CN205226689U - Pipeline - Google Patents

Pipeline Download PDF

Info

Publication number
CN205226689U
CN205226689U CN201520901950.1U CN201520901950U CN205226689U CN 205226689 U CN205226689 U CN 205226689U CN 201520901950 U CN201520901950 U CN 201520901950U CN 205226689 U CN205226689 U CN 205226689U
Authority
CN
China
Prior art keywords
pipeline
flange
chip
bolt
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520901950.1U
Other languages
Chinese (zh)
Inventor
陈伦俊
池振华
卢伟
刘伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU ZHUOXIN INDUSTRY Co Ltd
Original Assignee
CHENGDU ZHUOXIN INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU ZHUOXIN INDUSTRY Co Ltd filed Critical CHENGDU ZHUOXIN INDUSTRY Co Ltd
Priority to CN201520901950.1U priority Critical patent/CN205226689U/en
Application granted granted Critical
Publication of CN205226689U publication Critical patent/CN205226689U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a pipeline, including the pipeline that a plurality of roots linked together, its characterized in that: the pipeline passes through the flange or is in the same place through the connecting portion interconnect with pipeline integrated into one piece, be provided with the bolt hole and the chip of construction bolt in flange or the flange joint portion, buried nonmagnetic material underground in the bolt hole department of flange, install sensor and magnet in the nonmagnetic material. Scan with an electronic scanner the utility model discloses just know the accumulative total live time of flange, give the reference of changing pipeline and providing the accuracy, in time change pipeline, avoid guaranteeing that pipeline can normal use because pipeline exceedes the heavy losses that life arouses.

Description

A kind of pipeline
Technical field
The utility model relates to a kind of pipeline, particularly relates to a kind of pipeline for materials such as transfer oil rock gases.
Background technique
Pipeline is used to the article that transportation of substances is commonly used.The kind of pipeline is a lot, and the material mainly carried as required is selected.The basic structure of pipeline is all linked together by several pipelines substantially.And the connection of each pipeline generally also adopts Flange joint, also have and the two ends of pipeline are directly formed to flange arrangement, be then bolted together.In oil and natural gas exploitation field, pipeline is the important tool of oil and natural gas conveying, and together pipeline consists of Flange joint with a lot of pipes.Flange is the connection device that pipeline transport is commonly used.Due to the conveying of oil and natural gas pipeline is oil and natural gas, once have an accident, will cause huge loss.Therefore require very high working life to pipeline.After a protracted use, pipeline can damage slowly, and need to change in time, no person will cause the leakage of oil and natural gas, causes huge loss for pipeline.Adopt the accumulative service time of manual record pipeline during existing processing method, change pipeline by workman in time according to the accumulative service time of pipeline.There is following defect in such processing mode: because number of lines is huge; cause the data of manual record huge; pipeline often reclaims simultaneously; then install and use again; manual record can often be made mistakes; or error of omission flange and service time of pipeline, cause the flange that exceedes service life and pipeline install and use again and occur great potential safety hazard.
Model utility content
Flange and pipeline existing defects is changed in order to overcome above-mentioned prior art, the utility model provides a kind of pipeline, the accumulative service time just knowing pipeline and flange is scanned with electronic scanner, avoid because pipeline damages the heavy losses causing oil or natural gas leakage to cause, ensure that pipeline can normal transfer oil rock gas.
The utility model for solving the problems of the technologies described above adopted technological scheme is:
A kind of pipeline, comprise the some pipelines linked together, it is characterized in that: described pipeline is by flange or by interconnecting with the integrated joint of pipeline, described flange or Flange joint portion are provided with bolt hole and the chip of construction bolt, be embedded with nonmagnetic material at the bolt hole place of flange, sensor and magnet are installed in nonmagnetic material.
Described chip is connected by signaling line with sensor.
Signal transmitter is embedded with in described flange body.
Described signal transmitter is connected by signaling line with chip.
Described signal transmitter is integrated on chip mainboard.
Described signal transmitter is antenna.
Described pipeline comprises straight tube and bend pipe.
The manufacturer of flange, specification, model, the accumulative information such as service time, production time is stored inside time dispatching from the factory in described chip inherence.
Compared with prior art, the utility model has following beneficial effect:
When connecting line, the flange be fixed on two pipelines is close, is inserted into by bolt in bolt hole, is got up by Flange joint by bolt.Bolt is inserted in bolt hole, and bolt is magnet magnetized, and sensor detects the bolt be magnetized, and sensor activation chip, chip starts writing time automatically.Before the installing and using of pipeline, staff is with the flange on detector (as an electronic scanner) purge line, chip is in sleep state at ordinary times, chip is waken up when detector is near flange, the mode waken up can be that wireless telecommunications wake up or detector sends magnetic signal and makes sensor closed or disconnect, signal that is closed or that disconnect wakes chip up, chip is waken up rear detector and is communicated by wireless signal with chip, the information of preservation is sent to detector by chip, user just can know the information in chip by detector, information comprises the accumulative service time (being exactly the time of chip record) of pipeline, the time of making the product, manufacturer, the information such as specification.Whether such user only need use detector scanner scanning one lower flange with regard to information such as the accumulative service times of known road pipeline, continue to use pipeline to provide reference accurately to user.And user does not need the accumulative service time of recording flange and pipeline again, do not need to check record chart yet, simple and convenient.User can know the information such as the flange time of making the product, manufacturer, specification, model, accumulative service time simultaneously, occurs that accident is convenient to accident investigation, has trackability.User is when changing pipeline, need to take off bolt, bolt leaves bolt hole, sensor cannot detect the bolt be magnetized again, now sensor cannot detect that the Signal transmissions of magnetized bolt is to chip, chip no longer continues timing, preserves this time, and the time of now preserving is exactly accumulative service time of pipeline.User, by scanning the accumulative service time of the pipeline that changes just known road pipeline, avoids reusing flange and pipeline causes security incident.
Accompanying drawing explanation
Fig. 1 is the first structural representation of flange;
Fig. 2 is the second structural representation of flange;
Fig. 3 is the first structural representation of pipeline;
Fig. 4 is the second structural representation of pipeline;
Fig. 5 is the third structural representation of pipeline;
Fig. 6 is the 4th kind of structural representation of pipeline;
Fig. 7 is straight tube line construction schematic diagram;
Fig. 8 has bend pipe line construction schematic diagram;
Mark in figure: 1, flange, 2, bolt, 3, sensor, 4, magnet, 5, nonmagnetic material, 6, chip, 7, bolt hole, 8, bend pipe, 9, joint, 10, straight tube.
Embodiment
Below in conjunction with embodiment, the utility model will be further described, and described embodiment is only the utility model part embodiment, is not whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art, not making other embodiments used obtained under creative work prerequisite, belongs to protection domain of the present utility model.
Flange of the present utility model and our difference of common flange are: the information such as accumulative service time, manufacturer, specification, model, production time that just can be scanned flange by detector (electronic scanner) easily.
The utility model comprises the some pipelines linked together, it is characterized in that: described pipeline is by flange 1 or by interconnecting with the integrated joint 9 of pipeline, described flange 1 or joint 9 are provided with bolt hole 7 and the chip 6 of construction bolt 2, be embedded with nonmagnetic material 5 at bolt hole 7 place of flange, magnet 4 and sensor 3 are installed in described nonmagnetic material 5.And then chip 6 is buried underground in flange body 1, be connected by signaling line between chip with sensor.
Flange, when dispatching from the factory, stores manufacturer, specification, model, the accumulative information such as service time, production time in chip 6.
Flange body in the utility model can be metal, also can right and wrong metal, make if nonmetal, just no longer nonmagnetic material can be set, directly magnet and sensor are embedded in flange body, as for the particular location buried underground, as long as ensure that magnet can magnetize bolt, sensor can detect magnetized bolt.
For the ease of detector, the information of preserving in chip is read out, we can on chip an integrated antenna or bury an antenna in flange body underground, then antenna is connected by signaling line with chip.
When connecting line, the flange be fixed on two pipelines is close, is inserted into by bolt 2 in bolt hole 7, is got up by Flange joint by bolt 2.Bolt 2 is inserted in bolt hole 7, and bolt 2 is magnetized by magnet 4, and sensor 3 detects the bolt 2 be magnetized, and sensor 3 chip for activating 6, chip 6 starts writing time automatically.Before the installing and using of pipeline, staff is with the flange on detector (as an electronic scanner) purge line, chip is in sleep state at ordinary times, chip is waken up when detector is near flange, the mode waken up can be that wireless telecommunications wake up or detector sends magnetic signal and makes sensor closed or disconnect, signal that is closed or that disconnect wakes chip up, chip is waken up rear detector and is communicated by wireless signal with chip, the information of preservation is sent to detector by chip, user just can know the information in chip by detector, information comprises the accumulative service time (being exactly the time of chip record) of pipeline, the time of making the product, manufacturer, the information such as specification.Whether such user only need use detector scanner scanning one lower flange with regard to information such as the accumulative service times of known road pipeline, continue to use pipeline to provide reference accurately to user.And user does not need the accumulative service time of recording flange and pipeline again, do not need to check record chart yet, simple and convenient.User can know the information such as the flange time of making the product, manufacturer, specification, model, accumulative service time simultaneously, occurs that accident is convenient to accident investigation, has trackability.User is when changing pipeline, need to take off bolt, bolt leaves bolt hole, sensor cannot detect the bolt be magnetized again, now sensor cannot detect that the Signal transmissions of magnetized bolt is to chip, chip no longer continues timing, preserves this time, and the time of now preserving is exactly accumulative service time of pipeline.User, by scanning the accumulative service time of the pipeline that changes just known road pipeline, avoids reusing flange and pipeline causes security incident.
Pipeline of the present utility model comprises bend pipe 8 and straight tube 10.
Bend pipe 8 can connect into pipeline by flange 1, also can at the two ends of bend pipe 8 direct one-body molded joint 9, be connected by joint 9.
Straight tube 10 can connect into pipeline by flange 1, also can at the two ends of straight tube 10 direct one-body molded joint 9, be connected by joint 9.

Claims (6)

1. a pipeline, comprise the some pipelines linked together, it is characterized in that: described pipeline is by flange or by interconnecting with the integrated joint of pipeline, described flange or Flange joint portion are provided with bolt hole and the chip of construction bolt, be embedded with nonmagnetic material at the bolt hole place of flange, sensor and magnet are installed in nonmagnetic material.
2. a kind of pipeline according to claim 1, is characterized in that: described chip is connected by signaling line with sensor.
3. a kind of pipeline according to claim 1 and 2, is characterized in that: be embedded with signal transmitter in described flange body.
4. a kind of pipeline according to claim 3, is characterized in that: described signal transmitter is connected by signaling line with chip.
5. a kind of pipeline according to claim 4, is characterized in that: described signal transmitter is integrated on chip mainboard.
6. a kind of pipeline according to claim 5, is characterized in that: described signal transmitter is antenna.
CN201520901950.1U 2015-11-13 2015-11-13 Pipeline Expired - Fee Related CN205226689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520901950.1U CN205226689U (en) 2015-11-13 2015-11-13 Pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520901950.1U CN205226689U (en) 2015-11-13 2015-11-13 Pipeline

Publications (1)

Publication Number Publication Date
CN205226689U true CN205226689U (en) 2016-05-11

Family

ID=55901755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520901950.1U Expired - Fee Related CN205226689U (en) 2015-11-13 2015-11-13 Pipeline

Country Status (1)

Country Link
CN (1) CN205226689U (en)

Similar Documents

Publication Publication Date Title
CN103644940A (en) Coal seam gas pressure, gas flow and crustal stress monitoring device and monitoring method
CN103063126B (en) Coiled tubing ovality detection method
CN102680187A (en) Method and equipment for checking sealing quality of gas extraction drilled holes
CN205226689U (en) Pipeline
CN105447538B (en) A kind of flange being built-in with chip
CN205746048U (en) A kind of monitoring of leakage device of oil pipeline
CN107632061A (en) A kind of labeling method of coiled tubing on-line checking defect
CN204629116U (en) Oil transport pipeline accident warning device
CN205207982U (en) Flange
CN205207976U (en) Belt carcass piece flange
CN203614137U (en) Intelligent gas transmission pipeline monitoring system
CN205173774U (en) Intelligence flange
CN105299478B (en) A kind of method that can quickly read flange and the accumulative use time of pipeline
杜杨松 et al. Mesozoic mantle-derived magma underplating in Tongling, Anhui Province: Evidence from megacrysts and xenoliths
CN203927416U (en) A kind of pipeline patrols leakage bar
CN204114445U (en) Underground utility positioning device
CN207866447U (en) A kind of tubing interface seal detector
CN204944863U (en) A kind of geologic sampling tube
CN207231524U (en) A kind of well lid of intelligent measurement downhole parameters
CN206411695U (en) A kind of anti-interference double frequency underground utilities electron marker
CN105673076A (en) Hydrological real-time monitoring system
CN205968826U (en) LWD is instrument sealing joint puller in pit
CN204175330U (en) Gas drainage under suction grouping current collector
CN205896705U (en) Pipeline leak detection device based on impedance formula
CN218546027U (en) Coal bed gas detection device for underground extraction drill hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

CF01 Termination of patent right due to non-payment of annual fee