CN205325960U - Foaming cement side fascia mould production frame - Google Patents

Foaming cement side fascia mould production frame Download PDF

Info

Publication number
CN205325960U
CN205325960U CN201620004712.5U CN201620004712U CN205325960U CN 205325960 U CN205325960 U CN 205325960U CN 201620004712 U CN201620004712 U CN 201620004712U CN 205325960 U CN205325960 U CN 205325960U
Authority
CN
China
Prior art keywords
mould
scraper plate
side fascia
main body
die main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620004712.5U
Other languages
Chinese (zh)
Inventor
陈跃明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Mingneng New Building Material Co Ltd
Original Assignee
Fujian Mingneng New Building Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Mingneng New Building Material Co Ltd filed Critical Fujian Mingneng New Building Material Co Ltd
Priority to CN201620004712.5U priority Critical patent/CN205325960U/en
Application granted granted Critical
Publication of CN205325960U publication Critical patent/CN205325960U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model discloses a foaming cement side fascia mould production frame, include the mould and have two -layer above goods shelves, the mould has all been placed for every layer to goods shelves, the mould includes the open square mould main part in scraper blade and top, the scraper blade is installed in the mould main part with adjustable horizontally's mode, the height of scraper blade is the half the of foaming cement side fascia thickness, the width of scraper blade and the width of mould main part are unanimous, the scraper blade is vertical to be arranged in the mould main part, the distance of scraper blade bottom surface and mould main part bottom is the half the of cement wall plate thickness, the up end that highly is higher than the scraper blade of mould main part, the complete opening in upper portion of side before the mould main part, the bottom surface of open -ended bottom surface and scraper blade flushes, two adjacent moulds stagger in vertical orientation each other on the goods shelves, below mould main part is arranged in directly over to the opening of top mould main part. The utility model discloses the required plant area of preparation foaming cement side fascia is reduced in the upper space of make full use of factory building to production efficiency has been improved.

Description

A kind of foam cement Side fascia mould production frame
Technical field
This utility model relates to a kind of foam cement Side fascia mould production frame。
Background technology
Foam cement Side fascia has the performance more superior than conventional outer wall plate, which overcome the easy anti-halogen of conventional outer wall, not durable, heavy, be afraid of deficiency damp and easy to crack, there is protection against the tide, antidetonation sound insulation, fireproof heat insulating, occupation of land is little, intensity good and the advantage such as convenient of constructing。
Foam cement Side fascia generally divides 4 layers, is manufactured by the mould of box-like。Manufacturing process is, first the cement mixing liquid foamed toward mould, stop when range estimation is to mold height half position, manually take doctor blade, form bottom, put glass fabric again and form the second layer, and the froth bed of third layer, then cement mixing liquid is filled mould and forms the 4th layer, finally carry out standing molding, difference according to foaming ingredient, molding time is generally 6-20 hour。
In the Factory Building of existing making foam cement Side fascia, a plurality of workbench is set, the working region facilitating workman's operation is left between operated adjacent platform, manufacture mould to place on the table, mould is queued up on the table, and foam cement septum plate length is many more than 2.5 meters, so cause that the plant area that molding takies is very big。
In consideration of it, the present inventor develops a kind of foam cement Side fascia mould production frame for this, effectively solving the problems referred to above, this case thus produces。
Utility model content
A kind of foam cement Side fascia mould production frame that this utility model provides, makes full use of the upper sheaf space of Factory Building, reduces the plant area made needed for foam cement Side fascia, and improves production efficiency。
To achieve these goals, the technical solution of the utility model is as follows:
A kind of foam cement Side fascia mould production frame, including mould and the shelf with more than two-layer, shelf every layer are all placed with mould;
Mould includes square die main body and the scraper plate of open-top, scraper plate is arranged in die main body in horizontally movable mode, the height of scraper plate is the half of foam cement Side fascia thickness, the width of scraper plate is consistent with the width of die main body, scraper plate is vertically placed in die main body, distance bottom scraper plate bottom surface and die main body is the half of cement Side fascia thickness, the height of die main body is higher than the upper surface of scraper plate, the top of die main body front side edge is completely open, and the bottom surface of opening and the bottom surface of scraper plate flush;
On shelf, adjacent two mould in the vertical directions stagger mutually, the surface of the opening die main body placed below of top die main body。
On described shelf, the opening of adjacent two moulds is in the opposite direction, and two moulds being separated by then are in same vertical position。
The left and right sides of described scraper plate upper surface is respectively mounted L-type buckle, and scraper plate snaps over the left side of die main body and right edge respectively by two L-type buckles of upper surface thus the installation that completes on die main body。
Described scraper plate upper end and open bottom are mounted on the drainage plate of cement mixing liquid。
The top fixed installation block of described opening, when scraper plate moves to opening part, L-type buckle is stuck in block place。
Described scraper plate is installed hands handle。
Each layer of described shelf is mounted on the two relative L-type slides for placing mould。
Installing two positioners that horizontal interval distance is die length on described L-type slide, mould is stuck between positioner。
Described positioner includes grooved buckle and hinge seat, and grooved buckle is arranged on the outside of L-type slide vertical edge by hinge seat, and grooved buckle is buckled on the vertical edge of L-type slide thus blocking mould after rotating。
After adopting such scheme, use this utility model makes foam cement Side fascia process and is,
One, the making of foam cement Side fascia bottom, first the scraper plate on all moulds is moved to the one end differing from opening, again cement mixing liquid is poured in the mould of shelf the top, along with constantly pouring into of cement mixing liquid, cement mixing liquid flows to next mould from opening part effusion, until the mould of bottom have cement mixing liquid from its opening part overflow time, stop pouring into of cement mixing liquid, then successively all scraper plates being moved horizontally to opening part from top to bottom, now the height of the cement mixing liquid in mould is the height of foam cement Side fascia half。Again owing to the bottom surface of opening and the bottom surface of scraper plate flush, therefore when scraper plate moves to opening part, namely scraper plate blocks opening。
Two, put glass fabric and form the second layer, then put froth bed formation third layer。
Three, the making of the 4th layer, again cement mixing liquid is poured in the mould of shelf the top, owing to the upper surface of scraper plate is lower than the side of die main body, therefore constantly pouring into along with cement mixing liquid, cement mixing liquid will be overflowed from the upper surface of scraper plate, flows into next mould, when the mould of bottom also has cement mixing liquid to overflow, stop pouring into of cement mixing liquid, complete the preliminary making of foam cement Side fascia。
This utility model, by the mould of upper and lower layered arrangement, makes full use of the upper sheaf space of Factory Building, reduces the plant area made needed for foam cement Side fascia。Again due to without to the independent cementing mixed liquor of each mould, therefore improve production efficiency。
Accompanying drawing explanation
Fig. 1 is the structural representation of the present embodiment;
Fig. 2 is the structural representation of the present embodiment mould;
Fig. 3 is the structural representation of the present embodiment positioner。
Label declaration
Mould 1, die main body 11, left side 111, right edge 112, scraper plate 12, L-type buckle 13, opening 14, drainage plate 15, block 16, hands 17, shelf 2, L-type slide 21, horizontal sides 211, vertical edge 212, positioner 22, grooved buckle 221, hinge seat 222。
Detailed description of the invention
In order to the technical solution of the utility model is explained further, below by specific embodiment, the utility model is elaborated。
As it is shown in figure 1, be a kind of foam cement Side fascia mould production frame of disclosing of this utility model, including mould 1 and the shelf 2 with more than two-layer, every layer of shelf 2 is all placed with mould 1, such as adopts three layers shelf 2, then place three moulds 1。
As in figure 2 it is shown, mould 1 includes square die main body 11 and the scraper plate 12 of open-top。
Scraper plate 12 is arranged in die main body 11 in horizontally movable mode, this mounting means has a lot, the present embodiment preferably employs the mounting means of a kind of simple in construction, namely, it is respectively mounted L-type buckle 13 in the left and right sides of scraper plate 12 upper surface, two L-type buckles 13 snap over left side 111 and the right edge 112 of die main body 11 respectively, thus the installation completed on die main body 11。In order to facilitate the hand-held scraper plate 12 of workman, scraper plate 12 is provided with hands 17。
The height of its middle scraper 12 is the half of foam cement Side fascia thickness, and scraper plate 12 is vertically placed in die main body 11, and the width of scraper plate 12 is consistent with the width of die main body 11。The half that distance is cement Side fascia thickness bottom scraper plate 12 bottom surface and die main body 11, the height of die main body 11 is higher than the upper surface of scraper plate 12, and the top of die main body 11 front side edge is completely open, and the bottom surface of this opening 14 and the bottom surface of scraper plate 12 flush。
On shelf 2, adjacent two mould 1 in the vertical directions stagger mutually, the surface of opening 14 die main body 11 placed below of top die main body 11。The present embodiment adopt most space-efficient scheme as it is shown in figure 1, on shelf 2 opening 14 of adjacent two moulds 1 in the opposite direction, two moulds 1 being separated by then are in same vertical position。
Use this utility model makes foam cement Side fascia process。
One, the making of foam cement Side fascia bottom, first the scraper plate 12 on all moulds 1 is moved to the one end differing from opening 14, again cement mixing liquid is poured in the mould 1 of shelf 2 the top, along with constantly pouring into of cement mixing liquid, cement mixing liquid flows to next mould 1 from opening 14 effusion, until the mould 1 of bottom have cement mixing liquid from its opening 14 overflow time, stop the pouring into of cement mixing liquid。In order to prevent the cement mixing liquid overflowed from being irregular flowing along die main body 11 lateral surface, the drainage plate 15 of cement mixing liquid is installed in the bottom of opening 14, makes the cement mixing liquid of effusion flow into lower section mould 1 along drainage plate 15。
Then successively all scraper plates 12 being moved horizontally to opening 14 place from top to bottom, now the height of the cement mixing liquid in mould 1 is the height of foam cement Side fascia half。Again owing to the bottom surface of the bottom surface of opening 14 and scraper plate 12 flushes, therefore when scraper plate 12 moves to opening 14 place, namely scraper plate 12 blocks opening 14。In order to prevent scraper plate 12 from skidding off die main body 11 from opening 14, fixedly mounting block 16 on the top of opening 14, when scraper plate 12 moves to opening 14 place, L-type buckle 13 can be stuck in block 16 place。
Two, put glass fabric and form the second layer, then put froth bed formation third layer。
Three, the making of the 4th layer, again cement mixing liquid is poured in the mould 1 of shelf 2 the top, owing to the upper surface of scraper plate 12 is lower than the side of die main body 11, therefore constantly pouring into along with cement mixing liquid, cement mixing liquid will be overflowed from the upper surface of scraper plate 12, flows into next mould 1, when the mould 1 of bottom also has cement mixing liquid to overflow, stop pouring into of cement mixing liquid, complete the preliminary making of foam cement Side fascia。In order to prevent the cement mixing liquid overflowed from being irregular flowing along die main body 11 lateral surface, the drainage plate 15 of cement mixing liquid is also installed in the upper end of scraper plate 12, makes the cement mixing liquid of effusion flow into lower section mould 1 along drainage plate 15。
The present embodiment mould 1 by upper and lower layered arrangement, makes full use of the upper sheaf space of Factory Building, reduces the plant area made needed for foam cement Side fascia。Again due to without to each independent cementing mixed liquor of mould 1, therefore improve production efficiency。
Wherein each layer of shelf 2 is mounted on two relative L-type slides 21, and mould 1 is placed in the horizontal sides 211 of two L-type slides 21, and the vertical edge 212 of two L-type slides 21 then can limit mould 1 and move left and right。When shelf 2 place mould 1, only mould 1 need to be pushed from one end of two L-type slides 21, operate very simple。
After mould 1 is placed on L-type slide 21, in order to prevent mould 1 slide anteroposterior, L-type slide 21 is installed two positioners 22, between two positioners 22, level is separated by the length distance of a mould 1, therefore mould 1 can be stuck between two positioners 22, the positioner 22 that can realize this function has a lot, the positioner 22 that the present embodiment preferably employs has simple in construction, easy to operate feature, as shown in Figure 3, the positioner 22 of the present embodiment includes grooved buckle 221 and hinge seat 222, grooved buckle 221 is arranged on the outside of L-type slide 21 vertical edge 212 by hinge seat 222。
When placing mould 1, laterally rotate grooved buckle 221, make grooved buckle 221 entirety all in the outside of L-type slide 21, now unobstructed on L-type slide 21, it is possible to advance mould 1。
After having placed mould 1, turn to the inside grooved buckle 221, makes grooved buckle 221 be buckled on the vertical edge 212 of L-type slide 21, and grooved buckle 221 becomes the obstacle on L-type slide 21, blocks mould 1, thus the motion limited on mould 1 fore-and-aft direction。
These are only preferred embodiment of the present utility model, not the restriction to protection domain of the present utility model。All equivalent variations done according to the mentality of designing of this case, each fall within the protection domain of this case。

Claims (9)

1. a foam cement Side fascia mould production frame, it is characterised in that: including mould and have the shelf of more than two-layer, shelf every layer are all placed with mould;
Mould includes the square die main body of scraper plate and open-top, scraper plate is arranged in die main body in horizontally movable mode, the height of scraper plate is the half of foam cement Side fascia thickness, the width of scraper plate is consistent with the width of die main body, scraper plate is vertically placed in die main body, distance bottom scraper plate bottom surface and die main body is the half of cement Side fascia thickness, the height of die main body is higher than the upper surface of scraper plate, the top of die main body front side edge is completely open, and the bottom surface of opening and the bottom surface of scraper plate flush;
On shelf, adjacent two mould in the vertical directions stagger mutually, the surface of the opening die main body placed below of top die main body。
2. a kind of foam cement Side fascia mould production frame as claimed in claim 1, it is characterised in that: on described shelf, the opening of adjacent two moulds is in the opposite direction, and two moulds being separated by then are in same vertical position。
3. a kind of foam cement Side fascia mould production frame as claimed in claim 1, it is characterized in that: the left and right sides of described scraper plate upper surface is respectively mounted L-type buckle, scraper plate snaps over the left side of die main body and right edge respectively by two L-type buckles of upper surface thus the installation that completes on die main body。
4. a kind of foam cement Side fascia mould production frame as claimed in claim 1, it is characterised in that: described scraper plate upper end and open bottom are mounted on the drainage plate of cement mixing liquid。
5. a kind of foam cement Side fascia mould production frame as claimed in claim 1, it is characterised in that: the top fixed installation block of described opening, when scraper plate moves to opening part, L-type buckle is stuck in block place。
6. a kind of foam cement Side fascia mould production frame as claimed in claim 1, it is characterised in that: described scraper plate is installed hands handle。
7. foam cement Side fascia mould production frame as claimed in claim 1 a kind of, it is characterised in that: each layer of described shelf is mounted on the two relative L-type slides for placing mould。
8. a kind of foam cement Side fascia mould production frame as claimed in claim 7, it is characterised in that: installing two positioners that horizontal interval distance is die length on described L-type slide, mould is stuck between positioner。
9. a kind of foam cement Side fascia mould production frame as claimed in claim 8, it is characterized in that: described positioner includes grooved buckle and hinge seat, grooved buckle is arranged on the outside of L-type slide vertical edge by hinge seat, and grooved buckle is buckled on the vertical edge of L-type slide thus blocking mould after rotating。
CN201620004712.5U 2016-01-06 2016-01-06 Foaming cement side fascia mould production frame Expired - Fee Related CN205325960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620004712.5U CN205325960U (en) 2016-01-06 2016-01-06 Foaming cement side fascia mould production frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620004712.5U CN205325960U (en) 2016-01-06 2016-01-06 Foaming cement side fascia mould production frame

Publications (1)

Publication Number Publication Date
CN205325960U true CN205325960U (en) 2016-06-22

Family

ID=56210211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620004712.5U Expired - Fee Related CN205325960U (en) 2016-01-06 2016-01-06 Foaming cement side fascia mould production frame

Country Status (1)

Country Link
CN (1) CN205325960U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111015471A (en) * 2019-11-20 2020-04-17 嘉善天晟精密铸件有限公司 Grinding machine tool
CN111660438A (en) * 2019-08-02 2020-09-15 张丁 Large-scale concrete integration construction equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111660438A (en) * 2019-08-02 2020-09-15 张丁 Large-scale concrete integration construction equipment
CN111015471A (en) * 2019-11-20 2020-04-17 嘉善天晟精密铸件有限公司 Grinding machine tool

Similar Documents

Publication Publication Date Title
CN104541004B (en) Surface covering system and the method for preparing such system
CN205325960U (en) Foaming cement side fascia mould production frame
CN102628303B (en) Continuous production method for aerated concrete sandwiched polyurethane foam building blocks
KR101162748B1 (en) A variable mould
CN204456671U (en) Cast-in-place concrete structure floor bar thickness of slab Comprehensive Control part
CN210336357U (en) Mortar mould with silica aerogel insulating layer
CN205325933U (en) Fiber cement side fascia preparation mould
CN207829483U (en) Slab thickness controller
CN203347220U (en) Double-screw aluminum alloy formwork
CN206256713U (en) A kind of building construction EPS straight panel modules
JP2015021314A5 (en)
CN111791425A (en) Mould structure and waterproof dish of whole bathroom waterproof dish
CN210887763U (en) EPS prefabricated plate for building
CN205224660U (en) Wood type of moulding container formula bathroom
CN205036230U (en) Bathroom glass moves door
CN203782922U (en) Wall structure with horizontal construction joint concealed
CN209308193U (en) A kind of integrated toilet warterproof chassis
CN207448753U (en) A kind of thermal insulation porous bricks production molding die
US748352A (en) Concrete building-wall.
KR20160113923A (en) Block-making machine
JP5284387B2 (en) Sanitary equipment floor and its construction method
CN105587071B (en) The construction technology of heat-insulation wall plate for building
CN212602959U (en) Mould structure and waterproof dish of whole bathroom waterproof dish
CN209832018U (en) Assembled wallboard making devices
CN219235628U (en) Size-adjustable die

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622