CN205310483U CN201620083934.0U CN201620083934U CN205310483U CN 205310483 U CN205310483 U CN 205310483U CN 201620083934 U CN201620083934 U CN 201620083934U CN 205310483 U CN205310483 U CN 205310483U
Authority
CN
China
Prior art keywords
casting nozzle
box hat
casting mold
pouring
nozzle brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620083934.0U
Other languages
Chinese (zh)
Inventor
聂小雪
赵丹
李文强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Shichuang High Temperature Material Co Ltd
Original Assignee
Tangshan Shichuang High Temperature Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Shichuang High Temperature Material Co Ltd filed Critical Tangshan Shichuang High Temperature Material Co Ltd
Priority to CN201620083934.0U priority Critical patent/CN205310483U/en
Application granted granted Critical
Publication of CN205310483U publication Critical patent/CN205310483U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The utility model relates to a can pour into a mould equipment of a plurality of corundum matter casting nozzle bricks simultaneously belongs to refractory material former technical field. Technical scheme is: contain casting mold (1) and base (2), casting mold (1) that a plurality of structures are the same is one row and fixes on base (2), casting mold (1) contains core (4), pouring casting nozzle brick box hat (5), fixing bolt two (6), clamping ring (7) and die bed chassis (8), is equipped with in the pouring casting nozzle brick box hat (5) core (4), and pouring casting nozzle brick box hat (5) the outside is equipped with clamping ring (7), and pouring casting nozzle brick box hat (5) is established on die bed chassis (8), and fixing bolt two (6) passes clamping ring (7) and die bed chassis (8) fixed connection. The beneficial effects of the utility model are that: high production efficiency and stable product quality. Whole group pouring corundum matter casting nozzle brick is placed and is vibrated on the shaking platform, is difficult for walking about, guarantees normally to produce.

Description

The equipment of multiple corundum matter sprue brick can be poured into a mould simultaneously
Technical field
The utility model relates to a kind of equipment that can simultaneously pour into a mould multiple corundum matter sprue brick, belongs to refractory materials molding device technical field.
Background technology
In the corundum shaping pouring technology of matter sprue brick, to the kneading amount of mud material, kneading time, go out the duration of service etc. after grinding and have strict requirement. The stone roller mud material mixed all must use within the shortest time, if mud material is not finished within the regular hour, mud material will harden and can not use, and causes the waste of raw material. And from cast first piece of brick to last block brick, along with the performance of the increase mould material of time also there occurs change, so, also can make unstable product quality.
At present, conventional cast corundum matter sprue brick equipment, cast efficiency is low, affect the stability of quality product, and due to corundum pouring sprue brick volume less, in the process of vibration, easily move on shaking platform, affect and normally produce.
Practical novel content
The utility model object is to provide a kind of equipment that can simultaneously pour into a mould multiple corundum matter sprue brick, it is to increase production efficiency, stabilized product quality, solves Problems existing in background technology.
The technical solution of the utility model is:
A kind of equipment that can simultaneously pour into a mould multiple corundum matter sprue brick, comprise casting mold and base, the casting mold that multiple structure is identical is that a row is fixed on base, described casting mold comprises chassis at the bottom of type core, cast sprue brick box hat, standing bolt two, pressure ring and type, it is provided with type core in cast sprue brick box hat, being provided with pressure ring outside cast sprue brick box hat, cast sprue brick box hat is located on chassis at the bottom of type, and standing bolt two is fixedly connected with through pressure ring with chassis at the bottom of type.
At the bottom of type in described casting mold, chassis is fixed on base by standing bolt one.
Adopt the utility model, multiple casting mold be assembled on a platform, produce in the way of organizing, it is possible to increase single batch mixing amount, after mud material goes out to grind can Quick pouring shaping, and can whole group be placed on shaking platform vibration.
The beneficial effects of the utility model are: production efficiency height, constant product quality.Whole group of cast corundum matter sprue brick is placed on shaking platform to vibrate, not easily walk about, ensure normally to produce.
Accompanying drawing explanation
Fig. 1 is the utility model front view;
Fig. 2 is the utility model vertical view;
Fig. 3 is the utility model casting mold front view;
Fig. 4 is the utility model casting mold vertical view;
In figure: chassis 8 at the bottom of casting mold 1, base 2, standing bolt 1, type core 4, cast sprue brick box hat 5, standing bolt 26, pressure ring 7, type.
Embodiment
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
With reference to accompanying drawing 1,2,3,4, a kind of equipment that can simultaneously pour into a mould multiple corundum matter sprue brick, comprise casting mold 1 and base 2, the casting mold 1 that multiple structure is identical is fixed on base 2 in a row, described casting mold 1 comprises chassis 8 at the bottom of type core 4, cast sprue brick box hat 5, standing bolt 26, pressure ring 7 and type, it is provided with type core 4 in cast sprue brick box hat 5, it is provided with pressure ring 7 outside cast sprue brick box hat 5, cast sprue brick box hat 5 is located on chassis 8 at the bottom of type, and standing bolt 26 is fixedly connected with through pressure ring 7 with chassis at the bottom of type 8.
In the present embodiment, chassis 8 at the bottom of the type in casting mold 1 is fixed on base 2 by two standing bolts 1, and two standing bolts 1 are arranged symmetrically with along diameter direction, chassis at the bottom of type 8.
In process of production, assemble the parallel placement of multiple casting mold in advance, the kneading amount often grinding mud material can be increased, after mud material goes out to grind, just can quick whole group of cast, after being poured, can many groups poured into a mould be placed on shaking platform jointly vibrate (not walking about), be conducive to faster production efficiency, stably manufactured.

Claims (2)

1. can pour into a mould the equipment of multiple corundum matter sprue brick for one kind simultaneously, it is characterized in that comprising casting mold (1) and base (2), the casting mold (1) that multiple structure is identical is fixed on base (2) in a row, described casting mold (1) comprises type core (4), cast sprue brick box hat (5), standing bolt two (6), chassis (8) at the bottom of pressure ring (7) and type, it is provided with type core (4) in cast sprue brick box hat (5), cast sprue brick box hat (5) outside is provided with pressure ring (7), cast sprue brick box hat (5) is located on chassis at the bottom of type (8), standing bolt two (6) is fixedly connected with through pressure ring (7) with chassis at the bottom of type (8).
2. the equipment that can simultaneously pour into a mould multiple corundum matter sprue brick according to claim 1, it is characterised in that at the bottom of the type in described casting mold (1), chassis (8) are fixed on base (2) by standing bolt one (3).
CN201620083934.0U 2016-01-28 2016-01-28 Can pour into a mould equipment of a plurality of corundum matter casting nozzle bricks simultaneously Expired - Fee Related CN205310483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620083934.0U CN205310483U (en) 2016-01-28 2016-01-28 Can pour into a mould equipment of a plurality of corundum matter casting nozzle bricks simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620083934.0U CN205310483U (en) 2016-01-28 2016-01-28 Can pour into a mould equipment of a plurality of corundum matter casting nozzle bricks simultaneously

Publications (1)

Publication Number Publication Date
CN205310483U true CN205310483U (en) 2016-06-15

Family

ID=56187000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620083934.0U Expired - Fee Related CN205310483U (en) 2016-01-28 2016-01-28 Can pour into a mould equipment of a plurality of corundum matter casting nozzle bricks simultaneously

Country Status (1)

Country Link
CN (1) CN205310483U (en)

Similar Documents

Publication Publication Date Title
CN204075086U (en) Sandbox walking mechanism on full-automatic moulding machine and Ya Sha mechanism
CN101579890B (en) Vertical type vibratory molding process for concrete tube of lining type prestressed steel cylinder
CN102765122B (en) Curb production system and method
CN205310483U (en) Can pour into a mould equipment of a plurality of corundum matter casting nozzle bricks simultaneously
CN208230798U (en) A kind of cast structure for framework casting
CN211250535U (en) Octagonal cylinder refractory brick casting equipment for regenerative chamber of glass kiln
CN201645615U (en) Mold for hollow square pocket blocks of ladle nozzle
CN203697242U (en) Fixing frame for clamping adobe die
CN209718070U (en) A kind of resin concrete cast mineral die casting equipment
CN206765036U (en) It is a kind of applied to cement brick production from mold
CN201769271U (en) Steel ladle brick mold
CN208303799U (en) A kind of piston type product mold
CN205097346U (en) Vertical tubulation equipment
CN202826015U (en) Curbstone mold
CN105965681A (en) Vertical pouring and fast homogenizing device and method for pipe cores of PCCPs
CN206815831U (en) A kind of special-shaped stair cast template easy to use
CN104259396A (en) Manufacturing method for corbel
CN216914279U (en) Detachable stair mold
CN204819883U (en) Founding zirconium corundum crucible mould for stove
CN204976982U (en) A mould for batch production smallclothes electro - melting zirconium corundum brick
CN202292994U (en) Reinforced circular casting mold
CN202895424U (en) Composite-wall lightweight concrete prefabricated part mold
CN202318547U (en) Die for fused zirconia corundum diamond-shaped corner bricks
CN207616851U (en) Building blocks shaping mould
CN217703862U (en) Casting mould and fused brick sand mould structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20220128

CF01 Termination of patent right due to non-payment of annual fee