CN205242679U - Steel construction building body and interior wall connection structure thereof - Google Patents
Steel construction building body and interior wall connection structure thereof Download PDFInfo
- Publication number
- CN205242679U CN205242679U CN201520983782.5U CN201520983782U CN205242679U CN 205242679 U CN205242679 U CN 205242679U CN 201520983782 U CN201520983782 U CN 201520983782U CN 205242679 U CN205242679 U CN 205242679U
- Authority
- CN
- China
- Prior art keywords
- wall
- interior wall
- groove
- interior
- syndeton
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a steel construction building body and interior wall connection structure thereof, steel construction building body's interior wall includes in adjacent setting first wall body in wall body and the second, and interior wall connection structure includes the slide that is fixed in the building carrier plate, the opening direction orientation of slide the interior wall, just the extending direction of slide does the installation direction of interior wall, in first the wall body with wall body one among boths' top is provided with the embedding piece in the second, and another person's among both top is provided with the joint groove, embedding piece inlay in the joint inslot. Like this, this interior wall connection structure has realized reliability and the convenience that the interior wall is connected to guarantee the stable of wall body and connected, improved construction efficiency.
Description
Technical field
The utility model relates to construction engineering technical field, relates in particular to a kind of for steel construction building bodyInterior wall syndeton. The utility model also relates to a kind of steel construction building that comprises above-mentioned interior wall syndetonBody.
Background technology
Along with the raising day by day of living standard, people for house and the demand of doing utilities building more and moreGreatly. Existing building mostly is reinforced concrete structure, but traditional reinforced concrete structure is builtProcess is comparatively complicated, wastes a large amount of manpower and materials; Meanwhile, the building of reinforced concrete structure is torn openWhile removing, need to carry out destructiveness and remove, the construction material after dismounting cannot carry out recycling, makesThe serious waste of the resource becoming. Therefore, the steel construction building body of plug-in type arises at the historic moment, and is about to add in advanceThe body of wall that work is good is transported to precalculated position, and Bing Yu building body main frame connects, thereby completes quickly and easilyBuilding body is built. In plug-in type building body structure, solve interior wall connectivity problem, connect to realizing interior wallReliability and convenience, thereby ensure the stable connection of body of wall, improve construction efficiency, just become thisThose skilled in the art need the problem of solution badly.
Utility model content
The purpose of this utility model is to provide a kind of interior wall syndeton for steel construction building body, solvesInterior wall connectivity problem, the reliability and the convenience that connect to realizing interior wall, thus ensure the steady of body of wallFixed connection, improve construction efficiency. Another object of the present utility model is to provide one and comprises above-mentioned interior wallThe steel construction building body of syndeton.
To achieve these goals, the utility model provides a kind of interior wall johning knot for steel construction building bodyStructure, the interior wall of described steel construction building body comprises the first inner wall and second inner wall of adjacent setting, inWall syndeton comprises the slideway that is fixed on floor support plate, and the opening direction of described slideway is towards described interior wall,And the installation direction that the bearing of trend of described slideway is described interior wall; Described the first inner wall and describedThe top of the one of two inner walls in both is provided with embedded block, and the top of the another one in both arrangesHave buckling groove, described embedded block is embedded in described buckling groove.
Alternatively, described the first inner wall offers draw-in groove towards a side of described the second inner wall, instituteState the second inner wall and have projection towards a side of described the first inner wall, described projection embeds described cardIn groove.
Alternatively, described draw-in groove is dovetail groove, described projection be with described dovetail groove match trapezoidalProjection, the bottom land width of described dovetail groove is less than its width of rebate, the small end of described trapezoidal projection and instituteState bottom land and match, its large end matches with described notch.
Alternatively, described embedded block is arranged at the top of described the first inner wall, described buckling groove settingIn the top of described the second inner wall.
The utility model also provides a kind of steel construction building body, comprises first inner wall and of adjacent settingTwo inner walls, also comprise the interior wall syndeton that connects described the first inner wall and described the second inner wall,Described interior wall syndeton is interior wall syndeton as above.
The interior wall syndeton that the utility model provides is for steel construction building body, described steel construction building bodyInterior wall comprises the first inner wall and second inner wall of adjacent setting, and interior wall syndeton comprises and being fixed onThe slideway of floor support plate, the opening direction of described slideway is towards described interior wall, and the extension side of described slidewayTo the installation direction that is described interior wall; In described the first inner wall and described the second inner wall onePerson's top is provided with embedded block, and the top of the another one in both is provided with buckling groove, described embeddingPiece is embedded in described buckling groove. In body of wall installation process, first install sliding according to the position line of body of wallRoad, is fixed on floor support plate (or ground, beam bottom) by slideway, then by on-the-spot actual size cuttingBody of wall, erects the smooth road of body of wall body of wall is pushed into assigned address, realizes body of wall and installs. This interior wall connectsIn connecting structure, the making of all prefabricated components is all taken from green wood and makes simply, has saved interior wall plug-in unit and has madeAnd install, reduce cost and drop into, without nailing and processing hole for nailing, prefabricated component is pressed line body of wall nature is installedVertically, body of wall bottom treatment, saves the step such as timber wedge, cement stabilization, the convenient work that improves quick for installationMake efficiency. Like this, this interior wall syndeton has realized reliability and convenience that interior wall connects, therebyEnsure the stable connection of body of wall, improved construction efficiency.
Brief description of the drawings
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, below will be to implementingIn example, the accompanying drawing of required use is briefly described, and apparently, the accompanying drawing in the following describes is onlySome embodiment that record in the utility model, for those of ordinary skill in the art, can also basisThese accompanying drawings obtain other accompanying drawing.
Fig. 1 is the structural representation of a kind of detailed description of the invention of interior wall syndeton provided by the utility modelFigure;
Fig. 2 is the structural representation of the middle slideway of interior wall syndeton shown in Fig. 1;
Fig. 3 is the top view of interior wall syndeton shown in Fig. 1.
Detailed description of the invention
Core of the present utility model is to provide a kind of interior wall syndeton for steel construction building body, solvesInterior wall connectivity problem, the reliability and the convenience that connect to realizing interior wall, thus ensure the steady of body of wallFixed connection, improve construction efficiency. Another core of the present utility model is to provide one and comprises above-mentioned interior wallThe steel construction building body of syndeton.
In order to make those skilled in the art understand better the technical solution of the utility model, below in conjunction withAccompanying drawing is further detailed the utility model.
Please refer to Fig. 1-Fig. 3, Fig. 1 is a kind of concrete enforcement of interior wall syndeton provided by the utility modelThe structural representation of mode; Fig. 2 is the structural representation of the middle slideway of interior wall syndeton shown in Fig. 1; Fig. 3For the top view of the syndeton of interior wall shown in Fig. 1.
In a kind of detailed description of the invention, the interior wall syndeton that the utility model provides is for steel constructionLou Ti, the interior wall of described steel construction building body comprises the first inner wall 1 and second inner wall of adjacent setting2, interior wall syndeton comprises the slideway 4 that is fixed on floor support plate 3, the opening direction court of described slideway 4To described interior wall, and the bearing of trend of described slideway 4 installation direction that is described interior wall; Described firstThe top of inner wall 1 and described the second inner wall 2 one in both is provided with embedded block 11, bothIn the top of another one be provided with buckling groove 21, described embedded block 11 is embedded in described buckling groove 21.In body of wall installation process, first according to the position line of body of wall, slideway 4 is installed, slideway 4 is fixed onFloor support plate 3 (or ground, beam bottom), then, by on-the-spot actual size wall cutting, erects body of wallBody of wall is pushed into assigned address by smooth road 4, realizes body of wall and install. All in this interior wall syndetonThe making of prefabricated component is all taken from green wood and is made simply, has saved interior wall plug-in unit and has made and install, and reducesCost drops into, and without nailing and processing hole for nailing, prefabricated component is pressed line and body of wall is installed naturally vertically, at the bottom of body of wallPortion processes, and saves the step such as timber wedge, cement stabilization, quick for installationly conveniently increases work efficiency. Like this,This interior wall syndeton has realized reliability and convenience that interior wall connects, thereby has ensured the steady of body of wallFixed connection, improve construction efficiency.
Particularly, above-mentioned embedded block 11 is arranged at the top of described the first inner wall 1, described buckling groove21 are arranged at the top of described the second inner wall 2, to improve reasonable integral structure.
Further, above-mentioned the first inner wall 1 offers card towards a side of described the second inner wall 2Groove 12, described the second inner wall 2 has projection 22 towards a side of described the first inner wall 1, described inProjection 22 embeds in described draw-in groove 12, and after body of wall installs, projection 22 is embedded in draw-in groove 12In, thereby improve connection reliability and the structural stability between adjacent two bodies of wall.
Above-mentioned draw-in groove 12 is dovetail groove, described protruding 22 for described dovetail groove match trapezoidal protrudingRise, the bottom land width of described dovetail groove is less than its width of rebate, the small end of described trapezoidal projection with described inBottom land matches, and its large end matches with described notch; Apparently, draw-in groove 12 is also not limited to ladderShape groove, it can be also other forms, such as rectangular channel or deep-slotted chip breaker etc., the shape of projection 22 shouldMatch with draw-in groove 12 shapes,, in the time that draw-in groove 12 is rectangular channel, projection 22 is also rectangular preiection,When draw-in groove 12 is deep-slotted chip breaker, projection 22 is also arc convex.
It is pointed out that ordinal numbers such as " first, second " described in literary composition, is identical in order to distinguishThe different structure of title, only for convenience, does not represent certain order, more should not be construed as anyLimit.
Except above-mentioned interior wall syndeton, the utility model also provides one to comprise above-mentioned interior wall johning knotThe steel construction building body of structure, other each several part structures of this steel construction building body please refer to prior art, at thisRepeat no more.
Only describe some example embodiment of the present utility model by the mode of explanation above, need not putDoubt, for those of ordinary skill in the art, in the situation that not departing from spirit and scope of the present utility model,Can revise described embodiment by various mode. Therefore, above-mentioned accompanying drawing and being described inBe illustrative in essence, should not be construed as the restriction to the utility model claim protection domain.
Claims (5)
1. for an interior wall syndeton for steel construction building body, the interior wall of described steel construction building body comprisesFirst inner wall (1) of adjacent setting and the second inner wall (2), is characterized in that, interior wall connectsStructure comprises the slideway (4) that is fixed on floor support plate (3), the opening direction of described slideway (4) towardsDescribed interior wall, and the bearing of trend of described slideway (4) installation direction that is described interior wall; Described firstThe top of inner wall (1) and described the second inner wall (2) one in both is provided with embedded block (11),The top of the another one in both is provided with buckling groove (21), described in described embedded block (11) is embedded inIn buckling groove (21).
2. interior wall syndeton according to claim 1, is characterized in that, described the first interior wallBody (1) offers draw-in groove (12) towards a side of described the second inner wall (2), in described secondBody of wall (2) has projection (22) towards a side of described the first inner wall (1), described projection (22)Embed in described draw-in groove (12).
3. interior wall syndeton according to claim 2, is characterized in that, described draw-in groove (12)For dovetail groove, described projection (22) is the trapezoidal projection matching with described dovetail groove, described trapezoidalThe bottom land width of groove is less than its width of rebate, and the small end of described trapezoidal projection matches with described bottom land,Its large end matches with described notch.
4. interior wall syndeton according to claim 3, is characterized in that, described embedded block (11)Be arranged at the top of described the first inner wall (1), described buckling groove (21) is arranged in described secondThe top of body of wall (2).
5. a steel construction building body, comprises the first inner wall (1) and second inner wall of adjacent setting(2), it is characterized in that, also comprise and connect described the first inner wall (1) and described the second inner wall(2) interior wall syndeton, described interior wall syndeton is as described in claim 1-4 any oneInterior wall syndeton.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520983782.5U CN205242679U (en) | 2015-12-02 | 2015-12-02 | Steel construction building body and interior wall connection structure thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520983782.5U CN205242679U (en) | 2015-12-02 | 2015-12-02 | Steel construction building body and interior wall connection structure thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205242679U true CN205242679U (en) | 2016-05-18 |
Family
ID=55941757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520983782.5U Active CN205242679U (en) | 2015-12-02 | 2015-12-02 | Steel construction building body and interior wall connection structure thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205242679U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863109A (en) * | 2016-05-26 | 2016-08-17 | 河南仕腾建筑有限公司 | Novel wall body installation structure and novel wall body |
-
2015
- 2015-12-02 CN CN201520983782.5U patent/CN205242679U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863109A (en) * | 2016-05-26 | 2016-08-17 | 河南仕腾建筑有限公司 | Novel wall body installation structure and novel wall body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TW200500432A (en) | A cement system including a binder for use in freeform fabrication | |
CN105862537A (en) | Spliced interlocking structure water-permeable bricks | |
Plan | Volume I | |
CN205242679U (en) | Steel construction building body and interior wall connection structure thereof | |
CN204940505U (en) | A kind of finished product gutter being provided with seamless cover plate | |
CN204238092U (en) | Interim detachable roads plate for building | |
CN205116473U (en) | Steel construction building body and embedded interior wall body that has flat screen television thereof | |
KR20130131057A (en) | Apartment house remodeling construction method for shortage of term to construct with ensuring stock yard | |
CN110306396A (en) | A kind of assembly concrete road surface and construction method | |
CN208055784U (en) | construction site assembled hardened ground | |
CN205171753U (en) | Steel construction unit -installment wall body and door frame wall body node thereof | |
CN205509439U (en) | Swiftly install type cable ditch | |
CN103867210B (en) | A kind of city underground list branch-cut bridge excavating construction method | |
CN205242682U (en) | Steel construction building body and corner wall body node thereof | |
CN208202332U (en) | A kind of structural slab for housing construction | |
CN204899083U (en) | Steel construction building body and connection structure of outer wall and ground interfacial thereof | |
CN103410166A (en) | Basic device for fixing street lamp | |
CN205399833U (en) | Asphalt shingle roofing ridge structure | |
CN211772516U (en) | Interim pavement slab connection structure | |
CN209128830U (en) | Assembled road | |
CN104453017A (en) | Module wall for house building | |
CN205152973U (en) | Root stake | |
CN204920257U (en) | A face frontier defense guardrail bar for cast -in -place concrete roofing | |
Isaacs | Early building legislation | |
CN210439099U (en) | Building waste residue brick that permeates water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20190613 Granted publication date: 20160518 |
|
PD01 | Discharge of preservation of patent | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20220613 Granted publication date: 20160518 |
|
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20220817 Granted publication date: 20160518 |