CN205330685U - A plugging device for the concrete lining trolley of the second lining of the tunnel - Google Patents

A plugging device for the concrete lining trolley of the second lining of the tunnel Download PDF

Info

Publication number
CN205330685U
CN205330685U CN201620107962.1U CN201620107962U CN205330685U CN 205330685 U CN205330685 U CN 205330685U CN 201620107962 U CN201620107962 U CN 201620107962U CN 205330685 U CN205330685 U CN 205330685U
Authority
CN
China
Prior art keywords
formwork
lining
trolley
flange
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201620107962.1U
Other languages
Chinese (zh)
Inventor
黄高飞
程朝亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Gaofei Bridges And Tunnels Machinery Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620107962.1U priority Critical patent/CN205330685U/en
Application granted granted Critical
Publication of CN205330685U publication Critical patent/CN205330685U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型提供的一种隧道二衬模筑混凝土衬砌台车用的堵头装置,是在衬砌台车上设置模板法兰,通过铰耳连接上、下模板,实现台车面板向下翻转,保证衬砌台车通过混凝土断面;所述的固定柱固定在台车上,模板法兰设置在固定柱的前端,模板设置在模板法兰上;下模板下端通过铰耳连接装置与模板法兰连接,支顶丝杠下端设置在固定柱上,上模板、下模板的上端通过铰耳连接装置设置在支顶丝杆的上端;结构简单,能够减低衬砌台车通过混凝土断面时,减少对断面的破坏。

The utility model provides a plug device for the concrete lining trolley of the second lining of the tunnel. The formwork flange is arranged on the lining trolley, and the upper and lower formworks are connected through hinge ears, so that the panel of the trolley can be turned downwards. Ensure that the lining trolley passes through the concrete section; the fixed column is fixed on the trolley, the formwork flange is arranged on the front end of the fixed column, and the formwork is arranged on the formwork flange; the lower end of the lower formwork is connected to the formwork flange through the hinge ear connection device , the lower end of the top screw is set on the fixed column, and the upper ends of the upper formwork and the lower formwork are set on the upper end of the top screw through the hinge lug connection device; the structure is simple, and it can reduce the impact on the section when the lining trolley passes through the concrete section destroy.

Description

A kind of end cap of tunnel double-lining form concrete lining trolley
Art
This utility model relates to tunnel lining trolley field, particularly relates to the end cap of a kind of tunnel double-lining form concrete lining trolley。
Background technology
At present, along with the modernization of tunnel construction, the application of tunnel construction trolley accelerates the construction in tunnel, but existing tunnel lining trolley at the section passing through to build is, it is easy to section is damaged, it is necessary to the later stage repairs, both cause the waste in resource, have an effect on tunnel integral construction progress。
Utility model content
In order to overcome the deficiencies in the prior art, this utility model is to arrange template flange on lining trolley, connects upper and lower template by cutting with scissors ear, it is achieved chassis panel downwardly turns over, it is ensured that lining trolley passes through concrete cross section;Its technical scheme is: the end cap of a kind of tunnel double-lining form concrete lining trolley is by fixing post 1, template flange 2, template 3, cuts with scissors ear connecting device 4, and cope match-plate pattern 5, lower bolster 6, support top leading screw 7 is constituted;Described fixing post 1 is fixed on chassis, and template flange 2 is arranged on the front end of fixing post 1, and template 3 is arranged in template flange 2;Lower bolster 6 lower end is connected with template flange 2 by cutting with scissors ear connecting device 4, and support top leading screw 7 lower end is arranged on fixing post 1, cope match-plate pattern 5, and the upper end of lower bolster 6 is arranged on the upper end of support top screw mandrel 7 by cutting with scissors ear connecting device 4;
Described cope match-plate pattern 5 is provided with and slides up and down plank。
Beneficial effect, the end cap of a kind of tunnel double-lining form concrete lining trolley that this utility model provides, simple in construction, it is possible to when lowering lining trolley by concrete cross section, reduces the destruction to section。
Accompanying drawing explanation
Below in conjunction with accompanying drawing, this utility model is further illustrated。
Fig. 1 is structural representation of the present utility model;
In figure, fixing post (1), template flange (2), template (3), hinge ear connecting device (4), cope match-plate pattern (5), lower bolster (6), support top leading screw (7)。
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is further described。
As shown in the figure, the end cap of a kind of tunnel double-lining form concrete lining trolley is by fixing post (1), template flange (2), template (3), hinge ear connecting device (4), cope match-plate pattern (5), lower bolster (6), support top leading screw (7) is constituted;Described fixing post (1) is fixed on chassis, and template flange (2) is arranged on the front end of fixing post (1), and template (3) is arranged in template flange (2);Lower bolster (6) lower end is connected with template flange (2) by cutting with scissors ear connecting device (4), support top leading screw (7) lower end is arranged on fixing post (1), cope match-plate pattern (5), the upper end of lower bolster (6) is arranged on the upper end of support top screw mandrel (7) by cutting with scissors ear connecting device (4);
Described cope match-plate pattern (5) is provided with and slides up and down plank。

Claims (2)

1.一种隧道二衬模筑混凝土衬砌台车用的堵头装置,是由固定柱(1),模板法兰1. A plug device for the concrete lining trolley of the second lining of the tunnel, which is composed of a fixed column (1), a formwork flange (2),模板(3),铰耳连接装置(4),上模板(5),下模板(6),支顶丝杠(7)构成;其特征在于:所述的固定柱(1)固定在台车上,模板法兰(2)设置在固定柱(1)的前端,模板(3)设置在模板法兰(2)上;下模板(6)下端通过铰耳连接装置(4)与模板法兰(2)连接,支顶丝杠(7)下端设置在固定柱(1)上,上模板(5),下模板(6)的上端通过铰耳连接装置(4)设置在支顶丝杆(7)的上端。(2), formwork (3), hinge lug connecting device (4), upper formwork (5), lower formwork (6), top screw (7) constitute; It is characterized in that: described fixed post (1) Fixed on the trolley, the formwork flange (2) is set on the front end of the fixed column (1), the formwork (3) is set on the formwork flange (2); the lower end of the lower formwork (6) is connected with the hinge ear (4) It is connected with the formwork flange (2), the lower end of the top screw (7) is set on the fixed column (1), the upper end of the upper formwork (5) and the lower formwork (6) are set on the support through the hinge ear connection device (4). The upper end of jackscrew (7). 2.根据权利要求1中所述的一种隧道二衬模筑混凝土衬砌台车用的堵头装置,其特征在于:所述的上模板(5)上设置有上下滑动木板。2. A plug device for a concrete lining trolley for second-line tunnel lining molding according to claim 1, characterized in that: the upper formwork (5) is provided with sliding planks up and down.
CN201620107962.1U 2016-01-29 2016-01-29 A plugging device for the concrete lining trolley of the second lining of the tunnel Expired - Lifetime CN205330685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620107962.1U CN205330685U (en) 2016-01-29 2016-01-29 A plugging device for the concrete lining trolley of the second lining of the tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620107962.1U CN205330685U (en) 2016-01-29 2016-01-29 A plugging device for the concrete lining trolley of the second lining of the tunnel

Publications (1)

Publication Number Publication Date
CN205330685U true CN205330685U (en) 2016-06-22

Family

ID=56318062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620107962.1U Expired - Lifetime CN205330685U (en) 2016-01-29 2016-01-29 A plugging device for the concrete lining trolley of the second lining of the tunnel

Country Status (1)

Country Link
CN (1) CN205330685U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640136A (en) * 2016-12-24 2017-05-10 长沙进军机械有限公司 Plate sealing mechanism used for tunnel lining trolley
CN107620599A (en) * 2017-09-13 2018-01-23 四川皓德斯新材料科技有限公司 A kind of tunnel double-lining locking plug template with jacking apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640136A (en) * 2016-12-24 2017-05-10 长沙进军机械有限公司 Plate sealing mechanism used for tunnel lining trolley
CN107620599A (en) * 2017-09-13 2018-01-23 四川皓德斯新材料科技有限公司 A kind of tunnel double-lining locking plug template with jacking apparatus
CN107620599B (en) * 2017-09-13 2019-08-23 四川皓德斯新材料科技有限公司 A kind of tunnel double-lining locking plug template with jacking apparatus

Similar Documents

Publication Publication Date Title
CN104763446B (en) The multi-functional chassis of metro station construction
CN205063968U (en) A lining cutting platform truck that is used for tunnel section of widening to be under construction
CN206088920U (en) Construction scaffold
CN205171393U (en) A formworking jumbo for arch culvert construction
CN207700067U (en) A kind of packaged type box culvert construct trolley
CN204024676U (en) A kind of novel tunnel concrete steel form carrier
CN205172591U (en) Tunnel concrete placement new plastic formworking jumbo
CN207484512U (en) A kind of integrated reinforcement trolley for the construction of pipe gallery tunneling boring
CN204997807U (en) Prefabricated little case roof beam centre form device
CN207290429U (en) A kind of staircase prefabricated mold
CN203320425U (en) Cast-in-situ box girder construction apparatus with slidingly movable side mold
CN204278196U (en) A kind of jacking cylinder underneath type prefabricated subsection box girder inner formwork
CN103452328B (en) Post brutal bracing means and method is subtracted for reinforced concrete member
CN205990571U (en) A kind of quick removing device based on CRTS III template
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN202176341U (en) Model board trolley and grouting device of the same
CN207176732U (en) Segmented moves simple rack chassis
CN204510810U (en) A kind of formwork structure for shutoff exterior wall reserved opening
CN204098488U (en) A kind of fixed structure of end bay beam forms
CN203947419U (en) A kind of high-speed railway bridge pinner template
CN107142961B (en) Concrete pouring integral movable formwork
CN205223861U (en) Capable system is walked to cast -in -place simple box girder centre form of high -efficient support
CN206359897U (en) A kind of radial type steel core form unit
CN204081548U (en) Cantilever frame temporary support and main couple joint portion device
CN204532374U (en) The multi-functional chassis of metro station construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170522

Address after: 471000 Henan city of Luoyang Province Red Shan Xigong District under the village of Dragon Road No. 16

Patentee after: LUOYANG GAOFEI BRIDGE AND TUNNEL MACHINERY Co.,Ltd.

Address before: 471000 Yanshi province big mouth Township grass Temple Village Hao street, No. 18

Co-patentee before: Cheng Chaoliang

Patentee before: Huang Gaofei

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 471000 No. 16, Longteng North Road, Xiagou Village, Hongshan Township, Xigong District, Luoyang City, Henan Province

Patentee after: Luoyang Gaofei Bridges and Tunnels Machinery Co.,Ltd.

Address before: 471000 No. 16, Longteng North Road, Xiagou Village, Hongshan Township, Xigong District, Luoyang City, Henan Province

Patentee before: LUOYANG GAOFEI BRIDGE AND TUNNEL MACHINERY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20160622

CX01 Expiry of patent term