CN205206381U - Can add high -rise office building structure of bathroom - Google Patents

Can add high -rise office building structure of bathroom Download PDF

Info

Publication number
CN205206381U
CN205206381U CN201520930932.6U CN201520930932U CN205206381U CN 205206381 U CN205206381 U CN 205206381U CN 201520930932 U CN201520930932 U CN 201520930932U CN 205206381 U CN205206381 U CN 205206381U
Authority
CN
China
Prior art keywords
pipe
district
sewage
washroom
corridor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520930932.6U
Other languages
Chinese (zh)
Inventor
官伟兴
叶慧
柯海江
金坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Original Assignee
HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAHUI ENGINEERING DESIGN GROUP Co Ltd filed Critical HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Priority to CN201520930932.6U priority Critical patent/CN205206381U/en
Application granted granted Critical
Publication of CN205206381U publication Critical patent/CN205206381U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model relates to a can add high -rise office building structure of bathroom, it includes office area, corridor district, a core section of thick bamboo and a plurality of piping shaft, wherein, the inboard of office area is provided with and falls the board district, the corridor position is reserved in it and has been arranged feed pipe, sewage pipe and waste pipe in falling board district inboard, a core section of thick bamboo sets up in the corridor district inboardly, the piping shaft sets up respectively in the corner of a core section of thick bamboo and office area, be equipped with water supply riser, sewage riser and waste stack in each piping shaft, feed pipe and water supply riser switch -on, sewage pipe and the switch -on of sewage riser, waste pipe and waste stack switch -on, it is equipped with the three reserved pipe side by side of a plurality of groups in the board district to fall, wear connected manifolds in the reserved pipe, connected manifolds respectively with feed pipe, sewage pipe, useless water piping connection. The utility model has the advantages of simple structure, construction convenience with low costs and can not exert an influence etc. A great deal ofly to lower one deck.

Description

A kind of Tall Office Buildings structure setting up washroom
[technical field]
The utility model relates to the reserved structure of a kind of building, is specifically related to a kind of Tall Office Buildings structure setting up washroom, belongs to construction engineering technical field.
[background technology]
Current Tall Office Buildings typical floor is generally the general-purpose type working space of standard column net, arranges unified communal bathroom in floor side, and all the other working spaces can be separated arbitrarily.But working space is when secondary decoration, set up washroom as want at Administrative Area to be then good at meeting: one be sanitary apparatus drainage pipe by appear at next floor ceiling under, because of perception and the draining sound of property right reason and drainage pipe, and the office that possible leaking can affect lower one deck uses, two is that the drainage pipe of sanitary apparatus needs to access unified sewage standpipe, waste stack, but sewage standpipe, waste stack is arranged in pipe well, pipe well position in conventional design often near communal bathroom, be connected to each other to facilitate, thus when rear increasing washroom is not at communal bathroom homonymy, the washroom fixture drain access sewage standpipe of rear increase, waste stack needs the tube connector grown very much, by code requirement, soil pipe, waste water pipe all belongs to gravity line, need to arrange certain horizontal slope, tube connector can produce the larger discrepancy in elevation between delivery port to drain gully, the floor usage space so moved towards in scope at tube connector can be subject to extreme influence.Therefore, in Tall Office Buildings, set up washroom will be difficult to carry out.
Therefore, for solving the problems of the technologies described above, the necessary Tall Office Buildings structure setting up washroom providing a kind of innovation, to overcome described defect of the prior art.
[utility model content]
For solving the problem, the purpose of this utility model is to provide a kind of structure simple, easy construction, the low and Tall Office Buildings structure setting up washroom that is that can not have an impact to lower one deck of cost.
For achieving the above object, the technical scheme that the utility model is taked is: a kind of Tall Office Buildings structure setting up washroom, and it comprises Office Area, corridor district, Core Walls Structure and some piping shafts; Wherein, the inner side of described Office Area is provided with Jiang Ban district; Described corridor district is positioned at inside Jiang Ban district, reserves and be furnished with water service pipe, soil pipe and waste water pipe in it; Described Core Walls Structure is arranged on inside the district of corridor; Described piping shaft is separately positioned on corner and the Office Area of Core Walls Structure; Water supply riser, sewage standpipe and waste stack is provided with in each piping shaft; Described water service pipe and water supply riser are connected; Described soil pipe and sewage standpipe are connected; Described waste water pipe and waste stack are connected; Be provided with some groups three provided pipes side by side in described Jiang Ban district, wear connecting branch in described provided pipe, connecting branch is connected with water service pipe, soil pipe, waste water pipe respectively.
The Tall Office Buildings structure setting up washroom of the present utility model is set to further: the end face in described Jiang Ban district is lower than the end face 400mm in Office Area and corridor district; The both sides in described Jiang Ban district are provided with and fall plate brace summer; The end face in described Jiang Ban district inserts the light weight concrete construction of thickness 400mm.
The Tall Office Buildings structure setting up washroom of the present utility model is set to further: what described provided pipe was specifically arranged on Jiang Ban district falls in plate brace summer, its internal diameter is respectively 130mm and 70mm, 50mm, fall plate brace summer described in all through, and described in exposing outside respectively, fall plate brace summer side 20mm.
The Tall Office Buildings structure setting up washroom of the present utility model is set to further: the height that described provided pipe is arranged staggers mutually, and the installation position that internal diameter is little is high, and the installation position that internal diameter is large is low.
The Tall Office Buildings structure setting up washroom of the present utility model is also set to: described water service pipe is arranged feedwater spare interface; Described soil pipe is arranged sewage spare interface; Described waste water pipe is arranged waste water spare interface; Described connecting branch can dock with feedwater spare interface, sewage spare interface and waste water spare interface respectively.
Compared with prior art, the utility model has following beneficial effect:
1. the Tall Office Buildings structure structure setting up washroom of the present utility model is simple, easy construction, and cost is not high, but to provide convenience condition for setting up washroom during decorations, solves objective reality demand preferably.
2. of the present utility model can set up the Tall Office Buildings structure of washroom plate top surface falls lower than common floor end face 400mm, relevant sanitaryware and relevant pipeline can be laid at leisure, and can not have an impact to next floor.
3. the pipe well set up of Tall Office Buildings vibrational power flow provided pipe, water service pipe, soil pipe, the spare interface of waste water pipe, the Core Walls Structure bight setting up washroom of the present utility model, for sanitaryware are correlated with, pipeline accesses described water service pipe, soil pipe, waste water pipe provide convenience condition.
4. water service pipe, waste water pipe, the soil pipe setting up the Tall Office Buildings structure of washroom of the present utility model arrange position, highly stagger, avoid between pipeline and collide.
[accompanying drawing explanation]
Fig. 1 is the layout schematic diagram setting up the Tall Office Buildings structure of washroom of the present utility model.
Fig. 2 is the fragmentary detail view setting up the Tall Office Buildings structure of washroom of the present utility model.
Fig. 3 is the sectional drawing along A-A in Fig. 2.
[detailed description of the invention]
Refer to shown in Figure of description 1 to accompanying drawing 3, the utility model is a kind of Tall Office Buildings structure setting up washroom, and it is made up of a few parts such as Office Area 1, corridor district 3, Core Walls Structure 2 and some piping shafts 21.
Wherein, different working spaces can be divided into as required in described Office Area 1, and washroom (not shown) can be set in each working space.The inner side of described Office Area 1 is provided with Jiang Ban district 11.The end face in described Jiang Ban district 11 is lower than the end face 400mm in Office Area 1 and corridor district 3, and its end face inserts the light weight concrete construction 13 of thickness 400mm.Be provided with some groups three provided pipes 15 side by side in described Jiang Ban district 11, in described provided pipe 15, wear connecting branch 16.The both sides in described Jiang Ban district 11 are provided with and fall plate brace summer 12, and provided pipe 15 is specifically arranged on and falls in plate brace summer 12.Described provided pipe 15 internal diameter is respectively 130mm and 70mm, 50mm, falls plate brace summer 12 described in all through, and falls plate brace summer 12 side 20mm described in exposing outside respectively.The height that described provided pipe 15 is arranged staggers mutually, and the installation position that internal diameter is little is high, and the installation position that internal diameter is large is low.
Described corridor district 3 is positioned at inside Jiang Ban district 11, reserves and be furnished with water service pipe 31, soil pipe 32 and waste water pipe 33 in it.Described connecting branch 16 respectively with water service pipe 31, soil pipe 32 and waste water pipe 33.
Described Core Walls Structure 2 is arranged on inside corridor district 3.Described piping shaft 21 is separately positioned on corner and the Office Area 1 of Core Walls Structure 2.Water supply riser 34, sewage standpipe 212 and waste stack 211 is provided with in described piping shaft 21.Described water service pipe 31 and water supply riser 34 are connected; Described soil pipe 32 and sewage standpipe 212 are connected; Described waste water pipe 33 and waste stack 211 are connected.
Further, described water service pipe 31 arranges some feedwater spare interfaces 311; Described soil pipe 32 arranges some sewage spare interfaces 321; Described waste water pipe 33 arranges some waste water spare interfaces 331.Described connecting branch 16 can dock with feedwater spare interface 311, sewage spare interface 321 and waste water spare interface 331 respectively.When needs set up washroom in Office Area 1, as long as corresponding pipeline is docked to connecting branch 16.
Above detailed description of the invention is only the preferred embodiment of this creation, and not in order to limit this creation, any amendment made within all spirit in this creation and principle, equivalent replacement, improvement etc., within the protection domain that all should be included in this creation.

Claims (5)

1. can set up a Tall Office Buildings structure for washroom, it is characterized in that: comprise Office Area, corridor district, Core Walls Structure and some piping shafts; Wherein, the inner side of described Office Area is provided with Jiang Ban district; Described corridor district is positioned at inside Jiang Ban district, reserves and be furnished with water service pipe, soil pipe and waste water pipe in it; Described Core Walls Structure is arranged on inside the district of corridor; Described piping shaft is separately positioned on corner and the Office Area of Core Walls Structure; Water supply riser, sewage standpipe and waste stack is provided with in each piping shaft; Described water service pipe and water supply riser are connected; Described soil pipe and sewage standpipe are connected; Described waste water pipe and waste stack are connected; Be provided with some groups three provided pipes side by side in described Jiang Ban district, wear connecting branch in described provided pipe, connecting branch is connected with water service pipe, soil pipe, waste water pipe respectively.
2. can set up the Tall Office Buildings structure of washroom as claimed in claim 1, it is characterized in that: the end face in described Jiang Ban district is lower than the end face 400mm in Office Area and corridor district; The both sides in described Jiang Ban district are provided with and fall plate brace summer; The end face in described Jiang Ban district inserts the light weight concrete construction of thickness 400mm.
3. can set up the Tall Office Buildings structure of washroom as claimed in claim 2, it is characterized in that: what described provided pipe was specifically arranged on Jiang Ban district falls in plate brace summer, its internal diameter is respectively 130mm and 70mm, 50mm, fall plate brace summer described in all through, and described in exposing outside respectively, fall plate brace summer side 20mm.
4. can set up the Tall Office Buildings structure of washroom as claimed in claim 3, it is characterized in that: the height that described provided pipe is arranged staggers mutually, and the installation position that internal diameter is little is high, and the installation position that internal diameter is large is low.
5. can set up the Tall Office Buildings structure of washroom as claimed in claim 1, it is characterized in that: described water service pipe be arranged feedwater spare interface; Described soil pipe is arranged sewage spare interface; Described waste water pipe is arranged waste water spare interface; Described connecting branch can dock with feedwater spare interface, sewage spare interface and waste water spare interface respectively.
CN201520930932.6U 2015-11-23 2015-11-23 Can add high -rise office building structure of bathroom Active CN205206381U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520930932.6U CN205206381U (en) 2015-11-23 2015-11-23 Can add high -rise office building structure of bathroom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520930932.6U CN205206381U (en) 2015-11-23 2015-11-23 Can add high -rise office building structure of bathroom

Publications (1)

Publication Number Publication Date
CN205206381U true CN205206381U (en) 2016-05-04

Family

ID=55844107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520930932.6U Active CN205206381U (en) 2015-11-23 2015-11-23 Can add high -rise office building structure of bathroom

Country Status (1)

Country Link
CN (1) CN205206381U (en)

Similar Documents

Publication Publication Date Title
CN203473214U (en) Bathroom unit of cabin unit
CN205206381U (en) Can add high -rise office building structure of bathroom
CN204040175U (en) A kind of accessible water accumulator
CN205742268U (en) A kind of comprehensive pipe gallery structure
CN201236366Y (en) Pollution discharge conduit system for multi-storey building
CN214144450U (en) Building balcony waste water rainwater reposition of redundant personnel structure
CN205077562U (en) With layer drainage swirling flow five -way pipe fitting
CN202416536U (en) Embedded waterproof floor drain
CN202546029U (en) Waterproof preembedded pipe base
CN102561473A (en) Descending plate type same-layer drainage and drainage collector system
CN201495587U (en) Installation and drainage device of same-layer exposed pipe of sanitary equipment
CN201589029U (en) Water segregator
CN201056761Y (en) Cabinet capable of containing and releasing closet
CN205206337U (en) Top module system core section of thick bamboo wall body spraying system all
CN201074349Y (en) Kitchen-toilet modularization same floor water feeding and draining device
CN206071107U (en) Between a kind of environmentally-friendly sanitary
CN205476320U (en) Assembled plumbing installation
CN204081049U (en) With layer multichannel odour-proof floor drain
CN217325647U (en) Same-floor drainage system for assembled toilet
CN203049712U (en) Joint of drainage pipe
CN203238716U (en) Storage and recycling system for washing wastewater
CN204001070U (en) Exempt to clean water tank device for modifying
CN203891423U (en) Multifunctional supporting profile assembly of same-floor drainage toilet
CN202884270U (en) Embedded waterproof steel-plastic sleeve
CN201599509U (en) Direct-insert convex type reducing pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant