CN205347117U - Production metal complex dye's integrated sewage treatment system - Google Patents
Production metal complex dye's integrated sewage treatment system Download PDFInfo
- Publication number
- CN205347117U CN205347117U CN201521103514.6U CN201521103514U CN205347117U CN 205347117 U CN205347117 U CN 205347117U CN 201521103514 U CN201521103514 U CN 201521103514U CN 205347117 U CN205347117 U CN 205347117U
- Authority
- CN
- China
- Prior art keywords
- pond
- elevator pump
- activity charcoal
- production
- premetallized dye
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Water Treatment By Sorption (AREA)
- Treatment Of Water By Oxidation Or Reduction (AREA)
Abstract
The embodiment of the utility model discloses production metal complex dye's integrated sewage treatment system, this production metal complex dye's integrated sewage treatment system includes the wastewater disposal basin, a filter press is connected through first elevator pump and wastewater disposal basin, one -level activated carbon filter is connected with a filter press, the ozone treatment pond, activated carbon filter is connected with the one -level, second grade activated carbon filter is connected with the ozone treatment pond, the biological pond of integration, activated carbon filter is connected with the second grade, middle pond is connected through third elevator pump and integrated biological pond, RO membrane processing system is connected through fourth elevator pump and middle pond, the dope pond, processing system is connected with the RO membrane, the evaporimeter is connected through the 5th elevator pump and dope pond. The utility model discloses a production metal complex dye's integrated sewage treatment system disposes of sewage efficiently, compact structure, and equal area is little for each equipment, has practiced thrift the ground investment cost of mill, and is applicable in middle -size and small -size production metal complex dye's enterprise.
Description
Technical field
This utility model relates to a kind of sewage disposal system, particularly relates to a kind of integrated effluent disposal system producing premetallized dye.
Background technology
The sewage disposal system of the general factory producing premetallized dye, all contain multiple main equipment, such as fine fack, setting pot, second pond, sludge condensation and sludge treatment equipment etc., not only increase the ground cost of investment of factory, also it is unfavorable for producing control and management simultaneously, is not therefore suitable for midget plant.
Utility model content
This utility model embodiment technical problem to be solved is in that, sewage disposal system for the general factory producing premetallized dye, all contain multiple main equipment, such as fine fack, setting pot, second pond, sludge condensation and sludge treatment equipment etc., not only increase the ground cost of investment of factory, also it is unfavorable for producing control and management, the problem not therefore being suitable for midget plant, it is proposed that a kind of integrated effluent disposal system producing premetallized dye simultaneously.
In order to solve above-mentioned technical problem, this utility model embodiment provides a kind of integrated effluent disposal system producing premetallized dye, and the integrated effluent disposal system of this production premetallized dye includes: wastewater disposal basin;First filter press, is connected with wastewater disposal basin by the first elevator pump, for the preliminary sewage filtered from wastewater disposal basin output;Primary activity charcoal pond, is connected with the first filter press;Ozonization pond, is connected with primary activity charcoal pond;Second order activity charcoal pond, is connected with ozonization pond;Integral biological pond, is connected with second order activity charcoal pond;Intermediate pool, is connected with integral biological pond by the 3rd elevator pump, for storing the sewage of output from integral biological pond;RO film processing system, is connected with intermediate pool by the 4th elevator pump;Dope pond, is connected with RO film processing system, and the concentrated stream after the process of RO film processing system enters in dope pond;Vaporizer, is connected with dope pond by the 5th elevator pump.
Wherein, the integrated effluent disposal system producing premetallized dye farther includes the second filter press and the second elevator pump, primary activity charcoal pond, the second elevator pump and the second flame filter press are sequentially connected with, the sewage flowed out from primary activity charcoal pond is delivered to the second filter press through the second elevator pump, returns to again defeated for sewage in primary activity charcoal pond after filtering again.
Wherein, the integrated effluent disposal system producing premetallized dye farther includes clear water reserviors, is connected with RO film processing system, for storing the clear water of output from RO film processing system.
Wherein, the integrated effluent disposal system producing premetallized dye farther includes metering well, is connected with dope pond, for measuring the water quality of dense water in dope pond.
Implement this utility model embodiment, have the advantages that the integrated effluent disposal system of production premetallized dye of the present utility model processes sewage efficiency height, compact conformation, the equal floor space of each equipment is little, save fabrication facility floor cost of investment, be applicable to the enterprise of middle-size and small-size production premetallized dye.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation of the integrated effluent disposal system producing premetallized dye that this utility model provides.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
Refer to the structural representation that Fig. 1, Fig. 1 are the integrated effluent disposal systems producing premetallized dye that this utility model provides.The integrated effluent disposal system of this production premetallized dye includes wastewater disposal basin the 11, first filter press 13, primary activity charcoal pond 14, ozonization pond 17, second order activity charcoal pond 18, integral biological pond 19, intermediate pool 21, RO (ReverseOsmosis, reverse osmosis) film processing system 23, dope pond 25 and vaporizer 28.
First filter press 13 is connected with wastewater disposal basin 11 by the first elevator pump 12, for the preliminary sewage filtered from wastewater disposal basin output.
Primary activity charcoal pond 14 is connected with the first filter press 13.Primary activity charcoal pond the 14, second elevator pump 15 and the second flame filter press 16 are sequentially connected with, the sewage flowed out from primary activity charcoal pond 14 is delivered to the second filter press 16 through the second elevator pump 15, returns to again defeated for sewage in primary activity charcoal pond 14 after filtering again.
Ozonization pond 17 is connected with primary activity charcoal pond 14.
Second order activity charcoal pond 18 is connected with ozonization pond 17.
Integral biological pond 19 is connected with second order activity charcoal pond 18.
Intermediate pool 21 is connected with integral biological pond 19 by the 3rd elevator pump 20, for storing the sewage of output from integral biological pond 19.
RO film processing system 23 is connected with intermediate pool 21 by the 4th elevator pump 22.
Clear water reserviors 24 are connected with RO film processing system 23, for storing the clear water of output from RO film processing system 23.
Dope pond 25 is connected with RO film processing system 23, and the concentrated stream after RO film processing system 23 process enters in dope pond 25.
Metering well 26 is connected with dope pond 25, for measuring the water quality of dense water in dope pond 25.
Vaporizer 28 is connected with dope pond 25 by the 5th elevator pump 27.
The sewage flowed out from each workshop producing premetallized dye factory is unified to be flowed in wastewater disposal basin 11, squeeze in the first filter press 13 through the first elevator pump 12 and be filtered, sewage after filtration is re-fed in primary activity charcoal pond 14 to adsorb, a sewage part in primary activity charcoal pond 14 is squeezed in the second flame filter press 16 through the second elevator pump 15, return again to primary activity charcoal pond 14 after filtration, continue cycling through.The sewage flowed out from primary activity charcoal pond 14 is input in ozonization pond 17, carries out ozonidation, and the sewage after effect is re-fed in second order activity charcoal pond 18 to carry out activated carbon second adsorption process.The sewage flowed out from second order activity charcoal pond 18 is squeezed in intermediate pool 21 through the 3rd elevator pump 20 and is temporarily stored, water in intermediate pool 21 is driven into RO film processing system 23 by the 4th elevator pump 22 and processes, after process, the clear water of gained flows in clear water reserviors 24, remaining concentrated stream enters in dope pond 25, squeezing in vaporizer 28 through the 5th elevator pump 27 and evaporate, process transported by the waste residue obtained.Dope in dope pond 25 can pass through metering well 26 and carry out water quality measurement.
Implement this utility model embodiment, have the advantages that the integrated effluent disposal system of production premetallized dye of the present utility model processes sewage efficiency height, compact conformation, the equal floor space of each equipment is little, save fabrication facility floor cost of investment, be applicable to the enterprise of middle-size and small-size production premetallized dye.
The foregoing is only preferred embodiment of the present utility model; not in order to limit this utility model; all within spirit of the present utility model and principle, any amendment of making, equivalent replacement, improvement etc., should be included within protection domain of the present utility model.
Claims (4)
1. the integrated effluent disposal system producing premetallized dye, it is characterised in that the integrated effluent disposal system of described production premetallized dye includes:
Wastewater disposal basin;
First filter press, is connected with described wastewater disposal basin by the first elevator pump, for tentatively filtering the sewage exported from described wastewater disposal basin;
Primary activity charcoal pond, is connected with described first filter press;
Ozonization pond, is connected with described primary activity charcoal pond;
Second order activity charcoal pond, is connected with described ozonization pond;
Integral biological pond, is connected with described second order activity charcoal pond;
Intermediate pool, is connected with described integral biological pond by the 3rd elevator pump, for storing the sewage of output from described integral biological pond;
RO film processing system, is connected with described intermediate pool by the 4th elevator pump;
Dope pond, is connected with described RO film processing system, and the concentrated stream after the process of described RO film processing system enters in described dope pond;
Vaporizer, is connected with described dope pond by the 5th elevator pump.
2. the integrated effluent disposal system of production premetallized dye according to claim 1, it is characterized in that, the integrated effluent disposal system of described production premetallized dye farther includes the second filter press and the second elevator pump, described primary activity charcoal pond, described second elevator pump and described second flame filter press are sequentially connected with, the sewage flowed out from described primary activity charcoal pond is delivered to described second filter press through described second elevator pump, returns to again defeated for sewage in described primary activity charcoal pond after filtering again.
3. the integrated effluent disposal system of production premetallized dye according to claim 1, it is characterized in that, the integrated effluent disposal system of described production premetallized dye farther includes clear water reserviors, it is connected with described RO film processing system, for storing the clear water of output from described RO film processing system.
4. the integrated effluent disposal system of production premetallized dye according to claim 1, it is characterized in that, the integrated effluent disposal system of described production premetallized dye farther includes metering well, is connected with described dope pond, for measuring the water quality of dense water in described dope pond.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521103514.6U CN205347117U (en) | 2015-12-25 | 2015-12-25 | Production metal complex dye's integrated sewage treatment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521103514.6U CN205347117U (en) | 2015-12-25 | 2015-12-25 | Production metal complex dye's integrated sewage treatment system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205347117U true CN205347117U (en) | 2016-06-29 |
Family
ID=56171639
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521103514.6U Expired - Fee Related CN205347117U (en) | 2015-12-25 | 2015-12-25 | Production metal complex dye's integrated sewage treatment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205347117U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108623096A (en) * | 2018-05-11 | 2018-10-09 | 北京翰祺环境技术有限公司 | A kind for the treatment of process of high-concentration hardly-degradable sewage |
-
2015
- 2015-12-25 CN CN201521103514.6U patent/CN205347117U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108623096A (en) * | 2018-05-11 | 2018-10-09 | 北京翰祺环境技术有限公司 | A kind for the treatment of process of high-concentration hardly-degradable sewage |
CN108623096B (en) * | 2018-05-11 | 2021-07-06 | 北京翰祺环境技术有限公司 | Treatment process of high-concentration degradation-resistant sewage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201817357U (en) | Full-reuse treatment device for coking wastewater through Fenton oxidation and double-membrane process | |
RU76641U1 (en) | INTEGRATED MULTI-CIRCUIT MULTI-STAGE WATER TREATMENT AND WATER TREATMENT SYSTEM ON THE MOBILE PLATFORM | |
CN102285735B (en) | Ultrafiltration membrane treatment system and treatment process of heavy metal wastewater | |
CN101857329A (en) | Treatment technique for recycling waste water into industrial ultrapure water | |
CN209778571U (en) | Treatment system for leachate of household garbage landfill | |
CN204752404U (en) | Portable landfill leachate processing apparatus | |
CN105776608A (en) | Household reverse osmosis water purifier | |
CN104649454A (en) | Micro-wastewater purifier | |
CN206843145U (en) | A kind of water purifier that can retain water mineral according to setting value | |
CN205347117U (en) | Production metal complex dye's integrated sewage treatment system | |
CN205500954U (en) | Domestic reverse osmosis water purifier | |
CN104445802B (en) | The Multistage settling processing system of paper waste | |
CN103626316B (en) | A kind of for the emergency treatment device by heavy metal contamination drinking water source | |
CN206417964U (en) | A kind of weaving mill water process circulatory system | |
CN204815932U (en) | Water purifier | |
CN204529503U (en) | A kind of RO reverse osmosis water purifier | |
CN204039151U (en) | Self-priming household water filter | |
CN215163877U (en) | Laundry dragon nanofiltration filtration system | |
CN203960013U (en) | A kind of intermediate water reuse system based on membrane bioreactor | |
CN209226791U (en) | A kind of high-concentration organic wastewater treatment system | |
CN204714647U (en) | Integrated purifying system | |
CN202705149U (en) | Mobile integrated ultrafiltration membrane water purifier | |
CN210559721U (en) | Water-saving water purification system | |
CN211255492U (en) | Wastewater discharge-free water purifier with double RO (reverse osmosis) filter elements | |
CN206720997U (en) | A kind of sewage disposal line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160629 Termination date: 20181225 |
|
CF01 | Termination of patent right due to non-payment of annual fee |