CN205314341U CN201620016989.XU CN201620016989U CN205314341U CN 205314341 U CN205314341 U CN 205314341U CN 201620016989 U CN201620016989 U CN 201620016989U CN 205314341 U CN205314341 U CN 205314341U
Authority
CN
China
Prior art keywords
assembly
ribbed stiffener
lower assembly
filling box
lateral frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620016989.XU
Other languages
Chinese (zh)
Inventor
徐焱
郭伍常
王立国
吴建辉
丁艳涛
陈静波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620016989.XU priority Critical patent/CN205314341U/en
Application granted granted Critical
Publication of CN205314341U publication Critical patent/CN205314341U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laminated Bodies (AREA)

Abstract

The utility model relates to a pin -connected panel is breathed freely and is filled case from top to bottom belongs to general building construction field. This aspect of filling case (1) is the rectangle, its long limit is less than or equal to 2 with comparing of minor face size, fill case and bag and draw together upper assembly (2) and lower assembly (3), upper assembly (2) are by border panel (4), stiffening rib (5) and lamina tecti (6) constitute, be provided with at least one exhaust hole (7) on the lamina tecti, exhaust downtheholely or exhaust hole upper portion has exhaust net (8), lower assembly (3) are by border panel (4), stiffening rib (5) and ventilative net (10) constitute, ventilative net is located lower assembly's bottom, the stiffening rib is perpendicular rather than the border panel who hands over, the border panel that upper assembly and lower assembly correspond each other coincide mutually. The utility model discloses a fill the case, it is all very convenient to produce, install, and mechanical properties is good, and is also better with this kind of product formation's hollow superstructure reliability, shock resistance, crack resistance.

Description

The ventilative filling box of a kind of upper and lower pin-connected panel
(1) technical field
The utility model relates to the packing material in a kind of reinforced concrete hollow floor structure, especially a kind ofThe ventilative filling box of upper and lower pin-connected panel, belongs to buildings in general structure field.
(2) background technology
At building field, along with large-span concrete structure is increasing, increasing floor adopts hollowBuilding cover structure technology. Replace part concrete substantially can not affect the stressed property of structure with lightweight fillerCan, but the deadweight that can greatly alleviate structure.
In previous hollow building cover, the scholar taking Qiu Zeyou, Wang Benmiao as representative proposes to use high-strength cement systemMake pipe of cement and cement box as packing material, but the goods of cement class are from great. Afterwards, I will gatherBenzene foam class material is introduced in hollow building cover, and I successively proposed, and " a kind of lightweight with reinforced hard is sent outFoam material filling member " (ZL200420077923.9) with " a kind of expanded material with enhancement Layer and slurry leakage hole is filled outFill case " technology such as (ZL201010554837.2), these technology are used widely in engineering.
But, for built-in packing material, no matter polyphenyl class or cement class material, in construction allProduce larger buoyancy. According to Archimedes' principle, as long as the unit weight of packing material is less than concrete density,In the process of casting concrete, certainly lead to buoyancy. In order to overcome buoyancy, in construction, to take several stepsCarry out anti-floating, except expensive, take a lot of work, time-consuming, also larger to the damage of plate end template, once and certainThe technical measures packing material that causes not in place in road floats, and will bring very large potential safety hazard to structure.
Mr. Guo Wuchang introduces hollow building cover packing material,, Guo Wuchang in 2011 by the concept of reinforcing mat the earliest" a kind of obturator of filling concrete in situ " proposed (ZL201120161932.6); After, Mr. Guo carries again(ZL201420109836.0), in this technology, Mr. Guo is further bright to go out " a kind of cast-in-place concrete cored "Really " before upper and lower bar-mat reinforcement, be provided with core ", and propose to utilize the structure solution routine of " bar-mat reinforcement " to fill outFill material existing " displacement and floating problem ". But, clearly propose first to solve buoyancy problem with steel meshBe Wang Benmiao, 2013, he proposed " a kind of cast-in-place hollow building with combined type netted box component pore-formingLid " (CN203514592U). In this technology, Mr. Wang utilizes the gas permeability of mesh greatly to reduce very firstTo the buoyancy of eliminating packing material completely, ensure that by controlling the full-size of mesh concrete can not flow into and fill outFill in material, utilize moisture surface tension force that moisture can not infiltrated in packing material. After, Mr. Wang is land againContinuous propose " a kind of cast-in-situ hollow building roof that is combined into hole with steel mesh and organic object " (CN104005501A)," a kind of cast-in-situ hollow building roof with steel mesh and gas tube combination box pore-forming " is (CN103967181A) with " oneKind combine the hollow building cover of pore-forming with steel mesh and thin plate " technology such as (CN104631679A). Above-mentioned relevant skillArt brings revolutionary variation to whole hollow building cover industry, has formed at present whole industry whole updatingThe trend of regenerating.
There is respectively in the prior art following defect, mainly contain: 1, in work progress, can produce larger floatingPower; 2, the vertical and lateral stiffness of packing material product is smaller, when construction, tramples and build coagulation personnelIn the process of soil, deformation of products is larger; 3, packing material volume is relatively little; 4, when packing material size(while approaching 1mX1m as casing horizontal size) greatly, bottom half concrete is not easy to build closely knit; 5, whenLongitudinal and transverse, oblique pipeline is more and while clashing with packing material position in floor, cannot ensure pipelineSmooth construction.
In this case, develop a kind of buoyancy of concreting process concrete to packing material that both overcome,Again rigidity large, can effectively ensure that the concreting of packing material bottom is closely knit and facilitate pipeline construction, transportThe box filling product that cost is low, has become urgent problem in current hollow building cover.
(3) summary of the invention
In existing hollow building cover technology, exist packing material buoyancy to cause more greatly constructional difficulties, or superstructureHollow rate is low, packing material rigidity is little, plate base concrete pouring quality cannot ensure, pipeline difficult arrangement etc.Problem, the purpose of this utility model is to provide a kind of upper and lower pin-connected panel ventilative filling box.
On the basis of existing technology, for achieving the above object, the technical solution adopted in the utility model is:The ventilative filling box of a kind of upper and lower pin-connected panel, the flat shape of filling box (1) is rectangle, its long limit and minor face chiVery little ratio is less than or equal to 2, and filling box comprises assembly (2) and lower assembly (3), and upper assembly (2) is by limitDeckle board (4), ribbed stiffener (5) and lamina tecti (6) form, and are provided with at least one steam vent on lamina tecti(7), there is exhaust net (8) in steam vent or steam vent top, exhaust Webweb eye (9) width >=0.5mmAnd≤8mm, lower assembly (3) is made up of lateral frame board (4), ribbed stiffener (5) and gas-permeable nets (10), thoroughlyGas net is positioned at the bottom of lower assembly, in gas-permeable nets mesh width >=4mm and≤15mm, upper assembly and lower assemblyIn the lateral frame board handed over it of ribbed stiffener vertical, upper assembly and lower assembly consistency from top to bottom are assembled, upper assembly andThe lateral frame board that lower assembly corresponds to each other coincide mutually, and lateral frame board, ribbed stiffener and lamina tecti are plastic materials,Exhaust net and gas-permeable nets are metal or plastic materials. The flat shape of filling box is rectangle, its long limit and shortThe ratio of limit size is less than or equal to 2, makes the installation of production more convenient. By lateral frame board, ribbed stiffener and topThe upper assembly that cover plate forms is the unlimited box-structure in a kind of bottom surface, and the rigidity of lamina tecti is larger, acts on topLoad on cover plate down transmits by the vertical applied force structure being formed by lateral frame board and ribbed stiffener, makes filling boxVertical rigidity more yielding; And ribbed stiffener and lamina tecti become the support of lateral frame board in the horizontal direction,Greatly strengthen the horizontal rigidity of filling box. In exhaust net, in single mesh plane, the full-size at hole is netEye width, when mesh should ensure casting concrete, mortar is not easy hole to block, and allows air can oneselfBy getting rid of, mesh also will be avoided the concrete slurry filling box inside of therefrom bleeding; Through experimental verification, mesh is wideDegree lower limit is 0.5mm, and higher limit is 8mm, and when mesh width 2-5mm, effect is better. Exhaust Netcom is normalBe arranged on steam vent inside, if when the top of filling box lamina tecti is also provided with enhancement Layer (18), with rowIn enhancement Layer corresponding to pore position, be provided with mesh and also can reach same technique effect, exhaust net is all rightBe arranged on the top of steam vent. Gas-permeable nets is positioned at the bottom of lower assembly, on gas-permeable nets and lamina tecti one withUpper air-vent together, forms the passage of filling box inner air circulation, can avoid the inside and outside gas that forms of filling boxPressure reduction, the buoyancy of elimination concreting process. Equally through experimental verification, mesh width lower limit in gas-permeable netsValue is 4mm, and higher limit is 15mm, and when width 6-10mm, effect is better. Ribbed stiffener is vertical with lateral frame board,Under stressed prerequisite of making a concerted effort, materials are minimum. Can by tenon connection or to be coated with glue bond or jig fixing etc. manyThe mode of kind ensures that between assembly and lower assembly, consistency from top to bottom is assembled. Plastic materials is easily cut at the construction field (site)Cut, fluting or jewel hole, lateral frame board, ribbed stiffener and lamina tecti are defined as plastic materials, are for convenient emptyPipeline in core is installed, plastic materials can be polystyrene foam plastics, Vestolit,Polyurethane foam plastics, phenolic resins, epoxy resin, amino resins, vinyon, polypropylene plasticsOr extruded sheet etc. Exhaust net and gas-permeable nets can adopt lower-cost metal or plastic materials, canWith bonding, iron wire colligation, jig fix, fastener connect in one or more modes, gas-permeable nets is fixedIn the bottom of lower assembly.
Of the present utility modelly be characterised in that lamina tecti (6) in assembly (2) is for to filling box outer projectionCurved surface (11), curved edges is broken line or camber line chamfering, there is a vertical mortar leakage hole (12) at upper assembly middle part,Slurry leakage hole is up big and down small infundibulate, spillage hole wall (13) respectively with ribbed stiffener (5) and lamina tecti (6)Be connected, it is the up-small and down-big infundibulate of falling that also there are a vertical mortar leakage hole, slurry leakage hole in lower assembly (3) middle part,In lower assembly, spillage hole wall (13) is connected with ribbed stiffener, and in lower assembly, gas-permeable nets (10) shape is also to filling outFill the curved surface of case outer projection, curved edges is broken line or camber line chamfering, lateral frame board (4) in lower assembly, addsThe bottom shape of strength rib (5) and slurry leakage hole (12) and gas-permeable nets profile are coincide mutually. The upper following table of filling boxFace is the curved surface of outwardly convex, compared with pure rectangular cross section filling box, slightly loses some hollow rates, butTo obtain following effect: 1, can alleviate the degree of concrete girt strip stress concentration between filling box, mixedSolidifying soil is not easy to crack; 2, improve the concrete punch resistant capability in filling box top; 3, filling box bottom coagulationSoil is easily built closely knit. The setting of slurry leakage hole is first also to ensure filling box bottom concrete pouring quality. RootAccording to engineering experience, spillage dimension of opening is not less than 100mm, and plate base concrete just can reach builds effect preferablyReally, upper and lower funnel is set and can obtains following effect: 1, upper and lower funnel shaped can alleviate hole around floor is mixedThe degree of solidifying native stress concentration, concrete is not easy to crack; 2, upper and lower funnel shaped is equivalent in arch without beamCap, can improve the local punch resistant capability of following filling box top concrete floor; 3, squeezing of upper hopperPinch effect and can make concrete in spillage part, obtain larger flowing velocity, strengthened concrete impulsive force,The expanding effect of lower funnel makes concrete flow towards periphery fartherly from hole, therefore the existence of upper and lower funnelCan ensure well the concrete pouring quality in filling box bottom. The end of lateral frame board, ribbed stiffener and slurry leakage holePortion's shape and gas-permeable nets profile are coincide mutually, and the external force that acts on filling box top in construction can effectively be passedAt the bottom of plate, be unlikely to filling box to crush.
Between the upper assembly (2) that is characterised in that filling box (1) of the present utility model and lower assembly (3), have oneWhat joint or a joint were above increases part (14), increases in part and has ribbed stiffener (5), increases part and upper assembly and lower groupPart consistency from top to bottom, increases the lateral frame board (4) of part and kisses mutually with the lateral frame board that upper assembly and lower assembly correspond to each otherClose, in upper assembly ribbed stiffener with increase part in corresponding ribbed stiffener consistency from top to bottom. Filling box of the present utility modelConventionally can only use mould molding, as lower assembly or the be greater than >=400mm of upper size of components of filling box, semi-finished product fromThe speed of extracting in mould is very slow and percent defective is high, increase arranging of part can greatly reduce mould quantity andCan enhance productivity and reduce the number of rejects and seconds rate.
On the ribbed stiffener (5) being characterised in that in assembly (2) or lower assembly (3) of the present utility model, leaveHole (15) or notch (16), or in upper assembly and lower assembly, correspond to each other ribbed stiffener have one at leastRoad staggers mutually, and in lower assembly, the number of ribbed stiffener is greater than the bar of ribbed stiffener in the same direction of assemblyNumber. It is in order to be that the cavity of filling box inside is communicated with, if the inner all cavitys of filling box that hole or notch are setAll be communicated with one, the just effectively exhaust of a steam vent is set on lamina tecti. Upper assembly and lower assembly are put more energy intoIt is the cavity connection in order to be filling box inside equally that rib staggers mutually; Because lower assembly lacks in upper assemblyLamina tecti, so its horizontal direction rigidity is relatively more weak, it is to meet that more ribbed stiffener is set in lower assemblyThe corresponding ribbed stiffener of upper and lower assembly staggers under prerequisite, and the horizontal rigidity of lower assembly is strengthened.
Of the present utility model being characterised in that is provided with oblique rib (17) in lower assembly (3). Oblique rib is set firstIt is the horizontal rigidity of strengthening lower assembly; Instantly assembly bottom surface 4 limits are all when chamfering, institute's shape after different edge chamferingBecome the meld line of different curve just in time on the line in filling box central point and bight, when gas-permeable nets self rigidityHour, on this position, inclined stiffener is set, just can props up gas-permeable nets with the bottom of oblique rib and makeThe required shape of formation, can reach good technique effect.
Adopt after such scheme, the utility model compared with prior art has following beneficial effect:
Filling box of the present utility model arranges gas-permeable nets in box-structure bottom, can reduce to eliminate even completelyBuoyancy in concreting process, has first solved built-in packing material in existing hollow building cover technology and has producedThe defect of capture power; Secondly also there is following effect: 1, the utility model is by lateral frame board, ribbed stiffener and top coverPlate is common form the unlimited box-structure in a kind of bottom surface in vertical and level to all thering is larger rigidity, fillingCase is not yielding; 2, lateral frame board, ribbed stiffener and lamina tecti are defined as plastic materials, overcome metal material firmSpend little, yielding or cost is high and pipeline is installed difficult shortcoming; 3, increasing arranging of part can improveProduction efficiency and the rate of reducing the number of rejects and seconds; 4, oblique rib being set can improve filling box bottom level rigidity and ensure thoroughlyThe shape of gas net; 5, the setting of slurry leakage hole and upper and lower funnel and filling box upper and lower surface periphery chamfering are for mixedSolidifying native cracking resistance, ensure pouring quality, improve local bearing capacity and have very large benefit. Compared with prior art,The utility model has overcome packing material buoyancy and has caused more greatly constructional difficulties, or superstructure hollow rate is low, productThe problems such as rigidity is little, plate base concrete pouring quality cannot ensure, pipeline difficult arrangement. Of the present utility modelThe ventilative filling box of the upper and lower pin-connected panel of one, production, transport and installation are all very convenient, and mechanical property is good, uses thisThe hollow building cover span of kind of product formation is large, lightweight, sound insulation, good heat-insulation effect, reliability of structure,Shock resistance, crack resistance are also better. The utlity model has good economy and applicability, to Building technologyDevelopment play a driving role.
(4) brief description of the drawings
Below in conjunction with accompanying drawing, the utility model is described further.
Fig. 1 is the top view of the utility model filling box.
Fig. 2 is the A-A profile of the utility model filling box vertical direction.
Fig. 3 be the utility model filling box vertical direction B-B profile.
Fig. 4 goes up assembly, lower assembly and increases the C-C profile of part horizontal direction in filling box.
Fig. 5 is the schematic diagram that oblique rib is set in lower assembly.
Fig. 6 is the schematic diagram that has ribbed stiffener to stagger in upper and lower assembly.
Fig. 7 is upper assembly, increase part becomes the schematic diagram of filling box with lower parts assembling.
Fig. 8 is the schematic diagram that exhaust net is positioned at steam vent.
Fig. 9 is the schematic diagram that exhaust net is arranged in lamina tecti top enhancement Layer.
Figure 10 is the floor map of gas-permeable nets.
In figure: 1. filling box, 2. go up assembly, 3. play assembly, 4. lateral frame board, 5. ribbed stiffener, 6. lamina tecti, 7.Steam vent, 8. exhaust net, 9. mesh, 10. gas-permeable nets, 11. curved surfaces, 12. slurry leakage holes, 13. spillage hole walls, 14.Increase part, 15. holes, 16. notches, 17. oblique ribs, 18. enhancement Layers.
(5) detailed description of the invention
The utility model is to realize in such a way:
In Fig. 1-Fig. 4, Fig. 8-embodiment illustrated in fig. 10, the ventilative filling box of a kind of upper and lower pin-connected panel, fillsThe flat shape of case (1) is rectangle, and its long limit is less than or equal to 2 with the ratio of minor face size, and filling box comprisesUpper assembly (2) and lower assembly (3), is characterized in that assembly (2) is by lateral frame board (4), ribbed stiffener (5)With lamina tecti (6) forms, on lamina tecti, be provided with at least one steam vent (7), in steam vent or steam ventExhaust net (8) is arranged at top, and exhaust Netcom is often arranged on steam vent inside, also can be arranged on the upper of lamina tectiIn the enhancement Layer (18) of portion, exhaust Webweb eye (9) width >=0.5mm and≤8mm, lower assembly (3)Be made up of lateral frame board (4), ribbed stiffener (5) and gas-permeable nets (10), gas-permeable nets is positioned at the bottom of lower assembly,In gas-permeable nets mesh width >=4mm and≤15mm, the ribbed stiffener in upper assembly and lower assembly and its limit of handing overDeckle board is vertical, and upper assembly and lower assembly consistency from top to bottom are assembled, the lateral frame board that upper assembly and lower assembly correspond to each otherCoincide mutually, lateral frame board, ribbed stiffener and lamina tecti are plastic materials, exhaust net and gas-permeable nets be metal orPlastic materials.
Fig. 1-Fig. 4, embodiment illustrated in fig. 10 in, lamina tecti (6) is to filling box in upper assembly (2)The curved surface (11) of outer projection, curved edges is broken line or camber line chamfering, there is vertical a leakage at upper assembly middle partSlurry hole (12), slurry leakage hole is up big and down small infundibulate, spillage hole wall (13) respectively with ribbed stiffener (5)Be connected with lamina tecti (6), lower assembly (3) middle part also have a vertical mortar leakage hole, slurry leakage hole be upper little underLarge infundibulate, in lower assembly, spillage hole wall (13) is connected with ribbed stiffener, gas-permeable nets (10) in lower assemblyShape is also the curved surface to filling box outer projection, and curved edges is broken line or camber line chamfering, limit in lower assemblyThe bottom shape of deckle board (4), ribbed stiffener (5) and slurry leakage hole (12) and gas-permeable nets profile are coincide mutually.
Fig. 4, embodiment illustrated in fig. 7 in, the upper assembly (2) of filling box (1) and lower assembly (3) itBetween have a joint or a joint above increase part (14), increase in part and have ribbed stiffener (5), increase part and upper assemblyWith lower assembly consistency from top to bottom, the lateral frame board that the lateral frame board (4) of increasing part and upper assembly and lower assembly correspond to each otherCoincide mutually, in upper assembly ribbed stiffener with increase part in corresponding ribbed stiffener consistency from top to bottom.
Fig. 2, embodiment illustrated in fig. 3 in, the ribbed stiffener (5) in upper assembly (2) or lower assembly (3)On leave hole (15) or notch (16).
In the embodiment shown in fig. 6, upper assembly with in lower assembly, correspond to each other ribbed stiffener have at least together withStagger mutually, and in lower assembly, the number of ribbed stiffener is greater than the number of ribbed stiffener in the same direction of assembly.
In the embodiment shown in fig. 5, in lower assembly (3), be provided with oblique rib (17).

Claims (6)

1. the ventilative filling box of upper and lower pin-connected panel, the flat shape of filling box (1) is rectangle, its long limit is less than or equal to 2 with the ratio of minor face size, filling box comprises assembly (2) and lower assembly (3), it is characterized in that assembly (2) is by lateral frame board (4), ribbed stiffener (5) and lamina tecti (6) form, on lamina tecti, be provided with at least one steam vent (7), exhaust net (8) is arranged in steam vent or steam vent top, exhaust Webweb eye (9) width >=0.5mm and≤8mm, lower assembly (3) is by lateral frame board (4), ribbed stiffener (5) and gas-permeable nets (10) form, gas-permeable nets is positioned at the bottom of lower assembly, in gas-permeable nets mesh width >=4mm and≤15mm, upper assembly is vertical with the lateral frame board that the ribbed stiffener in lower assembly is handed over it, upper assembly and lower assembly consistency from top to bottom are assembled, the lateral frame board that upper assembly and lower assembly correspond to each other coincide mutually, lateral frame board, ribbed stiffener and lamina tecti are plastic materials, exhaust net and gas-permeable nets are metal or plastic materials.
2. the ventilative filling box of the upper and lower pin-connected panel of one according to claim 1, it is characterized in that in assembly (2), lamina tecti (6) is the curved surface (11) to filling box outer projection, curved edges is broken line or camber line chamfering, there is a vertical mortar leakage hole (12) at upper assembly middle part, slurry leakage hole is up big and down small infundibulate, spillage hole wall (13) is connected with lamina tecti (6) with ribbed stiffener (5) respectively, also there is a vertical mortar leakage hole at lower assembly (3) middle part, slurry leakage hole is the up-small and down-big infundibulate of falling, in lower assembly, spillage hole wall (13) is connected with ribbed stiffener, in lower assembly, gas-permeable nets (10) shape is also the curved surface to filling box outer projection, curved edges is broken line or camber line chamfering, lateral frame board (4) in lower assembly, the bottom shape of ribbed stiffener (5) and slurry leakage hole (12) and gas-permeable nets profile are coincide mutually.
3. the ventilative filling box of the upper and lower pin-connected panel of one according to claim 1, it is characterized in that having between the upper assembly (2) of filling box (1) and lower assembly (3) joint or a joint above increase part (14), increase and in part, have ribbed stiffener (5), increase part and upper assembly and lower assembly consistency from top to bottom, the lateral frame board (4) of increasing part coincide mutually with the lateral frame board that upper assembly and lower assembly correspond to each other, in upper assembly ribbed stiffener with increase part in corresponding ribbed stiffener consistency from top to bottom.
4. the ventilative filling box of the upper and lower pin-connected panel of one according to claim 1, is characterized in that leaving hole (15) or notch (16) on the ribbed stiffener (5) in assembly (2) or lower assembly (3).
5. the ventilative filling box of the upper and lower pin-connected panel of one according to claim 1, it is characterized in that assembly staggers mutually together with having at least with the ribbed stiffener corresponding to each other in lower assembly, and in lower assembly, the number of ribbed stiffener is greater than the number of ribbed stiffener in the same direction of assembly.
6. the ventilative filling box of the upper and lower pin-connected panel of one according to claim 1, is characterized in that being provided with in lower assembly (3) oblique rib (17).
CN201620016989.XU 2016-01-11 2016-01-11 Pin -connected panel is breathed freely and is filled case from top to bottom Active CN205314341U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620016989.XU CN205314341U (en) 2016-01-11 2016-01-11 Pin -connected panel is breathed freely and is filled case from top to bottom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620016989.XU CN205314341U (en) 2016-01-11 2016-01-11 Pin -connected panel is breathed freely and is filled case from top to bottom

Publications (1)

Publication Number Publication Date
CN205314341U true CN205314341U (en) 2016-06-15

Family

ID=56201887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620016989.XU Active CN205314341U (en) 2016-01-11 2016-01-11 Pin -connected panel is breathed freely and is filled case from top to bottom

Country Status (1)

Country Link
CN (1) CN205314341U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484418A (en) * 2016-01-11 2016-04-13 徐焱 Vertical assembly type ventilation filling box
CN108086554A (en) * 2018-01-23 2018-05-29 万柏鸿 For the hollow mode structure of hollow floor cover plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484418A (en) * 2016-01-11 2016-04-13 徐焱 Vertical assembly type ventilation filling box
CN108086554A (en) * 2018-01-23 2018-05-29 万柏鸿 For the hollow mode structure of hollow floor cover plate

Similar Documents

Publication Publication Date Title
CN102031870B (en) Foaming material filling box with reinforced layer and slurry leakage hole
CN204282543U (en) A kind of reinforced concrete beam and girder with rolled steel section en cased in concrete connecting joint structure
CN101793070A (en) Hollow floor system filled with an air-filling bag and construction method thereof
CN105484418A (en) Vertical assembly type ventilation filling box
CN105239709B (en) A kind of permeability type combination filling box of use metal sheet
CN205314341U (en) Pin -connected panel is breathed freely and is filled case from top to bottom
CN201620502U (en) Inflatable airbag buried in concrete
CN209293243U (en) Wall is filled outside the overlapping that a kind of and beam separately produces
CN105220815B (en) A kind of filling box with bottom gas-permeable nets and upper discharge hole
CN205314308U (en) Have composite wall of bearing and heat preservation function concurrently
CN101906874A (en) Concrete pore-forming core mould
CN103882992B (en) Band ring-type rebar connector
CN106013773B (en) A kind of assembly type inner-outer wall composite shuttering leakproof sizing device and construction method
CN201874237U (en) Foam material filling box with reinforced layer and slurry leakage hole
CN107700831A (en) A kind of construction mould and its construction method of concrete superstructure
CN205314342U (en) Ventilative formula plastic box
CN211007248U (en) Ventilative case with inner sheath
CN212295247U (en) Assembled light full precast slab
CN205088845U (en) Packing case in ventilative net in area bottom and upper portion exhaust hole
CN105297981B (en) A kind of hollow floor filled with ventilative case
CN204803881U (en) Stake of Y shape precast reinforced concrete
CN105239708A (en) Light material filling box with metal net surface layer
CN107355030A (en) A kind of exterior wall with modified polyphenyl particle concrete placings
CN205063132U (en) Take light material packing of metal mesh surface course
CN205063131U (en) Take light material of metal mesh surface course to fill case