CN205192771U - Hydrodrillrig test platform - Google Patents

Hydrodrillrig test platform Download PDF

Info

Publication number
CN205192771U
CN205192771U CN201520960198.8U CN201520960198U CN205192771U CN 205192771 U CN205192771 U CN 205192771U CN 201520960198 U CN201520960198 U CN 201520960198U CN 205192771 U CN205192771 U CN 205192771U
Authority
CN
China
Prior art keywords
propulsion
sleeper
spring
pressing plate
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520960198.8U
Other languages
Chinese (zh)
Inventor
罗佑新
文会军
汪伟芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Is Permanent In Rock Drilling Science And Technology Co Ltd
Original Assignee
Hunan Is Permanent In Rock Drilling Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Is Permanent In Rock Drilling Science And Technology Co Ltd filed Critical Hunan Is Permanent In Rock Drilling Science And Technology Co Ltd
Priority to CN201520960198.8U priority Critical patent/CN205192771U/en
Application granted granted Critical
Publication of CN205192771U publication Critical patent/CN205192771U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Hydrodrillrig test platform, the platform base is arranged in on the sheeting caps, on buffer spring arranged spring support in, spring support fills up the bottom had rubber tie plate to with bolt and clamp plate A, clamp plate B, clamp plate C with the spring support compaction on the platform base, billet, sleeper are bored a hole and are placed spring support upper portion in, and a propulsion - beam seat cover is on the sleeper, and fixture block, foot block, baffle weld on the propulsion - beam support, and the rock drilling seat is placed in between two fixture blocks of propulsion - beam support. The beneficial effect of the utility model: this platform is in when drilling simulation, and in the foot block of propulsion - beam support was arranged in to propulsion - beam top, propulsion - beam's limit was blocked by the baffle, the effectual skew that prevents propulsion - beam, and the drill bit of rock drill is pushing up the rock drilling seat and is drilling, the effectual protection rock drill of buffer capacity of buffer spring and sleeper.

Description

Hydraulic drill rig test platform
Technical field
The utility model relates to technical field of engineering machinery, is specifically a kind of hydraulic drill rig test platform.
Background technology
In hydraulic drill rig test adjustment process, need simulation boring operating mode, ensure can not offset in the course of work and destroy ground, therefore usually directly to drill on steel plate, but owing to directly drilling on steel plate and can offset, without buffering to jackdrill infringement greatly.
Utility model content
For above-mentioned Problems existing, the utility model object is to provide a kind of hydraulic drill rig test platform.
The technical solution of the utility model is: hydraulic drill rig test platform, comprises sheeting caps, platform base, pressing plate A, pressing plate B, pressing plate C, rubber mat plate, spring abutment, buffer spring, billet, sleeper, forward beam bearing, fixture block, dead head, rock drilling seat, baffle plate; It is characterized in that: platform base is placed on sheeting caps; Buffer spring is placed on spring abutment, is lined with rubber mat plate bottom spring abutment, and with bolt and pressing plate A, pressing plate B, pressing plate C by spring abutment compacting on platform base; The perforation of billet, sleeper is placed in spring abutment top, and forward beam bearing is enclosed within sleeper, and fixture block, dead head, baffle plate are welded on forward beam bearing, and rock drilling seat is placed between two fixture blocks of forward beam bearing.
The beneficial effects of the utility model: this platform is when simulating boring; in the top dead head being placed in forward beam bearing of forward beam; the limit of forward beam is blocked by baffle plate; effectively prevent the skew of forward beam; the drill bit of jackdrill heads on rock drilling seat and drills, and the buffer capacity of buffer spring and sleeper effectively protects jackdrill.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Embodiment
Now by reference to the accompanying drawings, the utility model is illustrated further.
As shown in Figure 1, platform base 2 is placed on sheeting caps 1; Buffer spring 8 is placed on spring abutment 7, is lined with rubber mat plate 6 bottom spring abutment 7, and with bolt and pressing plate A3, pressing plate B4, pressing plate C5 by spring abutment 7 compacting on platform base 2; The perforation of billet 9, sleeper 10 is placed in spring abutment 7 top, and forward beam bearing 11 is enclosed within sleeper 10, and fixture block 12, dead head 13, baffle plate 15 are welded on forward beam bearing 11, and rock drilling seat 14 is placed between two fixture blocks 12 of forward beam bearing 11.
During test adjustment; the top of forward beam is placed in the dead head 13 of forward beam bearing 11, and the limit of forward beam is blocked by baffle plate 15, effectively prevents the skew of forward beam; the drill bit of jackdrill heads on rock drilling seat 14 and drills, and the buffer capacity of buffer spring 8 and sleeper 10 effectively protects jackdrill.

Claims (1)

1. hydraulic drill rig test platform, comprises sheeting caps (1), platform base (2), pressing plate A(3), pressing plate B(4), pressing plate C(5), rubber mat plate (6), spring abutment (7), buffer spring (8), billet (9), sleeper (10), forward beam bearing (11), fixture block (12), dead head (13), rock drilling seat (14), baffle plate (15); It is characterized in that: platform base (2) is placed on sheeting caps (1); Buffer spring (8) is placed on spring abutment (7), and spring abutment (7) bottom is lined with rubber mat plate (6), and with bolt and pressing plate A(3), pressing plate B(4), pressing plate C(5) by spring abutment (7) compacting on platform base (2); The perforation of billet (9), sleeper (10) is placed in spring abutment (7) top, forward beam bearing (11) is enclosed within sleeper (10), fixture block (12), dead head (13), baffle plate (15) are welded on forward beam bearing, and rock drilling seat (14) is placed between two fixture blocks (12) of forward beam bearing (11).
CN201520960198.8U 2015-11-27 2015-11-27 Hydrodrillrig test platform Expired - Fee Related CN205192771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520960198.8U CN205192771U (en) 2015-11-27 2015-11-27 Hydrodrillrig test platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520960198.8U CN205192771U (en) 2015-11-27 2015-11-27 Hydrodrillrig test platform

Publications (1)

Publication Number Publication Date
CN205192771U true CN205192771U (en) 2016-04-27

Family

ID=55785750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520960198.8U Expired - Fee Related CN205192771U (en) 2015-11-27 2015-11-27 Hydrodrillrig test platform

Country Status (1)

Country Link
CN (1) CN205192771U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106054061A (en) * 2016-07-27 2016-10-26 竹昌精密冲压件(上海)有限公司 High accurate testing machine console

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106054061A (en) * 2016-07-27 2016-10-26 竹昌精密冲压件(上海)有限公司 High accurate testing machine console

Similar Documents

Publication Publication Date Title
CN104502995A (en) Ts-q method for evaluating floor water inrush dangerousness in coal mining of deep mine
CN101570971A (en) Rock mass pile foundation pore-forming preboring construction method
CN205778903U (en) A kind of soft-rock tunnel pucking preventing and treating device
CN205012953U (en) Drill bit of rotary drilling rig
CN205192771U (en) Hydrodrillrig test platform
CN203499559U (en) Conveniently moved hydraulic anchoring drill for roadway
CN103628898B (en) A kind of for preventing the diaphragm wall supporting method of Floor Heave in Roadway
CN103485805A (en) Structure of steel-bar concrete rack section, grouting port and air exhausting hole
CN203925295U (en) A kind of revolving dug drill bit
CN205062876U (en) Sand replacement method detects special use of dust compactness and digs hole device
JP2009167734A (en) Method and device for intruding reinforcement steel plate into ground in seismic strengthening construction
CN206768833U (en) A kind of concrete support and steel lattice column attachment structure
CN204492660U (en) A kind of ground-connecting-wall construction rectangular impact drill bit
CN204252120U (en) The construction equipment of concrete pile
CN203022001U (en) Pile-pulling device with vibrating sleeve ring
CN204151789U (en) Churning driven is utilized to bury the device of promoting the long casing of major diameter fast underground
CN209195263U (en) A kind of expansion bit
CN203361116U (en) Drilling construction platform
CN203547554U (en) Hydraulic mine drilling machine
CN204804694U (en) Hydrology prospecting drilling tool
CN203961863U (en) Prevent the device of high artesian crown drill
CN206346702U (en) A kind of novel trans well rig is just drilled head
CN205907683U (en) Composite set is used in construction of back pressure steel form dado in manual hole digging pile
CN205088673U (en) All casing drill sleeve pipe tool bit pipe
CN103046550B (en) A kind of vibrations collar pile pulling device and using method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Hydrodrillrig test platform

Effective date of registration: 20170111

Granted publication date: 20160427

Pledgee: Changde Caixin technology Company limited by guarantee

Pledgor: Hunan is permanent in rock drilling Science and Technology Co., Ltd.

Registration number: 2017430000005

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20180110

Granted publication date: 20160427

Pledgee: Changde Caixin technology Company limited by guarantee

Pledgor: Hunan is permanent in rock drilling Science and Technology Co., Ltd.

Registration number: 2017430000005

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Hydrodrillrig test platform

Effective date of registration: 20180130

Granted publication date: 20160427

Pledgee: Changde Caixin technology Company limited by guarantee

Pledgor: Hunan is permanent in rock drilling Science and Technology Co., Ltd.

Registration number: 2018430000013

PE01 Entry into force of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427

Termination date: 20181127

CF01 Termination of patent right due to non-payment of annual fee