Prior art keywords
observation
bar
housing
settlement
elastic bumps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620040833.5U
Other languages
Chinese (zh)
Inventor
闫相明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGSHA CONSTRUCTION Co Ltd
Original Assignee
ZHONGSHA CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHA CONSTRUCTION Co Ltd filed Critical ZHONGSHA CONSTRUCTION Co Ltd
Priority to CN201620040833.5U priority Critical patent/CN205280082U/en
Application granted granted Critical
Publication of CN205280082U publication Critical patent/CN205280082U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model discloses a building settlement observation point structure, its technical scheme main points include the settlement observation device, the settlement observation device includes the casing of tube -shape, the opening part of casing is equipped with the lid, wear to be equipped with the observation pole in the casing, the lid is equipped with and surveys the continuous string rope that is used for surveing the pole pull out of pole, be equipped with in the casing and act on the reset spring who surveys the pole, be equipped with on the observation pole and surveing the pole be used for the fixed fixed establishment who surveys the pole after pulling out the opening, the settlement observation device is installed in the wall body of building, the wall body is seted up flutedly, the casing of settlement observation device is pour with the inner wall of recess through the concrete and is connected. An object of the utility model is to provide a building settlement observation point structure has stable in structure, not fragile characteristics.

Description

A kind of building settlement point of observation structure
Technical field
The utility model relates to a kind of building structure, and more specifically it relates to a kind of building settlement point of observation structure.
Background technology
According to specification requirement, Highrise buildings needs to carry out necessary sedimentation observation between construction and usage period, shows the sinkability that this building is concrete and the relation of observation time after forming record, is judge the building whether direct foundation in the subsidence range of specification permission.
At present, in prior art, notification number is that the Chinese patent document of CN203274735U discloses a kind of settlement observation structure, it comprises the reinforcing bar with bending end, the end of described bending end is cone, the straight rod end of described reinforcing bar is fixed on the reinforcing bar of structure wall or post and point of observation opposite position, and the top of described cone is arranged vertically upward.
For existing above-mentioned settlement observer, outside exposed owing to protruding body of wall for a long time, be very easily subject to the impact of extraneous factor, as by accidental destruction, get rusty, corrosion etc., cause the accuracy of observation to be affected.
Practical novel content
For the deficiency that prior art exists, the purpose of this utility model is to provide a kind of building settlement point of observation structure, has Stability Analysis of Structures, non-damageable feature.
For achieving the above object, the utility model provides following technical scheme: a kind of building settlement point of observation structure, comprise settlement observer, described settlement observer comprises the housing of tubular, the opening place of described housing is provided with lid body, observation bar it is equipped with in described housing, described lid body be provided with observe bar be connected for by observation bar pull-out lanyard, described housing is provided with the return spring acting on observation bar, described observation bar is provided with after observation bar is drawn out opening for the fixed mechanism of fixed observer bar, described settlement observer is installed on the body of wall of buildings, described body of wall has offered groove, the housing of described settlement observer is built with the inwall of groove by concrete and is connected.
Effect of the present utility model is, compares existing settlement observation structure, and the utility model has been abandoned observation bar and has been directly fixed on the easy mode of body of wall this kind, by arranging the settlement observer of band housing, observation bar is played better provide protection. During construction, buildings housing stays and establishes groove, the housing of settlement observer is built fixing by concrete and body of wall, owing to housing is placed in body of wall, be therefore not easy to collide with outer thing damage. The setting of lid body then avoids observation bar exposed, plays better water proof and dust proof effect so that it is not easily corrosion. During use, only need to open lid body, bar pull-out will be observed by lanyard, observation operation can be carried out by the fixed mechanism fixed observer bar arranged on observation bar, it may also be useful to convenient. And so arrange, the external process of more convenient settlement observer, it is achieved volume production.
The utility model is set to further: described fixed mechanism is the elastic bumps being arranged at observation bar, described elastic bumps is curved, the sidewall of described observation bar is provided with the installation groove for embedding dress elastic bumps, is provided with the compression spring supporting elastic bumps in described installation groove.
By adopting technique scheme, disclose wherein a kind of fixed mechanism observing bar, it is made up of elastic bumps, observation bar is provided with installation groove, elastic bumps is flush-mounted in install in groove and prevents from coming off, and installation groove is provided with the compression spring for supporting elastic bumps, impel elastic bumps outwards to upspring. Under original state, elastic bumps shrinks in and installs in groove, the part that observation bar is provided with elastic bumps be drawn out housing outer after, the elastic bumps effect of lifting restrictions is ejected, contact at the opening place of housing, thus observation bar is fixed, due to the curved structure of elastic bumps, when firmly observation bar inwardly being pushed away, its arcuate structure can make elastic bumps be squeezed in installation groove once again, the reset of convenient observation bar.
The utility model is set to further: described fixed mechanism is the through hole that radial direction is opened in observation bar.
By adopting technique scheme, disclose the fixed mechanism of another kind of observation bar, its structure is simple, convenient setting, only need to insert in through hole when the part that observation bar is provided with through hole is drawn out housing and fill the opening place that any stripe object contacts at housing, owing to being subject to the elastic contribution of return spring, the stripe object inserting dress can not come off.
The utility model is set to further: described lid body is threadedly connected to housing.
By adopting technique scheme, lid body is threaded connection in housing fixed effect firm, difficult drop-off.
In sum, the utility model provides a kind of Stability Analysis of Structures, non-damageable building settlement point of observation structure.
Accompanying drawing explanation
Fig. 1 is the schematic diagram one of building settlement point of observation structure described in embodiment one;
Fig. 2 is the schematic diagram two of building settlement point of observation structure described in embodiment one;
Fig. 3 is the part A enlarged view of Fig. 2;
Fig. 4 is the schematic diagram of building settlement point of observation structure described in embodiment two.
Description of reference numerals: 1, body of wall; 2, return spring; 3, base plate; 4, the 2nd positive stop end; 5, the first positive stop end; 6, Gai Ti; 7, lanyard; 8, bar is observed; 9, housing; 10, elastic bumps; 11, groove is installed; 12, compression spring; 13, through hole.
Embodiment
It is described further referring to figs. 1 through 4 pairs of the utility model embodiments.
Building settlement point of observation structure described in the present embodiment one, as Figure 1-3, comprise settlement observer, described settlement observer comprises the housing 9 of tubular, the opening place of described housing 9 is provided with lid body 6, lid body 6 is preferably threadedly connected to housing 9, observation bar 8 it is equipped with in described housing 9, described lid body 6 is provided with and observes bar 8 and be connected for by the observation lanyard 7 that pulls out of bar 8, described housing 9 is provided with the return spring 2 acting on observation bar 8, return spring 2 is installed by opening the base plate 3 of housing 9, the inwall of housing 9 is provided with the first positive stop end 5, the inner of observation bar 8 is provided with the 2nd positive stop end 4, return spring 2 is sheathed on observation bar 8 and two ends contact at the first positive stop end 5 and the 2nd positive stop end 4 respectively, base plate 3 is threaded with housing 9.
Described observation bar 8 is provided with after observation bar 8 is drawn out opening for the fixed mechanism of fixed observer bar 8, described settlement observer is installed on the body of wall 1 of buildings, described body of wall 1 has offered groove, and the housing 9 of described settlement observer is built with the inwall of groove by concrete and is connected.
As shown in Figure 3, described fixed mechanism is the elastic bumps 10 being arranged at observation bar 8, described elastic bumps 10 is curved, and the sidewall of described observation bar 8 is provided with the installation groove 11 for embedding dress elastic bumps 10, is provided with the compression spring 12 supporting elastic bumps 10 in described installation groove 11. Being provided with on observation bar 8 and install groove 11, elastic bumps 10 is flush-mounted in install in groove 11 and prevents from coming off, and is provided with the compression spring 12 for supporting elastic bumps 10 in installation groove 11, impels elastic bumps 10 outwards to upspring. Under original state, elastic bumps 10 shrinks in and installs in groove 11, the part that observation bar 8 is provided with elastic bumps 10 be drawn out housing 9 outer after, elastic bumps 10 effect of lifting restrictions is ejected, contact at the opening place of housing 9, thus observation bar 8 is fixed, due to the curved structure of elastic bumps 10, when firmly observation bar 8 inwardly being pushed away, its arcuate structure can make elastic bumps 10 be squeezed in installation groove 11 once again, the reset of convenient observation bar 8.
With the difference of embodiment one, embodiment two, as shown in Figure 4, is only that described fixed mechanism is the through hole 13 that radial direction is opened in observation bar 8. Its structure is simple, convenient setting, only need to inserting at through hole 13 place when the part that observation bar 8 is provided with through hole 13 is drawn out housing 9 and fill the opening place that any stripe object contacts at housing 9, owing to being subject to the elastic contribution of return spring 2, the stripe object inserting dress can not come off.
Effect of the present utility model is, compares existing settlement observation structure, and the utility model has been abandoned observation bar 8 and has been directly fixed on body of wall 1 this kind of easy mode, by arranging the settlement observer of band housing 9, observation bar 8 is played better provide protection. During construction, buildings housing 9 stays and establishes groove, the housing 9 of settlement observer is built fixing by concrete and body of wall 1, owing to housing 9 is placed in body of wall 1, be therefore not easy to collide with outer thing damage. The setting of lid body 6 then avoids observation bar 8 exposed, plays better water proof and dust proof effect so that it is not easily corrosion. During use, only need to open lid body 6, by lanyard 7, observation bar 8 be pulled out, observation operation can be carried out by the fixed mechanism fixed observer bar 8 arranged on observation bar 8, it may also be useful to convenient. And so arrange, the external process of more convenient settlement observer, it is achieved volume production.
In sum, the utility model provides a kind of Stability Analysis of Structures, non-damageable building settlement point of observation structure.
The foregoing is only better embodiment of the present utility model, be not limited to the utility model, all within design of the present utility model is conceived, any amendment of doing, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (4)

1. a building settlement point of observation structure, it is characterized in that: comprise settlement observer, described settlement observer comprises the housing (9) of tubular, the opening place of described housing (9) is provided with lid body (6), observation bar (8) it is equipped with in described housing (9), described lid body (6) is provided with and the lanyard (7) observed bar (8) and be connected and pull out for observing bar (8), described housing (9) is provided with the return spring (2) acting on observation bar (8), described observation bar (8) is provided with after observation bar (8) is drawn out opening for the fixed mechanism of fixed observer bar (8), described settlement observer is installed on the body of wall (1) of buildings, described body of wall (1) has offered groove, the housing (9) of described settlement observer is built with the inwall of groove by concrete and is connected.
2. building settlement point of observation structure according to claim 1, it is characterized in that: described fixed mechanism is for being arranged at the elastic bumps (10) of observation bar (8), described elastic bumps (10) is curved, the sidewall of described observation bar (8) is provided with the installation groove (11) for embedding dress elastic bumps (10), is provided with the compression spring (12) supporting elastic bumps (10) in described installation groove (11).
3. building settlement point of observation structure according to claim 1, is characterized in that: described fixed mechanism is the through hole (13) that radial direction is opened in observation bar (8).
4. building settlement point of observation structure according to claim 1 or 2 or 3, is characterized in that: described lid body (6) is threadedly connected to housing (9).
CN201620040833.5U 2016-01-15 2016-01-15 Building settlement observation point structure Expired - Fee Related CN205280082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620040833.5U CN205280082U (en) 2016-01-15 2016-01-15 Building settlement observation point structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620040833.5U CN205280082U (en) 2016-01-15 2016-01-15 Building settlement observation point structure

Publications (1)

Publication Number Publication Date
CN205280082U true CN205280082U (en) 2016-06-01

Family

ID=56064649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620040833.5U Expired - Fee Related CN205280082U (en) 2016-01-15 2016-01-15 Building settlement observation point structure

Country Status (1)

Country Link
CN (1) CN205280082U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108627139A (en) * 2018-05-11 2018-10-09 林再颐 A kind of device of observation building settlement
CN113267433A (en) * 2021-05-18 2021-08-17 浙江众城检测技术有限公司 Novel building settlement measuring device
CN113959399A (en) * 2021-08-26 2022-01-21 中铁三局集团有限公司 Observation point without influence on road traffic

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108627139A (en) * 2018-05-11 2018-10-09 林再颐 A kind of device of observation building settlement
CN113267433A (en) * 2021-05-18 2021-08-17 浙江众城检测技术有限公司 Novel building settlement measuring device
CN113959399A (en) * 2021-08-26 2022-01-21 中铁三局集团有限公司 Observation point without influence on road traffic
CN113959399B (en) * 2021-08-26 2024-05-24 中铁三局集团有限公司 Observation point without influencing road traffic

Similar Documents

Publication Publication Date Title
CN205280082U (en) Building settlement observation point structure
Cattari et al. The seismic behaviour of ancient masonry buildings after the earthquake in Emilia (Italy) on May 20th and 29th, 2012
CN202793533U (en) Riverway water gauge
CN204001938U (en) Built on stilts span wire suspension protector
CN204111216U (en) A kind of tower crane attachment structure of building operation
CN208996103U (en) A kind of cast-in-place concrete pile hole bottom slurry pick-up
CN103759883B (en) A kind of earth pressure gauge stationary installation
CN209217546U (en) Substation's fire barrier fixes device
CN201550030U (en) Bird prevention thrust special for ground wire support of high voltage pylon
CN205653825U (en) A deviational survey pipe mounting structure is irritated to simple and easy pressure
CN201421701Y (en) Device for preventing flag from falling down
CN204704585U (en) Well lid electronic tag fixed structure
CN203741837U (en) Ground anchor
CN208313423U (en) A kind of suspension cable casing for road and bridge
CN207007401U (en) A kind of soil pressure cell fixing device for Tunnel Surrounding Rock Pressure test
CN207620019U (en) A kind of unit for single-pile vertical anti-pulling static test counterforce device
CN207392892U (en) Sand-proof built-in type fence pillar
CN205300575U (en) Building settlement observation point structure
CN205722315U (en) A kind of earthquake alarm bimetallic tube
CN207331470U (en) A kind of embedded box anchors assembled bracket
CN205896638U (en) TV set components of a whole that can function independently mounting
CN202324572U (en) Overhanging type steel scaffold for full-length overhanging balcony
CN217841099U (en) Portable combined anchor
CN205092550U (en) Base of lightning rod
CN205123603U (en) Box rectifier module fixes pencil square hole face

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601