CN205296280U - Water intaking structures that side direction was intake - Google Patents

Water intaking structures that side direction was intake Download PDF

Info

Publication number
CN205296280U
CN205296280U CN201620024159.1U CN201620024159U CN205296280U CN 205296280 U CN205296280 U CN 205296280U CN 201620024159 U CN201620024159 U CN 201620024159U CN 205296280 U CN205296280 U CN 205296280U
Authority
CN
China
Prior art keywords
intake
strucure
river course
irrigating gate
water intaking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620024159.1U
Other languages
Chinese (zh)
Inventor
徐飞飞
徐平
王家华
张达石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Co ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN201620024159.1U priority Critical patent/CN205296280U/en
Application granted granted Critical
Publication of CN205296280U publication Critical patent/CN205296280U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a water intaking structures that side direction was intake, water intaking structures body upper portion is the roof, is equipped with the irrigating gate on the water intaking structures body lateral wall, the irrigating gate is fixed inside the barricade, one side of irrigating gate is equipped with the grid, the inside oil removal weir plate that is equipped with of water intaking structures body, water intaking structures body still is connected with the leading water pipe, provides a water intaking structures that side direction was intake, removes the barricade in present partial river course, and box water intaking structures that construction and all the other river course barricades fused are equipped with the irrigating gate and set up the grid in the irrigating gate outside at the lateral wall that is close to the river course, can avoid the irrigating gate to stretch out the river course and open the navigation or air flight to the river course and lead to the fact the influence to can the interception float in the great floater of the surface of water. Simultaneously at the oil removal weir plate of the inside setting of structures with roof connection to get rid of the oil slick in the river course, simple structure, convenient to use, the practicality is strong.

Description

The intake strucure of lateral intake
Technical field
This utility model relates to water fetching device technical field, is specifically related to the intake strucure of a kind of lateral intake.
Background technology
Urban water supply often uses surface water as water supply source. When adopting surface water as water supply source, intake strucure can adopt fixed or portable, and in river course, south China area, water system is comparatively abundant, generally controls river water level with gate, and therefore SEA LEVEL VARIATION is little, and intake strucure is also based on fixed. In stationary water intaking structures, again with box intake strucure or directly intake pipe is extended in river course the most general. Box intake strucure refers to and sets a casing in Ha Noi, and river can be entered in casing by casing top or side effluent road, arranges oil removal facility on casing top, arranges grid at box house, reaches to block oil except the purpose of floating thing. When streamflow is more slow, when river gesture is stablized, it is possible to directly intake pipe is extended in river course, take river course mid-water, all there is certain distance from river surface and river bed, and set grid at the water intaking mouth of pipe, tentatively to remove float bigger in river course.
But, when river course is navigable river, water intaking form need to be determined in conjunction with the requirement of the form of channel revetment and navigation channel department. For the navigable river of higher level, navigation channel department must not usually require that has structures to put in river course scope, to avoid intake strucure to adversely affect for navigation. Then adopting box intake strucure or intake pipe extends the requirement that all can not meet navigation channel department in river course, comparatively suitable mode is that river causes the structures on bank, then is fetched water by bank structures.
For meeting the requirement of shelter in flood season in river course, both sides, riverbank are both needed to reserved certain width as flood control passage, therefore bank structures need to meet the requirement as flood control passage simultaneously, and intake strucure all can not meet the management requirement of navigation channel and river course department in existing design manual simultaneously, how arranging and both met design specification, the intake strucure meeting again navigation channel and river course division management requirement is very necessary.
Utility model content
Because the drawbacks described above of prior art, this utility model provides the intake strucure of a kind of lateral intake, remove the barricade in existing part river course, build the box intake strucure being connected with all the other river course barricades, it is provided with irrigating gate at the sidewall near river course and grid is set outside irrigating gate, irrigating gate can be avoided to stretch out river course river course navigation is impacted, and the bigger floating thing bubbled through the water column can be intercepted.The oil removal weir plate being connected with top board is set simultaneously inside structures, to remove the oil slick in river course, simple in construction, easy to use, practical.
For achieving the above object, this utility model provides the intake strucure of a kind of lateral intake, including intake strucure body, described intake strucure body upper part is top board, intake strucure body sidewall is provided with irrigating gate, and described irrigating gate is fixed on inside barricade, and the side of described irrigating gate is provided with grid, described intake strucure body interior is provided with oil removal weir plate, and intake strucure body is also associated with aqueduct.
Preferably, described grid adopts flat board coarse rack.
Preferably, described oil removal weir plate is arranged on the top board bottom of intake strucure body to any of the above-described scheme.
Any of the above-described scheme preferably, described oil removal weir plate top be connected with top board, bottom is slightly above intake strucure body inner bottom.
Preferably, described aqueduct is arranged on bottom, ground to any of the above-described scheme, and aqueduct is connected in the left wall of intake strucure body.
Any of the above-described scheme is preferably, it is characterised in that, the quantity of described aqueduct is more than one.
Any of the above-described scheme is preferably, it is characterised in that, the quantity of described aqueduct is two.
Preferably, described irrigating gate is arranged on the right wall of intake strucure body any of the above-described scheme, and the right wall of intake strucure and barricade are combined into one.
The beneficial effects of the utility model: intake strucure body upper part is top board, intake strucure body sidewall is provided with irrigating gate, described irrigating gate is fixed on inside barricade, the side of described irrigating gate is provided with grid, described intake strucure body interior is provided with oil removal weir plate, intake strucure body is also associated with aqueduct, provide the intake strucure of a kind of lateral intake, remove the barricade in existing part river course, build the box intake strucure being connected with all the other river course barricades, it is provided with irrigating gate at the sidewall near river course and grid is set outside irrigating gate, irrigating gate can be avoided to stretch out river course river course navigation is impacted, and the bigger floating thing bubbled through the water column can be intercepted. the oil removal weir plate being connected with top board is set simultaneously inside structures, to remove the oil slick in river course, simple in construction, easy to use, practical.
Below with reference to accompanying drawing, the technique effect of design of the present utility model, concrete structure and generation is described further, to be fully understood from the purpose of this utility model, feature and effect.
Accompanying drawing explanation
Fig. 1 is top view of the present utility model.
Fig. 2 is the sectional view of Fig. 1.
Detailed description of the invention
As shown in Figure 1 and Figure 2, a kind of intake strucure of lateral intake, including intake strucure body, described intake strucure body upper part is top board 1, intake strucure body sidewall is provided with irrigating gate 2, and it is internal that described irrigating gate 2 is fixed on barricade 3, and the side of described irrigating gate 2 is provided with grid 4, described intake strucure body interior is provided with oil removal weir plate 5, and intake strucure body is also associated with aqueduct 6. Water in river course enters intake strucure body from grid 4, counts follow-up water plant and process structures through one oil removal weir plate 5 again through aqueduct 6.
The technical scheme that this utility model optimizes further, described grid 4 adopts flat board coarse rack, and the outside of grid 4 is additionally provided with channel revetment 10.
The technical scheme that this utility model optimizes further, described oil removal weir plate 5 is arranged on top board 1 bottom of intake strucure body.
The technical scheme that this utility model optimizes further, the top of described oil removal weir plate 5 is connected with top board 1, and bottom is slightly above intake strucure body inner bottom.
The technical scheme that this utility model optimizes further, described aqueduct 6 is arranged on bottom, ground 7, and aqueduct 6 is connected in the left wall 8 of intake strucure body.
The technical scheme that this utility model optimizes further, the quantity of described aqueduct 6 is more than one.
The technical scheme that this utility model optimizes further, the quantity of described aqueduct 6 is two.
The technical scheme that this utility model optimizes further, described irrigating gate 2 is arranged on the right wall 9 of intake strucure body, and right wall 9 and the barricade 3 of intake strucure are combined into one. Irrigating gate 2 bottom is additionally provided with base plate 12 and pile foundation 11, increases stability further.
This utility model relates to the use of the existing river course barricade 3 part as intake strucure, it is provided with irrigating gate 2 at sidewall and adds grid 4, irrigating gate 2 can being avoided to stretch out river course river course navigation is impacted, irrigating gate 2 is as a part for barricade 3 simultaneously, keeps the seriality of barricade 3; Intake strucure top board 1 adopts closed design, and top board considers vehicular load, can meet the requirement being open to traffic as flood control passage; One oil removal weir 5 is set inside intake strucure, the oil slick in river course can be prevented effectively from and enter follow-up water intake pumping station by intake strucure and process structures, provide safeguard for effluent quality.
Preferred embodiment of the present utility model described in detail above. Should be appreciated that those of ordinary skill in the art just can make many modifications and variations according to design of the present utility model without creative work. Therefore, all technical staff in the art pass through the available technical scheme of logical analysis, reasoning, or a limited experiment on the basis of existing technology according to design of the present utility model, all should in the protection domain being defined in the patent claims.

Claims (8)

1. the intake strucure of a lateral intake, including intake strucure body, it is characterized in that, described intake strucure body upper part is top board (1), intake strucure body sidewall is provided with irrigating gate (2), it is internal that described irrigating gate (2) is fixed on barricade (3), the side of described irrigating gate (2) is provided with grid (4), described intake strucure body interior is provided with oil removal weir plate (5), and intake strucure body is also associated with aqueduct (6).
2. the intake strucure of a kind of lateral intake as claimed in claim 1, it is characterised in that, described grid (4) adopts flat board coarse rack.
3. the intake strucure of a kind of lateral intake as claimed in claim 1, it is characterised in that, described oil removal weir plate (5) is arranged on top board (1) bottom of intake strucure body.
4. the intake strucure of a kind of lateral intake as described in claim 1 or 3, it is characterised in that the top of described oil removal weir plate (5) is connected with top board (1), bottom is higher than intake strucure body inner bottom.
5. the intake strucure of a kind of lateral intake as claimed in claim 1, it is characterized in that, described aqueduct (6) is arranged on ground (7) bottom, and aqueduct (6) is connected in the left wall (8) of intake strucure body.
6. the intake strucure of a kind of lateral intake as described in claim 1 or 5, it is characterised in that, the quantity of described aqueduct (6) is more than one.
7. the intake strucure of a kind of lateral intake as described in claim 1 or 5, it is characterised in that, the quantity of described aqueduct (6) is two.
8. the intake strucure of a kind of lateral intake as claimed in claim 1, it is characterized in that, described irrigating gate (2) is arranged on the right wall (9) of intake strucure body, and the right wall (9) of intake strucure and barricade (3) are combined into one.
CN201620024159.1U 2016-01-12 2016-01-12 Water intaking structures that side direction was intake Active CN205296280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620024159.1U CN205296280U (en) 2016-01-12 2016-01-12 Water intaking structures that side direction was intake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620024159.1U CN205296280U (en) 2016-01-12 2016-01-12 Water intaking structures that side direction was intake

Publications (1)

Publication Number Publication Date
CN205296280U true CN205296280U (en) 2016-06-08

Family

ID=56474755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620024159.1U Active CN205296280U (en) 2016-01-12 2016-01-12 Water intaking structures that side direction was intake

Country Status (1)

Country Link
CN (1) CN205296280U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672404A (en) * 2016-01-12 2016-06-15 上海市城市建设设计研究总院 Lateral water inlet water intake structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672404A (en) * 2016-01-12 2016-06-15 上海市城市建设设计研究总院 Lateral water inlet water intake structure

Similar Documents

Publication Publication Date Title
CN202416437U (en) Collection and comprehensive utilization system for rainwater
CN106087632B (en) A kind of laying brick for having both row's water storage function based on sponge urban construction
CN205063005U (en) Can carry out novel rainwater well that compensates to groundwater
CN102966165B (en) System for eliminating and reducing urban inland inundation by utilizing adsorption layer of green area and inland inundation eliminating and reducing method
CN105672404B (en) The intake strucure of lateral intake
CN102322155A (en) Unconcerned table sea, multi-functional Great Wall and sandstorm control
CN205399547U (en) Detachable lateral wall rainwater dams and utilizes device
CN205296280U (en) Water intaking structures that side direction was intake
CN201874083U (en) Land-saving and energy-saving reservoir type pumping station drainage device for down digging channels
CN205063000U (en) Novel inlet for stom water reposition of redundant personnel funnel
CN202157297U (en) Gate control type urban rain and flood regulation, control and utilization system
CN201704774U (en) Downward passage storage-regulated leaching well draining device based on land saving and environmental protection
CN204940059U (en) A kind of permeable urban road
CN206110232U (en) Community landscaping rainwater utilization device
CN207812613U (en) A kind of sponge type rain flood ejectment system
CN105464190A (en) Green space rain sewage reuse system
CN207597565U (en) A kind of underpass flood reverse-filling drainage system
CN105113621A (en) Vertical fence mesh well lid
CN204370554U (en) A kind of greenbelt is from process formula storm detention tank
CN205839924U (en) A kind of first rain separate tank of band automatic open close gate
CN205276436U (en) A secret device for rainwater regulation
CN103526798A (en) Rainwater collecting system
CN203924319U (en) Double-deck rainwater reservoir
CN202139680U (en) Drainage ditch for ash storage yard of power plant
CN202187261U (en) Multifunctional street

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant