CN205314612U - Three amalgamation institute type villas of overlap - Google Patents

Three amalgamation institute type villas of overlap Download PDF

Info

Publication number
CN205314612U
CN205314612U CN201520840776.4U CN201520840776U CN205314612U CN 205314612 U CN205314612 U CN 205314612U CN 201520840776 U CN201520840776 U CN 201520840776U CN 205314612 U CN205314612 U CN 205314612U
Authority
CN
China
Prior art keywords
villa
layers
bors
oeuveres
east
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520840776.4U
Other languages
Chinese (zh)
Inventor
王旭
李宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520840776.4U priority Critical patent/CN205314612U/en
Application granted granted Critical
Publication of CN205314612U publication Critical patent/CN205314612U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a three amalgamation institute type villas of overlap, two layers of villa of two bors d's oeuveres including two layers of villa of two bors d's oeuveres in the east, west, and two sets two layers of villa of two bors d's oeuveres separate and the identical and symmetrical arrangement of inside each structure each other, and the intermediate spacing's of two layers of villa of two sets of two bors d's oeuveres regional setting has middle villa, the utility model provides a three amalgamation institute type villas of overlap had both guaranteed the privacy of living in, satisfied higher plot ratio index requirement again, had promoted the performance and the living conditions of villa by a wide margin. Simultaneously, it is required that it has complied with market, fills the blank of building trade to its function advantage comprehensive and economical and practical lets more crowds accept, will obtain the place on high -end house market.

Description

A kind of overlapping three split institute type villas
Technical field
This utility model relates to technical field of buildings, particularly relates to a kind of overlapping three split institute type villas.
Background technology
At present, main both at home and abroad villa buildings form mainly have only, Two bors d's oeuveres, several forms such as townhouse.
Wherein, villa truly is the building with only the form separated, owing to its plot ratio of single villa is relatively low, generally only having about 0.15, building area is big, and construction area is more than 300 square metres, architectural appearance fashionable, finishing top grade, has independent garden, is high-end residential. But owing to its floor space is big, with high costs, it not that general population can consume, be not suitable for China's national situation, order in China at present yet and forbid building this house.
Wherein, Two bors d's oeuveres villa is to be spelled, by the villa of two unit, single the villa that joint group becomes, and is characterized in: 1. reduce community's density, adds residential lighting face so that it is has the broader exterior space. 2. it is that low layer little Lou adds private garden, has on the basis of private garden in guarantee, the exchange of outdoor space should be strengthened, make private savings subenvironment merge community's overall situation, have also been changed the stiff face of military camp formula arrangement. 3. Two bors d's oeuveres villa is substantially three daylightings, and the room in outside generally has plural lighting surface, and in general, window is more, and ventilation will not be poor, it is important that daylighting and view. Along with the lifting of China's national life level, the crowd that Two bors d's oeuveres villa is no longer pyramid top exclusively enjoys, but because its site coverage is still very low, only about 0.6, causing that its land used cost is very high, and construction area is big, still some booming income crowd is difficult to bear.
But the folded split institute being only second to Two bors d's oeuveres villa and united villa on the market but loses its private and private garden area. Along with science and technology incorporates the every nook and cranny of life, privacy and private garden increasingly come into one's own, and become the heavyweight index of high-end housing quality;
Therefore, how under the premise ensureing privacy, moreover it is possible to ensure the plot ratio (such as: plot ratio is promoted to about 1.0) of villa, and suitably control each household construction area, it is those skilled in the art's technical problems urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is in that to provide one overlapping three split institute type villas, to solve the problems referred to above.
In order to achieve the above object, the technical solution of the utility model is achieved in that
This utility model provides a kind of overlapping three split institute type villas, two layers of villa 100 of Two bors d's oeuveres including two layers of villa 200 of Two bors d's oeuveres in east side, west side, and two set two layers of villa of described Two bors d's oeuveres spaced and internal each structure is identical and is arranged symmetrically with, the regions of the midfeather of two set two layers of villa of Two bors d's oeuveres are provided with middle villa 300;
Two set two layers of villa of described Two bors d's oeuveres, described middle villas are two-layer unitary space, and to be adjacent the second layer unitary space connecing two sets, two layers of villa of the described Two bors d's oeuveres folded spell shape of connection that is connected respectively integral in the second layer unitary space of described middle villa; And two set two layers of villa of described Two bors d's oeuveres, described middle villa, each villa is provided with the sinking style of court yard, front courtyard, balcony and door;
It is additionally provided with aerial courtyard in the second layer unitary space of described middle villa.
It should be noted that two layers of villa of Two bors d's oeuveres are two layers of villa of Two bors d's oeuveres of folder private savings garden composition in the middle of a kind of two layer unit; Middle villa takies respectively at two layers and is adjacent Two bors d's oeuveres villa two layer unit connect; East, both sides, west two set two layers of villa of Two bors d's oeuveres and described middle villas, it is integral that three set villas are connected with each other folded spell shape, and each villa is provided with single-family again: have sinking garden, there are two sheaf spaces, have secret garden, have balcony beautiful scenery, each integral, privacy is guaranteed. The aerial courtyard of middle villa more can bring the conjunction institute of the high-end other style of resident family and experience, and it is also the core in overlapping three split institute type villas of the present utility model.
Preferably, can embodiment as one; In the concrete structure of two layers of villa 200 of Two bors d's oeuveres in east side: the two layers of villa of Two bors d's oeuveres being positioned at east side are specifically divided into East Unit and Xidan unit, are its garden between East Unit and Xidan unit, wherein:
The described East Unit of two layers of villa 200 of Two bors d's oeuveres in east side totally two layers, ground floor is provided with three bedrooms from south orientation north, is specially a south orientation master bedroom successively, west, to west between secondary room and another to secondary room, and is all each provided with a toilet in bedroom between one; The second layer is disposed with a balcony, a south orientation principal bedroom (i.e. A2 house type bedroom), a toilet and a cloak room and another balcony from south orientation north;
The described Xidan unit of two layers of villa 200 of Two bors d's oeuveres in east side includes ground floor and partly-exposed basement, and ground floor is disposed with daily life room, dining room, kitchen and toilet from south orientation north; Partly-exposed basement is provided with sinking garden;
The described garden in centre of two layers of villa 200 of Two bors d's oeuveres in east side is disposed with garage, front courtyard, patio, sinking hot water bathing pool, hot spring bubble pond and vegetable garden from south orientation north.
Preferably, can embodiment as one; In the concrete structure of two layers of villa 100 of Two bors d's oeuveres in west side: the two layers of villa of Two bors d's oeuveres being positioned at west side are specifically divided into East Unit and Xidan unit, are its garden between East Unit and Xidan unit, wherein:
Totally two layers of the described Xidan unit of two layers of villa 100 of Two bors d's oeuveres in west side, ground floor is disposed with three bedrooms from south orientation north, it is specially a south orientation master bedroom, an east orientation secondary room and east orientation secondary room between another successively, and in bedroom, is all each provided with a toilet; The second layer complies with next balcony, a south orientation principal bedroom (i.e. A1 house type bedroom), a toilet and a cloak room and another balcony from south orientation north;
The described East Unit of two layers of villa 100 of Two bors d's oeuveres in west side includes ground floor and partly-exposed basement, and ground floor is disposed with daily life room, dining room, kitchen and toilet from south orientation north;Partly-exposed basement is provided with sinking garden;
The described garden in centre of two layers of villa 100 of Two bors d's oeuveres in west side is disposed with garage, front courtyard, patio, sinking hot water bathing pool, hot spring bubble pond and vegetable garden from south orientation north.
Preferably, can embodiment as one; In the concrete structure of middle villa 300: described middle villa includes ground floor, the second layer and partly-exposed basement, wherein:
The ground floor southern side of described middle villa is provided with front courtyard and a garage and north side is provided with parlor, dining room and toilet;
The partly-exposed basement of described middle villa is provided with the sinking garden of south orientation;
The second layer of described middle villa includes east room, western room, is its garden between described room, east and described western room, wherein:
Described garden is disposed with aerial courtyard and rear garden from south orientation north.
Preferably, can embodiment as one; In the connectivity structure of two layers of villa 200 of Two bors d's oeuveres in east side:
The west of the ground floor of the described East Unit of two layers of villa of Two bors d's oeuveres in east side is to being additionally provided with the upper and lower stair connected between secondary room and the south orientation principal bedroom of the second layer of East Unit; It should be noted that so by the stair of above-mentioned upper and lower connection, it is possible to achieve a layer of East Unit and two layers connect, walk up and down freely.
The described patio of two layers of villa of Two bors d's oeuveres in east side connects with the daily life room in the bedroom of the ground floor of East Unit and the ground floor of Xidan unit respectively.
Preferably, can embodiment as one; In the connectivity structure of two layers of villa 100 of Two bors d's oeuveres in west side:
It is additionally provided with the upper and lower stair connected between east orientation secondary room and the south orientation principal bedroom of the second layer of Xidan unit of the ground floor of the described Xidan unit of two layers of villa of Two bors d's oeuveres in west side; It should be noted that so by the stair of above-mentioned upper and lower connection, it is possible to achieve a layer of Xidan unit connects with two layers of Xidan unit, walks up and down freely.
The described patio of two layers of villa of Two bors d's oeuveres in west side connects with the living room in the bedroom of the ground floor of Xidan unit and the ground floor of East Unit respectively.
Preferably, can embodiment as one; In the concrete structure of middle villa 300: be provided with the upper and lower stair connected between the parlor of the ground floor of described middle villa with the rear garden of the second layer of described middle villa.
It should be noted that so by the stair of above-mentioned upper and lower connection, it is possible to achieve a layer of centre villa and two layers connect up and down, real achieving walks up and down freely.
Preferably, can embodiment as one; In the concrete structure of middle villa 300: the second layer of described middle villa 300 is open type aerial courtyard, and the western room of aerial courtyard is south orientation master bedroom, north orientation master bedroom and the interlayer with balcony, it is located at the upper strata of East Unit of two layers of villa 100 of Two bors d's oeuveres in west side; Room, aerial courtyard east is south orientation master bedroom and two balconies, and it is located at the upper strata of two layers of villa 200 Xidan of Two bors d's oeuveres unit in east side.
Preferably, can embodiment as one; East, two set two layers of villa of described Two bors d's oeuveres of both sides, west, described middle villa are respectively provided with respective conjunction courtyard wall body; And described conjunction courtyard wall body is for separating completely with the external world.
Preferably, can embodiment as one; The garden of the second layer of middle villa 300 is positioned in the middle of the second layer Xidan unit of the second layer East Unit of two layers of villa 200 of Two bors d's oeuveres in east side and two layers of villa 100 of Two bors d's oeuveres in west side. It should be noted that the internal living space of villa is separated by garden with activity space, accomplish that sound is separately.
Compared with prior art, the advantage of this utility model embodiment is in that:
The overlapping three split institute type villas of one that this utility model provides, it is made up of two layers of villa 200 of Two bors d's oeuveres in east side, two layers of villa 100 of Two bors d's oeuveres in west side and middle 300 3 primary structures of villa;The villa split of three kinds of structures forms overlapping three split institute type villas of the present utility model. This middle villa takies respectively at two layers and is adjacent Two bors d's oeuveres villa two layer unit connect. It is integral that three set villas are connected with each other folded spell shape, and each villa is single-family again: have sinking garden, has two sheaf spaces, has secret garden, has balcony beautiful scenery, and each integral, privacy is guaranteed.
Core of the present utility model is the semi-open form that courtyard changes conventional north and south courtyard or surrounding courtyard, makes each household be owned by the other institute of private savings of enclosing type, and privacy is extremely strong; Each household accomplishes that living space separates with activity space, clear distinction between mobility and immobility; Changing conventional two-fold spell shape formula, the folded spelling that intersects makes area utilization be greatly improved, and plot ratio can increase 1.5 times simultaneously; The area of middle villa is only 131, and two kitchens, the Room one are defended in three rooms four, still accomplishes private garden, super large balcony, all conditions of privacy and standard villa, and practicality is extremely strong, and the aerial courtyard of its uniqueness more can bring abundant conjunction institute very of resident family and experience.
Although overlapping three split institute type villas are internal to be separated complex, but still keep uniform Two bors d's oeuveres villa pattern in appearance, and inside also separates completely, does not interfere with each other. Every household is owned by whole process of villa and experiences, and area is relatively low simultaneously, and more families can accept.
The integrated mode that this utility model overlaps up and down also brings abundant stereovision, it is possible to makes full use of vertical direction spatial and creates more vividly changeable yard landscapes, promotes perception and house type degree of freedom.
This utility model is a kind of new villa pattern, by folded spelling raising the land utilization efficiency, it is to avoid the shortcoming of united villa and Two bors d's oeuveres villa, and the effect such as the daylighting of set type and ventilation all well solved.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model detailed description of the invention or technical scheme of the prior art, the accompanying drawing used required in detailed description of the invention or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is embodiments more of the present utility model, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the ground floor plane graph in the overlapping three split institute type villas of this utility model;
Fig. 2 is second layer plane graph and the interlayer plane graph in the overlapping three split institute type villas of this utility model;
Fig. 3 a is the ground floor plane graph in the Two bors d's oeuveres villa in west side of the present utility model;
Fig. 3 b is the second layer partial plan layout in the Two bors d's oeuveres villa in west side of the present utility model;
Fig. 4 a is the ground floor plane graph in the Two bors d's oeuveres villa in east side of the present utility model;
Fig. 4 b is the second layer partial plan layout in the Two bors d's oeuveres villa in east side of the present utility model;
Fig. 5 a is the ground floor plane graph of middle villa of the present utility model;
Fig. 5 b is the second layer and the interlayer plane graph of middle villa of the present utility model;
Fig. 6 is the ground floor sectional plan in the overlapping three split institute type villas of this utility model;
Fig. 7 is the second layer sectional plan in the overlapping three split institute type villas of this utility model;
Fig. 8 be the overlapping three split institute type villas of this utility model south orientation conceptual model schematic diagram;
The overlapping three split institute type villas of Fig. 9 position this utility model north orientation conceptual model schematic diagram;
In Fig. 8-9, A1, A2, B are three independent house types;
1 two sheaf spaces representing A1 house type, 2 represent a sheaf space of A1 house type, and 3 represent the private savings garden of A1 house type, and 4 represent two sheaf spaces of B house type, and 5 represent a sheaf space of A1 house type; 6 sheaf spaces representing B house type, 7 represent the garden of B house type, and 8 represent two layers of aerial courtyard of B house type, and 9 represent the rear garden of B house type, and 10 represent two sheaf spaces of B house type; 11 sheaf spaces representing A2 house type, 12 represent the private savings garden of A2 house type, and 13 represent two sheaf spaces of A2 house type, and 14 represent a sheaf space of A2 house type, and 15 represent two sheaf spaces of B house type, and 16 represent the mezzanine space of B house type;
100 two layers of villa of Two bors d's oeuveres representing west side;
200 two layers of villa of Two bors d's oeuveres representing east side;
300 represent middle villa.
Detailed description of the invention
Below by specific embodiment son and in conjunction with accompanying drawing, this utility model is described in further detail.
The overlapping three split institute type villas of the one that this utility model embodiment provides, two layers of villa 100 of Two bors d's oeuveres including two layers of villa 200 of Two bors d's oeuveres in east side, west side, and two set two layers of villa of described Two bors d's oeuveres spaced and internal each structure is identical and is arranged symmetrically with, the regions of the midfeather of two set two layers of villa of Two bors d's oeuveres are provided with middle villa 300;
Two set two layers of villa of described Two bors d's oeuveres, described middle villas are two-layer unitary space, and to be adjacent the second layer unitary space connecing two sets, two layers of villa of the described Two bors d's oeuveres folded spell shape of connection that is connected respectively integral in the second layer unitary space of described middle villa; And two set two layers of villa of described Two bors d's oeuveres, described middle villa, each villa is provided with the sinking style of court yard, front courtyard, balcony and door (namely realizing single-family technique effect);
It is additionally provided with aerial courtyard in the second layer unitary space of described middle villa.
It should be noted that two layers of villa of Two bors d's oeuveres are two layers of villa of Two bors d's oeuveres of folder private savings garden composition in the middle of a kind of two layer unit; Middle villa takies respectively at two layers and is adjacent Two bors d's oeuveres villa two layer unit connect; East, both sides, west two set two layers of villa of Two bors d's oeuveres and described middle villas, it is integral that three set villas are connected with each other folded spell shape, and each villa is provided with single-family again: have sinking garden, there are two sheaf spaces, have secret garden, have balcony beautiful scenery, each integral, privacy is guaranteed. The aerial courtyard of middle villa more can bring the conjunction institute of the high-end other style of resident family and experience, and it is also the core in overlapping three split institute type villas of the present utility model.
Concrete structure and the concrete technique effect in the overlapping three split institute type villas below this utility model embodiment provided do detailed description:
Room in each family of each layer described in above-mentioned accompanying drawing arranges and is summarized as follows:
About A1 house type: A1 house type one layer has: 3 bedrooms (crouching containing 1 south), 4 toilets, daily life room, kitchen, dining room, laundry, front courtyard, patio, vegetable garden, hot water bathing pool, the sinking style of court yard, outdoor garage, partly-exposed basements;
A1 house type two layers has: 1 master bedroom (south is sleeping), 2 balconies.
About A2 house type: A2 house type one layer has: 3 bedrooms (crouching containing 1 south), 4 toilets, daily life room, kitchen, dining room, laundry, front courtyard, patio, vegetable garden, hot water bathing pool, the sinking style of court yard, outdoor garage, partly-exposed basements;
A2 house type two layers has: 1 master bedroom (south is sleeping), 2 balconies.
About B house type: B house type one layer has: front courtyard, outdoor garage, the sinking style of court yard, parlor, kitchen, dining room, toilet, laundry, private garden.
B house type two layers has: 3 bedrooms (crouch containing 2 south), 3 toilets, aerial courtyards, give interlayer and balcony;
Referring to Fig. 1 and Fig. 2, in the concrete structure of two layers of villa 200 of Two bors d's oeuveres in east side: the two layers of villa of Two bors d's oeuveres being positioned at east side are specifically divided into East Unit and Xidan unit, are its garden between East Unit and Xidan unit, wherein:
In the concrete structure of two layers of villa 200 of Two bors d's oeuveres in east side: the two layers of villa of Two bors d's oeuveres being positioned at east side are specifically divided into East Unit and Xidan unit, are its garden between East Unit and Xidan unit, wherein:
The described East Unit of two layers of villa 200 of Two bors d's oeuveres in east side totally two layers, ground floor is provided with three bedrooms from south orientation north, is specially a south orientation master bedroom successively, west, to west between secondary room and another to secondary room, and is all each provided with a toilet in bedroom between one; The second layer is disposed with a balcony, a south orientation principal bedroom (i.e. A2 house type bedroom), a toilet and a cloak room and another balcony from south orientation north;
The described Xidan unit of two layers of villa 200 of Two bors d's oeuveres in east side includes ground floor and partly-exposed basement, and ground floor is disposed with daily life room, dining room, kitchen and toilet from south orientation north; Partly-exposed basement is provided with sinking garden;
The described garden in centre of two layers of villa 200 of Two bors d's oeuveres in east side is disposed with garage, front courtyard, patio, sinking hot water bathing pool, hot spring bubble pond and vegetable garden from south orientation north.
Referring to Fig. 1 and Fig. 2, in the concrete structure of two layers of villa 100 of Two bors d's oeuveres in west side: the two layers of villa of Two bors d's oeuveres being positioned at west side are specifically divided into East Unit and Xidan unit, are its garden between East Unit and Xidan unit, wherein:
Totally two layers of the described Xidan unit of two layers of villa 100 of Two bors d's oeuveres in west side, ground floor is disposed with three bedrooms from south orientation north, it is specially a south orientation master bedroom, an east orientation secondary room and east orientation secondary room between another successively, and in bedroom, is all each provided with a toilet; The second layer complies with next balcony, a south orientation principal bedroom (i.e. A1 house type bedroom), a toilet and a cloak room and another balcony from south orientation north;
The described East Unit of two layers of villa 100 of Two bors d's oeuveres in west side includes ground floor and partly-exposed basement, and ground floor is disposed with daily life room, dining room, kitchen and toilet from south orientation north; Partly-exposed basement is provided with sinking garden;
The described garden in centre of two layers of villa 100 of Two bors d's oeuveres in west side is disposed with garage, front courtyard, patio, sinking hot water bathing pool, hot spring bubble pond and vegetable garden from south orientation north.
Referring to Fig. 1 and Fig. 2, in the concrete structure of middle villa 300: described middle villa includes ground floor, the second layer and partly-exposed basement, wherein:
The ground floor southern side of described middle villa is provided with front courtyard and a garage and north side is provided with parlor, dining room and toilet;
The partly-exposed basement of described middle villa is provided with the sinking garden of south orientation;
The second layer of described middle villa includes east room, western room, is its garden between described room, east and described western room, wherein:
Described garden is disposed with aerial courtyard and rear garden from south orientation north.
In the connectivity structure of two layers of villa 200 of Two bors d's oeuveres in east side:
The west of the ground floor of the described East Unit of two layers of villa of Two bors d's oeuveres in east side is to being additionally provided with the upper and lower stair connected between secondary room and the south orientation principal bedroom of the second layer of East Unit; It should be noted that so by the stair of above-mentioned upper and lower connection, it is possible to achieve a layer of East Unit and two layers connect, walk up and down freely.
The described patio of two layers of villa of Two bors d's oeuveres in east side connects with the daily life room in the bedroom of the ground floor of East Unit and the ground floor of Xidan unit respectively. It should be noted that, it is positioned at the patio of a layer to realize connecting with the daily life room of a layer of the bedroom of a layer of East Unit and Xidan unit respectively, centre all realizes spaced apart by Yishanmen, namely the patio of a layer connect with the daily life room of a layer in the bedroom of a layer of East Unit and Xidan unit respectively, it is achieved that the thing walking of horizontal direction is freely.
In the connectivity structure of two layers of villa 100 of Two bors d's oeuveres in west side:
It is additionally provided with the upper and lower stair connected between east orientation secondary room and the south orientation principal bedroom of the second layer of Xidan unit of the ground floor of the described Xidan unit of two layers of villa of Two bors d's oeuveres in west side;It should be noted that so by the stair of above-mentioned upper and lower connection, it is possible to achieve a layer of Xidan unit connects with two layers of Xidan unit, walks up and down freely.
The described patio of two layers of villa of Two bors d's oeuveres in west side connects with the living room in the bedroom of the ground floor of Xidan unit and the ground floor of East Unit respectively.
In the concrete structure of middle villa 300:
The upper and lower stair connected it are provided with between the parlor of the ground floor of described middle villa with the rear garden of the second layer of described middle villa.
It should be noted that so by the stair of above-mentioned upper and lower connection, it is possible to achieve a layer of centre villa and two layers connect up and down, real achieving walks up and down freely.
In the concrete structure of middle villa: two layers of described middle villa are open type aerial courtyard, and the western room of aerial courtyard is south orientation master bedroom, north orientation master bedroom and the interlayer with balcony, it is located at the upper strata of East Unit of two layers of villa 100 of Two bors d's oeuveres in west side; Room, aerial courtyard east is south orientation master bedroom and two balconies, and it is located at the upper strata of two layers of villa 200 Xidan of Two bors d's oeuveres unit in east side.
A1 house type as shown in Fig. 3 a and Fig. 3 b, construction area is 175, is four Rooms, Room two five and defends kitchen one partly-exposed basement, and every bedroom is provided with toilet, it is ensured that the luxurious and comfort level of inhabitation.
Two unit of thing enclose a patio, and Double layer bedchamber and balcony are arranged in east side, patio, belong to static rest area: be upstairs containing cloak room, the principal bedroom of toilet and bilateral balcony between one, provide open space freely for owner; Being three bedrooms downstairs, it is necessary to be allowed for access by cell gate, safety is protected; Wherein, all there is southern window by the bedroom in southern side, it is simple to daylighting; Stall also has bedroom, a north side to be guest bedroom, it is possible to through patio, facilitates guest to pass in and out, and, makes a distinction between the important and the lesser one simultaneously and keep at a distance between master bedroom;
West side, patio layout daily life room and kitchen, and lead to the spiral stairs of partly-exposed basement, belonging to dynamic moving district: daily life room and dining room combination Founder, space and the visual field are all very open; The exterior window of L-type also makes the vision of indoor and outdoor exchange more abundant while strengthening south orientation daylighting; Floor height must be strengthened in double; two Rooms, sets up the distinctive luxurious impression of Deluxe villa, kitchen and toilet laundry and retains original floor height, and the headroom of saving is left B house type upstairs for and given practical space.
Patio sets up vegetable garden, north side, north side hot water bathing pool and garage parking, southern side separately, is admitted to hospital and imitates the form of old Beijing courtyard: first directly enters front courtyard, then proceeds to patio, puts flowers, slabstone path along road, and in institute, porch top is full of green planting, and forms tree shade, is like another world quite different from this world.
Static rest area and dynamic moving district connection private savings are closed institute and are collectively formed the Two bors d's oeuveres villa structure that a set of sound is separately uniform again.
A2 house type as shown in Fig. 4 a and Fig. 4 b is symmetrical with the A1 house type shown in Fig. 3 a and Fig. 3 b, this double-deck house type possesses the feature of " having sky to have garden with having " of villa, ventilation and lighting, luxury, privacy, safety and primary-slave relation are very strong simultaneously, the space of upper, middle and lower is all obtained by, and also possesses significantly high practicality.
B house type as shown in Fig. 5 a and Fig. 5 b, construction area is 131, is that kitchen one interlayer is defended in three Rooms, Room two four, and every bedroom is provided with toilet equally, it is ensured that the luxurious and comfort level of inhabitation.
It is garage parking as shown in Figure 5 a inside gate, one layer of overall parlor and dining room being directly entered high floor height by front courtyard; The end in dining room is external staircase, can be sensible two layers. Here indoor to exterior stair adopts the curtain wall of translucent material to be separated, and plants flowers inside stair, arranges folded water, for the private garden that sight line is penetrating.
Stair upper end is aerial courtyard as shown in Figure 5 b, garden west side by stair near-end is two bedrooms of B house type and gives mezzanine space, it is positioned at A1 house type parlor (dynamic moving district) upstairs, do not affect its static rest area, in order to ensure the privacy at A1 family, west side, bedroom does not all set window yet;South is sleeping ensures daylighting by south orientation window, and mezzanine space connects balcony as chess and card room or teahouse, and north is sleeping to be positioned above, and is overhead, interlayer balcony outside window; Garden east side is its master bedroom, it is positioned at A2 house type parlor (dynamic moving district) upstairs, do not affect its static rest area, the same with A1, A2 house type master bedroom, there are the very big interior space, cloak room and more spacious space, outdoor balcony, in order to ensure the privacy at A2 family, master bedroom east side does not set window, has south orientation window to ensure daylighting.
Aerial courtyard and give interlayer and ensure that B house type also has very abundant indoor space when area is less, is combined, with front courtyard and subsidence observation, the typical feature also making B house type possess villa. Aerial courtyard more can be transformed by finishing means, and such as glass sunlight house, outdoor facility activity space etc., the comfort level providing a kind of freely other style for B house type is experienced.
Three house types folded is spelled combination and can create a kind of comfortable, combined villa form that secret, space availability ratio are high, be fully used in the space of each household simultaneously, construction area obtains conservative control, and this folded spelling small apartment possesses all features of villa, and the market competitiveness is extremely strong.
In sum, the overlapping three split institute type villas that this utility model embodiment provides, both ensure that the privacy of inhabitation, and met again higher plot ratio index request, greatly improve serviceability and the living conditions of villa. Meanwhile, needed for it has complied with market, fill up the blank of building trade, allow more crowd accept with its complete function and economical and practical advantage, place will be obtained in high-end house market, also bring better good economic benefit to building enterprise simultaneously.
Last it is noted that various embodiments above is only in order to illustrate the technical solution of the utility model, it is not intended to limit; Although this utility model being described in detail with reference to foregoing embodiments, it will be understood by those within the art that: the technical scheme described in foregoing embodiments still can be modified by it, or wherein some or all of technical characteristic is carried out equivalent replacement; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of each embodiment technical scheme of this utility model.

Claims (10)

1. overlapping three split institute type villas, it is characterized in that, two layers of villa (100) of Two bors d's oeuveres including two layers of villa (200) of Two bors d's oeuveres in east side, west side, and two set two layers of villa of described Two bors d's oeuveres spaced and internal each structure is identical and is arranged symmetrically with, the regions of the midfeather of two set two layers of villa of Two bors d's oeuveres are provided with middle villa (300);
Two set two layers of villa of described Two bors d's oeuveres, described middle villas are two-layer unitary space, and to be adjacent the second layer unitary space connecing two sets, two layers of villa of the described Two bors d's oeuveres folded spell shape of connection that is connected respectively integral in the second layer unitary space of described middle villa; And two set two layers of villa of described Two bors d's oeuveres, described middle villa, each villa is provided with the sinking style of court yard, front courtyard, balcony and door;
It is additionally provided with aerial courtyard in the second layer unitary space of described middle villa.
2. overlapping three split institute type villas as claimed in claim 1, it is characterised in that
In the concrete structure of two layers of villa (200) of Two bors d's oeuveres in east side: the two layers of villa of Two bors d's oeuveres being positioned at east side are specifically divided into East Unit and Xidan unit, are its garden between East Unit and Xidan unit, wherein:
The described East Unit of two layers of villa (200) of the Two bors d's oeuveres in east side totally two layers;
The described Xidan unit of two layers of villa (200) of the Two bors d's oeuveres in east side includes ground floor and partly-exposed basement.
3. overlapping three split institute type villas as claimed in claim 2, it is characterised in that
In the concrete structure of two layers of villa (100) of Two bors d's oeuveres in west side: the two layers of villa of Two bors d's oeuveres being positioned at west side are specifically divided into East Unit and Xidan unit, are its garden between East Unit and Xidan unit, wherein:
Totally two layers of the described Xidan unit of two layers of villa (100) of the Two bors d's oeuveres in west side;
The described East Unit of two layers of villa (100) of the Two bors d's oeuveres in west side includes ground floor and partly-exposed basement.
4. overlapping three split institute type villas as claimed in claim 3, it is characterised in that
In the concrete structure of middle villa (300): described middle villa includes ground floor, the second layer and partly-exposed basement.
5. overlapping three split institute type villas as claimed in claim 2, it is characterised in that
In the connectivity structure of two layers of villa (200) of Two bors d's oeuveres in east side:
The west of the ground floor of the described East Unit of two layers of villa of Two bors d's oeuveres in east side is to being additionally provided with the upper and lower stair connected between secondary room and the south orientation principal bedroom of the second layer of East Unit.
6. overlapping three split institute type villas as claimed in claim 3, it is characterised in that
In the connectivity structure of two layers of villa (100) of Two bors d's oeuveres in west side:
It is additionally provided with the upper and lower stair connected between east orientation secondary room and the south orientation principal bedroom of the second layer of Xidan unit of the ground floor of the described Xidan unit of two layers of villa of Two bors d's oeuveres in west side.
7. overlapping three split institute type villas as claimed in claim 4, it is characterised in that
In the concrete structure of middle villa (300):
The upper and lower stair connected it are provided with between the parlor of the ground floor of described middle villa with the rear garden of the second layer of described middle villa.
8. overlapping three split institute type villas as claimed in claim 4, it is characterised in that
In the concrete structure of middle villa (300): the second layer of described middle villa (300) is open type aerial courtyard, and the western room of aerial courtyard is south orientation master bedroom, north orientation master bedroom and the interlayer with balcony, it is located at the upper strata of East Unit of two layers of villa (100) of Two bors d's oeuveres in west side; Room, east, aerial courtyard east side is south orientation master bedroom and two balconies, and it is located at the upper strata of two layers of villa (200) Xidan of Two bors d's oeuveres unit in east side.
9. overlapping three split institute type villas as claimed in claim 1, it is characterised in that
East, two set two layers of villa of described Two bors d's oeuveres of both sides, west, described middle villa are respectively provided with respective conjunction courtyard wall body; And described conjunction courtyard wall body is for separating completely with the external world.
10. overlapping three split institute type villas as claimed in claim 4, it is characterised in that
The garden of the second layer of middle villa (300) is positioned in the middle of the second layer Xidan unit of the second layer East Unit of two layers of villa (200) of Two bors d's oeuveres in east side and two layers of villa (100) of Two bors d's oeuveres in west side.
CN201520840776.4U 2015-10-27 2015-10-27 Three amalgamation institute type villas of overlap Expired - Fee Related CN205314612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520840776.4U CN205314612U (en) 2015-10-27 2015-10-27 Three amalgamation institute type villas of overlap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520840776.4U CN205314612U (en) 2015-10-27 2015-10-27 Three amalgamation institute type villas of overlap

Publications (1)

Publication Number Publication Date
CN205314612U true CN205314612U (en) 2016-06-15

Family

ID=56311702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520840776.4U Expired - Fee Related CN205314612U (en) 2015-10-27 2015-10-27 Three amalgamation institute type villas of overlap

Country Status (1)

Country Link
CN (1) CN205314612U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663805A (en) * 2020-06-30 2020-09-15 永威置业集团有限公司 Functional landscape module courtyard layout mode
CN112482828A (en) * 2020-10-20 2021-03-12 方圆国际投资集团有限公司 Private courtyard type stacked residential building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663805A (en) * 2020-06-30 2020-09-15 永威置业集团有限公司 Functional landscape module courtyard layout mode
CN112482828A (en) * 2020-10-20 2021-03-12 方圆国际投资集团有限公司 Private courtyard type stacked residential building

Similar Documents

Publication Publication Date Title
CN206279792U (en) A kind of folded institute's foreign-style house
CN205314612U (en) Three amalgamation institute type villas of overlap
CN202831675U (en) Stacked villas-type residence
CN201152031Y (en) Planning architecture unit
CN110778152B (en) High-rise residence providing multi-level neighborhood communication system
CN204163425U (en) A kind of enclosing type half public courtyard combination foreign-style house
CN215717545U (en) Ecological house
CN201095876Y (en) Courtyard dwelling
CN2913519Y (en) Courtyard residential building
CN101255769A (en) Enclosed type overlapped garden residence
CN210105387U (en) Three-layer double-splicing yard
CN201092743Y (en) Courtyard mansion home building
CN108868198B (en) Mountain villa
CN201095875Y (en) Courtyard dwelling
CN201095877Y (en) Courtyard dwelling
CN202401780U (en) House with broad-view hall with combination space
CN2883565Y (en) Courtyard type villas
CN2883561Y (en) Courtyard type villas
CN202745410U (en) Natural lighting large-house type residence
CN210105388U (en) Three-layer double-splicing Chinese folding yard
CN210105389U (en) Three-layer double-spliced Chinese folding yard
CN2883564Y (en) Courtyard type villas
CN201318031Y (en) Quad-like quadruplet-large-width-united villa
CN218265143U (en) City forest garden house
CN218265145U (en) City forest garden house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20191027

CF01 Termination of patent right due to non-payment of annual fee