CN205315368U - Hydraulic system of coal pulverizer - Google Patents

Hydraulic system of coal pulverizer Download PDF

Info

Publication number
CN205315368U
CN205315368U CN201521144787.5U CN201521144787U CN205315368U CN 205315368 U CN205315368 U CN 205315368U CN 201521144787 U CN201521144787 U CN 201521144787U CN 205315368 U CN205315368 U CN 205315368U
Authority
CN
China
Prior art keywords
hydraulic pump
coal pulverizer
pressure
fuel tank
cushion chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521144787.5U
Other languages
Chinese (zh)
Inventor
周晓亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oman New Energy Technology (Tianjin) Co., Ltd.
Original Assignee
TIANJIN CITY OMAN HYDRAULIC CIRCUIT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN CITY OMAN HYDRAULIC CIRCUIT ENGINEERING Co Ltd filed Critical TIANJIN CITY OMAN HYDRAULIC CIRCUIT ENGINEERING Co Ltd
Priority to CN201521144787.5U priority Critical patent/CN205315368U/en
Application granted granted Critical
Publication of CN205315368U publication Critical patent/CN205315368U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a hydraulic system of coal pulverizer, including oil tank, motor, the 1st hydraulic pump and the 2nd hydraulic pump, be connected with the 1st check valve, the 1st proportion overflow valve and pressure sensor on the 1st hydraulic pump delivery line to be connected with the loading chamber of 3 coal pulverizer loading jars respectively through 3 the 1st energy storage wares, be connected with the 2nd check valve, the 2nd proportion overflow valve and pressure sensor on the 2nd hydraulic pump delivery line to be connected with the cushion chamber of 3 coal pulverizer loading jars respectively through 3 choke valves, 1st, time oil pipe way of the 2nd proportion overflow valve and the oil pipe way of returning of 3 the 1st energy storage wares are connected with the oil tank respectively with through cooler and the binocular time oil filter. In this system, the load chamber of load jar is controlled with high -pressure proportion overflow valve, low pressure proportion overflow valve control for the cushion chamber, and overflow when surpassing adjustment pressure can not transshipped when the messenger system runs into great load, and the cushion chamber protects the cushion chamber to be unlikely to to inhale the sky by the pressure sensor control of cushion chamber.

Description

The hydraulic system of coal pulverizer
Technical field
This utility model relates to field of hydraulic control, particularly relates to the hydraulic system of a kind of coal pulverizer.
Background technology
Coal pulverizer is mainly used in power plant, for grinding coal cinder into coal ash. Coal pulverizer hydraulic system drives hold-down cylinder, and hold-down cylinder push-pull bar, equipped with pressure head on pull bar, described pressure head pushes down the coal cinder on deep bid, and in the rotation process of deep bid, pressure head pushes down the coal cinder on deep bid all the time, and so along with rotation, big coal cinder gradually becomes coal ash. But, existing coal pulverizer hydraulic system there will be overload phenomenon when running into relatively large load (if running into stone, iron block etc.).
Summary of the invention
The technical problems to be solved in the utility model is to provide the hydraulic system of a kind of coal pulverizer that will not transship when running into relatively large load.
For this, the technical solution of the utility model is as follows:
A kind of hydraulic system of coal pulverizer, including fuel tank, motor, the 1st hydraulic pump and the 2nd hydraulic pump, the output pipe of described 1st hydraulic pump is connected to the 1st check valve, the 1st proportional pressure control valve and the 1st pressure transducer, and the LOADED CAVITY loading cylinder with 3 coal pulverizers respectively by 3 the 1st accumulators is connected; The output pipe of described 1st hydraulic pump is connected to the 2nd check valve, the 2nd proportional pressure control valve and the 2nd pressure transducer, and the cushion chamber loading cylinder with 3 coal pulverizers respectively through 3 choke valves is connected; Described 1st, the return line of the 2nd proportional pressure control valve and the return line of described 3 the 1st accumulators are connected with fuel tank with cooled device and bitubular return filter respectively.
It addition, be also equipped with temperature relay, heater and air filter on described fuel tank, when in fuel tank, the temperature of oil is too low, the oil in fuel tank is heated by described heater.
Described 1st hydraulic pump is high-pressure pump, and its outlet pressure is 16MPa; Described 2nd hydraulic pump is low-lift pump, and its outlet pressure is 7MPa.
The beneficial effects of the utility model are as follows:
In this hydraulic system, proportional pressure control valve is overlapped with two in two chambeies loading cylinder, and LOADED CAVITY high-voltage ratio overflow valve controls, and cushion chamber low pressure proportional pressure control valve controls, and the pressure of such LOADED CAVITY is monitored by the pressure transducer of loading end. Exceed the load and overflow that adjust pressure; this ensure that system pressure will not transship when running into relatively large load (if running into stone, iron block etc.); low pressure chamber (cushion chamber) can be monitored by the pressure transducer of cushion chamber; protection cushion chamber is unlikely to be emptied, and namely occurs without vacuum state.
Accompanying drawing explanation
Fig. 1 is the front view of hydraulic system of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the hydraulic system of coal pulverizer of the present utility model is illustrated.
As shown in the figure, this hydraulic system includes fuel tank 5, motor the 2, the 1st hydraulic pump and the 2nd hydraulic pump (not shown), the output pipe of described 1st hydraulic pump is connected to the 1st check valve, the 1st proportional pressure control valve and the 1st pressure transducer 3a, and the LOADED CAVITY loading cylinder with 3 coal pulverizers respectively by 3 the 1st accumulators is connected; The output pipe of described 2nd hydraulic pump is connected to the 2nd check valve, the 2nd proportional pressure control valve and the 2nd pressure transducer 3b, and the cushion chamber loading cylinder with 3 coal pulverizers respectively through 3 choke valves is connected; Described 1st, the return line of the 2nd proportional pressure control valve and the return line of described 3 the 1st accumulators are connected with fuel tank with cooled device 4 and bitubular return filter respectively.
It addition, be also equipped with temperature relay, heater and air filter on described fuel tank, when in fuel tank, the temperature of oil is too low, the oil in fuel tank is heated by described heater.
Described 1st hydraulic pump is high-pressure pump, and its outlet pressure is 16MPa; Described 2nd hydraulic pump is low-lift pump, and its outlet pressure is 7MPa. Described fuel tank is connected to the 2nd accumulator 1.

Claims (4)

1. the hydraulic system of a coal pulverizer, it is characterized in that: include fuel tank, motor, the 1st hydraulic pump and the 2nd hydraulic pump, the output pipe of described 1st hydraulic pump is connected to the 1st check valve, the 1st proportional pressure control valve and the 1st pressure transducer, and the LOADED CAVITY loading cylinder with 3 coal pulverizers respectively by 3 the 1st accumulators is connected; The output pipe of described 2nd hydraulic pump is connected to the 2nd check valve, the 2nd proportional pressure control valve and the 2nd pressure transducer, and the cushion chamber loading cylinder with 3 coal pulverizers respectively through 3 choke valves is connected; Described 1st, the return line of the 2nd proportional pressure control valve and the return line of described 3 the 1st accumulators are connected with fuel tank with cooled device and bitubular return filter respectively.
2. the hydraulic system of coal pulverizer according to claim 1, it is characterised in that: being also equipped with temperature relay, heater and air filter on described fuel tank, when in fuel tank, the temperature of oil is too low, the oil in fuel tank is heated by described heater.
3. the hydraulic system of coal pulverizer according to claim 1, it is characterised in that: described 1st hydraulic pump is high-pressure pump, and its outlet pressure is 16MPa; Described 2nd hydraulic pump is low-lift pump, and its outlet pressure is 7MPa.
4. the hydraulic system of coal pulverizer according to claim 1, it is characterised in that: described fuel tank is connected to the 2nd accumulator.
CN201521144787.5U 2015-12-31 2015-12-31 Hydraulic system of coal pulverizer Active CN205315368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521144787.5U CN205315368U (en) 2015-12-31 2015-12-31 Hydraulic system of coal pulverizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521144787.5U CN205315368U (en) 2015-12-31 2015-12-31 Hydraulic system of coal pulverizer

Publications (1)

Publication Number Publication Date
CN205315368U true CN205315368U (en) 2016-06-15

Family

ID=56200581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521144787.5U Active CN205315368U (en) 2015-12-31 2015-12-31 Hydraulic system of coal pulverizer

Country Status (1)

Country Link
CN (1) CN205315368U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110966273A (en) * 2019-12-25 2020-04-07 江苏指南润滑液压科技有限公司 Intelligent coal vertical mill single-pump bidirectional loading hydraulic system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110966273A (en) * 2019-12-25 2020-04-07 江苏指南润滑液压科技有限公司 Intelligent coal vertical mill single-pump bidirectional loading hydraulic system
CN110966273B (en) * 2019-12-25 2021-07-09 江苏指南润滑液压科技有限公司 Intelligent coal vertical mill single-pump bidirectional loading hydraulic system

Similar Documents

Publication Publication Date Title
CN101929481A (en) Three-way pressure compensating valve for hydraulic energy-saving system
CN103883338A (en) Hydraulic support stand column self-service pressurizing system comprising hydraulic pressurizer
CN201823868U (en) Hydraulic system of die-forging quick hydraulic lifting device
CN205315368U (en) Hydraulic system of coal pulverizer
CN103306642B (en) Numerical control and energy saving is without rod beam-pumping unit
CN205388067U (en) Former coal bunker loosening machine hydraulic oil temperature cooling system
CN205225919U (en) Fluid pump controller
CN201763710U (en) Energy-saving hydraulic station
CN203476850U (en) Flow control device of energy accumulator used for concrete pump truck and concrete pump truck
CN204140545U (en) A kind of hydraulic mechanism increasing cylinder buffer stroke
CN204755431U (en) Refrigerated coal of brazing grinds immediately and becomes loading hydraulic system
CN204707520U (en) Straw briquetter
CN204041367U (en) A kind of three grades of oil hydraulic pumps
CN203655746U (en) Hydraulic system of excessive iron protection device for double-roll crushing machine
CN203239686U (en) Oil supplementing system for hydraulic motor
CN203962517U (en) The two hydraulic system of energy accumulators in double loop and hydraulic pressure beater
CN103410715A (en) Frequency-conversion constant-voltage control system of emulsion pump
CN203657971U (en) Moving type pressure testing device
CN201747687U (en) Three-way valve
CN201924406U (en) Novel water supply device without negative pressure
CN203384022U (en) Frequency conversion and constant voltage control system of emulsion pump
CN202883548U (en) Grate cooler buffering device
CN202344016U (en) Hydraulic device for plate shearing machine with adjustable angle
CN104164831A (en) Milling wheel speed regulating system of cold milling machine for pavement
CN206889372U (en) A kind of hydraulic control system of accumulator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 2-76, Block A, No. 2 Wuhua Road, Huayuan Industrial Zone, Nankai District, Tianjin

Patentee after: Oman New Energy Technology (Tianjin) Co., Ltd.

Address before: Room 2-76, Block A, No. 2 Wuhua Road, Huayuan Industrial Zone, Tianjin Binhai New Area, 300384

Patentee before: Tianjin City Oman Hydraulic Circuit Engineering Co., Ltd.