CN205241039U - Installation hoist of generator - Google Patents
Installation hoist of generator Download PDFInfo
- Publication number
- CN205241039U CN205241039U CN201521135324.2U CN201521135324U CN205241039U CN 205241039 U CN205241039 U CN 205241039U CN 201521135324 U CN201521135324 U CN 201521135324U CN 205241039 U CN205241039 U CN 205241039U
- Authority
- CN
- China
- Prior art keywords
- generator
- hanger
- flange
- suspender body
- generator according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本实用新型提供了一种发电机的安装吊具,该安装吊具包括吊具本体,所述吊具本体上设置有第一吊耳以及第二吊耳,吊具本体的一端为环状结构,所述环状结构上设置有与待吊装的发电机主轴上的法兰相匹配的连接法兰,所述吊具本体上还设置有至少一个辅助吊耳。本实用新型的发电机的安装吊具通过连接法兰与发电机紧固连接,能够有效地避免发生发电机连接不牢固、掉落发电机等现象,同时,辅助吊耳与第一吊耳协同将发电机起吊和翻身,减小了每台吊车上的重量,降低了吊车的吨位,节省了成本。
The utility model provides a generator installation hanger, the installation hanger includes a hanger body, the first hanger and the second hanger are arranged on the hanger body, and one end of the hanger body is a ring structure , the annular structure is provided with a connecting flange matching the flange on the main shaft of the generator to be hoisted, and at least one auxiliary lifting eye is also provided on the hanger body. The generator installation hanger of the utility model is tightly connected to the generator through the connecting flange, which can effectively avoid the phenomenon that the generator is not firmly connected and the generator is dropped. At the same time, the auxiliary lifting lug cooperates with the first lifting lug Hoisting and turning over the generator reduces the weight of each crane, reduces the tonnage of the crane, and saves costs.
Description
技术领域technical field
本实用新型涉及设备吊装技术,尤其涉及一种发电机的安装吊具。The utility model relates to equipment hoisting technology, in particular to a generator installation hanger.
背景技术Background technique
现有的风力发电机组发电机的安装过程主要是通过发电机上设置的两个对称的吊耳,主吊车与吊具通过提升吊耳将发电机提起,在发电机的外缘处安装翻身吊具,该吊具与辅助吊车相连进行发电机的翻身,翻身完成后主吊车将发电机提起,再进行发电机与机舱内底座的对接,安装完成后工作人员在机舱外拆卸吊具。The installation process of the existing wind turbine generator is mainly through the two symmetrical lifting lugs set on the generator, the main crane and the spreader lift the generator by lifting the lifting lugs, and install the turning spreader on the outer edge of the generator , the spreader is connected with the auxiliary crane to turn over the generator. After turning over, the main crane lifts the generator, and then connects the generator to the base in the engine room. After the installation is completed, the staff disassembles the spreader outside the engine room.
为了解决这个问题,一种发电机吊装设备在吊具本体上设有法兰,并通过本体上的法兰与发电机上的连接法兰进行螺栓连接,由此可避免直接提起发电机吊耳而造成发电机的变形。然而,该装置仅能够将发电机吊起翻身,而不能够与发电机的安装面形成一定的角度,使得在安装发电机时容易与发电机的安装面形成上张口,进而造成发电机轴承的损坏。此外,当拆卸吊具时,需要在机舱外进行操作,存在作业危险。In order to solve this problem, a generator hoisting device is provided with a flange on the sling body, and the flange on the body is bolted to the connecting flange on the generator, thereby avoiding the need to directly lift the generator lug and cause deformation of the generator. However, this device can only lift the generator and turn over, but cannot form a certain angle with the installation surface of the generator, so that it is easy to form an upper opening with the installation surface of the generator when installing the generator, and then cause the bearing of the generator to be damaged. damage. In addition, when the spreader is disassembled, it needs to be operated outside the engine room, and there is a risk of operation.
另一种发电机的翻身吊具,其通过至少三个偏心的转爪机构与发电机连接,用于对发电机进行平吊和翻身。当完成发电机的翻转后,其主吊点与发电机重心连线与发电机安装面形成了一定的角度,以便于安装发电机。然而,由于该翻身吊具通过偏心转爪与发电机连接,在经过长时间使用转爪磨损后,无法有效地与发电机紧固连接,容易造成发电机掉落等危险。此外,当拆卸吊具时,也需要在机舱外进行操作,存在作业危险。Another generator turn-over spreader is connected with the generator through at least three eccentric claw mechanisms, and is used for horizontal lifting and turn-over of the generator. After the generator is overturned, the connection line between the main lifting point and the center of gravity of the generator forms a certain angle with the installation surface of the generator, so as to facilitate the installation of the generator. However, since the overturning spreader is connected to the generator through the eccentric claws, after a long period of use, the claws are worn and cannot be effectively tightly connected to the generator, which may easily cause dangers such as the generator falling. In addition, when disassembling the spreader, it also needs to be operated outside the engine room, and there is a risk of operation.
实用新型内容Utility model content
本实用新型的实施例提供一种发电机的安装吊具,以有效地将发电机进行连接、固定,防止吊装的发电机发生掉落等现象,并降低吊车的承重。The embodiment of the utility model provides a generator installation hanger to effectively connect and fix the generator, prevent the hoisted generator from falling, and reduce the load bearing capacity of the crane.
为达到上述目的,本实用新型的实施例提供了一种发电机的安装吊具,其包括吊具本体,吊具本体上设置有第一吊耳以及第二吊耳,吊具本体的一端为环状结构,环状结构上设置有与待吊装的发电机主轴上的法兰相匹配的连接法兰,吊具本体上还设置有至少一个辅助吊耳。In order to achieve the above purpose, the embodiment of the utility model provides a generator installation hanger, which includes a hanger body, a first lifting lug and a second lifting lug are arranged on the spreader body, and one end of the hanger body is A ring structure, the ring structure is provided with a connecting flange matching the flange on the main shaft of the generator to be hoisted, and at least one auxiliary lifting lug is provided on the spreader body.
进一步的,第二吊耳位于吊具本体的重心处。Further, the second lifting lug is located at the center of gravity of the spreader body.
进一步的,第一吊耳的旋转中心和待吊装的发电机的重心的连线与所述发电机的安装面之间形成夹角ɑ,夹角ɑ不小于所述发电机的机舱仰角。Further, an included angle α is formed between the line connecting the rotation center of the first lifting lug and the center of gravity of the generator to be hoisted and the installation surface of the generator, and the included angle α is not less than the elevation angle of the generator cabin.
进一步的,夹角ɑ的大小为1~10°。Further, the size of the included angle α is 1° to 10°.
进一步的,所述第一吊耳位于吊具本体上远离环状结构的一端,辅助吊耳包括两个且对称安装在环状结构上。Further, the first lifting lug is located on the end of the spreader body away from the ring structure, and the auxiliary lifting lugs include two and are symmetrically installed on the ring structure.
进一步的,所述第一吊耳、所述第二吊耳及所述辅助吊耳为吊环、卸扣、带有螺纹孔的连接板或带有通孔的连接板。Further, the first lifting lug, the second lifting lug and the auxiliary lifting lug are lifting rings, shackles, connecting plates with threaded holes or connecting plates with through holes.
进一步的,环状结构为圆环形或正多边形环状结构。Further, the ring structure is a ring structure or a regular polygonal ring structure.
进一步的,连接法兰为圆形或正多边形法兰,连接法兰上的连接孔不少于20个。Further, the connecting flange is a circular or regular polygonal flange, and there are no less than 20 connecting holes on the connecting flange.
进一步的,还包括护栏,所述护栏与吊具本体焊接或通过螺栓拆卸式连接。Further, a guardrail is also included, and the guardrail is welded to the spreader body or detachably connected by bolts.
进一步的,所述护栏包括相互连接的第一踏板层及第二踏板层,第二踏板层位于所述第一踏板层与所述吊具本体之间,所述第一踏板层与发电机进人孔相对应,所述第二踏板层上设置有与所述第一踏板层相连通的通道。Further, the guardrail includes a first pedal layer and a second pedal layer connected to each other, the second pedal layer is located between the first pedal layer and the spreader body, and the first pedal layer is connected to the generator. Corresponding to the manhole, the second pedal layer is provided with a channel communicating with the first pedal layer.
本实用新型的发电机的安装吊具,通过连接法兰与发电机紧固连接,能够有效的避免发生发电机连接不牢固、掉落发电机等现象,同时,在吊具本体上设置的至少一个辅助吊耳与第一吊耳协同将发电机起吊和翻身,减小了每台吊车的承重,降低了吊车的吨位,节省了成本。The generator installation hanger of the utility model is fastened to the generator through the connecting flange, which can effectively avoid the phenomenon that the generator is not firmly connected and the generator is dropped. At the same time, at least An auxiliary lifting lug cooperates with the first lifting lug to hoist and turn over the generator, which reduces the load-bearing capacity of each crane, reduces the tonnage of the crane, and saves costs.
附图说明Description of drawings
图1为本实用新型实施例的发电机的安装吊具的结构示意图;Fig. 1 is the structural representation of the installation hanger of the generator of the utility model embodiment;
图2为本实用新型实施例的安装吊具与发电机组装的结构示意图;Fig. 2 is the structural representation of the assembly of the installation hanger and the generator of the utility model embodiment;
图3为发电机的结构示意图;Fig. 3 is the structural representation of generator;
图4为本实用新型实施例的安装吊具将发电机翻身后的示意图;Fig. 4 is a schematic diagram of the installation sling according to the embodiment of the present invention after turning over the generator;
附图标记说明:Explanation of reference signs:
1、吊具本体;1a、弯臂结构;1b、连接臂结构;11、第一吊耳;12、第二吊耳;13、环状结构;14、连接法兰;15、辅助吊耳;16、弯臂结构;2、护栏;21、第一踏板层;22、第二踏板层;23、通道;3、发电机;31、主轴;32、发电机法兰;33、发电机进人孔;4、螺栓。1. Spreader body; 1a, curved arm structure; 1b, connecting arm structure; 11. First lifting lug; 12. Second lifting lug; 13. Ring structure; 14. Connecting flange; 15. Auxiliary lifting lug; 16. Curved arm structure; 2. Guardrail; 21. First pedal layer; 22. Second pedal layer; 23. Channel; 3. Generator; 31. Main shaft; 32. Generator flange; 33. Generator entry Holes; 4, bolts.
具体实施方式detailed description
本实用新型实施例提出的发电机的安装吊具可用于永磁直驱风力发电机组的发电机的吊装,当然也可用于其他发电机的吊装。为了便于理解,先对发电机的相关结构进行简单介绍。The generator installation hanger proposed by the embodiment of the utility model can be used for the hoisting of the generator of the permanent magnet direct drive wind power generating set, and of course it can also be used for the hoisting of other generators. For ease of understanding, a brief introduction to the relevant structure of the generator is given first.
如图3所示,发电机3的内圈具有主轴31。该主轴31是支撑发电机3的旋转的部件,安装在发电机3上,且主轴31突出的部分较长。主轴31上设置有发电机法兰32,同时在发电机3上还设置有发电机进人孔33,主轴31与发电机进人孔33位于发电机3的同一侧。As shown in FIG. 3 , the inner ring of the generator 3 has a main shaft 31 . The main shaft 31 is a member that supports the rotation of the generator 3, and is attached to the generator 3, and the protruding part of the main shaft 31 is long. A generator flange 32 is arranged on the main shaft 31 , and a generator inlet hole 33 is also arranged on the generator 3 , and the main shaft 31 and the generator inlet hole 33 are located on the same side of the generator 3 .
本实用新型实施例的发电机的安装吊具正是根据上述发电机的结构特点所设计的,下面结合附图对本实用新型实施例的发电机的安装吊具进行详细描述。The installation hanger of the generator of the embodiment of the utility model is designed according to the structural characteristics of the above-mentioned generator, and the installation hanger of the generator of the embodiment of the utility model will be described in detail below with reference to the accompanying drawings.
如图1和图2所示,本实用新型实施例的发电机的安装吊具包括吊具本体1,吊具本体1上设置有用于提升发电机的第一吊耳11以及用于安装吊具的第二吊耳12。吊具本体1的一端为环状结构13,环状结构13上设置有与待吊装的发电机主轴31上的发电机法兰32相匹配的连接法兰14,通过吊装第二吊耳12将吊具安装在发电机3上。此外,在吊具本体1上还设置有至少一个用于辅助提升及翻转发电机的辅助吊耳15。As shown in Fig. 1 and Fig. 2, the generator installation sling of the embodiment of the present invention includes a sling body 1, and the sling body 1 is provided with a first lifting lug 11 for lifting the generator and a hanger for installing the sling. The second lug 12. One end of the spreader body 1 is a ring-shaped structure 13, and the ring-shaped structure 13 is provided with a connecting flange 14 that matches the generator flange 32 on the generator main shaft 31 to be hoisted. By hoisting the second lifting lug 12, the The spreader is installed on the generator 3. In addition, at least one auxiliary lifting lug 15 for assisting in lifting and turning over the generator is provided on the spreader body 1 .
当使用该安装吊具吊装发电机时,使用吊车与第二吊耳12相连接,将待吊装发电机的主轴31置入环状结构13,再将吊具水平提起,使其连接法兰14与发电机法兰32相对并通过螺栓连接;然后使用吊车吊装第一吊耳11及辅助吊耳15将发电机3吊离地面至适当高度后,提升第一吊耳11的同时降下辅助吊耳15对发电机3进行翻转直至发电机达到竖直状态;最后将发电机3与其机舱内底座对接并安装。吊具的连接法兰14与发电机法兰32相对并通过螺栓连接,能够有效地避免发生发电机连接不牢固、掉落发电机等现象。When using the installation sling to hoist the generator, use a crane to connect with the second lifting lug 12, put the main shaft 31 of the generator to be hoisted into the ring structure 13, and then lift the sling horizontally to connect the flange 14 It is opposite to the generator flange 32 and connected by bolts; then use a crane to hoist the first lifting lug 11 and the auxiliary lifting lug 15 to lift the generator 3 off the ground to an appropriate height, lift the first lifting lug 11 and lower the auxiliary lifting lug at the same time 15 Turn over the generator 3 until the generator reaches a vertical state; finally connect the generator 3 with its base in the nacelle and install it. The connecting flange 14 of the hanger is opposite to the generator flange 32 and is connected by bolts, which can effectively avoid phenomena such as weak connection of the generator and dropping of the generator.
在本实施例中,辅助吊耳15优选包括两个且对称安装在环状结构13上,两辅助吊耳15与第一吊耳11协同将发电机3起吊和翻身,减小了每台吊车的承重,降低了吊车的吨位,节省了成本,辅助吊耳15并不局限为两个,可以根据待吊装发电机的需要设定一个、三个或者多个。In this embodiment, the auxiliary lifting lugs 15 preferably include two and are symmetrically installed on the ring structure 13. The two auxiliary lifting lugs 15 cooperate with the first lifting lugs 11 to lift and turn over the generator 3, reducing the number of cranes for each crane. The load bearing reduces the tonnage of the crane and saves costs. The auxiliary lifting lugs 15 are not limited to two, and one, three or more can be set according to the needs of the generator to be hoisted.
为了更方便吊具与发电机相连,将第二吊耳12设置在吊具本体1的重心处,在提起吊具时,能够使其更为平衡,方便安装。In order to connect the sling to the generator more conveniently, the second lifting lug 12 is arranged at the center of gravity of the sling body 1, which can make it more balanced and convenient for installation when the sling is lifted.
如图4所示,当发电机3翻转后,第一吊耳11的旋转中心和待吊装的发电机3的重心的连线与发电机3的安装面之间形成夹角ɑ,并且夹角ɑ不小于发电机3的机舱仰角,其能够避免在安装发电机3时与发电机3的安装面形成上张口,造成发电机轴承的损坏,同时能够避免在安装发电机3时与发电机3的主轴发生干涉,方便发电机3与机舱内底座的对接,有利于发电机的安装。As shown in Figure 4, when the generator 3 is overturned, an included angle ɑ is formed between the rotation center of the first lifting lug 11 and the center of gravity of the generator 3 to be hoisted and the installation surface of the generator 3, and the included angle ɑ is not less than the elevation angle of the engine room of the generator 3, which can avoid forming an opening with the installation surface of the generator 3 when installing the generator 3, causing damage to the bearing of the generator, and can avoid contact with the generator 3 when installing the generator 3 Interference occurs between the main shaft, which facilitates the docking of the generator 3 and the base in the nacelle, and facilitates the installation of the generator.
为了达到上述夹角ɑ的预定值,在设计安装吊具时,优选的,吊具本体1包括弯臂结构1a及连接臂结构1b,第一吊耳11位于弯臂结构1a上,连接臂结构1b与发电机3的安装面平行,发电机3的机舱仰角是出厂时已经确定的,做一条直线L,使其通过发电机3的重心,同时与发电机3的安装面之间形成不小于发电机3机舱仰角的夹角ɑ,第一吊耳11的旋转中心要位于直线L上,同时保证弯臂结构1a与连接臂结构1b之间形成夹角C,且夹角C的数值为0-180°之间的任意数值,不包括0°及180°两个端值,即可满足当发电机3翻转后,第一吊耳11的旋转中心和待吊装的发电机3的重心的连线与发电机3的安装面之间形成夹角ɑ,并且夹角ɑ不小于发电机3的机舱仰角。In order to achieve the predetermined value of the above angle α, when designing and installing the spreader, preferably, the spreader body 1 includes a curved arm structure 1a and a connecting arm structure 1b, the first lifting lug 11 is located on the curved arm structure 1a, and the connecting arm structure 1b is parallel to the installation surface of the generator 3. The elevation angle of the engine room of the generator 3 has been determined at the time of delivery. A straight line L is made so that it passes through the center of gravity of the generator 3 and at the same time forms a distance not less than For the included angle ɑ of the elevation angle of the engine room of generator 3, the rotation center of the first lifting lug 11 must be located on the straight line L, and at the same time ensure that the included angle C is formed between the curved arm structure 1a and the connecting arm structure 1b, and the value of the included angle C is 0 Any value between -180°, excluding the two end values of 0° and 180°, can satisfy the connection between the rotation center of the first lifting lug 11 and the center of gravity of the generator 3 to be hoisted after the generator 3 is overturned. An included angle α is formed between the line and the installation surface of the generator 3, and the included angle α is not less than the elevation angle of the engine room of the generator 3.
由于不同型号发电机出厂时的机舱仰角是不同的,所以根据实际安装情况,夹角ɑ优选为1~10°之间的任意值,包括1°及10°两个端值,以满足不同发电机的安装需求。Since different types of generators have different elevation angles of the nacelle when they leave the factory, according to the actual installation situation, the included angle ɑ is preferably any value between 1° and 10°, including the two extreme values of 1° and 10°, so as to meet different power generation requirements. machine installation requirements.
第一吊耳11位于吊具本体1上远离环状结构13的一端,在起吊发电机时,主吊车与第一吊耳11相连接进行起吊,通过辅助吊车与位于环状结构13上的两辅助吊耳15相连接进行辅助起吊及翻身,使得吊具的结构更为简化,重量轻,节约成本,同时,易于发电机3的翻转。The first lifting lug 11 is located on the end of the spreader body 1 away from the ring structure 13. When lifting the generator, the main crane is connected to the first lifting lug 11 for lifting. The auxiliary lifting lugs 15 are connected for auxiliary lifting and turning over, so that the structure of the spreader is simplified, the weight is light, and the cost is saved. At the same time, it is easy to turn over the generator 3 .
第一吊耳11、第二吊耳12及辅助吊耳15为本实施例附图所示的吊环结构,但并不局限为吊环结构,其也可以采用卸扣、带有螺纹孔的连接板或带有通孔的连接板结构。第一吊耳11、第二吊耳12及辅助吊耳15可以为上述同一种结构形式,也可以采用上述不同的结构形式,如第一吊耳11采用吊环结构,第二吊耳12及辅助吊耳15采用卸扣结构,可以根据需要任意选择。The first lifting lug 11, the second lifting lug 12 and the auxiliary lifting lug 15 are the lifting ring structure shown in the drawings of this embodiment, but they are not limited to the lifting ring structure, and it can also use a shackle or a connecting plate with a threaded hole. Or a connection plate structure with through holes. The first lifting lug 11, the second lifting lug 12 and the auxiliary lifting lug 15 can be in the same structural form as above, and can also adopt a different structural form as above. For example, the first lifting lug 11 adopts a ring structure, the second lifting lug 12 and the auxiliary The lifting lug 15 adopts a shackle structure, which can be selected arbitrarily as required.
环状结构13不局限于本实施例附图所示的圆环形环装结构,也可采用正多边形环状结构,如正四边形环状结构,只要其能够满足让发电机主轴31通过的要求即可。The ring structure 13 is not limited to the circular ring structure shown in the drawings of this embodiment, and a regular polygon ring structure, such as a regular quadrilateral ring structure, can also be used, as long as it can meet the requirements for the generator main shaft 31 to pass through That's it.
相应地,连接法兰14也不局限于本实施例附图所示的圆形法兰,也可为正多边形法兰,如正四边形法兰,为了保证连接强度,连接法兰14上的连接孔优选不少于20个。Correspondingly, the connecting flange 14 is not limited to the circular flange shown in the accompanying drawings of this embodiment, and can also be a regular polygonal flange, such as a regular quadrilateral flange. In order to ensure the connection strength, the connection on the connecting flange 14 The number of holes is preferably not less than 20.
为了方便吊具的拆卸,同时保证操作人员的人身安全,上述各实施方式所述的安装吊具还包括护栏2,护栏2与吊具本体1通过螺栓4拆卸式连接,当然,护栏2与吊具本体1也可采用焊接固定,护栏2能够对工作人员及操作工具进行承载,方便吊具安装及拆卸工作的有序进行,安全可靠。In order to facilitate the disassembly of the spreader and at the same time ensure the personal safety of the operator, the installation spreader described in the above embodiments also includes a guardrail 2, which is detachably connected to the spreader body 1 through bolts 4. Of course, the guardrail 2 and the hanger The tool body 1 can also be fixed by welding, and the guardrail 2 can carry the staff and operating tools, so that the installation and disassembly of the spreader can be carried out in an orderly manner, and it is safe and reliable.
具体的,护栏2包括相互连接的第一踏板层21及第二踏板层22,第二踏板层22位于第一踏板层21与吊具本体1之间,第一踏板层21与发电机进人孔33相对应,工作人员从机舱内通过发电机进人孔33到达护栏2的第一踏板层21,安全可靠,方便安装,第二踏板层22上设置有与第一踏板层21相连通的通道23,第一踏板层21及第二踏板层22焊接固定,第二踏板层22用于承载工作人员以及操作工具,工作人员从第一踏板层21通过通道23进入第二踏板层22进行发电机吊具的拆卸工作,完成后可以乘坐发电机吊具下塔,安全可靠、方便快捷。Specifically, the guardrail 2 includes a first pedal layer 21 and a second pedal layer 22 connected to each other, the second pedal layer 22 is located between the first pedal layer 21 and the spreader body 1, and the first pedal layer 21 is connected to the generator. Corresponding to the hole 33, the staff arrives at the first pedal layer 21 of the guardrail 2 through the generator manhole 33 from the cabin, which is safe and reliable, and convenient for installation. The channel 23, the first pedal layer 21 and the second pedal layer 22 are welded and fixed, the second pedal layer 22 is used to carry the staff and operating tools, and the staff enters the second pedal layer 22 from the first pedal layer 21 through the channel 23 to generate electricity After the disassembly work of the generator spreader is completed, the generator spreader can be used to go down the tower, which is safe, reliable, convenient and fast.
本实用新型的发电机的安装吊具,通过连接法兰与发电机紧固连接,能够有效的避免发生发电机连接不牢固、掉落发电机等现象,同时,在吊具本体上设置的至少一个辅助吊耳与第一吊耳协同将发电机起吊和翻身,减小了每台吊车的承重,降低了吊车的吨位,节省了成本。The generator installation hanger of the utility model is fastened to the generator through the connecting flange, which can effectively avoid the phenomenon that the generator is not firmly connected and the generator is dropped. At the same time, at least An auxiliary lifting lug cooperates with the first lifting lug to hoist and turn over the generator, which reduces the load-bearing capacity of each crane, reduces the tonnage of the crane, and saves costs.
以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应以所述权利要求的保护范围为准。The above is only a specific embodiment of the present utility model, but the scope of protection of the present utility model is not limited thereto. Anyone familiar with the technical field can easily think of changes or changes within the technical scope disclosed by the utility model Replacement should be covered within the protection scope of the present utility model. Therefore, the protection scope of the present utility model should be based on the protection scope of the claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521135324.2U CN205241039U (en) | 2015-12-31 | 2015-12-31 | Installation hoist of generator |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521135324.2U CN205241039U (en) | 2015-12-31 | 2015-12-31 | Installation hoist of generator |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205241039U true CN205241039U (en) | 2016-05-18 |
Family
ID=55940118
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521135324.2U Expired - Lifetime CN205241039U (en) | 2015-12-31 | 2015-12-31 | Installation hoist of generator |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205241039U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105936470A (en) * | 2016-06-21 | 2016-09-14 | 中国十七冶集团有限公司 | Wind power generator automatic turning lifter and mounting method |
| CN109335947A (en) * | 2018-11-23 | 2019-02-15 | 张家港市三林金泰新能源有限公司 | Eccentric center trunnion for generator |
-
2015
- 2015-12-31 CN CN201521135324.2U patent/CN205241039U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105936470A (en) * | 2016-06-21 | 2016-09-14 | 中国十七冶集团有限公司 | Wind power generator automatic turning lifter and mounting method |
| CN109335947A (en) * | 2018-11-23 | 2019-02-15 | 张家港市三林金泰新能源有限公司 | Eccentric center trunnion for generator |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203806941U (en) | Hoisting overturning device of direct-drive wind power generator | |
| CN101966965A (en) | Special hanger with guide cover wheel hub and turning and hanging method | |
| CN104276510B (en) | Generator stand up suspender and using method thereof | |
| CN207108418U (en) | Turning tool for wind-driven generator | |
| CN201864454U (en) | Lifting appliance of centralized overhauling transportation system of electrolytic cell | |
| CN205241039U (en) | Installation hoist of generator | |
| CN201334306Y (en) | Hoisting machine for upright post member | |
| CN106516973A (en) | Lifting appliance for lifting impeller and impeller lifting method | |
| CN204251234U (en) | For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance | |
| CN103072888B (en) | Hoisting equipment and hoisting method for generator in wind power generating set | |
| CN202170216U (en) | Two-way adjusting dedicated combined lifting appliance for lifting of tower of wind generator | |
| CN201857209U (en) | Special lifting tool provided with wheel hub of diversion cover | |
| CN205838410U (en) | Blower fan hoisting mechanism | |
| CN108502700B (en) | Lifting appliance for cabin of wind driven generator | |
| CN205275002U (en) | Installation hoist of generator | |
| CN204057674U (en) | The turnover lifting appliance of electrical generator | |
| CN203222417U (en) | Special hanging tool for sleeving rotor of large direct-driven wind turbine generator | |
| CN206051406U (en) | The disconnecting switch hoisting apparatus of tiltable section | |
| CN207134952U (en) | Turning tool for wind-driven generator | |
| CN215711140U (en) | General turning-over hanger for sectional type tower | |
| CN206188204U (en) | Specialized tool is lifted by crane in inspection of turbo generator set axle bush | |
| CN204265419U (en) | A kind of upset of the Novel hanging for circuit breaker car | |
| CN104355241A (en) | Multifunctional high-altitude operation crane for overhauling and maintaining wind power generator | |
| CN207593154U (en) | A kind of wind power foundation ring is turned over connection lifting lug | |
| CN208345571U (en) | Engine rooms of wind power generators suspender |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 830026 No. 107, Shanghai Road, Urumqi economic and Technological Development Zone, the Xinjiang Uygur Autonomous Region Patentee after: Jinfeng Technology Co.,Ltd. Address before: 830026 No. 107, Shanghai Road, Urumqi economic and Technological Development Zone, the Xinjiang Uygur Autonomous Region Patentee before: XINJIANG GOLDWIND SCIENCE & TECHNOLOGY Co.,Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160518 |