CN205171685U - Flying piece for building - Google Patents
Flying piece for building Download PDFInfo
- Publication number
- CN205171685U CN205171685U CN201520868110.XU CN201520868110U CN205171685U CN 205171685 U CN205171685 U CN 205171685U CN 201520868110 U CN201520868110 U CN 201520868110U CN 205171685 U CN205171685 U CN 205171685U
- Authority
- CN
- China
- Prior art keywords
- suspender
- entity plate
- suspension
- described suspension
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a flying piece for building, including hanging the body board, the top that hangs the body board is provided with the lifting holes of the hoist hoist and mount of being convenient for, the bottom that hangs the body board is provided with the stop part that is used for increaseing the resistance, set gradually a plurality ofly and the fixed mounting holes of concrete reinforcement cooperation on hanging the body board, the bilateral symmetry that hangs the body board sets up porosely. Through the utility model provides a pour the problem that production efficiency is low, the quality is poor that the reinforcing bar thoughtlessly condenses and exists in constructing among the prior art, utilize this flying piece to make reinforced concrete structure in advance, need not cast in situs, improved production efficiency and reinforced concrete structure's quality.
Description
Technical field
The utility model construction engineering technical field, more particularly, relates to and is a kind ofly applied to architectural suspender structure.
Background technology
Along with the fast development of industry, the development of building trade is very fast, in prior art, architectural construction is mainly monolithic reinforced concrete structure, monolithic reinforced concrete structure refers at the scene according to design attitude, carry out formwork, then assembling reinforcement carries out concreting, produce reinforced concrete structure, but adopt the mode of cast in situs to construct at the scene in prior art, time restriction is strict, and need after having built wait for concrete solidify completely could continue production, delay production efficiency, in addition, the mode of cast in situs is also subject to environment simultaneously, the impact of temperature and weather each side factor, poor controllability, simultaneously likely because temperature humidity cannot reach standard and cause reinforced concrete structure of poor quality.
Utility model content
Technical problem to be solved in the utility model is: the utility model provides a kind of suspender for building, solve low, the ropy problem of the production efficiency existed in pouring reinforcement coagulation structure in prior art, utilize this suspender can make reinforced concrete structure in advance, without the need to cast in situs, improve the quality of production efficiency and reinforced concrete structure.
The purpose of this utility model is achieved through the following technical solutions:
A kind of suspender for building, it is characterized in that, comprise suspension entity plate, the top of described suspension entity plate is provided with the lift hole being convenient to suspender lifting, the bottom of described suspension entity plate is provided with the stop part for resistance, described suspension entity plate is disposed with and multiplely coordinates fixing installing hole with concrete reinforcement, the bilateral symmetry of described suspension entity plate arranges porose.
Preferably, described lift hole is mounting hole, semi-circular hole or slotted eye, through described suspension entity plate upper end, described lift hole.
Further, the one or both sides of described suspender entity plate are provided with stiffener.
Further, described installing hole is circular port along described suspension entity plate length direction sets gradually or semi-circular hole.
Further, described stop part is 2 and is arranged in there being certain angle the protruding leg hanging entity plate bottom, and described protruding leg is symmetrical arranged.
Further, described stop part is the stop projection generated that stretches out from the both sides of described suspension entity plate respectively, and described stop projection is symmetricly set on described suspension entity plate both sides, and described stop projection is provided with one or more pairs of.
Further, described suspension entity plate is stainless steel part, and described stop part is stainless steel part.
Further, described suspension entity plate and described stop part are formed in one part.
The utility model compared with prior art has many advantages and good effect: the utility model proposes a kind of suspender for building, include suspension entity plate, suspension entity plate is provided with lift hole, the bottom hanging entity plate is provided with stop part, on suspension entity plate, be provided with multiple installing hole simultaneously, correspondingly in its side be provided with side opening, in use, suspension linkage member is first embedded in reinforced concrete precast member, simultaneously by the installing hole in suspender corresponding with the reinforcing bar in steel concrete carry out cooperation fix, reinforced concrete precast member can be applied in construction with suspender lifting lift hole when steel concrete condensation is firm, on the one hand by adopting the suspender structural strengthening intensity of reinforced concrete precast member, and adopt this mode of building in advance can reduce the building time greatly simultaneously, increase work efficiency, quality controllability is better.
Accompanying drawing explanation
Fig. 1 is the front view of a kind of embodiment of the utility model suspender for building;
Fig. 2 is the left view of a kind of embodiment of the utility model suspender for building;
Fig. 3 is the front view of the another kind of embodiment of the utility model suspender for building;
Fig. 4 is the left view of the another kind of embodiment of the utility model suspender for building.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described.
Shown in Fig. 1-Fig. 4, the utility model provides a kind of embodiment of suspender for building, comprise and hang entity plate 1, the top of described suspension entity plate 1 is provided with the lift hole 2 being convenient to suspender lifting, the bottom of described suspension entity plate 1 is provided with the stop part 3 for resistance, described suspension entity plate 1 is disposed with and multiplely coordinates fixing installing hole 4 with concrete reinforcement, the bilateral symmetry of described suspension entity plate 1 arranges porose 5.
Concrete, a kind of suspender for building is proposed in the present embodiment, it is mainly used in prefabrication and assembly construction construction method, mainly be arranged in reinforced concrete precast member, when using, suspender is embedded in reinforced concrete precast member in advance, together be fixed in concrete with concrete when concrete carries out building making, become to be integrated with concrete after concrete coagulation is firm, the frame mode be arranged in reinforced concrete precast member by suspender also strengthens the intensity of reinforced concrete precast member simultaneously, in addition, when lifting, namely whole reinforced concrete precast member can be lifted by lifting suspender, easy to operate and quick.Suspender structure in the present embodiment specifically includes and hangs entity plate 1, hanging entity plate 1 is the body construction of suspender, play main carrying effect, lift hole 2 is provided with above suspension entity plate 1, by lifting the lifting lifting hole 2 and can realize concrete precast element with suspender after suspender and steel concrete are fixed, fix with coordinating of reinforced concrete precast member for realizing suspender, suspension entity plate 1 is provided with multiple installing hole 4, installing hole 4 is mainly used in carrying out plug-in mounting cooperation with the reinforcing bar in steel concrete, for guaranteeing the bulk strength of the tightness that suspender and reinforced concrete precast member coordinate and reinforced concrete precast member.The bottom hanging entity plate 1 is provided with stop part 3 simultaneously, stop part 3 is for the resistance strengthening reinforced concrete precast member and hang between entity plate 1, suspension entity plate 1 being more firmly fixed in reinforced concrete precast member, can effectively avoiding the phenomenon that suspender entity plate 1 departs from from reinforced concrete precast member when lifting.Also arranging porose 5 in the side hanging entity plate 1 simultaneously, for alleviating the weight of whole suspender entirety, reducing the lifting weight of the entirety when lifting.
Preferably, described lift hole 2 is mounting hole, semi-circular hole or slotted eye, the upper end of the through described suspension entity plate 1 in described lift hole 2.When installing with reinforced concrete precast member is pre-buried, lift position, hole 2 exceeds reinforced concrete precast member, and its exposed outer end at reinforced concrete precast member, is convenient to suspender and lifts.
Further, the one or both sides of described suspender entity plate 1 are provided with stiffener 6.Stiffener 6 can be arranged in the side hanging entity plate 1, also can be corresponding arrange in the both sides hanging entity plate 1, stiffener 6 one aspect is for strengthening the intensity of suspender entirety, the resistance between reinforced concrete precast member can be strengthened simultaneously when being connected with reinforced concrete precast member, making both fixing more firm.
Further, the installing hole 4 in the present embodiment is circular port along described suspension entity plate 1 length direction sets gradually or semi-circular hole.Installing hole 4 can be set to circular port or semi-circular hole by bar gauge accordingly that coordinate as required.
A kind of embodiment as stop part in the present embodiment 3 is: described stop part 3 is 2 and is arranged in there being certain angle the protruding leg hanging entity plate 1 bottom, and described protruding leg is symmetrical arranged.Protruding leg is arranged on and hangs entity plate 1 end and the identical setting of structure of two protruding legs, between the two in certain angle, the angular range of angle is preferably 30-60 degree, by 2 protruding leg structures, the resistance when lifting between suspender and reinforced concrete precast member can be strengthened further, prevent suspender from departing from from reinforced concrete precast member, what make between the two is fixing more firm.
Another kind of embodiment as stop part in the present embodiment 3 is: described stop part 3 is the stop projection generated that stretches out from the both sides of described suspension entity plate respectively, described stop projection is symmetricly set on described suspension entity plate 1 both sides, and described stop projection is provided with one or more pairs of.Stop and protruding is mainly arranged on the both sides hanging entity plate 1, realize between steel concrete and suspender by the stop projection of stretching out both sides fastening, can correspondence arrange one or more pairs of as required.
Preferably, described suspension entity plate 1 is stainless steel part, and described stop part 3 is stainless steel part.Select stainless steel part, its corrosion resistance and oxidative resistance by force, intensity can not reduce because air corrosion is oxidized, can guarantee service time and the intensity of whole reinforced concrete precast member.
Preferably, described suspension entity plate 1 and described stop part 3 are formed in one part.Adopt the bulk strength of one-body molded its correspondence of structure strong, fracture not easily occurs or damages.
The above, it is only preferred embodiment of the present utility model, be not restriction the utility model being made to other form, any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the Equivalent embodiments of equivalent variations.But everyly do not depart from technical solutions of the utility model content, any simple modification, equivalent variations and the remodeling done above embodiment according to technical spirit of the present utility model, still belong to the protection domain of technical solutions of the utility model.
Claims (8)
1. a suspender for building, it is characterized in that, comprise suspension entity plate, the top of described suspension entity plate is provided with the lift hole being convenient to suspender lifting, the bottom of described suspension entity plate is provided with the stop part for resistance, described suspension entity plate is disposed with and multiplely coordinates fixing installing hole with concrete reinforcement, the bilateral symmetry of described suspension entity plate arranges porose.
2. suspender for building according to claim 1, is characterized in that, described lift hole is mounting hole, semi-circular hole or slotted eye, through described suspension entity plate upper end, described lift hole.
3. suspender for building according to claim 2, is characterized in that, the one or both sides of described suspender entity plate are provided with stiffener.
4. suspender for building according to claim 3, is characterized in that, described installing hole is circular port along described suspension element length direction sets gradually or semi-circular hole.
5. suspender for building according to claim 4, is characterized in that, described stop part is 2 and is arranged in there being certain angle the protruding leg hanging entity plate bottom, and described protruding leg is symmetrical arranged.
6. suspender for building according to claim 4, it is characterized in that, described stop part is the stop projection generated that stretches out from the both sides of described suspension entity plate respectively, and described stop projection is symmetricly set on described suspension entity plate both sides, and described stop projection is provided with one or more pairs of.
7. suspender for building according to claim 6, is characterized in that, described suspension entity plate is stainless steel part, and described stop part is stainless steel part.
8. suspender for building according to claim 7, is characterized in that, described suspender and described stop part are formed in one part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520868110.XU CN205171685U (en) | 2015-11-04 | 2015-11-04 | Flying piece for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520868110.XU CN205171685U (en) | 2015-11-04 | 2015-11-04 | Flying piece for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205171685U true CN205171685U (en) | 2016-04-20 |
Family
ID=55735688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520868110.XU Active CN205171685U (en) | 2015-11-04 | 2015-11-04 | Flying piece for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205171685U (en) |
-
2015
- 2015-11-04 CN CN201520868110.XU patent/CN205171685U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208563561U (en) | It is a kind of can be with the assembled architecture component of fast hoisting | |
CN206644113U (en) | A kind of concrete lintel formwork for placing | |
CN105735481B (en) | Core tube of high-rise building lifting platform climbs attemperator and its construction method | |
CN103628621B (en) | Assembled integral shear wall corner for building side fascia and construction method | |
CN107053456B (en) | A kind of preparation method of web holes cast-type part combination prefabricated components | |
CN205171685U (en) | Flying piece for building | |
CN203334680U (en) | Upper reversed beam lifting mold for concrete pouring | |
CN105603891B (en) | Box culvert template | |
CN103866866B (en) | Super High Core Walls Structure and housing water node after setting a roof beam in place | |
CN205857691U (en) | A kind of basement haunch wall form supports | |
CN208396061U (en) | Structure draws seam plate | |
CN204850078U (en) | Short wall structure of leading of basement outer wall | |
CN208578236U (en) | A kind of reinforced blockwork of reinforcing bar | |
CN205171683U (en) | Flying piece for building | |
CN205314269U (en) | One -way superimposed sheet of concrete side inter -plate seam construction | |
CN205875737U (en) | Adopt single side wall body construction of flexible pull rod to use single -side supporting formwork system | |
CN204753935U (en) | Anti construction location structure that floats of thin wall square chest | |
CN204914203U (en) | Prefabricated template turning device that inverts of new jersey safety barrier | |
CN208668954U (en) | A kind of mold for concrete floor slab placement | |
CN104319707B (en) | Reinforced cable bridge | |
CN209161290U (en) | The suspender of multiple concrete prefabricated beams capable of hoisting | |
CN202850288U (en) | Modularization floor slab used for building | |
CN208534015U (en) | A kind of underwater armored concrete prefab-form | |
CN208473121U (en) | A kind of site operation structure of spiral | |
CN207727805U (en) | A kind of reinforced perps unit of fabricated shear wall anchor pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 266201 Shandong city of Qingdao province Jimo City Xishan Huanxiu office before Zhengyang Street No. 2 Patentee after: Qingdao wins intelligent industrial Limited by Share Ltd Address before: 266201 Shandong city of Qingdao province Jimo City Xishan village Huanxiu office Zhengyang Road No. 2 Patentee before: Qingdao Tianying Industry Co., Ltd. |