CN205205695U - Consolidate pier - Google Patents

Consolidate pier Download PDF

Info

Publication number
CN205205695U
CN205205695U CN201520809043.4U CN201520809043U CN205205695U CN 205205695 U CN205205695 U CN 205205695U CN 201520809043 U CN201520809043 U CN 201520809043U CN 205205695 U CN205205695 U CN 205205695U
Authority
CN
China
Prior art keywords
pier
bridge pier
glass
pbm
glass sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520809043.4U
Other languages
Chinese (zh)
Inventor
苗纯义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jiangda Diving Dredging Engineering Co ltd
Original Assignee
Guangzhou Jiangda Diving Dredging Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jiangda Diving Dredging Engineering Co ltd filed Critical Guangzhou Jiangda Diving Dredging Engineering Co ltd
Priority to CN201520809043.4U priority Critical patent/CN205205695U/en
Application granted granted Critical
Publication of CN205205695U publication Critical patent/CN205205695U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a consolidate pier, include: a pier pier stud, the fine sleeve of a glass, the fine sleeve of glass encloses to be located the outside of pier pier stud, the fine sleeve of glass with form in order to accept the chamber between the pier pier stud, it is equipped with with the sealing strip to accept the chamber bottom, accept the intracavity and fill up PBM polymer concrete, PBM polymer concrete with the pier pier stud and the fine sleeve of glass bonds. Accept the intracavity and fill up PBM polymer concrete, PBM polymer concrete with the pier pier stud and the fine sleeve of glass bonds. The viscidity of PBM polymer is very high, moreover in aqueous can fast cure, do not need the drainage operation at the in -process of operation, and reduce manpower and materials, improve economic benefits. Using the fine sleeve pipe parcel pier pier stud of glass, need not demolising the fine sleeve pipe of glass after the operation is accomplished, labour saving and time saving practices thrift the cost, and the fine sleeve pipe quality of glass is lighter moreover, can not increase the burden of pier, and further the fine sleeve pipe of glass can also play the effect of protection film.

Description

Reinforced bridge pier
Technical field
The utility model relates to a kind of bridge pier, espespecially a kind of reinforced bridge pier.
Background technology
All the time, engineering structures protection is under water all reinforcing and the reparation of stubborn problem, particularly bridge pier.The way of tradition reinforced bridge pier for using concrete protective H profile steel or reinforcing bar, or protects the bridge pier of the inside with steel bushing, but the two equal difficulty overcomes the Eroded in Lang Jian district, and halobiontic erosion.What high reconstructed cost was more urgent appeals the solution of economic ideal.Be use steel mesh reinforcement fixed abutment pier stud to repair or reinforced bridge pier in the past, and needed after having worked to remove steel mesh reinforcement, if do not remove the weight that will increase bridge pier actual vector.This mode of operation not only needs a large amount of manpower and materials, needs the work of large equipment, also expends time in very much, and the bridge pier reinforced is not very desirable.
Therefore, be necessary to design a kind of new reinforced bridge pier, to overcome the problems referred to above.
Summary of the invention
For background technology institute problems faced, the purpose of this utility model is to provide one only to need mini-plant work, does not need the cohesive of the material of form removal and reinforcing good and do not need the new reinforced bridge pier of drain operation after having worked,
For achieving the above object, the utility model adopts following technological means: a kind of reinforced bridge pier, it is characterized in that, comprise: a bridge pier, a glass sleeve, described glass sleeve is located in the outside of described bridge pier, formed with host cavity between described glass sleeve and described bridge pier, be provided with bottom described host cavity with weather strip, fill up PBM polymer concrete in described host cavity, described PBM polymer concrete and described bridge pier and described glass sleeve bond.
Further, described glass sleeve is also provided with many restraint zones outward.
Further, described glass sleeve is provided with a junction surface, and described junction surface is provided with multiple screw.
Further, be provided with multiple stop in described host cavity, described stop is fixedly connected with described bridge pier and glass sleeve.
Further, described glass sleeve is consistent with the shape of described bridge pier.
Compared with prior art, the utility model has following beneficial effect: fill up PBM polymer concrete in described host cavity, and described PBM polymer concrete and described bridge pier and described glass sleeve bond.The viscosity of PBM polymer concrete is very high, and can rapid curing in water, in the process of operation, do not need drain operation, reduces manpower and materials, increases economic efficiency.Use fiberglass sleeve parcel bridge pier, do not need after operation completes to remove fiberglass sleeve, time saving and energy saving cost-saving, and fiberglass sleeve lighter weight, can not increase the burden of bridge pier, further fiberglass sleeve can also play the effect of diaphragm.
Accompanying drawing explanation
Fig. 1 is the sectional view of reinforced bridge pier of the present utility model;
Fig. 2 is the stereogram of reinforced bridge pier of the present utility model.
The drawing reference numeral of detailed description of the invention illustrates:
Glass sleeve 1 Restraint zone 4 Screw 7
PBM polymer concrete 2 Stop 5
Bridge pier 3 Weather strip 6
Detailed description of the invention
For ease of better understanding the purpose of this utility model, structure, feature and effect etc., the utility model is described in further detail with detailed description of the invention by reference to the accompanying drawings.
As shown in accompanying drawing 1 and Fig. 2, reinforced bridge pier of the present utility model, comprises bridge pier 3, the glass sleeve 1 wrapping up bridge pier 3 and the PBM polymer concrete 2 be located between described glass sleeve 1 and described bridge pier 3.
As shown in accompanying drawing 1 and Fig. 2, described bridge pier 3 is a kind ofly positioned at ordinary concrete stake under water or piling bar or timber, and this kind of concrete pile is subject to corrosion in various degree or damage under water.Certainly, in other embodiments, described bridge pier 3 also can be a kind ofly be positioned at land concrete pile or piling bar or timber.
As shown in accompanying drawing 1 and Fig. 2, described glass sleeve 1 wraps up described bridge pier 3 and forms a host cavity, and the bottom of described host cavity is provided with weather strip 6.Described glass sleeve 1 is a kind of sleeve of permanent, high strength, the destruction of Salt And Alkali Tolerance, corrosive contaminants, drying and watering cycle and Frozen-thawed cycled, and quality is gently many compared with reinforcing bar.Described glass sleeve 1 can according to the profile design of bridge pier, to meet construction requirement widely.Described glass sleeve 1 is provided with a joint, makes described glass sleeve 1 wrap up described bridge pier 3, and described joint is also provided with multiple screw 7 with glass sleeve 1 described in snap close.Bottom and the top of described glass sleeve 1 are provided with weather strip 6, avoid the material in described host cavity leak outside or expose in water.Further, be provided with multiple stop 5 in described host cavity, described stop 5 is fixedly connected with described bridge pier 3 and glass sleeve 1, and described glass sleeve 1 can not be moved relative to described bridge pier 3.Also be provided with many restraint zones 44 outside described glass sleeve 1, described restraint zone 44 makes described glass sleeve 1 wrap up described bridge pier 3 tightly.Described restraint zone 44 can be removed after operation completes, to reduce the burden of bridge pier.
As shown in accompanying drawing 1 and Fig. 2, described PBM polymer concrete 2 is located in described host cavity.Described PBM polymer concrete 2 is with PBM resin for bonding agent, and by the polymer concrete that itself and aggregate (stone, sand, cement) are consolidated into, it has the combination property of macromolecule and inorganic material, can rapid curing in water.Simultaneously under the prerequisite meeting the requirement of concrete defect Disposal quality, PBM resin is water insoluble, and make again aggregate have very high viscosity, its mix does not disperse in water, does not need conduit during construction, can directly be poured into water through water layer.In the present embodiment, the proportioning (Kg/m3) of described PBM polymer concrete 2 is as follows: stone 745, sand 950, cement 216, PBM-A335, PBM-B33.5, accelerant C 6.7, initator D6.7.The step that described PBM polymer concrete 2 mixes is as follows: 1, the stone of drying, sand and cement are pre-mixed evenly as filler.2, first component A and B component are stirred in a reservoir; Then component C is poured in A, B mixed liquor and stir, finally D component (is forbidden C, D component to be mixed separately) to entering in A, B, C mixed liquor to stir evenly.3, the resin Composition mixed is poured in the filler mixed, stir.4, the concrete be stirred is hung in water, be poured into the position of construction requirement by diver.
As shown in accompanying drawing 1 and Fig. 2, described reinforced bridge pier, repairs the pier stud that is badly damaged, and without the need to building cofferdam and using expensive drainage plant, only needs mini-plant and simple construction sequence, can realize quick, economic, long-lasting structural shielding.
In sum, the utility model has following beneficial effect:
Fill up PBM polymer concrete 2 in described host cavity, described PBM polymer concrete 2 bonds with described bridge pier 3 and described glass sleeve 1.The viscosity of PBM polymer concrete 2 is very high, and can rapid curing in water, in the process of operation, do not need drain operation, reduces manpower and materials, increases economic efficiency.Use fiberglass sleeve parcel bridge pier 3, do not need after operation completes to remove fiberglass sleeve, time saving and energy saving cost-saving, and fiberglass sleeve lighter weight, can not increase the burden of bridge pier, further fiberglass sleeve can also play the effect of diaphragm.
More than describe the explanation being only the preferred embodiment of the utility model in detail, non-ly therefore limit to the scope of the claims of the present utility model, so the equivalence techniques change that all this creation of utilization manuals and diagramatic content are done, is all contained in the scope of the claims of the present utility model.

Claims (5)

1. a reinforced bridge pier, is characterized in that, comprising:
One bridge pier,
One glass sleeve, described glass sleeve is located in the outside of described bridge pier, formed with host cavity between described glass sleeve and described bridge pier, be provided with bottom described host cavity with weather strip, fill up PBM polymer concrete in described host cavity, described PBM polymer concrete and described bridge pier and described glass sleeve bond.
2. reinforced bridge pier as claimed in claim 1, is characterized in that: described glass sleeve is also provided with many restraint zones outward.
3. reinforced bridge pier as claimed in claim 1, is characterized in that: described glass sleeve is provided with a junction surface, and described junction surface is provided with multiple screw.
4. reinforced bridge pier as claimed in claim 1, it is characterized in that: be provided with multiple stop in described host cavity, described stop is fixedly connected with described bridge pier and glass sleeve.
5. reinforced bridge pier as claimed in claim 1, is characterized in that: described glass sleeve is consistent with the shape of described bridge pier.
CN201520809043.4U 2015-10-20 2015-10-20 Consolidate pier Active CN205205695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520809043.4U CN205205695U (en) 2015-10-20 2015-10-20 Consolidate pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520809043.4U CN205205695U (en) 2015-10-20 2015-10-20 Consolidate pier

Publications (1)

Publication Number Publication Date
CN205205695U true CN205205695U (en) 2016-05-04

Family

ID=55843423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520809043.4U Active CN205205695U (en) 2015-10-20 2015-10-20 Consolidate pier

Country Status (1)

Country Link
CN (1) CN205205695U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862574A (en) * 2016-05-27 2016-08-17 连云港奥尼斯环保设备有限公司 Glass fiber reinforced plastic pier for bridge
CN107053701A (en) * 2017-06-07 2017-08-18 郑州中德新亚建筑材料有限公司 High-intensity corrosion loses glass sleeve and its production technology
CN107152079A (en) * 2017-04-01 2017-09-12 中国建筑第八工程局有限公司 The mounting structure and construction method of a kind of restricted type beam column built from concrete
CN107761580A (en) * 2017-10-13 2018-03-06 温州市交通工程咨询监理有限公司 A kind of old pier stud rebuilding construction scheme of bridge
CN113026837A (en) * 2021-03-19 2021-06-25 哈尔滨工业大学 Restoration, reinforcement and anticorrosion construction method for port RC pile foundation in alpine region

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862574A (en) * 2016-05-27 2016-08-17 连云港奥尼斯环保设备有限公司 Glass fiber reinforced plastic pier for bridge
CN107152079A (en) * 2017-04-01 2017-09-12 中国建筑第八工程局有限公司 The mounting structure and construction method of a kind of restricted type beam column built from concrete
CN107053701A (en) * 2017-06-07 2017-08-18 郑州中德新亚建筑材料有限公司 High-intensity corrosion loses glass sleeve and its production technology
CN107761580A (en) * 2017-10-13 2018-03-06 温州市交通工程咨询监理有限公司 A kind of old pier stud rebuilding construction scheme of bridge
CN113026837A (en) * 2021-03-19 2021-06-25 哈尔滨工业大学 Restoration, reinforcement and anticorrosion construction method for port RC pile foundation in alpine region

Similar Documents

Publication Publication Date Title
CN205205695U (en) Consolidate pier
CN104018526B (en) EPR deformation joint repairs water-stopping structure and construction method thereof
CN105442862A (en) Method for leakage water plugging, strengthening and repairing against concrete crack
CN106401205A (en) Construction method for reinforcement of externally bonded profile steel of reinforced concrete structure
CN105274967A (en) Repairing method for hydraulic concrete crack
CN207904991U (en) A kind of underground engineering repairing concrete crack construction
CN103388338A (en) Novel rapid water stopping and soil mass improving method
KR102049538B1 (en) Structural Repair and Protection system for Underwater Concrete Pier, Concrete Pile, Steel Pile by using Fiberglass jacket and underwater Repair materials
CN103276735B (en) Integrated form high polymer grouting system
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN109025338B (en) Method for repairing reinforced concrete wall crack
CN104179205A (en) Anticorrosion reinforcing method of transmission line tower foundation
CN106567554A (en) Reinforcing construction method of masonry structural building
CN203960812U (en) Hydraulic concrete structure shrinkage joint embedded water stop band repair structure
KR100940937B1 (en) Concrete structure repairing method
CN101591883A (en) Concrete road crack treating method
CN104805864A (en) Basement reverse building method outer wall groove and tongue and water-proofing gel combined waterproof construction technology
CN111502721A (en) Joint roadway concrete joint supporting structure and construction method thereof
CN106337443A (en) Jointless construction structure combining SCC (self-compacting concrete) and common concrete
CN101397772A (en) Processing method of concrete road crack
CN107460827A (en) A kind of method of cast-in-situ box girder form bracing system precompressed
CN208379644U (en) A kind of post-cast strip built for basement
CN207944990U (en) The quick floodgate wall walling equipment of mine and the quick floodgate wall of mine
CN105464005A (en) Method for repairing upper padstone through TGM bracket grouting materials
KR102583733B1 (en) Waterproofing device using Micro-cement of Crack repair material and Method for reinforcing concrete

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant