CN205168962U - Branch material metering device of energy storage secondary refrigerant filling equipment - Google Patents

Branch material metering device of energy storage secondary refrigerant filling equipment Download PDF

Info

Publication number
CN205168962U
CN205168962U CN201521010193.5U CN201521010193U CN205168962U CN 205168962 U CN205168962 U CN 205168962U CN 201521010193 U CN201521010193 U CN 201521010193U CN 205168962 U CN205168962 U CN 205168962U
Authority
CN
China
Prior art keywords
energy storage
secondary refrigerant
ejection
compact
storage secondary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521010193.5U
Other languages
Chinese (zh)
Inventor
徐�明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Kebang Chemical Products Co Ltd
Original Assignee
Tianjin Kebang Chemical Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Kebang Chemical Products Co Ltd filed Critical Tianjin Kebang Chemical Products Co Ltd
Priority to CN201521010193.5U priority Critical patent/CN205168962U/en
Application granted granted Critical
Publication of CN205168962U publication Critical patent/CN205168962U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model belongs to the technical field of equipment for packing, especially, relate to a branch material metering device of energy storage secondary refrigerant filling equipment. Including the frame, fixed mounting has the feed cylinder in the frame, is equipped with a plurality of ejection of compact pipelines side by side in the bottom of feed cylinder lateral wall, all is equipped with metering valve, end at the middle part of each ejection of compact pipeline and all is equipped with ejection of compact spigot joint, all is connected with the unloading hose on each ejection of compact spigot joint, still including the material pump, its access connection to feed bucket, its export are said through feeding tube and are connected to the feed inlet of seting up on the feed cylinder. The utility model provides a simple equitable branch material metering device of energy storage secondary refrigerant filling equipment of structural design through setting up the feed cylinder and for the material pump of its material loading, having realized the energy storage secondary refrigerant and from the high -order transport storage of tendency, through setting up a plurality of ejection of compact pipelines that tie for and setting up the metering valve at respective middle part, realized the ejection of compact supply and the precise measurement supply of multistation, has promoted the efficiency and the filling accuracy of filling.

Description

The sub-material gauging device of energy storage secondary refrigerant filling apparatus
Technical field
The utility model belongs to packaging facilities technical field, particularly relates to a kind of sub-material gauging device of energy storage secondary refrigerant filling apparatus.
Background technology
Energy storage secondary refrigerant is a kind of conventional cold and hot energy interchange agent, is widely used in the systems such as modern central air-conditioning.The production process of energy storage secondary refrigerant comprises the weighing of composition, mixing and the operation such as filling.Above-mentioned filling apparatus not rational in infrastructure in prior art, usual needs are by manually carrying out filling processing on S. A. canning line, reduce filling efficiency so undoubtedly, continous way cannot be realized produce, and above-mentioned pouring process can not ensure the conformability of filling quality, need the auto-filling equipment that a kind of degree of automation of R & D design is high.And in above-mentioned auto-filling equipment, metering assigned unit is carried out to energy storage secondary refrigerant and directly determines the efficiency of pouring process and filling precision.
Utility model content
The utility model provides that a kind of structure is simple, degree of automation is high, the sub-material gauging device of filling accurate energy storage secondary refrigerant filling apparatus for solving in known technology the technical matters that exists.
The technical scheme that the utility model is taked for the technical matters existed in solution known technology is: the sub-material gauging device of energy storage secondary refrigerant filling apparatus comprises frame, frame is installed with barrel, multiple discharge pipe is provided with side by side in the bottom of barrel sidewall, be equipped with calibrate valve at the middle part of each discharge pipe, end is equipped with discharging and connects mouth, connect on mouth in each discharging and be all connected with blanking flexible pipe; Also comprise material pump, its import is connected to feeding box, its outlet is connected to by material loading pipeline the inlet point be opened on barrel.
Advantage of the present utility model and good effect are: the utility model provides a kind of sub-material gauging device of energy storage secondary refrigerant filling apparatus of structure design advantages of simple, by arranging barrel and the material pump for its material loading, achieve energy storage secondary refrigerant to store from the conveying of a trend high position, by arranging multiple discharge pipe arranged side by side and arranging calibrate valve at respective middle part, achieve discharging supply and the accurate measurement supply of multistation, improve filling efficiency and filling accuracy.Connect blanking flexible pipe by arranging discharging at the end of each discharge pipe and connecing mouth and connect on mouth in each discharging, improve the convenience be connected between discharge pipe with follow-up filling mechanism, blanking flexible pipe ensures that the allowance of filling mechanism action is unaffected.
Preferably: the diapire of described barrel has the gradient making energy storage secondary refrigerant flow to discharge pipe.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present utility model.
In figure: 1, frame; 2, barrel; 3, pump is expected; 4, material loading pipeline; 5, calibrate valve; 6, discharge pipe; 7, discharging connects mouth; 8, blanking flexible pipe.
Detailed description of the invention
For summary of the invention of the present utility model, Characteristic can be understood further, hereby lift following examples and be described in detail as follows:
Refer to Fig. 1, the utility model comprises frame 1, frame 1 is installed with barrel 2, multiple discharge pipe 6 is provided with side by side in the bottom of barrel 2 sidewall, be equipped with calibrate valve 5 at the middle part of each discharge pipe 6, end is equipped with discharging and connects mouth 7, connect on mouth 7 in each discharging and be all connected with blanking flexible pipe 8.
Sub-material gauging device also comprises material pump 3, and its import is connected to feeding box, its outlet is connected to by material loading pipeline 4 inlet point be opened on barrel 2.Material pump 3 stores carrying out a high position in energy storage coolant pump feeding cylinder 2, and each high-precision calibrate valve 5 carries out accurate measurement to the single flow in respective discharge pipe 6, and this single flow is the filling flow of single.
In the present embodiment, in order to the flowing power of energy storage secondary refrigerant in enhancing tube, meet and still can carry out filling requirement when low liquid level, the diapire arranging barrel 2 has the gradient making energy storage secondary refrigerant flow to discharge pipe 6.

Claims (2)

1. the sub-material gauging device of an energy storage secondary refrigerant filling apparatus, it is characterized in that: comprise frame (1), frame (1) is installed with barrel (2), multiple discharge pipe (6) is provided with side by side in the bottom of barrel (2) sidewall, be equipped with calibrate valve (5) at the middle part of each discharge pipe (6), end is equipped with discharging and connects mouth (7), connect on mouth (7) in each discharging and be all connected with blanking flexible pipe (8); Also comprise material pump (3), its import is connected to feeding box, its outlet is connected to by material loading pipeline (4) inlet point be opened on barrel (2).
2. the sub-material gauging device of energy storage secondary refrigerant filling apparatus as claimed in claim 1, is characterized in that: the diapire of described barrel (2) has the gradient making energy storage secondary refrigerant flow to discharge pipe (6).
CN201521010193.5U 2015-12-07 2015-12-07 Branch material metering device of energy storage secondary refrigerant filling equipment Expired - Fee Related CN205168962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521010193.5U CN205168962U (en) 2015-12-07 2015-12-07 Branch material metering device of energy storage secondary refrigerant filling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521010193.5U CN205168962U (en) 2015-12-07 2015-12-07 Branch material metering device of energy storage secondary refrigerant filling equipment

Publications (1)

Publication Number Publication Date
CN205168962U true CN205168962U (en) 2016-04-20

Family

ID=55732979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521010193.5U Expired - Fee Related CN205168962U (en) 2015-12-07 2015-12-07 Branch material metering device of energy storage secondary refrigerant filling equipment

Country Status (1)

Country Link
CN (1) CN205168962U (en)

Similar Documents

Publication Publication Date Title
CN105384131A (en) Filling equipment for energy-storing secondary refrigerants
CN102848474B (en) Additive metering hopper quantitative water flushing apparatus for concrete stirring station
CN205442013U (en) Automatic feeding device
CN205168962U (en) Branch material metering device of energy storage secondary refrigerant filling equipment
CN103041744A (en) Equivalent automatic proportioning device for solutions
CN104071736A (en) Dosing device of filling machine
CN108516511B (en) Liquid quantitative subpackaging device
CN207929159U (en) Polycarboxylic acids water reducing agent compositional charging device
CN205998656U (en) Air conveying automatic formulation equipment in high precision
CN207434206U (en) Automated fluid feeding device
CN206078506U (en) Liquid material feeding system and plant
CN205170365U (en) Filling device of energy storage secondary refrigerant filling equipment
CN208264609U (en) A kind of anti-corrosion bottle placer with baffle mobile mechanism
CN207213649U (en) Solution feeding system
CN204149356U (en) A kind of extensive efficient automatic batching system
CN204694336U (en) A kind of additive essence is equipped puts
CN203833690U (en) Lime adding device
CN205150990U (en) Powder conveyor that powder was retrieved can carry out
CN204369557U (en) A kind of liquid feeding system carrying out accurate measurement
CN205294798U (en) Hierarchical accurate metering device
CN211619358U (en) Automatic volume device of transferring of food additive
CN210022075U (en) Solid-liquid reaction automatic metering equipment
CN208242801U (en) A kind of airless spray unit in feed processing
CN104880240A (en) Additive precise-preparation device
CN207215231U (en) A kind of solution feeding metering device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20211207

CF01 Termination of patent right due to non-payment of annual fee