CN205222452U - Capable hoist device that hangs of oil pipe - Google Patents

Capable hoist device that hangs of oil pipe Download PDF

Info

Publication number
CN205222452U
CN205222452U CN201521019024.8U CN201521019024U CN205222452U CN 205222452 U CN205222452 U CN 205222452U CN 201521019024 U CN201521019024 U CN 201521019024U CN 205222452 U CN205222452 U CN 205222452U
Authority
CN
China
Prior art keywords
main beam
floor
oil pipe
angle
otic placode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521019024.8U
Other languages
Chinese (zh)
Inventor
于洪英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengli Oil Field Jindao Industrial Co., Ltd.
Original Assignee
于洪英
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 于洪英 filed Critical 于洪英
Priority to CN201521019024.8U priority Critical patent/CN205222452U/en
Application granted granted Critical
Publication of CN205222452U publication Critical patent/CN205222452U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a capable hoist device that hangs of oil pipe, including main beam, otic placode and the lifting hook link of going, the otic placode sets up the both sides at the main beam, the top of main beam is equipped with the floor that is triangle -shaped, the top of floor has the contained angle, the lifting hook link of going sets up the contained angle department at the floor. The utility model discloses use rational in infrastructure, as to get rid of wire rope, reduce cost, ability eliminate jitter phenomenon, safe and reliable.

Description

Oil pipe is capable hangs hanging apparatus
Technical field
The utility model relates to a kind of lifting device of oil pipe, is specifically related to that a kind of oil pipe is capable hangs hanging apparatus.
Background technology
At present, row lifting, according to the different situation such as profile, material of different article hoisting, selects different suspenders.Coil of strip dedicated lifting hook, rapid wear product suspender belt, hard weight steel rope.When tying up article hoisting, if article itself are without hook place, according to article center of gravity, rationally must determine to tie up position, after ensureing to lift by crane, keep balance.During lifting oil pipe, owing to being elongate article, so easily rock when lifting, action is steady, light and slow, first examination hang proper height, observe oil pipe overhead after whether keep balance, tie up whether firm, when needs are shifted, liftoff be no more than one meter time stop rising, carry out shift operation.When shaking amplitude is large; often some faults can be there are in swing pipe frock; main beam there will be jitter phenomenon when lifting; reduce safety; and need during lifting to use steel rope, steel rope needs frequent replacing, improves productive costs; and have larger potential safety hazard when lifting, cause production not carry out continuously.
Summary of the invention
The purpose of this utility model is exactly the defect existed for prior art, and provide a kind of rational in infrastructure, can remove the use of steel rope, reduce costs, can eliminate jitter phenomenon, safe and reliable oil pipe is capable hangs hanging apparatus.
Its technical scheme is: oil pipe is capable hangs hanging apparatus, comprise main beam, otic placode and row suspension hook link, described otic placode is arranged on the both sides of main beam, and the top of described main beam is provided with floor triangular in shape, the top of described floor has angle, and described row suspension hook link is arranged on the angle of floor.
The angle of described floor in obtuse angle.
Described floor also comprises the extension be connected with main beam, and described extension is consistent with the width of main beam.
The utility model compared with prior art, has the following advantages: rational in infrastructure, can remove the use of steel rope, reduce costs, and can eliminate jitter phenomenon, safe and reliable.
Accompanying drawing explanation
Here further illustrates the utility model in conjunction with the accompanying drawings and embodiments.
Fig. 1 is the structural representation of a kind of embodiment of the utility model.
In figure: 1. main beam; 2. otic placode; 3. row suspension hook link; 4. floor; 5. angle; 6. extension.
Detailed description of the invention
With reference to Fig. 1, oil pipe is capable hangs hanging apparatus, comprise main beam 1, otic placode 2 and row suspension hook link 3, described otic placode 2 is arranged on the both sides of main beam 1, the top of described main beam 1 is provided with floor 4 triangular in shape, the top of described floor 4 has angle 5, and described row suspension hook link 3 is arranged on angle 5 place of floor 4.
The angle 5 of described floor 4 in obtuse angle.The jitter phenomenon of main beam 1 in hoisting process can be prevented by this angle 5 structure, improve security and stability.
Described floor 4 also comprises the extension 6 be connected with main beam 1, and described extension 6 is consistent with the width of main beam 1.Such bulk strength that can improve main beam 1, improves lifting stability.
Main beam 1 can eliminate jitter phenomenon, improves safety, easy to operate, energy-efficient; Remove the use of steel rope, save the frequent replacing of steel rope, save production cost.
The utility model is not limited to above-mentioned embodiment, and in the ken that those skilled in the art possess, can also make a variety of changes under the prerequisite not departing from the utility model aim, the content after change still belongs to protection domain of the present utility model.

Claims (3)

1. oil pipe is capable hangs hanging apparatus, comprise main beam, otic placode and row suspension hook link, it is characterized in that: described otic placode is arranged on the both sides of main beam, the top of described main beam is provided with floor triangular in shape, the top of described floor has angle, and described row suspension hook link is arranged on the angle of floor.
2. oil pipe according to claim 1 is capable hangs hanging apparatus, it is characterized in that: the angle of described floor in obtuse angle.
3. oil pipe according to claim 1 and 2 is capable hangs hanging apparatus, and it is characterized in that: described floor also comprises the extension be connected with main beam, described extension is consistent with the width of main beam.
CN201521019024.8U 2015-12-10 2015-12-10 Capable hoist device that hangs of oil pipe Expired - Fee Related CN205222452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521019024.8U CN205222452U (en) 2015-12-10 2015-12-10 Capable hoist device that hangs of oil pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521019024.8U CN205222452U (en) 2015-12-10 2015-12-10 Capable hoist device that hangs of oil pipe

Publications (1)

Publication Number Publication Date
CN205222452U true CN205222452U (en) 2016-05-11

Family

ID=55897529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521019024.8U Expired - Fee Related CN205222452U (en) 2015-12-10 2015-12-10 Capable hoist device that hangs of oil pipe

Country Status (1)

Country Link
CN (1) CN205222452U (en)

Similar Documents

Publication Publication Date Title
CN202131007U (en) Long and straight workpiece hoisting tool
CN204847764U (en) Prefabricated component production is with hoist and mount frame
CN205916895U (en) But chain hoist that multiple spot hung
CN204847755U (en) Guide rail hoist and mount frock
CN205045703U (en) Hoist of a convenient loading and unloading miscellany goods
CN203411232U (en) Suspending hook for hoisting strip steel
CN204057684U (en) A kind of Three-jaw sling
CN202808173U (en) Lifting device special for lateral columns
CN205222452U (en) Capable hoist device that hangs of oil pipe
CN104925665B (en) A kind of special chain sling of test run
CN202131004U (en) Balance hanging beam for combination operation of two cranes
CN205990181U (en) A kind of light-duty shockproof suspension hook
CN203545436U (en) Multipurpose lifting tool
CN203237917U (en) Triangular flat glass hanger
CN203754232U (en) Simple steel rail lifting tool
CN203345919U (en) Lifting tool for lifting multiple ring pieces
CN103466431B (en) Multipurpose hanger
CN203006718U (en) Finished-product flat steel lifting device
CN205662225U (en) Become a bundle semitrailer pterygoid lamina special lifting device
CN206580218U (en) A kind of belt collet roll change tools
CN203638964U (en) Suspension device for crane
CN204281030U (en) A kind of special hanger lifting section bar
CN203889897U (en) Device for rapidly hoisting lifting machine winding drum steel pipe
CN204569145U (en) Load-transfer device special hanger
CN203624810U (en) Special lifting tool for steel material with a huge section

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Yu Hongying

Inventor after: Wu Zhuqing

Inventor after: Liu Weisheng

Inventor after: Song Bo

Inventor before: Yu Hongying

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20170203

Address after: 257231 Shandong province Dongying Yongle Island estuary Town Road No. 27

Patentee after: Shengli Oil Field Jindao Industrial Co., Ltd.

Address before: 257235 Shandong province Dongying City estuary village collaboration No. 5 Building 2 unit 102 room

Patentee before: Yu Hongying

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

Termination date: 20201210

CF01 Termination of patent right due to non-payment of annual fee