CN205296806U - Company's wall structure of outer protection frame of building - Google Patents
Company's wall structure of outer protection frame of building Download PDFInfo
- Publication number
- CN205296806U CN205296806U CN201520971743.3U CN201520971743U CN205296806U CN 205296806 U CN205296806 U CN 205296806U CN 201520971743 U CN201520971743 U CN 201520971743U CN 205296806 U CN205296806 U CN 205296806U
- Authority
- CN
- China
- Prior art keywords
- plug connector
- service sleeve
- steel pipe
- wall construction
- outer protective
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides a company's wall structure of outer protection frame of building, include: it is pre -buried in concrete beam's buried sleeve, insert and locate plug connector in the buried sleeve, and connect in outer protection frame with the connecting piece of plug connector. The utility model discloses a set up buried sleeve in concrete beam, insert the plug connector and locate in the buried sleeve, use the connecting piece connect in outer protection frame with the plug connector, the later stage only need be demolishd when being under construction the connecting piece, and extract the plug connector can, need not to cut the steel pipe, has saved the steel pipe material, and then has solved present building and protected the frame outward and waste the steel pipe material, expend artifical scheduling problem with the drawknot way of structure.
Description
Technical field
This utility model relates to the realm of building construction, is specifically related to a kind of company's wall construction building outer protective frame.
Background technology
The drawknot way of the outer protective frame of common buildings and structure is embedded steel tube on structural concrete flooring, complete after concreting reaches design strength, external scaffolding steel pipe, fastener are connected with embedded steel tube and make drawknot, arrive the construction later stage, after outer protective frame is removed, embedded steel tube needs cutting, and embedded steel tube waste material is more serious, and cuts labor intensive.
Utility model content
For overcoming the defect existing for prior art, now provide a kind of company's wall construction building outer protective frame, to solve the drawknot way waste problem such as tube material, labor intensive of the outer protective frame of existing building and structure.
For achieving the above object, a kind of company's wall construction building outer protective frame, including: it is embedded in the service sleeve of beams of concrete in advance; It is inserted in the plug connector in described service sleeve; And it is connected to outer protective frame and the connector of described plug connector.
This utility model builds further improvement is that of company's wall construction of outer protective frame, and it is concordant that described service sleeve beams of concrete suitable for reading and described builds finished surface.
This utility model builds further improvement is that of company's wall construction of outer protective frame, and described service sleeve end opening is sealed with adhesive tape.
This utility model builds further improvement is that of company's wall construction of outer protective frame, and described connector is that two ends drawknot respectively is in the drawknot steel pipe of described outer protective frame and described plug connector.
This utility model builds further improvement is that of company's wall construction of outer protective frame, and described plug connector is the insertion steel pipe being inserted in described service sleeve.
This utility model builds further improvement is that of company's wall construction of outer protective frame, and described insertion steel pipe caliber, less than described service sleeve caliber, plugs timber wedge in described service sleeve and the gap of described insertion steel pipe.
This utility model builds further improvement is that of company's wall construction of outer protective frame, and described service sleeve is pvc pipe.
The beneficial effects of the utility model are in that, by arranging service sleeve in beams of concrete, plug connector is inserted in described service sleeve, connector is used to be connected to outer protective frame and described plug connector, only need to remove described connector during construction in later period, and extract described plug connector, it is not necessary to pipe cutting, save tube material, and then solve the drawknot way waste problem such as tube material, labor intensive of the outer protective frame of existing building and structure.
Accompanying drawing explanation
Fig. 1 is the floor map that this utility model builds company's wall construction of outer protective frame.
Fig. 2 is the Fig. 1 sectional view at Section A-A.
Detailed description of the invention
Below by way of specific instantiation, embodiment of the present utility model being described, those skilled in the art the content disclosed by this specification can understand other advantages of the present utility model and effect easily. This utility model can also be carried out by additionally different detailed description of the invention or apply, and the every details in this specification based on different viewpoints and application, can also carry out various modification or change under without departing from spirit of the present utility model.
It should be noted that, the structure of this specification institute accompanying drawings depicted, ratio, size etc., all only in order to coordinate the disclosed content of description, understand for those skilled in the art and read, it is not limited to the enforceable qualifications of this utility model, therefore do not have technical essential meaning, the adjustment of the modification of any structure, the change of proportionate relationship or size, under not affecting effect that this utility model can be generated by and the purpose that can reach, all should still drop on the disclosed technology contents of this utility model and obtain in the scope that can contain. Simultaneously, in this specification cited as " on ", D score, "left", "right", " centre " and " one " etc. term, it is merely convenient to understanding of narration, and it is not used to limit the enforceable scope of this utility model, the change of its relativeness or adjustment, changing under technology contents without essence, when being also considered as the enforceable category of this utility model.
Refer to Fig. 1 and Fig. 2, Fig. 1 is the floor map that this utility model builds company's wall construction of outer protective frame, and Fig. 2 is the Fig. 1 sectional view at Section A-A.
As depicted in figs. 1 and 2, this utility model provides a kind of company's wall construction building outer protective frame, including: it is embedded in the service sleeve 2 of beams of concrete 1 in advance; It is inserted in the plug connector 3 in service sleeve 2; And it is connected to the connector 5 of outer protective frame 4 and plug connector 3.
Hereinafter said modules is described in detail.
As depicted in figs. 1 and 2, before floor concreting, at door, window (if climbing frame is to the full extent near " seat in the plane point " vertical main framework, it is ensured that often place is not more than 30cm from the air line distance of " seat in the plane point " vertical main framework) hole Lin Bianliangchu and be embedded with service sleeve 2 in the distance that specification allows. It is preferred that service sleeve 2 build finished surface with beams of concrete 1 concordant, service sleeve 2 end opening adhesive tape is sealed reality, it is prevented that concrete pours into, and impact uses. Service sleeve 2 can be pvc pipe, and the degree of depth that pvc pipe inserts can be 30cm.
As depicted in figs. 1 and 2, reach after design strength until concrete, plug connector 3 is inserted in service sleeve 2. Plug connector 3 can be the caliber insertion steel pipe less than service sleeve 2 caliber, and the gap existed between service sleeve 2 and described insertion steel pipe adopts timber wedge 6 to fill in reality, so that the described insertion steel pipe being inserted in service sleeve 2 will not rock.
As depicted in figs. 1 and 2, the gap existed between service sleeve 2 and described insertion steel pipe adopts timber wedge 6 to fill in after in fact, uses connector 5 to connect outer protective frame 4 and plug connector 3. Connector 5 distinguishes drawknot in the drawknot steel pipe of outer protective frame 4 and plug connector 3 for two ends. The quantity of described drawknot steel pipe can be multiple, as in figure 2 it is shown, the quantity of described drawknot steel pipe is two, a described drawknot steel pipe transverse drawknot is in outer protective frame 4 and plug connector 3, and another described oblique drawknot of drawknot steel pipe is in outer protective frame 4 and plug connector 3.Fastener 7 drawknot respectively is passed through in outer protective frame 4 and plug connector 3 in the two ends of described drawknot steel pipe.
The beneficial effects of the utility model are in that:
By arranging service sleeve in beams of concrete, plug connector is inserted in described service sleeve, connector is used to be connected to outer protective frame and described plug connector, described connector only need to be removed during construction in later period, and extract described plug connector, without pipe cutting, save tube material, and then solve the drawknot way waste problem such as tube material, labor intensive of the outer protective frame of existing building and structure.
Above in association with accompanying drawing embodiment, this utility model being described in detail, this utility model can be made many variations example by those skilled in the art according to the above description. Thus, some details in embodiment should not constitute restriction of the present utility model, this utility model by the scope that defines using appended claims as protection domain.
Claims (7)
1. the company's wall construction building outer protective frame, it is characterised in that including:
It is embedded in the service sleeve of beams of concrete in advance;
It is inserted in the plug connector in described service sleeve; And
It is connected to outer protective frame and the connector of described plug connector.
2. even wall construction according to claim 1, it is characterised in that it is concordant that described service sleeve beams of concrete suitable for reading and described builds finished surface.
3. even wall construction according to claim 2, it is characterised in that described service sleeve end opening is sealed with adhesive tape.
4. even wall construction according to claim 1, it is characterised in that described connector is that two ends drawknot respectively is in the drawknot steel pipe of described outer protective frame and described plug connector.
5. even wall construction according to claim 1, it is characterised in that described plug connector is the insertion steel pipe being inserted in described service sleeve.
6. even wall construction according to claim 5, it is characterised in that described insertion steel pipe caliber, less than described service sleeve caliber, plugs timber wedge in described service sleeve and the gap of described insertion steel pipe.
7. even wall construction according to claim 1, it is characterised in that described service sleeve is pvc pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520971743.3U CN205296806U (en) | 2015-11-30 | 2015-11-30 | Company's wall structure of outer protection frame of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520971743.3U CN205296806U (en) | 2015-11-30 | 2015-11-30 | Company's wall structure of outer protection frame of building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205296806U true CN205296806U (en) | 2016-06-08 |
Family
ID=56435153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520971743.3U Expired - Fee Related CN205296806U (en) | 2015-11-30 | 2015-11-30 | Company's wall structure of outer protection frame of building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205296806U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112554532A (en) * | 2020-12-18 | 2021-03-26 | 北京城建六建设集团有限公司 | Protective frame system free of pulling connection with wall surface and construction method |
-
2015
- 2015-11-30 CN CN201520971743.3U patent/CN205296806U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112554532A (en) * | 2020-12-18 | 2021-03-26 | 北京城建六建设集团有限公司 | Protective frame system free of pulling connection with wall surface and construction method |
CN112554532B (en) * | 2020-12-18 | 2022-04-12 | 北京城建六建设集团有限公司 | Construction method of protective frame system without pulling and connecting with wall surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205776339U (en) | Both arms Retaining Wall | |
CN204940556U (en) | A kind of steel structure girder of building in the style of the ancients and the syndeton of pin | |
CN205296806U (en) | Company's wall structure of outer protection frame of building | |
CN204919828U (en) | Archaize building's wooden frame and steel structure column's connection structure | |
CN203961052U (en) | A kind of new type block wall body structure | |
CN204252571U (en) | A kind of newly-increased girder construction of concrete structure | |
CN104091516A (en) | Teaching model for construction external-prevention internal-bonded method of underground structure | |
CN104594533B (en) | Adjustable masonry filler wall and frame column flexible connecting structure | |
CN205079771U (en) | Disconnect -type settlement observation point | |
CN105133735B (en) | The method for blocking that a kind of precast concrete shear wall is in the milk with floor seam crossing | |
CN107620387B (en) | Method for detecting internal defects of connecting sleeve of assembly type building component | |
CN204676925U (en) | A kind of support | |
CN204418433U (en) | A kind of adjustable masonry filler wall and frame column flexible connecting structure | |
CN204532344U (en) | Artificial core | |
CN204571125U (en) | A kind of stair bench and unit of marking time | |
CN203878968U (en) | Connecting structure between scaffold and main body structure | |
CN205662945U (en) | Precast concrete piping lane | |
CN206289587U (en) | A kind of frame structure of protection rivers bunding | |
CN204571135U (en) | The syndeton of a kind of stair and stair step thereof | |
CN204139639U (en) | Soft isolating and protecting component for building | |
CN204571124U (en) | A kind of stair and stair tie-beam thereof | |
CN205296179U (en) | Can turnover formula face frontier defense and protect basis | |
CN204098334U (en) | The building block of wedge-type interpenetrating structure | |
CN110242027A (en) | Ground decoration plate and installation method | |
CN203583755U (en) | Non-crack-sealing and non-leveling elaborate wall brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160608 Termination date: 20201130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |