CN205153542U - Template time stupefied metal fixture fastening structure in construction - Google Patents

Template time stupefied metal fixture fastening structure in construction Download PDF

Info

Publication number
CN205153542U
CN205153542U CN201520591801.XU CN201520591801U CN205153542U CN 205153542 U CN205153542 U CN 205153542U CN 201520591801 U CN201520591801 U CN 201520591801U CN 205153542 U CN205153542 U CN 205153542U
Authority
CN
China
Prior art keywords
stupefied
shaped card
screw rod
type card
fastening structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520591801.XU
Other languages
Chinese (zh)
Inventor
张涛
张振辉
沈勤
许丽华
熊延军
娄四林
安建平
于雪霞
赵长宝
葛贤启
程洋
毕江寰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN TIANYI CONSTRUCTION GROUP CO Ltd
Total Group Co ltd That Builds Is Lived In Tianjin
Original Assignee
TIANJIN TIANYI CONSTRUCTION GROUP CO Ltd
Total Group Co ltd That Builds Is Lived In Tianjin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN TIANYI CONSTRUCTION GROUP CO Ltd, Total Group Co ltd That Builds Is Lived In Tianjin filed Critical TIANJIN TIANYI CONSTRUCTION GROUP CO Ltd
Priority to CN201520591801.XU priority Critical patent/CN205153542U/en
Application granted granted Critical
Publication of CN205153542U publication Critical patent/CN205153542U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a template time stupefied metal fixture fastening structure in construction, the first interior U type card of this fixture fastening structure and the top surface of the interior U type card of second all are equipped with the protruding end of U type to fix respectively in inferior stupefied both sides, outer U type card sets up in two main stupefied one sides, and U type card sets up at two main stupefied opposite sides in first interior U type card, the second, lead to outer U type card, two round steel supports, the first interior U type card detaining the screw rod and pass inferior stupefied one side in proper order, leading to the both ends of detaining the screw rod through the fixation nut fastening, lead to the interior U type card of outer U type card, two round steel supports, second of detaining the screw rod and passing inferior stupefied opposite side in proper order, leading to the both ends of detaining the screw rod through the fixation nut fastening. The utility model discloses an effect is can be in the fixed time stupefied position of accurate control to and time stupefied interval, can improve time stupefied stability by a wide margin, simple operating technology. With low comprehensive cost. The rigidity and the reliability of effectual improvement mould to improve the concrete member quality by a wide margin.

Description

Template time stupefied metal jig fastening structure in building operations
Technical field
The utility model relates to template time stupefied metal jig fastening structure in template in building operations secondary stupefied fastening devices, particularly a kind of building operations.
Background technology
In common buildings construction, the reinforced concrete member of cast in situs has post, beam, plate etc., needs to arrange mould.This mould generally by delta wood veneer, generally claim template, secondary stupefied be 40 × 80 flitches, or metal square tube, main stupefied be double joint 40 × 80 metal square tube, and split bolt forms.For ensureing the integral rigidity of mould, secondary stupefied spacing can not be greater than the spacing of calculation requirement.But, the mass defects such as shortcoming have three in construction in, causes the quality of concrete members of building bad, easily produce external waviness, protruding.Be mainly manifested in following 3 points:
One is that the method for putting by hand controls secondary stupefied spacing, and its deviation is larger;
Two is in the process of fastening mould, easily cause secondary stupefied skew;
Three are time stupefied cross sections is rectangles, is improve stress performance, and use minor face contact template and main stupefied, the ratio on its length limit is 2, more greatly, under larger concreting and the load action that vibrates, easily produces unstability.
Summary of the invention
The purpose of this utility model is to provide template time stupefied metal jig fastening structure in a kind of building operations, by this metal jig fixing secondary stupefied position fast, and effective rigidity and the reliability improving mould, thus significantly improve quality of concrete members.
For achieving the above object, the technical solution adopted in the utility model is to provide template time stupefied metal jig fastening structure in building operations, by the stupefied and secondary stupefied spacing of the master in this jig fixed mould, master is stupefied is arranged on secondary stupefied outside, two masters are fixedly connected with stupefied by two round steel supports, wherein: this jig fastening structure includes outer U-shaped card, U-shaped card in first, U-shaped card in second, hold-down nut, logical button screw rod, in described first, in U-shaped card and second, the end face of U-shaped card is equipped with U-shaped protruding end, and be separately fixed at secondary stupefied both sides, described outer U-shaped card is arranged on two main stupefied sides, U-shaped card in first, in second, U-shaped card is arranged on two main stupefied opposite sides, described logical button screw rod through U-shaped card in the outer U-shaped card of time stupefied side, two round steel supports, first, is fastened on the two ends of logical button screw rod successively by hold-down nut, described logical button screw rod through U-shaped card in the outer U-shaped card of time stupefied opposite side, two round steel supports, second, is fastened on the two ends of logical button screw rod successively by hold-down nut.
Effect of the present utility model is that this template time stupefied metal jig has advantage and has following five aspects:
The first, can accurately control fixing secondary stupefied position, and secondary stupefied spacing;
The second, significantly can improve secondary stupefied stability;
3rd, operating procedure is easy, adopts common hand hammer;
4th, integrated cost is low.This metal card lamps structure is simple, and cost of manufacture is low, and can have enough to meet the need use for a long time, and once cost is low need not be able to change in 5 years in amortization.
5th, the rigidity of concrete mold improves more than 10%, and steelframe uniform force, concrete component flatness deviation brings up to about 1mm by 3mm, and quality significantly promotes.
Accompanying drawing explanation
Fig. 1 is template of the present utility model time stupefied metal card lamps structure schematic diagram;
Fig. 2 is the 1-1 sectional view of Fig. 1.
In figure:
1, U-shaped card 3, hold-down nut in outer U-shaped card 2, first
4, U-shaped card 5 in second, logically buckle screw rod 6, lead stupefied 7, secondary stupefied
8, concrete component 9, delta wood veneer 10, round steel support
Detailed description of the invention
By reference to the accompanying drawings time stupefied metal jig fastening structure of template in building operations of the present utility model is illustrated.
As shown in Figure 1, 2, template time stupefied metal jig fastening structure in building operations of the present utility model, by leading the spacing of stupefied 6 and secondary stupefied 7 in this jig fixed mould, main stupefied 6 be arranged on times stupefied 7 outside, this jig fastening structure to include in outer U-shaped card 1, first U-shaped card 4 in U-shaped card 2, second, hold-down nut 3, logically buckles screw rod 5.U-shaped card 4 in U-shaped card 2, second in outer U-shaped card 1, first is fastened on main stupefied 6 by hold-down nut 3, logical screw rod 5 of buckleing by described metal jig, and main stupefied 6 is the square tube of metal, and secondary stupefied 7 is 40 × 80 flitches, or the square tube of metal.Be fixedly connected with two main stupefied 6 by two round steel supports 10, in described first, in U-shaped card 2 and second, the end face of U-shaped card 4 is equipped with U-shaped protruding end, and is separately fixed at the both sides of times stupefied 7, and U-shaped protruding end plays the effect of restriction time stupefied position.Described outer U-shaped card 1 is arranged on two main stupefied sides, and in first, in U-shaped card 2, second, U-shaped card 4 is arranged on two main stupefied opposite sides; Described logical button screw rod 5 successively through times stupefied 7 side outer U-shaped card 1, two round steel support 10, first in U-shaped card 2, be fastened on the two ends of logical button screw rod 5 by hold-down nut 3; Described logical button screw rod 5 successively through times stupefied 7 opposite side outer U-shaped card 1, two round steel support 10, second in U-shaped card 4, be fastened on the two ends of logical button screw rod 5 by hold-down nut 3.
The length of described round steel support 10 is greater than the diameter of logical button screw rod 5.
In building operations of the present utility model, template time stupefied metal jig installation process is as follows:
Step one: base treatment
The surface of cleaning main stupefied 6, makes it to be easy to install template time stupefied metal jig in building operations.
Step 2: setting-out
Going out the center of secondary stupefied 7 in main stupefied 6 surface markers, is namely the mounting center position of template time stupefied metal jig in building operations.
Position relationship and the effect of main stupefied 6, secondary stupefied 7, delta wood veneer 9 are as follows: main stupefied 6 be arranged on times stupefied 7 outside, secondary stupefied 7 are arranged on outside delta wood veneer 9.Wherein secondary stupefied 7 is that uniform intervals is arranged, object be delta wood veneer 9 in guarantee 2 time stupefied 7 intervals by distortion during concreting load in allowed band; Main stupefied 6 spacing arrange according to designing and calculating spacing, and object is that the distortion of secondary stupefied 7 in stupefied 6 intervals of guarantee 2 masters when being subject to concreting load is in allowed band.
Main stupefied structure: 2 masters stupefied 6 welded together by 2 round steel supports 10, the length of round steel support 10 is greater than the diameter of logical button screw rod 5, is convenient to fitting operation.
Step 3: to install in first U-shaped card 2 in first
U-shaped card 2 in first is arranged on main stupefied 6 by hold-down nut 3, logical button screw rod 5.
Step 4: the position of adjustment secondary stupefied 7
Is alignd in the center that the secondary center line of stupefied 7 and main stupefied 6 surface markers go out secondary stupefied 7.
Step 5: install U-shaped card 4 in second
U-shaped card 4 in second is arranged on main stupefied 6 by hold-down nut 3, logical button screw rod 5.

Claims (2)

1. template time stupefied metal jig fastening structure in a building operations, by the stupefied and secondary stupefied spacing of the master in this jig fixed mould, master is stupefied is arranged on secondary stupefied outside, two masters are fixedly connected with stupefied by two round steel supports (10), it is characterized in that: this jig fastening structure includes outer U-shaped card (1), U-shaped card (2) in first, U-shaped card (4) in second, hold-down nut (3), logical button screw rod (5), in described first, in U-shaped card (2) and second, the end face of U-shaped card (4) is equipped with U-shaped protruding end, and be separately fixed at the both sides of time stupefied (7), described outer U-shaped card (1) is arranged on two main stupefied sides, U-shaped card (2) in first, in second, U-shaped card (4) is arranged on two main stupefied opposite sides, described logical button screw rod (5) through U-shaped card (2) in the outer U-shaped card (1) of the side of time stupefied (7), two round steel supports (10), first, is fastened on the two ends of logical button screw rod (5) successively by hold-down nut (3), described logical button screw rod (5) through U-shaped card (4) in the outer U-shaped card (1) of the opposite side of time stupefied (7), two round steel supports (10), second, is fastened on the two ends of logical button screw rod (5) successively by hold-down nut (3).
2. template time stupefied metal jig fastening structure in building operations according to claim 1, is characterized in that: the length of described round steel support (10) is greater than the diameter of logical button screw rod (5).
CN201520591801.XU 2015-08-03 2015-08-03 Template time stupefied metal fixture fastening structure in construction Withdrawn - After Issue CN205153542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520591801.XU CN205153542U (en) 2015-08-03 2015-08-03 Template time stupefied metal fixture fastening structure in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520591801.XU CN205153542U (en) 2015-08-03 2015-08-03 Template time stupefied metal fixture fastening structure in construction

Publications (1)

Publication Number Publication Date
CN205153542U true CN205153542U (en) 2016-04-13

Family

ID=55689254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520591801.XU Withdrawn - After Issue CN205153542U (en) 2015-08-03 2015-08-03 Template time stupefied metal fixture fastening structure in construction

Country Status (1)

Country Link
CN (1) CN205153542U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178600A (en) * 2015-08-03 2015-12-23 天津住总建筑集团有限公司 Metal clamp fastening structure for template secondary ridges in building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178600A (en) * 2015-08-03 2015-12-23 天津住总建筑集团有限公司 Metal clamp fastening structure for template secondary ridges in building construction

Similar Documents

Publication Publication Date Title
CN202570872U (en) Cold bending correction device for steel pipe type rod piece
CN205153542U (en) Template time stupefied metal fixture fastening structure in construction
CN204609295U (en) A kind of square column template anchor ear encloses purlin
CN105178600A (en) Metal clamp fastening structure for template secondary ridges in building construction
CN103410345A (en) Reinforced concrete column reinforcement device and method
CN101870338B (en) Inclined ladder for ship
CN102287020B (en) Steel cable prestressed glass curtain wall
CN201714077U (en) Steel tube support jacking
CN201825617U (en) Fixed structure of elevator guide rail support
CN210032246U (en) Plate-type embedded part of glass curtain wall
CN208744617U (en) A kind of pier stud embedded ribs positioning clamping fixture
CN209620597U (en) Wall external angle formwork lock assembly
CN203878983U (en) Composite floor slab steel angle side formwork device fast fixed through bolts
CN202380740U (en) Opposite-pull bolt for building templates
CN219060844U (en) Cutting-free outer frame wall connecting piece for full concrete outer wall
CN215168392U (en) Supporting device
CN110847361A (en) Fixing device for steel structure building
CN215167244U (en) Nut type concrete cushion block
CN202081650U (en) Through-wall opposite-pull limiting bolt
CN211939793U (en) Reinforcing steel bar screw machine
CN202248455U (en) Roof truss purline group
CN210767222U (en) Light steel assembled H type light steel component for building
CN214884420U (en) Steel structure support frame
CN102383614A (en) Steel column base correction device
CN216884495U (en) Prefabricated concrete wallboard steel formwork with adjustable size

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160413

Effective date of abandoning: 20170609