CN205225291U - Coal road tunnelling temporary support device - Google Patents

Coal road tunnelling temporary support device Download PDF

Info

Publication number
CN205225291U
CN205225291U CN201521058678.1U CN201521058678U CN205225291U CN 205225291 U CN205225291 U CN 205225291U CN 201521058678 U CN201521058678 U CN 201521058678U CN 205225291 U CN205225291 U CN 205225291U
Authority
CN
China
Prior art keywords
visiting
roof beam
gallows
temporary support
suspension bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521058678.1U
Other languages
Chinese (zh)
Inventor
赵启峰
周天津
田多
李�昊
邱海涛
郭敬中
师皓宇
黄刚
江山山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haizi Coal Mine Huaibei Mining Co Ltd
North China Institute of Science and Technology
Original Assignee
Haizi Coal Mine Huaibei Mining Co Ltd
North China Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haizi Coal Mine Huaibei Mining Co Ltd, North China Institute of Science and Technology filed Critical Haizi Coal Mine Huaibei Mining Co Ltd
Priority to CN201521058678.1U priority Critical patent/CN205225291U/en
Application granted granted Critical
Publication of CN205225291U publication Critical patent/CN205225291U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a coal road tunnelling temporary support device, belongs to the coal mine tunnel supporting technology field, has solved the existing colliery underworkings tunnelling problem that exists of temporary support device head -on, and it contains three parallel arrangement's spy roof beam, is provided with two gallowss respectively three the same one end of visiting roof beams, the width of gallows is greater than the width of visiting the roof beam, is provided with a jackscrew respectively in the left and right sides of gallows and will visits the roof beam location, can change the angle of visiting the roof beam through the adjustment jackscrew to the level of adaptation coal road turns to, the height of gallows suits with visiting the depth of beam, and the bottom plate of gallows passes through the bolt and visit the roof beam to be connected, prevents that the coal road from facing upward to one side or bowing and visit the roof beam slippage when tunneling to one side, and in order to change the angle of visiting the roof beam, the hole that the bolt of setting on the gallows bottom plate passed is the arc hole, and the arc hole of two gallowss on every spy roof beam sets up relatively, be provided with two metal protection nets three parts that set up beyond the gallows of visiting the roof beam, the utility model is used for coal road tunnelling temporary support.

Description

A kind of coal roadway tunneling temporary support device
Technical field
The utility model belongs to colliery tunnel support technical field, is specifically related to a kind of coal roadway tunneling temporary support device.
Background technology
At present, domestic existing coal mine down-hole tunnel boring head temporary support device, as: underground coal mine temporary support for drivage face equipment (publication number CN203531931U), a kind of front beam for dig heading face temporary support device (publication number CN204646278U), longeron alternating expression temporary support for drivage face support (publication number CN203756209U), automatic paving, networking temporary support device for drivage (publication number CN204140110U) etc. adopt support, hook, forestope to be interconnected technical scheme, visit temporary support device before belonging to suspension type or frame canopy formula.Although use above-mentioned existing apparatus can realize boring head immediate support in coal roadway tunneling meets head on temporary lining process, but rise and fall at coal roadway tunneling inclination angle, level is when turning to, the problem such as still there is assembling and disassembling complex procedures, back timber and top net can not synchronously set up.
Summary of the invention
The purpose of this utility model is the problems referred to above existed to solve existing coal mine down-hole tunnel boring head temporary support device, and provide a kind of coal roadway tunneling temporary support device, its technical scheme is as follows:
A kind of coal roadway tunneling temporary support device, it comprises three spy beams be arranged in parallel, and the identical one end visiting beam at three is respectively arranged with two suspension brackets, each suspension bracket is provided with the connectors such as otic placode, is used for spy beam to be connected with permanent suspension device; The width of described suspension bracket is greater than the width visiting beam, is respectively arranged with a jackscrew will visits beam location in the left and right sides of suspension bracket, can change the angle visiting beam, turn to the level adapting to coal road by adjustment jackscrew; The height of described suspension bracket adapts with spy depth of beam, the base plate of suspension bracket is connected with spy beam by bolt, beam slippage is visited when preventing coal road from facing upward oblique or advancing to the dip, in order to the angle visiting beam can be changed, the hole that the bolt that suspension bracket base plate is arranged passes is arcuate socket, and the arcuate socket of two suspension brackets that every root is visited on beam is oppositely arranged; The part arranged beyond suspension bracket visiting beam at three is provided with two panels Chain Link Fence, in order to easy accessibility, the surrounding of every sheet Chain Link Fence is provided with frame, two panels Chain Link Fence load is the upper surfaces of three spy beams visit corbels by three, the relative side of two panels Chain Link Fence is connected with the upper surface visiting beam being positioned at centre respectively by two or more right angles hook, the spy beam being positioned at centre is provided with and links up with corresponding dog hole with right angle.
The beneficial effects of the utility model are: down-hole dismounting is flexible, reduce labor intensity, the functions such as spacing anti-skidding, adjustable angle, the back timber of boring head temporary lining and the synchronous erection of top net can be realized, stop empty top operation, prevent the inbreak of driving face roof strata and early stage absciss layer from damaging staff, increase work efficiency.
accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the exploded view of Fig. 1;
Fig. 3 is an enlarged drawing visiting two suspension brackets on beam.
detailed description of the invention:
With reference to Fig. 1, Fig. 2 and Fig. 3, a kind of coal roadway tunneling temporary support device, it comprises three spy beams 1 be arranged in parallel, and the identical one end visiting beam 1 at three is respectively arranged with two suspension brackets 2, each suspension bracket 2 is provided with the connectors such as otic placode 2-1, is used for spy beam 1 to be connected with permanent suspension device; The width of described suspension bracket 2 is greater than the width visiting beam 1, is respectively arranged with a jackscrew 2-2 is located by spy beam 1 in the left and right sides of suspension bracket 2, can change the angle visiting beam 1, turn to the level adapting to coal road by adjustment jackscrew 2-2; The height of described suspension bracket 2 adapts with the height visiting beam 1, the base plate of suspension bracket 2 is connected with spy beam 1 by bolt 2-3, beam 1 slippage is visited when preventing coal road from facing upward oblique or advancing to the dip, in order to the angle visiting beam 1 can be changed, the hole that the bolt 2-3 that suspension bracket 2 base plate is arranged passes is arcuate socket 2-4, and the arcuate socket 2-4 of two suspension brackets 2 that every root is visited on beam 1 is oppositely arranged; The part arranged beyond suspension bracket 2 visiting beam 1 at three is provided with two panels Chain Link Fence 3, in order to easy accessibility, the surrounding of every sheet Chain Link Fence 3 is provided with frame 3-1, two panels Chain Link Fence 3 is carried on a shoulder pole the upper surface visiting beam 1 at three and is held up by three spy beams 1, the relative side of two panels Chain Link Fence 3 is connected with the upper surface visiting beam 1 being positioned at centre respectively by two or more right angle hook 3-2, the spy beam 1 being positioned at centre is provided with and links up with dog hole 3-3 corresponding to 3-2 with right angle.

Claims (2)

1. a coal roadway tunneling temporary support device, it is characterized in that it comprises three spy beams (1) be arranged in parallel, the identical one end visiting beam (1) at three is respectively arranged with two suspension brackets (2), and each suspension bracket (2) is provided with otic placode (2-1); The width of described suspension bracket (2) is greater than the width visiting beam (1), is respectively arranged with a jackscrew (2-2) will visits beam (1) location in the left and right sides of suspension bracket (2); The height of described suspension bracket (2) adapts with the height visiting beam (1), the base plate of suspension bracket (2) is connected with spy beam (1) by bolt (2-3), the hole that the bolt (2-3) that suspension bracket (2) base plate is arranged passes is arcuate socket (2-4), and the arcuate socket (2-4) of two suspension brackets (2) that every root is visited on beam (1) is oppositely arranged; The part arranged beyond suspension bracket (2) visiting beam (1) at three is provided with two panels Chain Link Fence (3).
2. a kind of coal roadway tunneling temporary support device as claimed in claim 1, it is characterized in that the surrounding of every sheet Chain Link Fence (3) is provided with frame (3-1), two panels Chain Link Fence (3) load visits beam (1) picking-up at the upper surface that three are visited beam (1) by three, the relative side of two panels Chain Link Fence (3) is linked up with (3-2) respectively by two or more right angle and is connected with the upper surface visiting beam (1) being positioned at centre, spy beam (1) being positioned at centre is provided with and links up with dog hole corresponding to (3-2) (3-3) with right angle.
CN201521058678.1U 2015-12-18 2015-12-18 Coal road tunnelling temporary support device Expired - Fee Related CN205225291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521058678.1U CN205225291U (en) 2015-12-18 2015-12-18 Coal road tunnelling temporary support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521058678.1U CN205225291U (en) 2015-12-18 2015-12-18 Coal road tunnelling temporary support device

Publications (1)

Publication Number Publication Date
CN205225291U true CN205225291U (en) 2016-05-11

Family

ID=55900365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521058678.1U Expired - Fee Related CN205225291U (en) 2015-12-18 2015-12-18 Coal road tunnelling temporary support device

Country Status (1)

Country Link
CN (1) CN205225291U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110023587A (en) * 2016-08-02 2019-07-16 克热斯塑料(澳大利亚)私人有限公司 Polymer flake and its installation and preparation method
CN114233346A (en) * 2021-12-10 2022-03-25 华北科技学院(中国煤矿安全技术培训中心) Temporary support device for roadway excavation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110023587A (en) * 2016-08-02 2019-07-16 克热斯塑料(澳大利亚)私人有限公司 Polymer flake and its installation and preparation method
CN110023587B (en) * 2016-08-02 2022-04-15 克热斯塑料(澳大利亚)私人有限公司 Polymer sheet and method for installing and preparing same
CN114233346A (en) * 2021-12-10 2022-03-25 华北科技学院(中国煤矿安全技术培训中心) Temporary support device for roadway excavation
CN114233346B (en) * 2021-12-10 2023-11-24 华北科技学院(中国煤矿安全技术培训中心) Temporary support device for tunnel tunneling

Similar Documents

Publication Publication Date Title
CN104564090B (en) Repair all-in-one in multi-functional lane
CN200985799Y (en) Roadway advance support bracket
CN102410017B (en) Supporting type integrated tunneling-anchoring machine
CN103899319B (en) Pick anchor continuous and automatic fast digging technique
CN104879061A (en) Multifunctional self-propelled portal wagon drill
CN202500562U (en) Excavating, supporting and anchoring parallel operating system
CN205225291U (en) Coal road tunnelling temporary support device
CN202391424U (en) Supporting type comprehensive bolter miner
CN102874691B (en) Coal mine fully-mechanized mining the middle pan of scraper conveyor hanging apparatus
CN104948109A (en) Suspension type omni-directional anchor rod drill carriage
CN204060743U (en) Coal mining digging laneway gas buttress formula forestope temporary support device
CN204344148U (en) A kind of hydraulic test
CN101818649B (en) Hydraulic supporting device for fully-mechanized coal driving workface
CN203499722U (en) Adjusting device of scraper conveyor
CN102587904B (en) Comprehensive mechanical rock lane tunneling machine
CN206448809U (en) Pick, branch, anchor, drill integrated fully-mechanized digging machine
CN105887589A (en) Track mounting machine and method for mounting track by using same
CN203879514U (en) Metal net tensioning equipment
CN204001001U (en) Working device of loader multifunctional rapid converting mechanism
CN203808829U (en) Suspension type omnibearing anchor rod drilling carriage
CN204609920U (en) Cantilever support fast hydraulic pressure formula Fast Installation creeper truck
CN206487486U (en) A kind of mining TBM safe temporary support device
CN202346715U (en) Integral fast translation device for electric drilling machine
CN204402515U (en) Hydraulic support and bottom lifting device thereof
CN210365680U (en) Colliery electromechanical device conveyer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511