CN205240491U - A discharge apparatus for sintering finished product ore storehouse - Google Patents

A discharge apparatus for sintering finished product ore storehouse Download PDF

Info

Publication number
CN205240491U
CN205240491U CN201521027462.9U CN201521027462U CN205240491U CN 205240491 U CN205240491 U CN 205240491U CN 201521027462 U CN201521027462 U CN 201521027462U CN 205240491 U CN205240491 U CN 205240491U
Authority
CN
China
Prior art keywords
discharging
storage bin
ore storage
sintering finished
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521027462.9U
Other languages
Chinese (zh)
Inventor
周志安
李康
吴奇
夏春才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Changtian International Engineering Co Ltd
Original Assignee
Zhongye Changtian International Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Changtian International Engineering Co Ltd filed Critical Zhongye Changtian International Engineering Co Ltd
Priority to CN201521027462.9U priority Critical patent/CN205240491U/en
Application granted granted Critical
Publication of CN205240491U publication Critical patent/CN205240491U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

The utility model relates to an iron and steel sintering plant discharging equipment technical field especially relates to a discharge apparatus for sintering finished product ore storehouse. Through frame one end is equipped with driving pulley and a drive arrangement and conveyer, reversible conveyer belt can carry out the head, the tail switches the unloading, the driving pulley forward rotates, carry the sintering finished product on the material conveyor belt in the tee bend funnel of unloading of head, the rethread is unloaded during the tee bend funnel unloads forward ore bin with sintering finished product ore, the driving pulley antiport, carry the sintering finished product on the material conveyer belt in the tee bend funnel of unloading of afterbody, the rethread is unloaded during the tee bend funnel unloads reverse ore bin with sintering finished product ore, thereby realize that a walking position corresponds two unloading points, walking fixed point position reduces by half, control is simplified, reduce discharge apparatus's removal load, operation efficiency improves, energy consumption is reduced, ore bin availability has been increased, through set up sealed belt on the finished product ore storehouse, reduced the raise dust, improved sack cleaner transmission dust collection efficiency.

Description

A kind of device for discharging for sintering finished ore storage bin
Technical field
The utility model relates to steel sintering factory delivery device technical field, relates in particular to a kind of usingIn the device for discharging of sintering finished ore storage bin.
Background technology
At present, at the sintering finished ore storage bin of sintering plant, device for discharging is generally ingoldsby car, existingSome ingoldsby car system primary structures by vehicle frame, walking mechanism, device for transporting objects, unloadMaterial threeway funnel, elephant trunk and walking track composition; Walking mechanism, device for transporting objects, unloadMaterial threeway funnel and elephant trunk are arranged on vehicle frame, and walking track is arranged on ore storage bin top. Adopt heavySintering deposit is assigned to each finished product ore storage bin by ingoldsby car, and setting walking position for one can only be correspondingA blanking point, but along with the maximization of ore storage bin construction and the increase of quantity, blanking point quantity phaseShould increase, need control point to increase, control difficulty and increase, complicated operation, operational paradigm is low,In addition the ingoldsby car discharging that walks back and forth is frequent, and the moving load of running gear is large, and energy consumption is high,Stroke Control element is easier loss also, has increased production cost and maintenance cost. In addition adopt heavyIngoldsby car discharging, on the sintering finished steel barrier of directly falling ore storage bin top blanking hole, dustSeriously, bring very large trouble to dedusting, to environment.
In addition, adopt in addition reversible adhesive to carry out discharging, generally adopt reversible adhesive to carry out dischargingSintering finished ore storage bin Cang Ding, have a rectangular blanking hole in middle, ore storage bin top, in blankingOn hole, be provided with steel barrier, lay track on blanking hole both sides; Device for discharging dolly in orbitOperation is provided with fixed-point unloading device, device for discharging dolly two ends above device for discharging dollyBe provided with single straight-through funnel. Because the reversible adhesive of prior art fixes a point to carry out discharging in orbitTime, blanking hole exposed except emptying point is without any covering, sintering finishedly directly fallsOn the steel barrier of ore storage bin top blanking hole, dust is serious, brings very large trouble to dedusting, rightEnvironment, and existing reversible adhesive only has end to end the straight-through funnels of two lists, and it unloadsMaterial efficiency is low, and ore storage bin effective rate of utilization is low, and the discharge time is long, and cost increases.
Therefore,, for above deficiency, need to provide a kind of dress of the discharging for sintering finished ore storage binPut.
Utility model content
(1) technical problem that will solve
The technical problems to be solved in the utility model is to solve to control difficulty increase, complicated operation,Operational paradigm is low, and the ingoldsby car discharging that walks back and forth is frequent in addition, and the movement of running gear is negativeLotus is large, and energy consumption is high, and Stroke Control element is easier loss also, and production cost and maintenance cost are higherAnd the efficiency of existing reversible adhesive is low and the problem of airborne dust.
(2) technical scheme
In order to solve the problems of the technologies described above, it is a kind of for sintering finished ores that the utility model providesThe device for discharging in storehouse, comprising: vehicle frame, conveyer belt assembly and discharging tee joint funnel;
Described conveyer belt assembly comprises: driving drum, the first drive unit, tail wheel, conveyer belt,The first carrying roller and take-up device;
Described driving drum and the first drive unit are arranged on one end of described vehicle frame, described firstDrive unit is used for driving driving drum, and the described vehicle frame other end is provided with described tail wheel;
Described conveying belt tension is between described driving drum and described tail wheel;
Described take-up device is for conveyer belt described in tensioning;
Described the first carrying roller is arranged between described driving drum and described tail wheel, described the first holderRoller is used for supporting described conveyer belt;
Described vehicle frame end is provided with discharging tee joint funnel, and described discharging tee joint funnel is provided with twoDischarge port, two discharge ports are relative with two openings that are parallel to each other at ore storage bin top respectively.
Preferably, the two ends of described vehicle frame are equipped with described discharging tee joint funnel.
Preferably, described the first drive unit is used for driving driving drum rotating.
Preferably, two of described ore storage bin opening parts are equipped with steel barrier.
Preferably, the described device for discharging for sintering finished ore storage bin, also comprises dust arrester,Described dust arrester comprises: dust excluding hood and sack cleaner, described sack cleaner is arranged on instituteState the top of discharging tee joint funnel, described dust excluding hood is arranged on ore storage bin top by support, andIn blanking process, coordinate with the exit seal of described sack cleaner.
Preferably, the described device for discharging for sintering finished ore storage bin, also comprises closed belt,Described closed belt has two, walks around respectively discharge port and covers on described steel barrier.
Preferably, the Liang Gexia corner of described discharge port is equipped with pressure roller, described discharge portLiang Geshang corner is equipped with the second carrying roller, described closed belt walk around successively one of them pressure roller,Two the second carrying rollers and another pressure roller.
Preferably, described dust arrester also comprises for the end of fixing described closed belt and fixingDevice.
Preferably, the described device for discharging for sintering finished ore storage bin, also comprises walking assembly,Described walking assembly comprises and being connected on described vehicle frame: drive wheel, the second drive unit andSome driven wheels, described the second drive unit is used for driving driving rotation of wheel, described drivingWheel is used for driving described vehicle frame along rail moving.
Preferably, described take-up device adopts middle spiral tension.
(3) beneficial effect
Technique scheme tool of the present utility model has the following advantages: the use that the utility model providesIn the device for discharging of sintering finished ore storage bin, by be provided with driving drum and in described vehicle frame one endOne drive unit and conveyer, reversible conveyer belt can carry out head, tail switches blanking, transmissionCylinder forward rotation, by the sintering finished discharging tee joint that is transported to head on mass transport beltFunnel, then by discharging tee joint funnel, sintering finished ores is discharged in forward ore storage bin to driving drumRotate backward, by the sintering finished discharging tee joint funnel that is transported to afterbody on material conveyer belt,By discharging tee joint funnel, sintering finished ores is discharged in reverse ore storage bin again, thereby realizes a rowWalk corresponding two blanking points in position, walking fixed position reduces half, controls and simplifies, and reduction is unloadedThe moving load of materials device, operational paradigm improves, and greatly reduces energy consumption, and having increased ore storage bin hasEffect utilization rate; By on finished product ore storage bin, closed belt being set, greatly reduce airborne dust, improveSack cleaner transmission efficiency of dust collection.
Brief description of the drawings
Fig. 1 is the entirety knot of the utility model embodiment for the device for discharging of sintering finished ore storage binStructure schematic diagram;
Fig. 2 is the utility model embodiment chats chamber structure top view;
Fig. 3 is the entirety knot of the utility model embodiment for the device for discharging of sintering finished ore storage binStructure side view.
In figure: 1: vehicle frame; 2: driving drum; 3: discharging tee joint funnel; 4: tail wheel; 5:Conveyer belt; 6: the first carrying rollers; 7: take-up device; 8: drive wheel; Drive dress at 9: the secondPut; 10: driven wheel; 11: track; 12: sack cleaner; 13: closed belt; 14:Tail end fixing device; 15: pressure roller; 16: the second carrying rollers; 17: dust excluding hood; 18: steel barrier.
Detailed description of the invention
For making object, technical scheme and the advantage of the utility model embodiment clearer, belowIn connection with the accompanying drawing in the utility model embodiment, to the technical side in the utility model embodimentCase is clearly and completely described, and obviously, described embodiment is of the present utility model onePart embodiment, instead of whole embodiment. Based on the embodiment in the utility model, thisIt is every other that field those of ordinary skill obtains under the prerequisite of not making creative workEmbodiment, belongs to the scope that the utility model is protected.
As shown in Figures 1 to 3, the dress of the discharging for sintering finished ore storage bin that the utility model providesPut,
Comprise: vehicle frame 1, conveyer belt assembly and discharging tee joint funnel 3;
Described conveyer belt assembly comprises: driving drum 2, the first drive unit, tail wheel 4, conveyingBe with 5, the first carrying roller 6 and take-up device 7;
Described driving drum 2 and the first drive unit are arranged on one end of described vehicle frame 1, described inThe first drive unit is used for driving driving drum 2, and described vehicle frame 1 other end is provided with described tail wheel 4;
Described conveyer belt 5 is stretched between described driving drum 2 and described tail wheel 4;
Described take-up device 7 is for conveyer belt described in tensioning 5;
Described the first carrying roller 6 is arranged between described driving drum 2 and described tail wheel 4, described inThe first carrying roller 6 is for supporting described conveyer belt 5;
Described vehicle frame 1 end is provided with discharging tee joint funnel 3, and described discharging tee joint funnel 3 is provided withTwo discharge ports, two discharge ports are relative with two openings that are parallel to each other at ore storage bin top respectively.
Preferably, the both sides at described vehicle frame 1 two ends are equipped with discharging tee joint funnel 3, the present embodimentIn be not only provided with discharging tee joint funnel 3 at vehicle frame 1 two ends, to solve the two-way discharging that realizes, andBoth sides in every one end are all provided with discharging tee joint funnel 3, and effectively solving ingoldsby car will burnKnot ore deposit is assigned to each finished product ore storage bin, and setting walking position for one can only a corresponding blanking point,But along with the maximization of ore storage bin construction and the increase of quantity, the corresponding increase of blanking point quantity, needsControl point increases, and controls difficulty and increases, complicated operation, the problem that operational paradigm is low.
Preferably, described the first drive unit can drive conveyer belt 5 to carry out vehicle frame 1 two ends switchingBlanking, the first drive unit gives driving drum 2 power, realizes driving drum 2 forwards or contraryTo rotation, thereby drive the two-way running of conveyer belt.
Preferably, two of described ore storage bin opening parts are equipped with steel barrier 18.
Preferably, the described device for discharging for sintering finished ore storage bin, also comprises dust arrester,Described dust arrester comprises: dust excluding hood 17 and sack cleaner 12, described sack cleaner 12Be arranged on the top of described discharging tee joint funnel 3, described dust excluding hood 17 is arranged on ore deposit by supportTop, storehouse, and coordinate with the exit seal of described sack cleaner 12 in blanking process.
Preferably, also comprise closed belt 13, described closed belt has two. Article two, described closeCover tape 13 is walked around respectively discharge port and is covered on described steel barrier 18. Two of described ore storage binOpening part is equipped with steel barrier, and described closed belt 13 covers respectively on described steel barrier 18,And walk around the top of two described discharge ports, sack cleaner 12 is placed in discharging tee joint funnel 3Top, sack cleaner 12 dust-exhausting ports upward, at each walking position point, establish upward by dust-exhausting portPut dust excluding hood 17, closed belt 13 covers the parallel bedding of discharging tee joint funnel 3 at ore storage bin blanking holeSteel barrier 18 tops.
Preferably, the Liang Gexia corner of described discharge port is equipped with pressure roller 15, described discharge portLiang Geshang corner be equipped with the second carrying roller 16, described closed belt 13 walks around wherein one successivelyIndividual pressure roller 15, two the second carrying rollers 16 and another pressure rollers 15. Because this device is in blanking processIn have position and move, meeting between closed belt 13 and discharging tee joint funnel 3 in moving processProduce certain gap, dust can be diffused into the external world from this gap, for anti-phenomenon here occurs,Closed belt 13 exists through outside carrying roller 16 and pressure roller 15 beddings of installing of discharging tee joint funnel 3On ore storage bin steel barrier 18, closed belt 3 contacts completely with steel barrier 18, effectively prevents dustDiffusion.
Preferably, described dust arrester also comprises tail end fixing device 14, the fixing dress of described endPut 14 and be arranged on described closed belt 13 two ends, described tail end fixing device 14 is for fixing instituteState closed belt 13, avoid occurring related at closed belt 13 because of single unit system mobile.
Preferably, described take-up device 7 be arranged at described driving drum 2 and described tail wheel 4 itBetween, described take-up device 7 is for straining conveyer belt 5, and described take-up device 7 is arranged on transmission and rollsBetween cylinder 2 and tail wheel 4, take-up device 7 is arranged on vehicle frame 1, and take-up device 7 has twoIndividual or more than two regulating wheel, conveyer belt 5 interts through these regulating wheels, by take-up device 7Tension processing, conveyer belt 5 launches completely, described take-up device is selected middle spiral tension.
Preferably, described the first carrying roller 6 be arranged at described driving drum 2 and described tail wheel 4 itBetween described the first carrying roller 6 for supporting described conveyer belt 5, the laminating of the upper strata of described the first carrying roller 6Conveyer belt 5, not only can play the effect of support belt, also can realize at material and placing simultaneouslyOn conveyer belt 5 time, can be because of conveyer belt 5 because elastic deformation causes conveyer belt 5 breakagesOr disturb with other parts in moving process.
Preferably, the described device for discharging for sintering finished ore storage bin, also comprises walking assembly,Described walking assembly comprises: drive wheel 8, the second drive unit 9 and driven wheel 10, instituteState and drive wheel 8 and the second drive unit 9 to be arranged at described vehicle frame 1 one end, described second drivesMoving device 9 is used for driving and drives wheel 8, and described vehicle frame 1 bottom is provided with multiple driven wheels10, described driven wheel 10 can move along track 11.
Preferably, described take-up device 7 is selected middle spiral tension.
After on the sintering finished conveyer belt 5 of falling on device for discharging in fixed point blanking device,Device for discharging rests on the position of certain setting on track 11, now the cloth bag at vehicle frame 1 two endsDeduster 13 dust-exhausting ports are all positioned at fixed point dust excluding hood 17 scopes, conveyer belt 5 can carry out head,Tail switches blanking, driving drum 2 forward rotation, sintering finished defeated by mass transport beltDeliver to the discharging tee joint funnel 3 of head, then by discharging tee joint funnel 3, sintering finished ores is discharged toIn forward ore storage bin, driving drum 2 rotates backward, by sintering finished being transported on conveyer belt 5The discharging tee joint funnel 3 of afterbody, then by discharging tee joint funnel 3, sintering finished ores is discharged to oppositelyIn ore storage bin, thereby realize corresponding two blanking points of a walking position, walking fixed position reducesHalf, controls and simplifies, and reduces the moving load of device for discharging, and operational paradigm improves, and greatly fallsLow energy consumption.
The sealed belt 13 of dust producing in discharge process in ore storage bin covers in, and greatly fallsLow airborne dust, has improved sack cleaner 12 transmission efficiency of dust collections, and most of dust is removed by cloth bagDirt device 12 returns to finished product ore storage bin after processing, all the other on a small quantity not Ex-all dust discharge by dust-exhausting port,Be transported to dust collection center through top dust excluding hood 17. And in the whole process of mobile discharge,Due to the effect of closed belt 13, avoid secondary dust, well solve dust removal problem.
In sum, the device for discharging for sintering finished ore storage bin that the utility model provides is logicalCross in described vehicle frame 1 one end and be provided with driving drum 2 and the first drive unit and conveyer, canContrary 5 bands of carrying can carry out head, tail switching blanking, and driving drum 2 forward rotation, by materialThe sintering finished discharging tee joint funnel 3 that is transported to head on belt conveyor, then pass through discharging tee jointFunnel 3 is discharged to sintering finished ores in forward ore storage bin, and driving drum 2 rotates backward, by materialThe sintering finished discharging tee joint funnel 3 that is transported to afterbody on conveyer belt 5, then pass through discharging tee jointFunnel 3 is discharged to sintering finished ores in reverse ore storage bin, thereby realizes a walking position correspondence twoIndividual blanking point, walking fixed position reduces half, controls and simplifies, and reduces the movement of device for dischargingLoad, operational paradigm improves, and greatly reduces energy consumption, has increased ore storage bin effective rate of utilization. LogicalCross closed belt 13 is set on finished product ore storage bin, greatly reduce airborne dust, improved bag-type dustDevice 12 transmission efficiency of dust collections.
Finally it should be noted that: above embodiment is only in order to the technical solution of the utility model to be described,Be not intended to limit; Although the utility model is had been described in detail with reference to previous embodiment,Those of ordinary skill in the art is to be understood that: it still can be recorded aforementioned each embodimentTechnical scheme modify, or part technical characterictic is wherein equal to replacement; And thisA little amendments or replacement, do not make essence disengaging the utility model of appropriate technical solution respectively implementThe spirit and scope of example technical scheme.

Claims (10)

1. for a device for discharging for sintering finished ore storage bin, it is characterized in that, comprising: vehicle frame(1), conveyer belt assembly and discharging tee joint funnel (3);
Described conveyer belt assembly comprises: driving drum (2), the first drive unit, tail wheel (4),Conveyer belt (5), the first carrying roller (6) and take-up device (7);
Described driving drum (2) and the first drive unit are arranged on one end of described vehicle frame (1),Described the first drive unit is used for driving driving drum (2), and described vehicle frame (1) other end is provided withDescribed tail wheel (4);
Described conveyer belt (5) is stretched between described driving drum (2) and described tail wheel (4);
Described take-up device (7) is for conveyer belt described in tensioning (5);
Described the first carrying roller (6) be arranged at described driving drum (2) and described tail wheel (4) itBetween, described the first carrying roller (6) is for supporting described conveyer belt (5);
Described vehicle frame (1) end is provided with discharging tee joint funnel (3), described discharging tee joint funnel (3)Be provided with two discharge ports, two discharge ports respectively with two opening of being parallel to each other at ore storage bin topMouth relatively.
2. the device for discharging for sintering finished ore storage bin according to claim 1, its featureBe: the two ends of described vehicle frame (1) are equipped with described discharging tee joint funnel (3).
3. the device for discharging for sintering finished ore storage bin according to claim 2, its featureBe: described the first drive unit is used for driving driving drum (2) rotating.
4. the device for discharging for sintering finished ore storage bin according to claim 1, its featureBe: two opening parts of described ore storage bin are equipped with steel barrier (18).
5. the device for discharging for sintering finished ore storage bin according to claim 4, its featureBe: also comprise dust arrester, described dust arrester comprises: dust excluding hood (17) and cloth bag removeDirt device (12), described sack cleaner (12) is arranged on described discharging tee joint funnel (3)Top, described dust excluding hood (17) is arranged on ore storage bin top by support, and in blanking processCoordinate with the exit seal of described sack cleaner (12).
6. the device for discharging for sintering finished ore storage bin according to claim 5, its featureBe: also comprise closed belt (13), described closed belt (13) has two, walks around respectivelyDischarge port covers on described steel barrier (18).
7. the device for discharging for sintering finished ore storage bin according to claim 6, its featureBe: the Liang Gexia corner of described discharge port is equipped with pressure roller (15), two of described discharge portGe Shang corner is equipped with the second carrying roller (16), and described closed belt (13) is walked around wherein successivelyA pressure roller (15), two the second carrying rollers (16) and another pressure roller (15).
8. the device for discharging for sintering finished ore storage bin according to claim 7, its featureBe: described dust arrester also comprises for the end of fixing described closed belt (13) to be fixedDevice (14).
9. the device for discharging for sintering finished ore storage bin according to claim 1, its featureBe: also comprise walking assembly, described walking assembly comprises and being connected on described vehicle frame (1):Drive wheel (8), the second drive unit (9) and some driven wheels (10), described secondDrive unit (9) be used for drive drive wheel (8) rotation, described driving wheel (8) forDrive described vehicle frame (1) mobile along track (11).
10. the device for discharging for sintering finished ore storage bin according to claim 1, its spyLevy and be: described take-up device (7) adopts middle spiral tension.
CN201521027462.9U 2015-12-10 2015-12-10 A discharge apparatus for sintering finished product ore storehouse Active CN205240491U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521027462.9U CN205240491U (en) 2015-12-10 2015-12-10 A discharge apparatus for sintering finished product ore storehouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521027462.9U CN205240491U (en) 2015-12-10 2015-12-10 A discharge apparatus for sintering finished product ore storehouse

Publications (1)

Publication Number Publication Date
CN205240491U true CN205240491U (en) 2016-05-18

Family

ID=55939562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521027462.9U Active CN205240491U (en) 2015-12-10 2015-12-10 A discharge apparatus for sintering finished product ore storehouse

Country Status (1)

Country Link
CN (1) CN205240491U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106966114A (en) * 2017-04-26 2017-07-21 中冶北方(大连)工程技术有限公司 Mobile reversible tape machine for sealing dedusting
CN107758371A (en) * 2017-11-15 2018-03-06 河北机电职业技术学院 A kind of more storage bin automatic distributing devices
CN110294342A (en) * 2019-07-10 2019-10-01 夏晨光 A kind of dummy car with sealing dedusting function

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106966114A (en) * 2017-04-26 2017-07-21 中冶北方(大连)工程技术有限公司 Mobile reversible tape machine for sealing dedusting
CN107758371A (en) * 2017-11-15 2018-03-06 河北机电职业技术学院 A kind of more storage bin automatic distributing devices
CN110294342A (en) * 2019-07-10 2019-10-01 夏晨光 A kind of dummy car with sealing dedusting function
CN110294342B (en) * 2019-07-10 2024-04-05 夏晨光 Discharging car with sealing and dedusting functions

Similar Documents

Publication Publication Date Title
CN205240491U (en) A discharge apparatus for sintering finished product ore storehouse
CN104860083A (en) Environment-friendly stock yard stacking and reclaiming system
CN215471980U (en) Two-way moving material distribution trolley
CN209427547U (en) The double air cushion belt conveyers of covering band
CN202743759U (en) Vertical feed type ore storage bin mechanism
CN208916025U (en) Combined type adhesive tape and conveying system
CN102815469B (en) Vertical feeding ore storage bin mechanism
CN207078637U (en) A kind of tabular material transport carriage
CN215363210U (en) Full-closed reversible distribution belt conveyor
CN105836496A (en) Cleaning type pulverized coal ball press
CN204822959U (en) Sealed Z type ripple shelves limit band conveyer
CN214030603U (en) Deviation preventing device of belt conveyor
CN105059822B (en) Floor type belt transporting apparatus
CN205060988U (en) Gate -type stacker -reclaimer
CN209480534U (en) A kind of belt conveyor
CN208593758U (en) A kind of rotary rubber conveyer
CN203903270U (en) Conveying device
CN105000327A (en) Sealed Z-type corrugated edge belt conveyor
CN208868811U (en) Efficient and environment-friendly type circular tube shaped conveyer
CN206407521U (en) A kind of double-deck roller screen device of pelletizing
CN107399586A (en) A kind of cleaning plant of conveyer belt
CN207090261U (en) A kind of RGV feeding trolleys with new hopper
CN206901194U (en) Container lifts conveyer belt
CN220950286U (en) Environment-friendly dust collection and discharge vehicle
CN216736007U (en) Assembled scraper conveyor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant