CN205219405U - Panel installation device that production recess board was used - Google Patents

Panel installation device that production recess board was used Download PDF

Info

Publication number
CN205219405U
CN205219405U CN201521052420.0U CN201521052420U CN205219405U CN 205219405 U CN205219405 U CN 205219405U CN 201521052420 U CN201521052420 U CN 201521052420U CN 205219405 U CN205219405 U CN 205219405U
Authority
CN
China
Prior art keywords
panel
frame
mast
coaster
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521052420.0U
Other languages
Chinese (zh)
Inventor
刘建伟
王巍
夏素芬
樊玉新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521052420.0U priority Critical patent/CN205219405U/en
Application granted granted Critical
Publication of CN205219405U publication Critical patent/CN205219405U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model belongs to recess board production facility field, concretely relates to panel installation device that production recess board was used, including body frame, the coaster of rectangle, the coaster setting is in the body frame top, and the up end of coaster and body frame forms sliding fit, the coaster be provided with the panel and snatch the mechanism, the panel snatchs the mechanism including the perpendicular hoist and mount frame that sets up and snatch the frame, hoist and mount frame lower extreme is provided with the pivot, snatchs the frame and forms normal running fit with the help of pivot and hoist and mount frame, snatchs and is provided with grabbing device on the frame. The utility model discloses a pick the frame and pick the panel of recess board, through and the board device will pick the frame and accomplish the work of placing of panel by horizontal rotation to vertical state, convenient hoist and mount frame in placing the panel of recess board on the mould, realized that the automation of recess face board is placed, saved a large amount of human costs, separate the workman from tedious manual labor and release, promoted the efficiency that the recess board was produced greatly.

Description

Produce the panel mounting device of concave-board
Technical field
The utility model belongs to concave-board production equipment field, is specifically related to the panel mounting device producing concave-board.
Background technology
Prefabricated groove plate is the reeded non-bearing filling wallboard of top tape, and comprise interior wall strip and the large plate of exterior wall two kinds, they all have sound insulation and fireproofing function, and the large plate of exterior wall has incubation and thermal insulation function concurrently.The unique distinction of concave-board is: one is that its Binder Materials cost is low, performance is high and environmental protection; Two is the double templates doing wall top coupling beam of top groove, lays coupling beam reinforcing bar cage in a groove and together with edge member after casting concrete, forms the combined wall of the noggin piece high-performance integrated with structural elements, green, environmental protection.
During concave-board is produced, in order to easily manufactured employing concave-board mould is produced, conveniently production line running, concave-board mould is also arranged on mould car, in being produced by two of concave-board blocks of large plates of exterior wall during production, said panel is placed in mould, then being filled with by gel rubber material is flushed in mould, after filler solidifies, just produce the concave-board of three-decker, still rely on to the step of installation panel in the mould of concave-board in current production and manually complete, panel size is larger, operator is wasted time and energy when taking panel, concave-board mould is long and narrow and mould height is higher, panel is not easily in place, make the concave-board size produced not up to standard, seriously drag the throughput rate of slow concave-board.
Utility model content
The utility model manually completes to solve in production at present still to rely on to the step of installation panel in the mould of concave-board, panel size is larger, operator is wasted time and energy when taking panel, and concave-board mould is long and narrow and mould height is higher, panel is not easily in place, make the concave-board size produced not up to standard, seriously drag the problem of the throughput rate of slow concave-board, provide the panel mounting device producing concave-board, can effectively solve the problem, alleviate personnel labor intensity, enhance productivity.
The concrete technical scheme that the utility model adopts is:
Produce the panel mounting device of concave-board, comprise the body frame of rectangle, coaster, coaster is arranged on above body frame, the upper surface of coaster and body frame is formed and is slidably matched, described coaster is provided with panel grasping mechanism, and panel grasping mechanism comprises vertically disposed mast-up and captures frame, and mast-up lower end is provided with rotating shaft, crawl frame is formed by rotating shaft and mast-up and is rotatably assorted, and captures on frame and is provided with grabbing device.
Described grabbing device is sucker, and the lateral surface that sucker is capturing frame is uniformly distributed, and sucker is connected with air pump.
Described crawl erection is equipped with two, and two capture frame and arrange in the bilateral symmetry of mast-up.
Described mast-up is provided with and panel assembly, and panel assembly comprises capstan winch, capstan winch connects the upper end capturing frame by strand cable.
Described also panel assembly also comprises the directive wheel being arranged on mast-up, and directive wheel is separately positioned on the both sides of mast-up.
Described mast-up is by guide rails assembling on coaster, and guide rail and mast-up are formed and be slidably matched, and coaster is also provided with lifting device, and lifting device is electric block, and electric block is connected with mast-up by raising cord.
Also be provided with panel lodging bench, panel lodging bench is positioned at below coaster, and panel lodging bench lower end is provided with running roller, and running roller is formed with the storing cart track being arranged on body frame bottom surface and is slidably matched.
The beneficial effects of the utility model are:
The utility model adopts and captures the panel that frame captures concave-board, by and panel assembly by crawl frame by horizontally rotating vertical state, mast-up is facilitated to be placed in mould by the panel of concave-board, complete the placement work of panel, the automation achieving concave-board panel is placed, save a large amount of human costs, workman is freed from heavy manual labor, greatly improve the efficiency that concave-board is produced.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram in the top view direction of Fig. 1;
Fig. 3 is the structural representation of mast-up part;
Fig. 4 captures schematic diagram when frame opens up into horizontal level;
In accompanying drawing, 1, body frame, 2, coaster, 3, mast-up, 4, capture frame, 5, sucker, 6, capstan winch, 7, strand cable, 8, directive wheel, 9, panel lodging bench, 10, storing cart track.
Detailed description of the invention
The utility model manually completes to solve in production at present still to rely on to the step of installation panel in the mould of concave-board, panel size is larger, operator is wasted time and energy when taking panel, and concave-board mould is long and narrow and mould car is higher, panel is not easily in place, make the concave-board size produced not up to standard, seriously drag the problem of the throughput rate of slow concave-board, provide the panel mounting device producing concave-board, adopt and capture the panel that frame captures concave-board, by and panel assembly by crawl frame by horizontally rotating vertical state, mast-up is facilitated to be placed in mould by the panel of concave-board, complete the placement work of panel, the automation achieving concave-board panel is placed, save a large amount of human costs, workman is freed from heavy manual labor, greatly improve the efficiency that concave-board is produced.
Below in conjunction with drawings and the specific embodiments, the utility model is described in further detail:
The utility model is the panel mounting device producing concave-board, comprise the body frame 1 of rectangle, coaster 2, coaster 2 is arranged on above body frame 1, coaster 2 is formed with the upper surface of body frame 1 and is slidably matched, described coaster 2 is provided with panel grasping mechanism, and panel grasping mechanism comprises vertically disposed mast-up 3 and captures frame 4, and mast-up 3 lower end is provided with rotating shaft, crawl frame 4 is formed by rotating shaft and mast-up 3 and is rotatably assorted, and captures on frame 4 and is provided with grabbing device.
In order to make the crawl of grabbing device reliable, easy to operate, described grabbing device is sucker 5, and the lateral surface that sucker 5 is capturing frame 4 is uniformly distributed, and sucker 5 is connected with air pump.
In order to improve the efficiency of equipment installation panel, described crawl frame 4 is provided with two, and two capture frame 4 and arrange in the bilateral symmetry of mast-up 3.
Conveniently long and narrow concave-board mould put into by panel by mast-up 3, described mast-up 3 is provided with and panel assembly, and panel assembly comprises capstan winch 6, and capstan winch 6 connects the upper end capturing frame 4 by strand cable 7.Described also panel assembly also comprises the directive wheel 8 preventing strand cable 7 from wearing and tearing being arranged on mast-up 3, and directive wheel 8 is separately positioned on the both sides of mast-up 3.After panel captures by grabbing device, and crawl frame 4 and mast-up 3 close up by panel assembly, make mast-up 3 can put into narrow concave-board mould.
In order to optimize convenience of the present utility model further, described mast-up 3 is by guide rails assembling on coaster 2, and guide rail and mast-up 3 are formed and be slidably matched, and coaster 2 is also provided with lifting device, lifting device is electric block, and electric block is connected with mast-up 3 by raising cord.Also be provided with panel lodging bench 9, panel lodging bench 9 is positioned at below coaster 2, and panel lodging bench 9 lower end is provided with running roller, and running roller is formed with the storing cart track 10 being arranged on body frame 1 bottom surface and is slidably matched.
Specific embodiment is as shown in Fig. 1 to Fig. 4, the utility model is in use by two pieces of panel upper surfaces at panel lodging bench 9 placed side by side, two pieces of panel-level are placed, now mast-up 3 moves to coaster 2 top that entrucking 9 deposited by panel, the electric block being arranged on coaster starts, mast-up 3 moves straight down along the guide rail being arranged on coaster 2 under gravity, when mast-up 3 lower end and plate contact, the capstan winch 6 be arranged on mast-up 3 is energized and rotates, strand cable 7 is extended, the crawl frame 4 that strand cable 7 end connects rotates around the rotating shaft being arranged on mast-up 3 lower end, when crawl frame 4 turns over 90 °, namely now capture frame 4 and rotate to level from vertical state, be arranged on the sucker 5 and plate contact that capture frame 4, the air pump that sucker 5 connects starts, panel adsorbs by sucker 5, now capstan winch 6 rotates backward, make to capture frame 4 and return to vertical state from level, now complete and capture closing up of frame 4 and mast-up 3, the grasping manipulation of panel completes.
The electric block be now arranged on coaster 2 starts, mast-up 3 is promoted straight up, concave-board mould is placed into body frame 1 time by manpower or mould car, coaster 2 moves to above mould, mast-up 3 is moved down, mast-up 3 stretches in mould, now air pump cuts out, panel unclamps by sucker 5, mast-up 3 is packed up, complete the installation placement work of panel, the mould installing panel just can carry out next step operation, the utility model achieves the automation of concave-board erecting of panel, greatly improve the production efficiency of concave-board, save a large amount of human cost.

Claims (7)

1. produce the panel mounting device of concave-board, comprise the body frame (1) of rectangle, coaster (2), coaster (2) is arranged on body frame (1) top, coaster (2) is formed with the upper surface of body frame (1) and is slidably matched, it is characterized in that: described coaster (2) is provided with panel grasping mechanism, panel grasping mechanism comprises vertically disposed mast-up (3) and captures frame (4), mast-up (3) lower end is provided with rotating shaft, crawl frame (4) is formed by rotating shaft and mast-up (3) and is rotatably assorted, capture on frame (4) and be provided with grabbing device.
2. the panel mounting device of production concave-board according to claim 1, it is characterized in that: described grabbing device is sucker (5), the lateral surface that sucker (5) is capturing frame (4) is uniformly distributed, and sucker (5) is connected with air pump.
3. the panel mounting device of production concave-board according to claim 1, is characterized in that: described crawl frame (4) is provided with two, and two capture frame (4) and arrange in the bilateral symmetry of mast-up (3).
4. the panel mounting device of production concave-board according to claim 1, it is characterized in that: described mast-up (3) is provided with and panel assembly, and panel assembly comprises capstan winch (6), capstan winch (6) connects the upper end capturing frame (4) by strand cable (7).
5. the panel mounting device of production concave-board according to claim 4, it is characterized in that: described also panel assembly also comprises the directive wheel (8) being arranged on mast-up (3), and directive wheel (8) is separately positioned on the both sides of mast-up (3).
6. the panel mounting device of production concave-board according to claim 1, it is characterized in that: described mast-up (3) by guide rails assembling on coaster (2), guide rail and mast-up (3) are formed and are slidably matched, (2) are also provided with lifting device with coaster, lifting device is electric block, and electric block is connected with mast-up (3) by raising cord.
7. the panel mounting device of production concave-board according to claim 1, it is characterized in that: be also provided with panel lodging bench (9), panel lodging bench (9) is positioned at coaster (2) below, panel lodging bench (9) lower end is provided with running roller, and running roller is formed with the storing cart track (10) being arranged on body frame (1) bottom surface and is slidably matched.
CN201521052420.0U 2015-12-16 2015-12-16 Panel installation device that production recess board was used Active CN205219405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521052420.0U CN205219405U (en) 2015-12-16 2015-12-16 Panel installation device that production recess board was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521052420.0U CN205219405U (en) 2015-12-16 2015-12-16 Panel installation device that production recess board was used

Publications (1)

Publication Number Publication Date
CN205219405U true CN205219405U (en) 2016-05-11

Family

ID=55894497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521052420.0U Active CN205219405U (en) 2015-12-16 2015-12-16 Panel installation device that production recess board was used

Country Status (1)

Country Link
CN (1) CN205219405U (en)

Similar Documents

Publication Publication Date Title
CN206849958U (en) A kind of up- coiler battery core stamp adhesive tape rubberizing mechanism
CN205219405U (en) Panel installation device that production recess board was used
CN112854763A (en) Construction device of energy-saving building and working method thereof
CN210103357U (en) Hoisting accessory of wallboard installation
CN211078260U (en) Building is built a wall and is used fragment of brick hoisting device
CN203181749U (en) Automatic feeding device
CN202465162U (en) Small electric lifting feeding machine for building
CN213231280U (en) Lifting device with protection effect for decoration construction
CN204163350U (en) A kind of cement trowelling machine
CN209291486U (en) A kind of production line automation equipment automatic charging device
CN203821796U (en) Sectioning and jacking type whitewashing machine for exposed corners of doors and windows
CN207177298U (en) A kind of appts. for transferring ready-mixed concrete
CN210175547U (en) Cable drum transportation frame
CN211895655U (en) Large-size glass hoisting machine tool for glass curtain wall
CN205201777U (en) Device is covered in tearing open that production recess board was used
CN205201783U (en) Dress lid locking device that production recess board was used
CN207188750U (en) One kind automation coremaking equipment
CN206606811U (en) One kind production cloth hoist engine
CN206464451U (en) A kind of aluminium flake kludge
CN217051049U (en) Cable integration device for electrical engineering automation
CN201627347U (en) Wall surface plastering machine
CN205778930U (en) A kind of monolateral ditch cable trench chassis
CN218114835U (en) Hoisting structure for concrete cover plate
CN214733985U (en) Hoisting device for intelligent building
CN202134279U (en) Cable plate crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant