CN205314396U - Equipment base watertight fittings is createed to roofing - Google Patents
Equipment base watertight fittings is createed to roofing Download PDFInfo
- Publication number
- CN205314396U CN205314396U CN201521136896.2U CN201521136896U CN205314396U CN 205314396 U CN205314396 U CN 205314396U CN 201521136896 U CN201521136896 U CN 201521136896U CN 205314396 U CN205314396 U CN 205314396U
- Authority
- CN
- China
- Prior art keywords
- layer
- roofing
- equipment base
- water
- waterproof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The utility model discloses an equipment base watertight fittings is createed to roofing, including equipment base (9), original structure roofing layer (1) and recovering structure roofing layer (3), original structure roofing layer (1) has the chamber of holding, and should hold the chamber and be used for placing equipment base (9), resume structure roofing layer (3) including roofing structure basic unit, heat preservation (10), first waterproof layer (4) and protective layer (11), equipment base (9) set up in roofing structure basic unit surface, first waterproof layer along equipment base (9) surface setting, heat preservation (10) set up in first waterproof layer (4) upper portion, protective layer (11) set up in heat preservation (10) upper portion. First waterproof layer (4) and equipment base (9) and roofing structure basic unit completely glue, prevent that roofing structure basic unit from scurrying the phenomenon of water, a damaged many places seepage, after convenient during the roofing seepage, the seeking, maintain of the damaged position of waterproof layer.
Description
Technical field
This utility model relates to the technical field of the recovery structure roof waterproof after newly-built equipment base, particularly relates to a kind of newly-built equipment base water-tight device of roofing.
Background technology
At present, a lot of old roofs need the pedestal of more newly-built main equipments, and after equipment base builds up, roof leakage phenomenon is serious. During the newly-built equipment base of roofing, current way is:
1) a range of roof construction layer is cut to roof structure basic unit;
2) bar planting;
3) pouring reinforcement concrete pedestal;
4) roofing is recovered according to tectonic remnant basin such as original heat-insulation layer, waterproof layer, protective layers.
According to the original shortcoming constructing way: be all negative and positive angle around existing equipment pedestal, it it is the weak spot of waterproof, if recovering according to original positively fixed type or inverted roof structure, the weakness of roof waterproof system own adds weak part around equipment, to cause that around roofing pedestal, waterproof is weaker, waterproof effect it is difficult to ensure that.
Utility model content
In order to overcome above shortcomings in prior art, this utility model provides a kind of newly-built equipment base water-tight device of roofing.
Specific term of the present utility model is explained: hold chamber, holds chamber and refers to and cut the cavity formed after original structure roofing layer, newly-built equipment base and recover roof construction layer on this cavity.
The technical solution adopted in the utility model is: a kind of newly-built equipment base water-tight device of roofing, including equipment base, original structure roofing layer and recovery structure roofing, described original structure roofing layer has accommodation chamber, this accommodation chamber is used for place apparatus pedestal, and described recovery structure roofing layer includes roof structure basic unit, heat-insulation layer, first waterproof layer and protective layer; Described equipment base is arranged at roof structure substrate surface, and described first waterproof layer is along equipment base surface configuration, and described heat-insulation layer is arranged at first waterproof layer top, and described protective layer is arranged at heat-insulation layer top.
Preferably, described original structure roofing layer includes place where troops were originally stationed water layer, described recovery structure roofing layer also includes water blocking member, described water blocking member is arranged at roof structure substrate surface, this water blocking member height extends to concordant with heat-insulation layer from roof structure substrate surface, described first waterproof layer is along equipment base and this water blocking member surface configuration, with the place where troops were originally stationed water layer overlap joint of original structure roofing layer.
Preferably, described first waterproof layer is 200-350mm with the place where troops were originally stationed water layer lap width of original structure roofing layer.
Preferably, described water blocking member is concrete dash platform.
Preferably, described first waterproof layer adopts seal member to seal with the place where troops were originally stationed water layer lap-joint of original structure roofing layer.
Preferably, described equipment base corner is provided with knuckle parts.
Preferably, described knuckle parts are that leak stopping is precious.
Preferably, described recovery structure roofing layer also includes second waterproof layer, and described second waterproof layer is arranged between heat-insulation layer and protective layer.
Preferably, described second waterproof layer is waterproof roll.
Preferably, described equipment base corner is additionally provided with additional waterproofing layer.
Advantage of the present utility model and having the beneficial effects that: a kind of newly-built equipment base water-tight device of roofing of the present utility model, this device is applicable to original structure roofing is cut, so as newly-built equipment base, recover the waterproof of the structure roofing cut simultaneously, provide a kind of new old roof transformation (newly-built equipment base) water-tight device, roof structure basic unit can be protected, twice waterproof layer is set, moreover it is possible to protection heat-insulation layer; If second waterproof layer destroys, the first waterproof layer being close to equipment base still can effectively protect roof structure basic unit and equipment base; First waterproof layer and equipment base and roof structure basic unit are completely viscous, it is prevented that roof structure basic unit channeling water, breakage many places, a place seepage phenomenon; After convenient during roof leakage, the lookup of waterproof layer damaged part, maintenance.
Accompanying drawing explanation
Fig. 1 is the structural representation of the first embodiment of this utility model; And
Fig. 2 is the structural representation of this utility model the second embodiment; And
In figure: 1-original structure roofing layer 2-water blocking member 3-recovers structure roofing layer 4-first waterproof layer 5-additional waterproofing layer 6-knuckle parts 7-seal member 8-second waterproof layer 9-equipment base 10-heat-insulation layer 11-protective layer.
Detailed description of the invention
Below in conjunction with drawings and Examples, detailed description of the invention of the present utility model being further described, following example are only for clearly illustrating the technical solution of the utility model, and can not limit protection domain of the present utility model with this.
As shown in Figure 1, structural representation for the first embodiment of this utility model, the first embodiment is primarily adapted for use in the situation that rooftop AC unit requirement is two grades, a kind of newly-built equipment base water-tight device of roofing, this device is primarily adapted for use in the situation at the newly-built equipment base of original structure roofing, wherein cut a range of original roof construction layer 1 to roof structure basic unit, recover the structure roofing cut simultaneously, to meet waterproof thermal-insulated demand, this device mainly includes equipment base 9, original structure roofing layer 1 and recovery structure roofing layer 3, original structure roofing layer (1) includes place where troops were originally stationed water layer, recover structure roofing layer 3 and include roof structure basic unit, heat-insulation layer 10, first waterproof layer 4 and protective layer 11, described equipment base 9 is arranged at roof structure substrate surface, first waterproof layer 4 is along equipment base 9 surface configuration, until the place where troops were originally stationed water layer overlap joint with original structure roofing layer 1, heat-insulation layer 10 is arranged at first waterproof layer 4 top, protective layer 11 is arranged at heat-insulation layer 10 top, equipment base 9 is played good protection effect by the first waterproof layer 4 being close to equipment base 9 surface, stop channeling water phenomenon, pedestal is avoided to be subject to water soaking for a long time, destroy structural concrete and reinforcing bar, reduce building structure maintenance cost, extend building service life.
Above-mentioned recovery structure roofing layer way is:
1) a range of original structure roofing layer 1 to roof structure basic unit is cut;
2) reinforcing bar is implanted;
3) pouring reinforcement concrete pedestal, forms this equipment base 9;
4) roof structure basic unit checks and cleaning;
5) do with in roof structure basic unit at equipment base 9 together with coating waterproof layer and first waterproof layer 4, and the place where troops were originally stationed water layer overlap joint of original structure roofing layer 1, and obturaging by sealing compound;
6) at first waterproof layer 4 surface configuration heat-insulation layer 10;
7) at the surface configuration protective layer 11 of heat-insulation layer 10.
Recover structure roofing layer 3 and further can also include water blocking member 2, this water blocking member can be concrete dash platform, preferably by pea gravel concreten dash platform, this dash platform is arranged at roof structure substrate surface, extend to concordant with heat-insulation layer 10 from roof structure substrate surface, first waterproof layer 4 is along equipment base 9 and this water blocking member 2 surface configuration, overlap with place where troops were originally stationed water layer, selected pea gravel concreten dash platform is not restricted to this, and other structures meeting said function also correspond to condition.
This pea gravel concreten dash platform can in above-mentioned steps 3) after arrange, cutting structure periphery build pea gravel concreten dash platform.
Above-mentioned first waterproof layer 4 can be 200mm with place where troops were originally stationed water layer lap width, it is also possible to is 350mm, naturally it is also possible to be any one value between the two, it is preferable that take 250mm.
As above-mentioned steps 5) described in, adopt seal member to seal at first waterproof layer 4 with place where troops were originally stationed water layer lap-joint, this seal member can adopt sealing compound, it would however also be possible to employ other encapsulant.
In general newly-built equipment base 9 all can have turning, namely negative and positive angle, this negative and positive angle is the weak spot of waterproof, if recovered according to original positively fixed type or inverted roof structure, the weakness of roof waterproof system own adds weak part around equipment, will cause that equipment base 9 surrounding waterproof is weaker, waterproof effect it is difficult to ensure that, arranging knuckle parts 6 at equipment base 9, these parts can adopt leak stopping precious, it would however also be possible to employ other transition member.
Above-mentioned leak stopping treasured can in step 4) after be configured, utilize the precious circular arc that negative and positive angle is done of leak stopping to process.
To sum up, the way of this recovery structure roofing layer is preferably following steps:
1) a range of original structure roofing layer 1 to roof structure basic unit is cut;
2) reinforcing bar is implanted;
3) pouring reinforcement concrete pedestal, forms this equipment base 9;
4) structure periphery build pea gravel concreten dash platform is being cut;
5) roof structure basic unit checks and cleaning;
6) with leak stopping treasured, negative and positive angle is done circular arc to process;
7) do with in roof structure basic unit at equipment base 9 together with coating waterproof layer and first waterproof layer 4, and the place where troops were originally stationed water layer overlap joint of original structure roofing layer 1, and obturaging by sealing compound;
8) at first waterproof layer 4 surface configuration road heat-insulation layer 10;
9) at the surface configuration protective layer 11 of heat-insulation layer 10.
As shown in Figure 2, for the second embodiment of the present utility model, this embodiment is primarily adapted for use in when rooftop AC unit is one-level and adopts, this embodiment is different from the first embodiment and is distinctive in that: be additionally provided with second waterproof layer 8, second waterproof layer 8 is arranged between heat-insulation layer 10 and protective layer 11, the purpose so arranged, if two-layer waterproof is all impaired, waterproof coating layer breakdown point can be accurately found according to breakthrough, fixed point is repaired, big face is avoided to repair waterproof layer, reduce waterproof layer maintenance cost, heat-insulation layer 10 is between twice waterproof layer simultaneously, heat-insulation layer 10 is effectively protected while protection equipment base 9, second waterproof layer 8 can adopt waterproof roll, the waterproof material of other said functions can also be adopted.
The specific practice of the second embodiment is:
1) a range of original structure roofing layer 1 to roof structure basic unit is cut;
2) reinforcing bar is implanted;
3) pouring reinforcement concrete pedestal, forms this equipment base 9;
4) structure periphery build pea gravel concreten dash platform is being cut;
5) roof structure basic unit checks and cleaning;
6) with leak stopping treasured, negative and positive angle is done circular arc to process;
7) do with in roof structure basic unit at equipment base together with coating waterproof layer and first waterproof layer 9, be 250mm with the place where troops were originally stationed water layer lap width of original structure roofing layer 1, and obturage by sealing compound;
8) at first waterproof layer 4 surface configuration heat-insulation layer 10, in order to recover heat-insulation layer.
9) at heat-insulation layer 10 surface configuration second waterproof layer 8, i.e. coil waterproof layer, overlap 250mm with the place where troops were originally stationed water layer of original roof construction layer 1, and obturage by sealing compound;
10) it is arranged above with protective layer 11 at second waterproof layer 8, in order to recover protective layer.
The first embodiment above-mentioned and the second embodiment can also be provided with additional waterproofing layer 5 recovering structure roofing layer 3, and this additional waterproofing layer 5 is arranged along equipment base 9 turning.
The above is only preferred embodiments of the present utility model; should be understood that; for those skilled in the art; under the premise without departing from this utility model know-why; can also making some improvements and modifications, these improvements and modifications also should be regarded as protection domain of the present utility model.
Claims (10)
1. the newly-built equipment base water-tight device of roofing, including equipment base (9), original structure roofing layer (1) and recovery structure roofing layer (3), described original structure roofing layer (1) has accommodation chamber, this accommodation chamber is used for place apparatus pedestal (9), it is characterized in that, described recovery structure roofing layer (3) includes roof structure basic unit, heat-insulation layer (10), first waterproof layer (4) and protective layer (11); Described equipment base (9) is arranged at roof structure substrate surface; described first waterproof layer is along equipment base (9) surface configuration; described heat-insulation layer (10) is arranged at first waterproof layer (4) top, and described protective layer (11) is arranged at heat-insulation layer (10) top.
2. the newly-built equipment base water-tight device of roofing according to claim 1, it is characterized in that, described original structure roofing layer (1) includes place where troops were originally stationed water layer, described recovery structure roofing layer (3) also includes water blocking member (2), described water blocking member (2) is arranged at roof structure substrate surface, this water blocking member height extends to concordant with heat-insulation layer (10) from roof structure substrate surface, described first waterproof layer (4) is along equipment base (9) and this water blocking member (2) surface configuration, place where troops were originally stationed water layer overlap joint with original structure roofing layer (1).
3. the newly-built equipment base water-tight device of roofing according to claim 2, it is characterised in that the place where troops were originally stationed water layer lap width of described first waterproof layer (4) and original structure roofing layer (1) is 200-350mm.
4. the newly-built equipment base water-tight device of roofing according to claim 2, it is characterised in that described water blocking member (2) is concrete dash platform.
5. the newly-built equipment base water-tight device of roofing according to Claims 2 or 3 or 4, it is characterized in that, the place where troops were originally stationed water layer lap-joint of described first waterproof layer (4) and original structure roofing layer (1) adopts seal member (7) to seal.
6. the newly-built equipment base water-tight device of roofing according to claim 1, it is characterised in that described equipment base (9) corner is provided with knuckle parts (6).
7. the newly-built equipment base water-tight device of roofing according to claim 6, it is characterised in that described knuckle parts (6) are precious for leak stopping.
8. the newly-built equipment base water-tight device of roofing according to claim 1-4 or any one of 6-7; it is characterized in that; described recovery structure roofing layer (3) also includes second waterproof layer (8), and described second waterproof layer (8) is arranged between heat-insulation layer (10) and protective layer (11).
9. the newly-built equipment base water-tight device of roofing according to claim 8, it is characterised in that described second waterproof layer (8) is waterproof roll.
10. the newly-built equipment base water-tight device of roofing according to claim 6, it is characterised in that described equipment base (9) corner is additionally provided with additional waterproofing layer (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521136896.2U CN205314396U (en) | 2015-12-31 | 2015-12-31 | Equipment base watertight fittings is createed to roofing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521136896.2U CN205314396U (en) | 2015-12-31 | 2015-12-31 | Equipment base watertight fittings is createed to roofing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205314396U true CN205314396U (en) | 2016-06-15 |
Family
ID=56200389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521136896.2U Active CN205314396U (en) | 2015-12-31 | 2015-12-31 | Equipment base watertight fittings is createed to roofing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205314396U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111411795A (en) * | 2020-04-15 | 2020-07-14 | 福州市宇心建材科技有限公司 | Waterproof energy-saving integrated system for old roof reconstruction |
CN113969672A (en) * | 2021-08-09 | 2022-01-25 | 中建一局集团建设发展有限公司 | Metal gutter waterproof integral maintenance structure and construction method |
CN115478626A (en) * | 2022-10-26 | 2022-12-16 | 山东省建筑设计研究院有限公司 | Heat-insulation waterproof system and method for additionally opening external window |
-
2015
- 2015-12-31 CN CN201521136896.2U patent/CN205314396U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111411795A (en) * | 2020-04-15 | 2020-07-14 | 福州市宇心建材科技有限公司 | Waterproof energy-saving integrated system for old roof reconstruction |
CN113969672A (en) * | 2021-08-09 | 2022-01-25 | 中建一局集团建设发展有限公司 | Metal gutter waterproof integral maintenance structure and construction method |
CN115478626A (en) * | 2022-10-26 | 2022-12-16 | 山东省建筑设计研究院有限公司 | Heat-insulation waterproof system and method for additionally opening external window |
CN115478626B (en) * | 2022-10-26 | 2023-12-05 | 山东省建筑设计研究院有限公司 | Thermal insulation waterproof system and method for extended outer window |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205314396U (en) | Equipment base watertight fittings is createed to roofing | |
CN202830997U (en) | Deformation joint waterproof structure for subway station main body side wall | |
CN206352400U (en) | Positively fixed type parapet of roofing position waterproof modular repair structure | |
CN104846849B (en) | A kind of method for preventing basement bottom plate rear pouring tape seepage | |
CN107575264A (en) | A kind of composite material corrugated slab supporting waterproof and water drainage system | |
CN104652495B (en) | Internal support of foundation pit column and base plate node waterproof construction technology | |
CN202851009U (en) | Tunnel buffering multilayer waterproof-drainage structure | |
CN209760629U (en) | Just put local seepage maintenance structure in formula roofing pipe root position | |
CN209179060U (en) | The deformation joint structure of underground pipe gallery | |
CN207314375U (en) | A kind of the complete of underground pipe gallery surrounds skin-type structure | |
CN112081324B (en) | Ring-crossing method of side wall waterproof coating and top plate waterproof system | |
CN205186992U (en) | Oil depot storage tank edge board anticorrosion structure | |
CN203412598U (en) | Cable-tunnel composite lining waterproof structure | |
CN107083780A (en) | The full encirclement skin-type structure and construction method of a kind of underground waterproof engineering | |
CN103628899B (en) | Retain CRD median septum and be welded with water flange construction technology | |
CN202644587U (en) | Subway station main body structure plate deformation gap water-proof structure | |
CN205134569U (en) | Landing stage is constructed with linking of adjacent coal conveying system building | |
CN205314379U (en) | Roofing flames of anger can expose waterproof system | |
CN209760286U (en) | Anti-leakage structure of tower crane foundation | |
CN104060529A (en) | Stainless steel U-shaped flanging body for expansion joint and using method of stainless steel U-shaped flanging body | |
CN207092065U (en) | A kind of diaphragm wall seepage repairs structure | |
CN208415994U (en) | A kind of concrete slab hole is without damaged plugging structure | |
CN208748690U (en) | The waterproof slab structure of prefabricated piping lane | |
CN103967313B (en) | A kind of water-proof repairing method of steel concrete squat silo roof | |
CN206090551U (en) | Underground pile head watertight fittings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |