CN205242401U - Pile bolck supports walking and removes pile platform - Google Patents

Pile bolck supports walking and removes pile platform Download PDF

Info

Publication number
CN205242401U
CN205242401U CN201520970490.8U CN201520970490U CN205242401U CN 205242401 U CN205242401 U CN 205242401U CN 201520970490 U CN201520970490 U CN 201520970490U CN 205242401 U CN205242401 U CN 205242401U
Authority
CN
China
Prior art keywords
platform
framed bent
stake
fixed
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520970490.8U
Other languages
Chinese (zh)
Inventor
张鸿
谢道平
汪文霞
郭强
薛志武
封有德
茅兵海
冯先导
张晓平
侯晓勤
刘益平
张梦元
李曾曾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201520970490.8U priority Critical patent/CN205242401U/en
Application granted granted Critical
Publication of CN205242401U publication Critical patent/CN205242401U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a pile bolck supports walking and removes pile platform, pile bolck top including being fixed in the steel -pipe pile top pushes away positioner, and the pile bolck top is fixed with the bearing platform on pushing away positioner, is fixed with work platform on the bearing platform, and work platform's front portion is fixed with big framed bent leading truck, and the left and right sides of bearing platform is fixed with a float frame leading truck respectively, and both sides are fixed with the mounting platform in the position department that corresponds with the steel -pipe pile around the bearing platform. The three -dimensional jack that pushes away positioner through the pile bolck top realizes that the walking top of platform pushes away the antedisplacement. Can confirm the position to the steel -pipe pile rapidogen through lifting adjusting device, three -dimensional jack and the common work of big or small framed bent leading truck, can realize the construction at whole platform within range steel -pipe pile through the leading truck sideslip, through the mounting platform can realize fast to the installation that the pile bolck top pushed away positioner demolish with the follow -up construction of pile bolck.

Description

Stake topmast support walking moves piling platform
Technical field
The present invention relates to pile foundation construction equipment technical field, refer to that particularly a kind of stake topmast support walking moves piling platform.
Background technology
The conventional fixed operation platform that adopts jack-up unit or set up of aquatic pile foundation construction carries out the injection of steel-pipe pile as basis. Jack-up unit is as special equipment, can adapt to the piling work under different water depth and wave environment, but cost is high, need professional to operate, and when displacement, affected greatly by wave period, move and locate length consuming time, be subject to sea situation ambient influnence large, when change each position, positioning precision is not high, and work efficiency is relatively low; While carrying out steel-pipe pile injection using fixed platform as basis, positioning precision is high, very convenient carry out position conversion in flat roof area time, it is high that but large-area fixed platform is set up cost, narrow application range, only can carry out the piling work in flat roof area, and environmental suitability is poor, generally, only for inland river and lake environment, cannot set up platform in adverse circumstances such as off-lying seas. Environment is also had to considerable influence.
Summary of the invention
Object of the present invention is exactly the deficiency that will solve above-mentioned background technology, provide a kind of stake topmast support walking to move piling platform, this piling platform utilizes pushing tow positioner to move, and carry out piling construction operation by big or small framed bent leading truck, can meet the construction requirement of complex environment, practical.
For realizing this object, the designed stake topmast support walking of the present invention moves piling platform, comprise the stake top pushing tow positioner that is arranged at steel-pipe pile top, on the pushing tow positioner of described stake top, be provided with bearing platform, on described bearing platform, be provided with job platform, the front portion of described job platform is provided with large framed bent leading truck, the left and right sides of described bearing platform is respectively arranged with a float frame leading truck, and the both sides, front and back of described bearing platform are being provided with mounting platform with the corresponding position of steel-pipe pile.
Further, described bearing platform comprises the many main longitudinal griders that be arranged in parallel, between described main longitudinal grider, be fixedly connected with the many crossbeams vertical with main longitudinal grider, in the rearward end of described main longitudinal grider, be fixed with the contact beam parallel with crossbeam, on described contact beam, be fixed with mounting platform, the front end of described main longitudinal grider is also fixed with mounting platform.
Further, the middle part of two main longitudinal griders of the described bearing platform leftmost side and the rightmost side is respectively arranged with a guide support frame, and described float frame leading truck is arranged on guide support frame.
Further, described large framed bent leading truck comprises large framed bent support, the top of described large framed bent support is fixed with large framed bent guide rail, bottom is fixed with large framed bent support body bracing frame, on described large framed bent guide rail, be provided with slide block, described slide block is fixedly connected with the oil cylinder axle of sideslip oil cylinder one side, the oil cylinder axle of described sideslip oil cylinder opposite side is fixedly connected with large framed bent guiding support body, described large framed bent guiding support body top is provided with large framed bent guide support frame, described large framed bent guide support sets up and is placed in large framed bent guide rail, the bottom of described large framed bent guiding support body is arranged in large framed bent support body bracing frame.
Further, described stake top pushing tow positioner comprises a top positioning seat, and positioning seat bottom, described stake top has with steel-pipe pile stake pushes up the locating slot coordinating; Positioning seat top, described stake top is provided with bracing frame, between support frame as described above and stake top positioning seat, is connected with elevation and subsidence regulating device; The locking device that is fixed with three-way jack on the top board of support frame as described above and is fixed with bearing platform base plate.
Further, described elevation and subsidence regulating device comprises and is arranged at a screw shell at positioning seat top, top, and described screw shell internal thread is connected with internal and external threads sleeve pipe, and described internal and external threads sleeve pipe internal thread is connected with screw rod, and described screw rod top is fixed in bracing frame.
Further, the center of top of described screw rod has positioning through hole, the both sides, front and back of described positioning through hole are respectively equipped with a screw rod location-plate, between described two screw rod location-plates and the positioning through hole of screw rod, are connected with alignment pin, and described screw rod location-plate is fixed in bracing frame; The top of described elevation and subsidence regulating device is also fixed with ball pivot nut, in described ball pivot nut, is combined with ball pivot bolt, and described ball pivot bolt top is connected with ball pivot, and the bottom laminating of described ball pivot and bracing frame compresses.
Further, the top board bilateral symmetry of support frame as described above is fixed with a locking device; Described locking device comprises lock bracket, and described lock bracket top has been fixed locking adjustable plate, on described locking adjustable plate, has longitudinal screw hole, is combined with the clamping screw that compresses bearing platform base plate in described longitudinal screw hole.
Further, described lock bracket comprises two just right rocker plate, and the top of described two rocker plate is connected with connecting axle, and described connecting axle is through locking bed, the top of described locking bed is provided with the plate that is locked, described in the be locked rear portion of plate be provided with locking support plate; The back support of described locking adjustable plate is on locking support plate, the both sides, middle part of described locking adjustable plate bottom surface are respectively arranged with a stop sleeve, the both sides, rear portion of the described plate that is locked are respectively arranged with a longitudinal adjusting bolt, described longitudinal adjusting bolt is arranged in stop sleeve, the top of described longitudinal adjusting bolt is connected with locking nut through locking adjustable plate, and described clamping screw is arranged at the front part sides of locking adjustable plate.
Further, the both sides of described locking adjustable plate have slotted hole, the top of described clamping screw is through connecting locking nut in slotted hole, and the internal diameter of described stop sleeve is greater than the diameter of longitudinal adjusting bolt, described in be locked and be fixedly connected with stiffener between the both sides, rear portion of plate and locking bed.
The invention has the beneficial effects as follows: stake top pushing tow positioner is installed on stake top, and bearing platform is supported on pushing tow positioner, by the walking pushing tow reach of three-way jack implementation platform. Because platform is supported on the steel-pipe pile of having constructed, the first location of platform can complete automatically, can accurately locate fast steel-pipe pile by elevation and subsidence regulating device, three-way jack and the common work of big or small framed bent leading truck, by the traversing construction that realizes steel-pipe pile in whole flat roof area of leading truck, can realize fast the assembling and disassembling of stake top pushing tow positioner and the stake follow-up construction in top by mounting platform. Platform movement is simple to operate, has greatly improved efficiency of construction, has reduced the artificial amount of labour, has good practicality and market using value.
Brief description of the drawings
Fig. 1 is the top view of platform of driving piles in the present invention;
Fig. 2 is the top view of bearing platform in the present invention;
Fig. 3 is the mounting structure schematic diagram of the medium and small framed bent leading truck of the present invention;
Fig. 4 is the mounting structure schematic diagram of large framed bent leading truck in the present invention;
Fig. 5 is king-pile of the present invention top pushing tow positioner coordinates location structural representation with bearing platform base plate;
Fig. 6 is the front view of king-pile of the present invention top pushing tow positioner;
Fig. 7 is that in the present invention, screw rod is arranged at the structural representation in bracing frame;
Fig. 8 is the side view of three-way jack in the present invention;
Fig. 9 is the side view of rocking arm in the present invention;
Figure 10 is the top view of three-way jack in the present invention;
Figure 11 is the top view of king-pile of the present invention top positioning seat;
Figure 12 is the platform technology flow chart one of driving piles in the present invention;
Figure 13 is the platform technology flowchart 2 of driving piles in the present invention;
Figure 14 is the platform technology flow chart 3 of driving piles in the present invention;
Figure 15 is the platform technology flow chart four of driving piles in the present invention;
Figure 16 is the side view of large framed bent leading truck location structure in the present invention;
Figure 17 is the structural representation of large framed bent leading truck top localization part in the present invention;
Figure 18 is the structural representation of large framed bent leading truck bottom localization part in the present invention;
Wherein, 101-stake top positioning seat, 101.1-screw shell locating hole, 101.2-ball pivot bolt positioning hole, 102-steel-pipe pile, 103-locating slot, 104-bracing frame, 105-elevation and subsidence regulating device, 105.1-screw shell, 105.2-internal and external threads sleeve pipe, 105.3-screw rod, 106-three-way jack, 106.1-main top, 106.2-vertical shift oil cylinder, 106.3-sideslip oil cylinder, 107-bearing platform, 108-locking device, 108.1-locking adjustable plate, 108.2-locking bed, 108.3-plate is locked, 108.4-locking support plate, 108.5-stop sleeve, 108.6-longitudinally adjusting bolt, 108.7-locking nut, 108.8-clamping screw, 108.9-stiffener, 109-rubber ring, 110-positioning through hole, 111-screw rod location-plate, 112-alignment pin, 113-rocker plate, 114-connecting axle, 115-ball pivot nut, 116-ball pivot bolt, 117-ball pivot. 200-job platform, 201-large framed bent leading truck, 201.1-large framed bent support, 201.2-large framed bent guide rail, 201.3-slide block, 201.4-sideslip oil cylinder, 201.5-large framed bent guiding support body, 201.6-large framed bent guide support frame, 201.7-large framed bent support body bracing frame, 202-float frame leading truck, 203-mounting platform, 204-tie-rod.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Stake topmast support walking as shown in Fig. 1-4 moves piling platform, comprise the stake top pushing tow positioner that is fixed on steel-pipe pile 102 tops, on the pushing tow positioner of stake top, be fixed with bearing platform 107, on bearing platform 107, be fixed with job platform 200, the front portion of job platform 200 is fixed with large framed bent leading truck 201, the left and right sides of bearing platform 107 is fixed with respectively a float frame leading truck 202, and the both sides, front and back of bearing platform 107 are being fixed with mounting platform 203 with the corresponding position of steel-pipe pile 102.
As shown in Figure 2, bearing platform 107 comprises the many main longitudinal griders that be arranged in parallel 107.1, between main longitudinal grider 107.1, be fixedly connected with the many crossbeams 107.2 vertical with main longitudinal grider 107.1, in the rearward end of main longitudinal grider 107.1, be fixed with parallel with crossbeam 107.2 beam 107.3 that contacts, on contact beam 107.3, be fixed with mounting platform 203, the front end of main longitudinal grider 107.1 is also fixed with mounting platform 203. Main longitudinal grider 107.1 is supported on a top pushing tow positioner.
In technique scheme, the middle part of two main longitudinal griders 107.1 of bearing platform 107 leftmost sides and the rightmost side is fixed with respectively a guide support frame 107.4, and float frame leading truck 202 is fixed on guide support frame 107.4. Guide support frame 107.4 is strengthened the structural strength of float frame leading truck 202.
As Fig. 4, shown in Figure 16-18, large framed bent leading truck 201 comprises large framed bent support 201.1, the top of large framed bent support 201.1 is fixed with large framed bent guide rail 201.2, bottom is fixed with large framed bent support body bracing frame 201.7, on large framed bent guide rail 201.2, be provided with slide block 201.3, slide block 201.3 is fixedly connected with the oil cylinder axle of sideslip oil cylinder 201.4 one sides, the oil cylinder axle of sideslip oil cylinder 201.4 opposite sides is fixedly connected with large framed bent guiding support body 201.5, large framed bent guiding support body 201.5 tops are provided with large framed bent guide support frame 201.6, large framed bent guide support frame 201.6 is arranged in large framed bent guide rail 201.2, the bottom of large framed bent guiding support body 201.5 is arranged in large framed bent support body bracing frame 201.7. slide block 201.3 is driven by sideslip oil cylinder 201.4, on large framed bent guide rail 201.2, slide, slide block 201.3 is bolted on large framed bent guide rail 201.2 after arriving precalculated position, sideslip oil cylinder 201.4 again moves and pulls large framed bent guiding support body 201.5 to slide and arrive assigned address on large framed bent guide rail 201.2, coordinate again crawler crane to feed stake operation, can in the direction of advance of mobile platform, make a call to row's steel-pipe pile 102.
As shown in Fig. 5-11, stake top pushing tow positioner comprises a top positioning seat 101, and stake positioning seat 101 bottoms, top have the locating slot 103 coordinating with 102 tops of steel-pipe pile; Stake positioning seat 101 tops, top are provided with bracing frame 104, between bracing frame 104 and stake top positioning seat 101, are connected with elevation and subsidence regulating device 105; The locking device 108 that is fixed with three-way jack 106 on the top board of bracing frame 104 and is fixed with bearing platform 107 base plates. Stake top positioning seat 101 designs according to the shape at steel-pipe pile 102 tops, coordinate location with steel-pipe pile 102, regulate the height of elevation and subsidence regulating device 105 adjusting support frames 104, when platform is during in construction location place, operation locking device 108 locking platforms, in the time that platform need to move, unclamp locking device 108, by three-way jack 106, platform is carried out to pushing tow and movement.
As shown in Fig. 5, Fig. 7-9, on the circumferential cell wall of the locating slot 103 of stake top positioning seat 101, be fixed with rubber ring 109. Improve the structural stability that 102 tops of stake top positioning seat 101 and steel-pipe pile coordinate location.
As shown in Fig. 5-9, elevation and subsidence regulating device 105 comprises and is arranged at a screw shell 105.1 at top positioning seat 101 tops, screw shell 105.1 internal threads are connected with internal and external threads sleeve pipe 105.2, internal and external threads sleeve pipe 105.2 internal threads are connected with screw rod 105.3, and screw rod 105.3 tops are fixed in bracing frame 104; The top of described elevation and subsidence regulating device 105 is also fixed with ball pivot nut 115, in described ball pivot nut 115, is combined with ball pivot bolt 116, and described ball pivot bolt 116 tops are connected with ball pivot 117, and described ball pivot 117 compresses with the bottom laminating of bracing frame 104. As shown in figure 10, the top week of stake top positioning seat 101 upwards has screw shell locating hole 101.1 and ball pivot bolt positioning hole 101.2 in even interval, screw shell 105.1 is fixed in screw shell locating hole 101.1, and ball pivot bolt 116 is arranged in ball pivot bolt positioning hole 101.2. By the structure of ball pivot 117, ensure supporting seat 104 levels, guarantee that jacking is stable. Rotation internal and external threads sleeve pipe 105.2, moves up and down screw rod 105.3, thereby adjusts the height of bracing frame 104.
As shown in Figure 7, the center of top of screw rod 105.3 has positioning through hole 110, the both sides, front and back of positioning through hole 110 are respectively equipped with a screw rod location-plate 111, between two screw rod location-plates 111 and the positioning through hole 110 of screw rod 105.3, be connected with alignment pin 112, screw rod location-plate 111 is fixed in bracing frame 104. Between screw rod 105.3 and bracing frame 104, there is little activity space, can make screw rod 105.3 in the time bearing bracing frame 104 weight, carry out self-compensating, further improve structural stability.
As shown in Figure 6, the top board bilateral symmetry of bracing frame 104 is fixed with a locking device 108; Locking device comprises lock bracket, and lock bracket top has been fixed locking adjustable plate 108.1, on locking adjustable plate 108.1, has longitudinal screw hole, is combined with the clamping screw 108.8 that compresses bearing platform 107 base plates in longitudinal screw hole.
As shown in Fig. 6 and Fig. 9, described lock bracket comprises two just right rocker plate 113, the top of described two rocker plate 113 is provided with connecting axle 114 (being an elongated axle), described connecting axle 114 is through locking bed 108.2, the top of described locking bed 108.2 is provided with the plate 108.3 that is locked, described in the be locked rear portion of plate 108.3 be provided with locking support plate 108.4; The back support of described locking adjustable plate 108.1 is on locking support plate 108.4, the both sides, middle part of described locking adjustable plate 108.1 bottom surfaces are respectively arranged with a stop sleeve 108.5, the both sides, rear portion of the described plate 108.3 that is locked are respectively arranged with a longitudinal adjusting bolt 108.6, described longitudinal adjusting bolt 108.6 is arranged in stop sleeve 108.5, the top of described longitudinal adjusting bolt 108.6 is connected with locking nut 108.7 through locking adjustable plate 108.1, and described clamping screw 108.8 is arranged at the front part sides of locking adjustable plate 108.1.
In technique scheme, the both sides of locking adjustable plate 108.1 have slotted hole, the top of clamping screw 108.8 is through connecting locking nut 108.7 in slotted hole, the internal diameter of stop sleeve 108.5 is greater than the diameter of longitudinal adjusting bolt 108.6, between the both sides, rear portion of locking support plate 108.3 and lock bracket plate 108.2, is fixedly connected with stiffener 108.9. The structural strength of further strengthening locking support plate 108.3, ensures the locking effect to bearing platform 107 base plates.
As shown in Figure 12-15, between stake top positioning seat 101, be also fixedly connected with tie-rod, thrustor is linked into an integrated entity, guarantee that jacking is stable.
The moving process of the designed piling platform of the present invention is: as shown in Figure 1, walking moves piling platform and comprises and set up at the stake top pushing tow positioner on 102 tops of steel-pipe pile, set up bearing platform 107 on the pushing tow positioner of stake top, set up job platform 200 on bearing platform 107, on job platform 200 and bearing platform 107, set up respectively big or small framed bent leading truck, sets up mounting platform 203 in the front and back of bearing platform 107.
As shown in figure 12, according to in-site measurement data, adjust after a height of top pushing tow positioner, whole platform is installed successively, after platform is in place, bearing platform 107 is locked with locking device 108. After completing, platform testing will carry out piling construction by large framed bent leading truck 201 or float frame leading truck 202.
As shown in figure 13, after steel-pipe pile injection completes, on the stake top of the new construction steel pile tube 102 of correspondence, stake top pushing tow positioner is installed by mounting platform 203.
As shown in figure 14, after installation, three-way jack 106 pushes up bearing platform 107 from bearing and promotes bearing platform 107 and synchronously moves forward, move forward after a stroke, three-way jack 106 declines, and bearing platform 107 drops on a top pushing tow positioner, 106.2 oil returns of vertical shift oil cylinder, so move in circles, whole platform synchronous push is advanced. While there is skew, the sideslip oil cylinder 106.3 of three-way jack 106 can promote platform and laterally rectify a deviation.
As shown in figure 15, after platform synchronous push puts in place, platform drops on locking device 108 both sides and locking, and the stake top pushing tow positioner after removing by mounting platform 203 on campshed stake top, carries out next campshed injection.
The above, be only preferred embodiment of the present invention, not structure of the present invention done to any pro forma restriction. Any simple modification, equivalent variations and modification that every foundation technical spirit of the present invention is done above embodiment, all still belong in the scope of technical scheme of the present invention.

Claims (10)

1. a stake topmast support walking moves piling platform, it is characterized in that: it comprises the stake top pushing tow positioner that is arranged at steel-pipe pile (102) top, on the pushing tow positioner of described stake top, be provided with bearing platform (107), on described bearing platform (107), be fixed with job platform (200), the front portion of described job platform (200) is provided with large framed bent leading truck (201), the left and right sides of described bearing platform (107) is respectively arranged with a float frame leading truck (202), the both sides, front and back of described bearing platform (107) are being provided with mounting platform (203) with the corresponding position of steel-pipe pile (102).
2. a kind of stake topmast support walking according to claim 1 moves piling platform, it is characterized in that: described bearing platform (107) comprises the many main longitudinal griders that be arranged in parallel (107.1), between described main longitudinal grider (107.1), be fixedly connected with the many crossbeams (107.2) vertical with main longitudinal grider (107.1), in the rearward end of described main longitudinal grider (107.1), be fixed with the contact beam (107.3) parallel with crossbeam (107.2), on described contact beam (107.3), be provided with mounting platform (203), the front end of described main longitudinal grider (107.1) is also provided with mounting platform (203).
3. a kind of stake topmast support walking according to claim 2 moves piling platform, it is characterized in that: the middle part of two main longitudinal griders (107.1) of described bearing platform (107) leftmost side and the rightmost side is respectively arranged with a guide support frame (107.4), and described float frame leading truck (202) is arranged on guide support frame (107.4).
4. a kind of stake topmast support walking according to claim 1 moves piling platform, it is characterized in that: described large framed bent leading truck (201) comprises large framed bent support (201.1), the top of described large framed bent support (201.1) is provided with large framed bent guide rail (201.2), bottom is provided with large framed bent support body bracing frame (201.7), on described large framed bent guide rail (201.2), be provided with slide block (201.3), described slide block (201.3) is connected with the oil cylinder axle of sideslip oil cylinder (201.4) one sides, the oil cylinder axle of described sideslip oil cylinder (201.4) opposite side connects large framed bent guiding support body (201.5), described large framed bent guiding support body (201.5) top is provided with large framed bent guide support frame (201.6), described large framed bent guide support frame (201.6) is arranged in large framed bent guide rail (201.2), the bottom of described large framed bent guiding support body (201.5) is arranged in large framed bent support body bracing frame (201.7).
5. a kind of stake topmast support walking according to claim 1 moves piling platform, it is characterized in that: described stake top pushing tow positioner comprises a top positioning seat (101), and described stake top positioning seat (101) bottom has the locating slot (103) coordinating with steel-pipe pile (102) stake top; Described stake top positioning seat (101) top is provided with bracing frame (104), between support frame as described above (104) and stake top positioning seat (101), is connected with elevation and subsidence regulating device (105); The locking device (108) that is fixed with three-way jack (106) on the top board of support frame as described above (104) and is fixed with bearing platform (107) base plate.
6. a kind of stake topmast support walking according to claim 5 moves piling platform, it is characterized in that: described elevation and subsidence regulating device (105) comprises and is arranged at a screw shell (105.1) at top positioning seat (101) top, described screw shell (105.1) internal thread is connected with internal and external threads sleeve pipe (105.2), described internal and external threads sleeve pipe (105.2) internal thread is connected with screw rod (105.3), and described screw rod (105.3) top is fixed in bracing frame (104).
7. a kind of stake topmast support walking according to claim 6 moves piling platform, it is characterized in that: the center of top of described screw rod (105.3) has positioning through hole (110), the both sides, front and back of described positioning through hole (110) are respectively equipped with a screw rod location-plate (111), between the positioning through hole (110) of described two screw rod location-plates (111) and screw rod (105.3), be connected with alignment pin (112), described screw rod location-plate (111) is fixed in bracing frame (104); The top of described elevation and subsidence regulating device (105) is also fixed with ball pivot nut (115), in described ball pivot nut (115), be combined with ball pivot bolt (116), described ball pivot bolt (116) top is connected with ball pivot (117), and described ball pivot (117) compresses with the bottom laminating of bracing frame (104).
8. a kind of stake topmast support walking according to claim 5 moves piling platform, it is characterized in that: the top board bilateral symmetry of support frame as described above (104) is fixed with a locking device (108); Described locking device comprises lock bracket, described lock bracket top has been fixed locking adjustable plate (108.1), on described locking adjustable plate (108.1), have longitudinal screw hole, in described longitudinal screw hole, be combined with the clamping screw (108.8) that compresses bearing platform (107) base plate.
9. a kind of stake topmast support walking according to claim 8 moves piling platform, it is characterized in that: described lock bracket comprises two just right rocker plate (113), between the top of described two rocker plate (113), be connected with connecting axle (114), described connecting axle (114) is through locking bed (108.2), the top of described locking bed (108.2) is provided with the plate that is locked (108.3), described in the be locked rear portion of plate (108.3) be provided with locking support plate (108.4), the back support of described locking adjustable plate (108.1) is on locking support plate (108.4), the both sides, middle part of described locking adjustable plate (108.1) bottom surface are respectively arranged with a stop sleeve (108.5), the both sides, rear portion of the described plate that is locked (108.3) are respectively arranged with a longitudinal adjusting bolt (108.6), described longitudinal adjusting bolt (108.6) is arranged in stop sleeve (108.5), the top of described longitudinal adjusting bolt (108.6) is connected with locking nut (108.7) through locking adjustable plate (108.1), described clamping screw (108.8) is arranged at the front part sides of locking adjustable plate (108.1).
10. a kind of stake topmast support walking according to claim 9 moves piling platform, it is characterized in that: the both sides of described locking adjustable plate (108.1) have slotted hole, the top of described clamping screw (108.8) is through connecting locking nut (108.7) in slotted hole, the internal diameter of described stop sleeve (108.5) is greater than the diameter of longitudinal adjusting bolt (108.6), described in be locked and be fixedly connected with stiffener (108.9) between the both sides, rear portion of plate (108.3) and locking bed (108.2).
CN201520970490.8U 2015-11-27 2015-11-27 Pile bolck supports walking and removes pile platform Withdrawn - After Issue CN205242401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520970490.8U CN205242401U (en) 2015-11-27 2015-11-27 Pile bolck supports walking and removes pile platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520970490.8U CN205242401U (en) 2015-11-27 2015-11-27 Pile bolck supports walking and removes pile platform

Publications (1)

Publication Number Publication Date
CN205242401U true CN205242401U (en) 2016-05-18

Family

ID=55941479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520970490.8U Withdrawn - After Issue CN205242401U (en) 2015-11-27 2015-11-27 Pile bolck supports walking and removes pile platform

Country Status (1)

Country Link
CN (1) CN205242401U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421454A (en) * 2015-11-27 2016-03-23 中交第二航务工程局有限公司 Pile top supporting walking type moving piling platform
WO2018000408A1 (en) * 2016-07-01 2018-01-04 中交武汉港湾工程设计研究院有限公司 Pile top pushing and positioning device
WO2018000409A1 (en) * 2016-07-01 2018-01-04 中交第二航务工程局有限公司 Pile top-supported walking type moving pile-driving platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421454A (en) * 2015-11-27 2016-03-23 中交第二航务工程局有限公司 Pile top supporting walking type moving piling platform
WO2018000408A1 (en) * 2016-07-01 2018-01-04 中交武汉港湾工程设计研究院有限公司 Pile top pushing and positioning device
WO2018000409A1 (en) * 2016-07-01 2018-01-04 中交第二航务工程局有限公司 Pile top-supported walking type moving pile-driving platform

Similar Documents

Publication Publication Date Title
CN105421454A (en) Pile top supporting walking type moving piling platform
CN205242401U (en) Pile bolck supports walking and removes pile platform
WO2018000409A1 (en) Pile top-supported walking type moving pile-driving platform
CN202466592U (en) Tool type guiding pile-sinking device
CN105442517A (en) Pile top pushing and positioning device
CN204524643U (en) To pipe device
CN203793390U (en) Mobile car for mounting guide rail rack
CN102535469B (en) Tool type guiding pile-sinking device
CN210482355U (en) Offshore wind power jacket foundation pile sinking retainer
CN104276527A (en) Tower equipment hoisting device and using method thereof
CN205296119U (en) Pile bolck top pushes away positioner
CN201980397U (en) Underwater slipway for ship berth
CN104514201A (en) Bridge jacking applied three-axis parallel mechanism
CN204662444U (en) Large diameter steel pipe sunk pile fixed guide
CN109946040B (en) Liftable wave generation system
CN201579547U (en) Mini-excavator unloading frame correcting device
CN204235054U (en) Pressure container cylinder grouping machine
CN103132554B (en) Wireless remote control stride formula underwater leveling machine working method
CN205046535U (en) Portable steel platform of marine construction operation
CN203846403U (en) Assembled type ashore temporary buttress device
CN204151018U (en) tower equipment hoisting device
CN203544344U (en) Ship displacement lateral positioning device
CN215977257U (en) Portable stake machine construction platform on water
CN208949961U (en) The dedicated pile frame of trolley
CN203546691U (en) Overwater movable lifting type multifunctional working platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160518

Effective date of abandoning: 20170825