CN205314925U - Bar planting drilling appurtenance - Google Patents

Bar planting drilling appurtenance Download PDF

Info

Publication number
CN205314925U
CN205314925U CN201620053421.5U CN201620053421U CN205314925U CN 205314925 U CN205314925 U CN 205314925U CN 201620053421 U CN201620053421 U CN 201620053421U CN 205314925 U CN205314925 U CN 205314925U
Authority
CN
China
Prior art keywords
sleeve pipe
bar
mobile sleeve
support bar
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620053421.5U
Other languages
Chinese (zh)
Inventor
赖品丞
杨洋
陈学英
袁波
刘斌文
张定业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201620053421.5U priority Critical patent/CN205314925U/en
Application granted granted Critical
Publication of CN205314925U publication Critical patent/CN205314925U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model provides a bar planting drilling appurtenance, includes the bracing piece, with the parallel removal sleeve pipe of bracing piece and be connected operating handle between them and adjustable connecting plate, it is connected with adjustable locating lever, top connection and has the support of scalable top to remove the sheathed tube bottom, adjustable connecting plate is connected at bracing piece and removal sheathed tube homonymy, operating handle connects at bracing piece and removal sheathed tube homonymy, the top of bracing piece and removing be connected with between the sleeve pipe be connected with between spacing of top, lower part and the adjustable locating lever bottom spacing. The utility model discloses only can carry out roof drilling through hand operation and open the hole construction, the site operation is convenient and fast more, and the drilling position is controllable, and the construction rate of accuracy improves greatly, moreover the utility model discloses a member can be dismantled, asks for in the material scene, but recycle with low costs. The utility model discloses in can extensively applying to fitment and two secondary structure construction, provide the auxiliary stay for processes such as the bar planting of floor roof, decorative structure reinforcements.

Description

A kind of bar planting auxiliary workpiece for drilling tool
Technical field
The utility model relates to building structure field, particularly a kind of floor punching device.
Background technology
At Highrise buildings, comprise in vault building, usually can carry out secondary structure construction, namely need floor top board is carried out bar planting perforate. When but the construction of main building secondary structure starts, lower floor formwork-support is removed, floor top board bar planting does not have the padded supporting structure in bottom, end user's word ladder is needed to construct, the movement of people's word ladder and workman up and down ladder operation will virtually add the engineering time, affect operating efficiency, too increasing the workload of workman, in addition, working aloft also can the corresponding security risk increasing workman simultaneously.
Practical novel content
The purpose of this utility model is to provide a kind of bar planting auxiliary workpiece for drilling tool, will solve that tradition bar planting punching operating efficiency is low, workload big, there is the technical problem of potential safety hazard.
For achieving the above object, the utility model adopts following technical scheme:
A kind of bar planting auxiliary workpiece for drilling tool, comprises the support bar mobile sleeve pipe parallel with support bar and connects both operation handle arms and adjustable web plate, and the bottom of described mobile sleeve pipe is connected with adjustable location bar, top connects and has retractable top holder; Described adjustable web plate is connected to support bar and the same side of mobile sleeve pipe, and its one end is with support bar is hinged, the other end with to move sleeve pipe hinged, adjustable web plate has the slotted hole through the first bolt by the first bolt; Described operation handle arm is connected to support bar and the same side of mobile sleeve pipe, in the middle part of it, front end hinged with support bar is hinged with mobile sleeve pipe by the 2nd bolt, operation handle arm has the slotted hole through the 2nd bolt, described 2nd bolt and the perpendicular upwards conllinear of the first bolt; It is connected with between top position-limited rack, bottom and adjustable location bar to be connected with bottom position-limited rack between the top of described support bar and mobile sleeve pipe.
Described operation handle arm has two, the offside that middle part symmetry is hinged on the offside of support bar, anterior symmetry is hinged on mobile sleeve pipe of two operation handle arms;Described adjustable web plate has two pieces, and one end of two pieces of adjustable web plates is symmetrical offside, the symmetrical offside being hinged on mobile sleeve pipe of the other end being hinged on support bar respectively.
The bottom of described mobile sleeve pipe has the through hole that adjustable location bar passes.
Described adjustable location bar is T-bar, and its cross bar is socketed in the inside of mobile sleeve pipe and moves sleeve pipe and is slidably connected, and its montant is passed by the through hole moving sleeve pipe bottom.
Described retractable top care set is connected on the inside of mobile sleeve pipe and mobile sleeve pipe is slidably connected, and is fixed with movement sleeve pipe by first fastening piece of the top ports that is connected to mobile sleeve pipe and the first holding bolt.
The side of described support bar is connected with handle, facilitates staff to carry.
The bottom of described support bar is connected with base, and described base is rubber base, can increase the frictional force on base and ground, has simultaneously and decreases the requirement to surface condition, even if there being the rubble also can gentle support.
One end of described top position-limited rack is fixedly connected with support bar, the other end has the through hole through mobile sleeve pipe, and its clear size of opening adapts with the size of mobile sleeve pipe.
One end of described bottom position-limited rack is fixedly connected with support bar, the other end has the through hole through montant, and the size of its clear size of opening and montant adapts.
Described bottom position-limited rack has two and parallel interval setting.
The upper side of described mobile sleeve pipe is provided with scale, facilitates staff accurately to construct, controls the punching degree of depth.
Compared with prior art the utility model has following feature and useful effect:
The utility model changes traditional operation frame or instrument ladder non-productive operation carries out the technique that hole is opened in bar planting, solves when hole is opened in bar planting the labor intensive time, the problem such as efficiency is low, progress is slow, danger coefficient height.
Support bar of the present utility model adopts aluminum alloy square steel pipe to make, and bottom can be connected with moveable base, light and facilitate running fix; Operation handle arm and adjustable web plate adopt aluminum alloy materials to make, hinged with mobile sleeve pipe by bolt and support bar, both front ends all have the slotted hole through bolt, pass through lever principle, one support bar is as fulcrum, drive mobile sleeve pipe to move by operation handle arm, and coordinate top position-limited rack and bottom position-limited rack to make mobile sleeve pipe can only do perpendicular movement upwards along position-limited rack; In addition, the mobile upper and lower two ends of sleeve pipe devise retractable top holder and adjustable location bar respectively, facilitating installation and the Specific construction operation of cork drill, workman, without the need to climbing, only can carry out top board boring by hand steered operation and open hole construction, site operation is more convenient, bore position is controlled, and construction accuracy rate improves greatly, and component of the present utility model can be dismantled, asking in material scene, cost is low, recoverable.
The utility model can be widely used in finishing and secondary structure construction, is that the operations such as floor top board bar planting, decorating structure reinforcing provide supplemental support.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is main TV structure schematic diagram of the present utility model.
Fig. 3 is the connection structural representation of adjustable web plate of the present utility model with mobile sleeve pipe.
Fig. 4 is the connection structural representation of bottom of the present utility model position-limited rack and support bar.
Fig. 5 is the connection structural representation of adjustable location of the present utility model bar with mobile sleeve pipe.
Fig. 6 is the connection structural representation of retractable top holder of the present utility model with mobile sleeve pipe.
Position-limited rack, 7-operation handle arm bottom Reference numeral: 1-support bar, 2-move sleeve pipe, 3-is adjustable location bar, 4-retractable top holder, 5-top position-limited rack, 6-, 8-is adjustable web plate, 9-handle, 10-base, fastening piece of 11-first, 12-first bolt, 13-the 2nd bolt, 14-first holding bolt, 15-the 2nd fastening piece, 16-the 2nd holding bolt.
Embodiment
Embodiment is shown in Figure 2, this kind of bar planting auxiliary workpiece for drilling tool, comprising the support bar 1 mobile sleeve pipe 2 parallel with support bar and connect both operation handle arm 7 and adjustable web plate 8, the bottom of described mobile sleeve pipe 2 is connected with adjustable location bar 3, top connects and has retractable top holder 4; The upper side of described mobile sleeve pipe is provided with scale.
Described adjustable web plate 8 is connected to support bar 1 and the same side of mobile sleeve pipe 2, its one end and support bar 1 is hinged, the other end and mobile sleeve pipe 2 hinged, shown in Figure 3, described adjustable web plate 8 is hinged with mobile sleeve pipe 2 by the first bolt, and adjustable web plate 8 has the slotted hole through the first bolt.
Described operation handle arm 7 is connected to support bar 1 and the same side of mobile sleeve pipe 2, in the middle part of it, front end hinged with support bar 1 and mobile sleeve pipe 2 are hinged, described operation handle arm 7 is hinged with mobile sleeve pipe 2 by the 2nd bolt, operation handle arm 7 has the slotted hole through the 2nd bolt, described 2nd bolt and the perpendicular upwards conllinear of the first bolt.
It is connected with between top position-limited rack 5, bottom and adjustable location bar 3 to be connected with bottom position-limited rack 6 between the top of described support bar 1 and mobile sleeve pipe 2; The side of described support bar 1 is connected with handle 9; The bottom of described support bar 1 is connected with base 10.
Described retractable top holder 4 is socketed in the inside of mobile sleeve pipe 2 and mobile sleeve pipe 2 is slidably connected, and is fixed with mobile sleeve pipe 2 by first fastening piece 11 of the top ports that is connected to mobile sleeve pipe 2 and the first holding bolt 14, described retractable top holder 4 comprises the bracket being connected with cork drill and supports the supporting steel pipe of bracket, described steel pipe is slidably connected with mobile sleeve pipe, bracket adopts angle steel and reinforcement welding to be formed, and fix with steel tube fastener, supporting steel pipe is directly choose diameter 48mm by scene, the steel pipe of wall thickness 3mm, length is chosen according to floor height or cuts into, described first fastening piece 11 and the first holding bolt 14 are connected to the offside of retractable top holder 4, wherein it is welded on for first fastening piece 11 on mobile sleeve pipe 2 inwall, first holding bolt 14 ecto-entad is through the sidewall of mobile sleeve pipe 2, both are threaded, time fixing, by the retractable top holder 4 screwed between the first holding bolt 14 fastening first fastening piece 11 and the first holding bolt 14.
One end of described top position-limited rack 5 is fixedly connected with support bar 1, the other end has the through hole through mobile sleeve pipe 2, and its clear size of opening adapts with the size of mobile sleeve pipe 2; Shown in Figure 4, one end of described bottom position-limited rack 6 is fixedly connected with support bar 1, the other end has the through hole through bar cover, and described bottom position-limited rack 6 has two and parallel interval setting.
Shown in Figure 1, described operation handle arm 7 has two, the offside that middle part symmetry is hinged on the offside of support bar 1, anterior symmetry is hinged on mobile sleeve pipe 2 of two operation handle arms; Described adjustable web plate 8 has two pieces, and one end of two pieces of adjustable web plates 8 is symmetrical offside, the symmetrical offside being hinged on mobile sleeve pipe 2 of the other end being hinged on support bar 1 respectively.
Shown in Figure 5, the bottom of described mobile sleeve pipe 2 has the through hole that adjustable location bar 3 passes, described adjustable location bar 3 is T-bar, its cross bar is socketed in the inside of mobile sleeve pipe 2, it is slidably connected with mobile sleeve pipe 2, its montant is through the through hole of mobile sleeve pipe bottom, and the lower end overlapped by bar passes, described adjustable location bar 3 is fixed with mobile sleeve pipe 2 by the 2nd fastening piece 15 and the 2nd holding bolt 16 being connected to the bottom nozzle of mobile sleeve pipe 2, described 2nd fastening piece 15 and the 2nd holding bolt 16 are connected to the offside of montant, wherein it is welded on for the 2nd fastening piece 15 on mobile sleeve pipe 2 inwall, 2nd holding bolt 16 ecto-entad is through the sidewall of mobile sleeve pipe 2, both are threaded, time fixing, by the montant screwed between the 2nd holding bolt 16 fastening 2nd fastening piece 15 and the 2nd holding bolt 16.
Principle of work of the present utility model, see, shown in Fig. 3, Fig. 5, first following closely execution conditions according to working-yard ear, adjusts the amount of stretching out of adjustable location bar 3 flexibly and is bolted; Secondly, the bracket of cork drill with retractable top holder 4 is connected, regulates the relative position of retractable top holder 4 with mobile sleeve pipe and fixed by first fastening piece 11 and the first holding bolt 14; Again, operation operation handle arm 7, owing to mobile sleeve pipe 2 is top position-limited rack and the restriction of bottom position-limited rack, can only erect to movement, now, first bolt slides along the slotted hole on adjustable web plate, the 2nd bolt slides along the slotted hole on operation handle arm 7, cooperatively interacts, drives mobile sleeve pipe 2 to be moved upward to correct position, can carry out punching construction.

Claims (10)

1. a bar planting auxiliary workpiece for drilling tool, comprises support bar (1) the mobile sleeve pipe (2) parallel with support bar and connects both operation handle arm (7) and adjustable web plate (8), it is characterised in that:
The bottom of described mobile sleeve pipe (2) is connected with adjustable location bar (3), top connects and has retractable top holder (4);
Described adjustable web plate (8) is connected to support bar (1) and the same side of mobile sleeve pipe (2), its one end and support bar (1) is hinged, the other end is hinged with mobile sleeve pipe (2) by the first bolt (12), adjustable web plate has the slotted hole through the first bolt on (8);
Described operation handle arm (7) is connected to support bar (1) and the same side of mobile sleeve pipe (2), in the middle part of it, front end hinged with support bar (1) is hinged with mobile sleeve pipe (2) by the 2nd bolt, operation handle arm (7) has the slotted hole through the 2nd bolt, described 2nd bolt (13) upwards conllinear perpendicular with the first bolt;
It is connected with between top position-limited rack (5), bottom and adjustable location bar (3) to be connected with bottom position-limited rack (6) between the top of described support bar (1) and mobile sleeve pipe (2).
2. bar planting auxiliary workpiece for drilling tool according to claim 1, it is characterised in that: described operation handle arm (7) has two, the offside that the middle part symmetry of two operation handle arms is hinged on the offside of support bar (1), anterior symmetry is hinged on mobile sleeve pipe (2);
Described adjustable web plate (8) has two pieces, one end of two pieces of adjustable web plates (8) offside that symmetry is hinged on the offside of support bar (1) respectively, the other end symmetry is hinged on mobile sleeve pipe (2).
3. bar planting auxiliary workpiece for drilling tool according to claim 1 and 2, it is characterised in that: the bottom of described mobile sleeve pipe (2) has the through hole that adjustable location bar (3) passes.
4. bar planting auxiliary workpiece for drilling tool according to claim 3, it is characterized in that: described adjustable location bar (3) is T-bar, its cross bar is socketed in the inside of mobile sleeve pipe (2) and moves sleeve pipe (2) and is slidably connected, and its montant is passed by the through hole moving sleeve pipe bottom.
5. bar planting auxiliary workpiece for drilling tool according to claim 4, it is characterized in that: described retractable top holder (4) is socketed in the inside of mobile sleeve pipe (2) and mobile sleeve pipe (2) is slidably connected, and fixed with mobile sleeve pipe (2) by first fastening piece (11) of the top ports that is connected to mobile sleeve pipe (2) and the first holding bolt (14).
6. bar planting auxiliary workpiece for drilling tool according to claim 5, it is characterised in that: the side of described support bar (1) is connected with handle (9).
7. bar planting auxiliary workpiece for drilling tool according to claim 6, it is characterised in that: the bottom of described support bar (1) is connected with base (10).
8. bar planting auxiliary workpiece for drilling tool according to claim 4 to 7 any one, it is characterized in that: the one end at described top position-limited rack (5) is fixedly connected with support bar (1), the other end has the through hole through mobile sleeve pipe (2), and its clear size of opening adapts with the size of mobile sleeve pipe (2).
9. bar planting auxiliary workpiece for drilling tool according to claim 8, it is characterised in that: one end of described bottom position-limited rack (6) is fixedly connected with support bar (1), the other end has the through hole through montant, and the size of its clear size of opening and montant adapts.
10. bar planting auxiliary workpiece for drilling tool according to claim 9, it is characterised in that: two and parallel interval setting are arranged at described bottom position-limited rack (6).
CN201620053421.5U 2016-01-20 2016-01-20 Bar planting drilling appurtenance Expired - Fee Related CN205314925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620053421.5U CN205314925U (en) 2016-01-20 2016-01-20 Bar planting drilling appurtenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620053421.5U CN205314925U (en) 2016-01-20 2016-01-20 Bar planting drilling appurtenance

Publications (1)

Publication Number Publication Date
CN205314925U true CN205314925U (en) 2016-06-15

Family

ID=56206162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620053421.5U Expired - Fee Related CN205314925U (en) 2016-01-20 2016-01-20 Bar planting drilling appurtenance

Country Status (1)

Country Link
CN (1) CN205314925U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107042326A (en) * 2017-05-05 2017-08-15 骆兰珍 A kind of drilling machine for indoor decoration based on compressor automatic speed regulation
CN107052402A (en) * 2017-03-30 2017-08-18 浙江省三建建设集团有限公司 One kind exempts from suspended ceiling drilling device of ascending a height
CN109779521A (en) * 2019-02-21 2019-05-21 中国五冶集团有限公司 The drilling device for bonded rebar of beam bottom constructional column reinforcing bar can be accurately positioned
CN112194035A (en) * 2020-08-24 2021-01-08 四川华胜农业股份有限公司 Method for maintaining vine frame of kiwi fruit plantation and inhaul cable jacking device adopted by method
CN113334587A (en) * 2021-06-15 2021-09-03 中国十七冶集团有限公司 Manufacturing method of concrete column bar planting auxiliary tool

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107052402A (en) * 2017-03-30 2017-08-18 浙江省三建建设集团有限公司 One kind exempts from suspended ceiling drilling device of ascending a height
CN107042326A (en) * 2017-05-05 2017-08-15 骆兰珍 A kind of drilling machine for indoor decoration based on compressor automatic speed regulation
CN107042326B (en) * 2017-05-05 2018-11-27 杭州富阳飞尚装饰工程有限公司 A kind of drilling machine for indoor decoration adjusted the speed automatically based on compressor
CN109779521A (en) * 2019-02-21 2019-05-21 中国五冶集团有限公司 The drilling device for bonded rebar of beam bottom constructional column reinforcing bar can be accurately positioned
CN112194035A (en) * 2020-08-24 2021-01-08 四川华胜农业股份有限公司 Method for maintaining vine frame of kiwi fruit plantation and inhaul cable jacking device adopted by method
CN113334587A (en) * 2021-06-15 2021-09-03 中国十七冶集团有限公司 Manufacturing method of concrete column bar planting auxiliary tool

Similar Documents

Publication Publication Date Title
CN205314925U (en) Bar planting drilling appurtenance
CN108442693B (en) Quick-moving installation support system
CN103611967B (en) A kind of elevation type percussion drill auxiliary support apparatus
CN103386381A (en) Mining long-distance paint spraying device
CN207076903U (en) Civil engineering portable multi-angle bending device for rebars
CN211680141U (en) Electric drill support device capable of accurately punching
CN203541623U (en) Novel punching frame
CN204510814U (en) Beam for building jacking
CN202559678U (en) Lifting operation platform device of electric hammer
CN203526628U (en) Lifting-type auxiliary support device of percussion drill
CN220920988U (en) Mechanical girder template perforating tool
CN208396644U (en) A kind of tunnel punching vehicle
CN220880349U (en) Reinforcing bar butt joint auxiliary assembly
CN210550958U (en) Support for drilling planted bars
CN211304895U (en) Can climb bar planting drilling equipment
CN219334623U (en) Paint spraying device
CN213195768U (en) Electric drill support frame for drilling bar planting at bottom of beam
CN214874436U (en) Pile driver stand column device of highway guardrail breakdown van
CN215520162U (en) Novel steel construction building escape way
CN217680649U (en) Quick and accurate positioning device for armor seam
CN210426313U (en) Aluminum angle square support frame
CN220561533U (en) Auxiliary tool for marking and positioning of bar planting
CN209736703U (en) A roof perforating device for furred ceiling construction
CN210648657U (en) Top drilling auxiliary frame
CN220747662U (en) Single shaping operation frame arranged on aluminum die back edge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20170120