides of template body frame 2 are respectively fixed with connector 6, the lower end of two connectors 6 has been respectively articulated with a master module 7, secondary template raise-lower hydraulic 8 is installed in the middle part of the lower surface of template body frame 2, secondary template 9 is arranged on the telescopic shaft of secondary template raise-lower hydraulic 8, when the telescopic shaft of secondary template raise-lower hydraulic 8 stretches out, master module 7 cooperatively forms central trench structure with secondary template 9.
Further, being additionally provided with master module traction steel rope of cable 10 between bottom and the sidewall of secondary template 9 of described master module 7, master module 7 can be drawn by master module traction steel rope of cable 10 to centre, is conducive to master module 7 to depart from central trench inwall.
Further, described template assembly also includes positioning screw rod 11, and the two ends of positioning screw rod 11 are pushed up in the middle part of the medial wall being pressed in two master modules 7 respectively, during pouring construction, is supportted by positioning screw rod 11 on the inwall of master module 7 so that the structure of template assembly is more stable.
Work process of the present utility model is as follows: during pouring construction, the telescopic shaft of template lift cylinder 3 is regained, template body frame 2 moves down, master module 7 arrives construction location, and make secondary template raise-lower hydraulic 8 pair template 9 be moved down, master module 7 coordinates with secondary template 9, form central trench structure, positioning screw rod 11 is fixed on the inwall of master module 7, realize master module 7 to fix, as shown in Figure 1, then pouring construction is carried out, after having constructed, remove positioning screw rod 11, control secondary template raise-lower hydraulic 8 telescopic shaft to regain, secondary template 9 is driven to move up, in secondary template 9 moving process, master module traction steel rope of cable 10 stretches gradually, as shown in Figure 2, secondary template 9 continues to move up, master module traction steel rope of cable 10 pulls the lower end of master module 7 to draw in centre, the inwall of the outer wall and central trench that realize master module 7 departs from, stretching out template lift cylinder 3 again makes template lifting steel cable 5 mention template body frame 2, namely mentioned a whole set of template simultaneously, as shown in Figure 3.
Claims (3)
1. constructing tunnel central trench template, it is characterized in that: it includes sliding beam (1), template body frame (2), template lift cylinder (3) and template assembly, sliding beam (1) is arranged on trestle, and can slide along the length direction of trestle, the two ends of sliding beam (1) are respectively mounted template lift cylinder (3), the telescopic shaft of template lift cylinder (3) is rotatablely equipped with pulley (4), template body frame (2) is arranged at the lower section of sliding beam (1), the two ends of sliding beam (1) are connected to template lifting steel cable (5), template lifting steel cable (5) walks around the pulley (4) of homonymy, and be connected with the end of template body frame (2), described template assembly is arranged on the lower section of template body frame (2), template assembly includes connector (6), master module (7) and secondary template (9), the lower surface both sides of template body frame (2) are respectively fixed with connector (6), the lower end of two connectors (6) has been respectively articulated with a master module (7), secondary template raise-lower hydraulic (8) is installed in the middle part of the lower surface of template body frame (2), secondary template (9) is arranged on the telescopic shaft of secondary template raise-lower hydraulic (8), when the telescopic shaft of secondary template raise-lower hydraulic (8) stretches out, master module (7) cooperatively forms central trench structure with secondary template (9).
2. constructing tunnel central trench template according to claim 1, it is characterised in that: it is additionally provided with master module traction steel rope of cable (10) between bottom and the sidewall of secondary template (9) of described master module (7).
3. constructing tunnel central trench template according to claim 1, it is characterised in that: described template assembly also includes positioning screw rod (11), and the two ends of positioning screw rod (11) are pushed up in the middle part of the medial wall being pressed in two master modules (7) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521084440.6U CN205349357U (en) | 2015-12-23 | 2015-12-23 | Tunnel construction is with central ditch template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521084440.6U CN205349357U (en) | 2015-12-23 | 2015-12-23 | Tunnel construction is with central ditch template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205349357U true CN205349357U (en) | 2016-06-29 |
Family
ID=56169130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521084440.6U Expired - Fee Related CN205349357U (en) | 2015-12-23 | 2015-12-23 | Tunnel construction is with central ditch template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205349357U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106939793A (en) * | 2017-04-21 | 2017-07-11 | 四川省创力隧道机械设备有限公司 | It is easy to the tunnel central trench chassis efficiently constructed |
-
2015
- 2015-12-23 CN CN201521084440.6U patent/CN205349357U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106939793A (en) * | 2017-04-21 | 2017-07-11 | 四川省创力隧道机械设备有限公司 | It is easy to the tunnel central trench chassis efficiently constructed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104695984A (en) | Multifunctional tunnel construction trolley | |
CN203022024U (en) | Integrally-movable formwork for pipe gallery cast-in-situ construction | |
CN104790977A (en) | Tunnel primary lining formwork trolley and construction method thereof | |
CN110513125A (en) | Inside and outside mould trolley shoring system for open cut closed conduit | |
CN205778918U (en) | Loess tunnel excavation and just formwork build concrete construction combined type chassis | |
CN103982200B (en) | Slide rail Mobile steel mould trolley in tunneling boring | |
CN204627623U (en) | Tunnel just serves as a contrast formwork jumbo | |
CN201588236U (en) | Hydraulic grab for construction of underground continuous wall and grab machine | |
CN205349357U (en) | Tunnel construction is with central ditch template | |
CN204627622U (en) | The multi-functional construction trolley in a kind of tunnel | |
CN110359448B (en) | Method for reinforcing shallow soft foundation by bidirectional integral stirring equipment | |
CN202688884U (en) | Back support leg walking support lifting mechanism of highway bridge girder erection machine | |
CN204782747U (en) | A complete set of pipe full -rotating drill | |
CN204002842U (en) | In full section, slide rail moves steel form carrier | |
CN203603123U (en) | Dam height adjusting and limiting device of ecological airbag supporting dam | |
CN203383155U (en) | Fully automatic traveling gear | |
CN108060929B (en) | Roller type tunnel two-liner pipe piece assembling equipment and lining method | |
CN202391434U (en) | Water-proof cloth laying trolley | |
CN211523211U (en) | Pile extractor for hydraulic engineering | |
CN204163762U (en) | A kind of filling in mine barricade | |
CN103590376B (en) | A kind of height of dam regulation limiting device of ecological bladder support dam | |
CN204059197U (en) | Hanging Basket running gear | |
CN203404486U (en) | Hydraulic pipeline installation machine | |
CN203795429U (en) | Telescopic device for walking-frame travelling mechanisms and engineering machine employing telescopic device | |
CN206513377U (en) | A kind of novel circular tunnel concrete formwork for placing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160629 Termination date: 20211223 |
|
CF01 | Termination of patent right due to non-payment of annual fee |