CN205296844U - Precast box girder steel strand wires hoisting point - Google Patents

Precast box girder steel strand wires hoisting point Download PDF

Info

Publication number
CN205296844U
CN205296844U CN201620061005.XU CN201620061005U CN205296844U CN 205296844 U CN205296844 U CN 205296844U CN 201620061005 U CN201620061005 U CN 201620061005U CN 205296844 U CN205296844 U CN 205296844U
Authority
CN
China
Prior art keywords
steel strand
box girder
steel
prefabricated
case beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620061005.XU
Other languages
Chinese (zh)
Inventor
陈晖�
张义龙
龙亮
黄卫东
崔伟
张荣桓
刘琳
王丁
王丁一
蒋欢
赵士杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201620061005.XU priority Critical patent/CN205296844U/en
Application granted granted Critical
Publication of CN205296844U publication Critical patent/CN205296844U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种预制箱梁钢绞线吊点,其特征是:在预制箱梁中预埋钢绞线,由钢绞线在箱梁顶板的设定位置上形成各吊环,利用各吊环对预制箱梁进行吊装,以多根钢绞线为一组并列成钢绞线束,钢绞线束在中部折弯形成吊环。本实用新型结构合理、受力均匀,使箱梁能够平稳吊装,避免了箱梁发生偏心而发生倾斜,作业安全可靠。

The utility model discloses a prefabricated box girder steel strand lifting point, which is characterized in that: steel strands are pre-embedded in the prefabricated box girder, each suspension ring is formed by the steel strands on the set position of the box girder roof, and each The hoisting ring is used to hoist the prefabricated box girder, and multiple steel strands are arranged in parallel to form a steel strand bundle, and the steel strand bundle is bent in the middle to form a hoisting ring. The utility model has reasonable structure and uniform force, so that the box girder can be hoisted stably, avoiding the eccentricity of the box girder and causing inclination, and the operation is safe and reliable.

Description

预制箱梁钢绞线吊点Prefabricated box girder steel strand hanging point

技术领域technical field

本实用新型涉及一种钢绞线吊点,更具体地说是应用于箱梁中实施箱梁吊装作业的钢绞线吊点。The utility model relates to a steel strand hanging point, in particular to a steel strand hanging point used in box girders for box girder hoisting operations.

背景技术Background technique

现有技术中,对于箱梁吊装作业仍然采用传统的抱吊方式,这种方式存在如下不足:In the prior art, the traditional hoisting method is still used for the box girder hoisting operation, which has the following disadvantages:

一、钢丝绳在起吊箱梁时不仅受到拉力作用还受到剪切力作用,增加了对钢丝绳的损害,减少了钢丝绳的使用寿命,增加了钢丝绳的使用成本;1. When lifting the box girder, the steel wire rope is not only subjected to tensile force but also shear force, which increases the damage to the steel wire rope, reduces the service life of the steel wire rope, and increases the use cost of the steel wire rope;

二、在箱梁吊装过程中,钢丝绳对于箱梁底板和腹板结合处,以及在翼缘板的两端产生挤压作用,可能使相应部位混凝土在挤压应力的作用下发生破裂或出现裂缝等损害;2. During the hoisting process of the box girder, the steel wire rope will squeeze the junction of the bottom plate and the web of the box girder, as well as the two ends of the flange plate, which may cause the concrete at the corresponding part to break or crack under the action of extrusion stress other damages;

三、钢丝绳的使用长度过大,不易于在吊装作业前的检查工作的进行;3. The length of the wire rope is too long, so it is not easy to carry out the inspection work before the hoisting operation;

四、采用抱吊时,钢丝绳不易于安装,增加了人工劳动成本;4. When using hoisting, the wire rope is not easy to install, which increases the labor cost;

五、在箱梁吊装作业过程中,由于箱梁的重心偏移等因素,箱梁会因偏心作用而发生倾斜,增加了箱梁吊装作业中不安全因素。5. During the hoisting operation of the box girder, due to factors such as the offset of the center of gravity of the box girder, the box girder will be inclined due to eccentricity, which increases the unsafe factors in the hoisting operation of the box girder.

实用新型内容Utility model content

本实用新型是为避免上述现有技术所存在的不足,提供一种预制箱梁钢绞线吊点,以保证箱梁在吊装除过程的稳定性,使箱梁能够平稳吊装,避免箱梁因偏心而发生倾斜,减少防撞墙施工中不安全因素,降低吊装作业的施工成本,提高工作效率。The utility model is to avoid the shortcomings of the above-mentioned prior art, and provides a prefabricated box girder steel strand hanging point to ensure the stability of the box girder in the hoisting and removing process, so that the box girder can be hoisted smoothly, and avoid the box girder due to Tilting due to eccentricity reduces unsafe factors in the construction of the anti-collision wall, reduces the construction cost of hoisting operations, and improves work efficiency.

本实用新型为解决技术问题采用如下技术方案:The utility model adopts following technical scheme for solving technical problems:

本实用新型预制箱梁钢绞线吊点的结构特点是:在预制箱梁中预埋钢绞线,由所述钢绞线在箱梁顶板的设定位置上形成各吊环,利用所述各吊环对所述预制箱梁进行吊装。The structural feature of the prefabricated box girder steel strand lifting point of the utility model is that the steel strand is pre-embedded in the prefabricated box girder, and each suspension ring is formed by the steel strand on the set position of the box girder roof, and each Lifting rings lift the prefabricated box girder.

本实用新型预制箱梁钢绞线吊点的结构特点也在于:The structural features of the prefabricated box girder steel strand hanging point of the utility model also lie in:

以多根钢绞线为一组并列成钢绞线束,所述钢绞线束在中部折弯形成所述吊环。Multiple steel strands are used as a group to form a steel strand bundle, and the steel strand bundle is bent in the middle to form the suspension ring.

在所述钢绞线束的两端分别设置有定位板,所述钢绞线束中各钢绞线在两端分别贯穿所述定位板上对应的定位孔获得定位。Positioning plates are arranged at both ends of the steel strand bundle, and each steel strand in the steel strand bundle passes through corresponding positioning holes on the positioning plate at both ends to obtain positioning.

所述钢绞线束与箱梁钢筋骨架共同绑扎,并与箱梁同共预制成型。The steel strand bundle is bound together with the box girder reinforcement frame, and is prefabricated together with the box girder.

所述吊环有四处,分处在箱梁顶板的四个角的位置上。There are four suspension rings, which are located at the four corners of the box girder roof.

与已有技术相比,本实用新型有益效果体现在:Compared with the prior art, the beneficial effects of the utility model are reflected in:

1、本实用新型结构合理,受力均匀,使箱梁能够平稳吊装,避免了箱梁发生偏心而发生倾斜;1. The structure of the utility model is reasonable, and the force is uniform, so that the box girder can be hoisted smoothly, and the eccentricity of the box girder is avoided and the inclination occurs;

2、本实用新型有效的避免了箱梁在吊装过程中钢丝绳对箱梁翼缘板混凝土的损害,对箱梁起到了良好的保护作用;2. The utility model effectively avoids the damage of the steel wire rope to the concrete of the box girder flange plate during the hoisting process of the box girder, and plays a good role in protecting the box girder;

3、本实用新型采用吊点的形式,钢丝绳无需环抱箱梁,避免了对钢丝绳的损害,延长了钢丝绳的使用寿命;同时还缩短了钢丝绳的使用长度,因而降低了钢丝绳的使用成本,其易于安装,降低人工成本;3. The utility model adopts the form of hanging point, and the steel wire rope does not need to surround the box girder, which avoids damage to the steel wire rope and prolongs the service life of the steel wire rope; at the same time, it also shortens the use length of the steel wire rope, thus reducing the use cost of the steel wire rope. Installation, reduce labor costs;

附图说明Description of drawings

图1为本实用新型中箱梁钢绞线吊点平面布置图;Fig. 1 is the plane layout diagram of the hanging point of the box girder steel strand in the utility model;

图2为本实用新型中吊点所在位置箱梁断面结构示意图;Fig. 2 is the schematic diagram of the section structure of the box girder at the location of the lifting point in the utility model;

图3为本实用新型中钢绞线吊具示意图;Fig. 3 is a schematic diagram of a steel strand hanger in the utility model;

图4为本实用新型钢绞线吊具与箱梁钢筋固定绑扎示意图;Fig. 4 is the utility model steel strand suspender and box girder steel bar fixed binding schematic diagram;

图中标号:1预制箱梁,2钢绞线,3吊环,4定位板,5箱梁钢筋骨架。Labels in the figure: 1 prefabricated box girder, 2 steel strand, 3 suspension ring, 4 positioning plate, 5 box girder reinforced skeleton.

具体实施方式detailed description

参见图1、图2、图3和图4,本实施例中预制箱梁钢绞线吊点的结构形式是:在预制箱梁1中预埋钢绞线2,由钢绞线2在箱梁顶板的设定位置上形成各吊环3,利用各吊环3对预制箱梁1进行吊装。Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the structural form of the steel strand hanging point of the prefabricated box girder in this embodiment is: the steel strand 2 is pre-embedded in the prefabricated box girder 1, and the steel strand 2 is placed in the box Each suspension ring 3 is formed on the set position of the beam top plate, and the prefabricated box girder 1 is hoisted by each suspension ring 3 .

具体实施中,如图3所示,以多根钢绞线2为一组并列成钢绞线束,钢绞线束在中部折弯形成吊环3;在钢绞线束的两端分别设置有定位板4,钢绞线束中各钢绞线在两端分别贯穿定位板4上对应的定位孔获得定位,如图4所示,钢绞线束与箱梁钢筋骨架5共同绑扎,并与箱梁同共预制成型。In the specific implementation, as shown in Figure 3, a plurality of steel strands 2 are used as a group to form a steel strand bundle, and the steel strand bundle is bent in the middle to form a suspension ring 3; positioning plates 4 are respectively arranged at both ends of the steel strand bundle , each steel strand in the steel strand bundle passes through the corresponding positioning holes on the positioning plate 4 at both ends to obtain positioning, as shown in Figure 4, the steel strand bundle is bound together with the box girder reinforcement skeleton 5, and is prefabricated together with the box girder forming.

图1所示,本实施例中吊环3有四处,分处在箱梁顶板的四个角的位置上,其受力均匀。As shown in Fig. 1, there are four suspension rings 3 in this embodiment, which are located at the four corners of the box girder top plate, and the force is uniform.

钢绞线的选择应考虑:每根钢绞线的抗拉强度达到1860MP,其综合破断力应符合国标GB1200—88的规定;其最大负荷、伸长率、屈服负荷以及松弛率的试验结果应符合国标GB/T5224—1995的规定;其拉力试验按国标GB228—87进行,其扭转实验按GB239—84进行,松弛试验按国标GB10120—88进行。The selection of steel strands should be considered: the tensile strength of each steel strand should reach 1860MP, and its comprehensive breaking force should meet the requirements of the national standard GB1200-88; the test results of its maximum load, elongation, yield load and relaxation rate should be It meets the requirements of the national standard GB/T5224-1995; the tensile test is carried out according to the national standard GB228-87, the torsion test is carried out according to the national standard GB239-84, and the relaxation test is carried out according to the national standard GB10120-88.

本实用新型中钢绞线吊点抗拉强度大,结构合理,易于安装,钢绞线吊环与箱梁预制成一个整体,平面位置布置合理,受力均匀,能够保证在吊装作业时箱梁可以平稳行进,避免发生偏心而造成箱梁在吊装过程中发生倾斜。In the utility model, the steel strand lifting point has high tensile strength, reasonable structure, and is easy to install. The steel strand suspension ring and the box girder are prefabricated as a whole, the plane position is arranged reasonably, and the force is uniform, which can ensure the box girder during hoisting operation. It can move smoothly, avoiding eccentricity and causing the box girder to tilt during hoisting.

本实用新型减少了钢丝绳的使用长度,更易于安装,减少了人工使用成本,方便了在箱梁吊装作业前对钢丝绳的检查工作。The utility model reduces the use length of the steel wire rope, is easier to install, reduces labor cost, and facilitates inspection of the steel wire rope before the hoisting operation of the box girder.

Claims (5)

1. prefabricated case beam steel strand hang a little, it is characterized in that: in prefabricated case beam (1), bury steel strand (2) in advance, on the desired location of case back plate, form each suspension ring (3) by described steel strand (2), utilize described each suspension ring (3) to be lifted by described prefabricated case beam (1).
2. prefabricated case beam steel strand according to claim 1 hang a little, it is characterized in that: become steel wire bundle taking many steel strand (2) side by side as one group, and described steel wire bundle forms described suspension ring (3) in middle part bending.
3. prefabricated case beam steel strand according to claim 2 hang a little, it is characterized in that: be respectively arranged with strongback (4) at the two ends of described steel wire bundle, in described steel wire bundle, each steel strand run through described strongback (4) upper corresponding pilot hole acquisition location respectively at two ends.
4. prefabricated case beam steel strand according to claim 2 hang a little, it is characterized in that: described steel wire bundle and the common colligation of steel bar framework of box beam (5), and with case beam with pre-formed altogether.
5. prefabricated case beam steel strand according to claim 1 hang a little, it is characterized in that: described suspension ring (3) have everywhere, divide and are on the position at four angles of case back plate.
CN201620061005.XU 2016-01-21 2016-01-21 Precast box girder steel strand wires hoisting point Expired - Fee Related CN205296844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620061005.XU CN205296844U (en) 2016-01-21 2016-01-21 Precast box girder steel strand wires hoisting point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620061005.XU CN205296844U (en) 2016-01-21 2016-01-21 Precast box girder steel strand wires hoisting point

Publications (1)

Publication Number Publication Date
CN205296844U true CN205296844U (en) 2016-06-08

Family

ID=56426396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620061005.XU Expired - Fee Related CN205296844U (en) 2016-01-21 2016-01-21 Precast box girder steel strand wires hoisting point

Country Status (1)

Country Link
CN (1) CN205296844U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532467A (en) * 2018-04-26 2018-09-14 浙江交工集团股份有限公司 A kind of prefabricated components suspension centre structure
CN109052148A (en) * 2018-08-23 2018-12-21 中国二十冶集团有限公司 Production method using steel strand wires as the pre-buried suspension hook of I beam
CN114214952A (en) * 2021-12-23 2022-03-22 中国建筑土木建设有限公司 Anti-overturning device and method for side beam of small box beam of prefabricated anti-collision wall
CN114275658A (en) * 2022-01-04 2022-04-05 新疆交建市政工程有限责任公司 Positioning device for box girder hoisting steel strand
CN114837224A (en) * 2022-06-08 2022-08-02 青岛中科坤泰装配建筑科技有限公司 Multi-layer prefabricated wall structure of underground station and vertical rotation installation process of multi-layer prefabricated wall structure
CN115724331A (en) * 2022-11-14 2023-03-03 中铁大桥局集团第五工程有限公司 Prefabricated box girder hoisting device and rapid construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532467A (en) * 2018-04-26 2018-09-14 浙江交工集团股份有限公司 A kind of prefabricated components suspension centre structure
CN109052148A (en) * 2018-08-23 2018-12-21 中国二十冶集团有限公司 Production method using steel strand wires as the pre-buried suspension hook of I beam
CN114214952A (en) * 2021-12-23 2022-03-22 中国建筑土木建设有限公司 Anti-overturning device and method for side beam of small box beam of prefabricated anti-collision wall
CN114275658A (en) * 2022-01-04 2022-04-05 新疆交建市政工程有限责任公司 Positioning device for box girder hoisting steel strand
CN114837224A (en) * 2022-06-08 2022-08-02 青岛中科坤泰装配建筑科技有限公司 Multi-layer prefabricated wall structure of underground station and vertical rotation installation process of multi-layer prefabricated wall structure
CN115724331A (en) * 2022-11-14 2023-03-03 中铁大桥局集团第五工程有限公司 Prefabricated box girder hoisting device and rapid construction method

Similar Documents

Publication Publication Date Title
CN205296844U (en) Precast box girder steel strand wires hoisting point
CN102070071B (en) Steel reinforcement cage hoisting method
CN201240771Y (en) System for hoisting reinforcement cage
CN201686432U (en) 800 tons of hanging row
CN102286943B (en) Suspension bridge sling replacing device
CN111847218A (en) A kind of balance hanger for precast concrete composite slab bottom plate and its making method
CN206720558U (en) A kind of adjustable steel-reinforcement cage hanger
CN205170161U (en) Precast beam board framework of steel reinforcement hoist
CN105780659A (en) Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge
CN214783820U (en) A suspension point reinforced overweight underground diaphragm wall steel cage
CN210505201U (en) A kind of equipment for hoisting steel bars in batches
CN202967862U (en) Lifting appliance for beam channel reinforcement cage
CN201027135Y (en) Hanging tool mechanism for swinging 55mPHC pipe pile
CN208948679U (en) Assembled hanger
CN209778062U (en) An extension spreader for hoisting steel pipe arch bridge lattice girders
CN211545653U (en) A steel plate hanging point device
CN215364466U (en) Hoisting device for precast concrete beam in construction site
CN204211348U (en) A kind of hanging apparatus
CN206158207U (en) Construction is with platform of unloading
CN103938555B (en) A kind of method for designing detecting reinforcing prestressing force adjustable support
CN213059836U (en) Prefabricated case roof beam framework of steel reinforcement hoist and mount system
CN104085832A (en) Flexible component lifting device and lifting method thereof
CN202936088U (en) T-shaped beam steel lifting bracket
CN115262984A (en) Hoisting method for steel bar truss floor bearing plate inside building
CN206872268U (en) T beams are revealed all the details suspender

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608