CN205153495U - Scaffold - Google Patents
Scaffold Download PDFInfo
- Publication number
- CN205153495U CN205153495U CN201520807334.XU CN201520807334U CN205153495U CN 205153495 U CN205153495 U CN 205153495U CN 201520807334 U CN201520807334 U CN 201520807334U CN 205153495 U CN205153495 U CN 205153495U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- pole
- vertical
- cross
- diagonal stay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑施工领域,尤其涉及一种脚手架。The utility model relates to the field of building construction, in particular to a scaffold.
背景技术Background technique
脚手架是建筑施工领域必备的一种器材。传统的脚手架通常包括用毛竹或者钢管作立杆的支撑杆、与支撑杆垂直的横梁以及将支撑杆和横梁扣结于一体的扣件。传统的脚手架存在很多缺点:由于传统的脚手架在安装时需要调整支撑杆的高度,施工期就需要配备各种不同尺寸的支撑杆,而支撑杆的配置工作较为麻烦且成本较高;其次,由于支撑杆与横梁以扣件扣结,在改变高度时需要解开各个扣件,然后横梁沿着支撑件移至施工所需的高度上,并重新用扣件将支撑杆和横梁扣结,此过程由于扣件多而使工作量变得很大,费事费力;另外,扣件的扣结工作还容易受到人为的不确定因素影响,使可靠性及承载能力受到影响。Scaffolding is a necessary equipment in the field of construction. Traditional scaffolding usually includes a support rod made of moso bamboo or a steel pipe, a crossbeam perpendicular to the support rod, and a fastener that integrates the support rod and the crossbeam. There are many disadvantages in traditional scaffolding: because traditional scaffolding needs to adjust the height of support rods during installation, it is necessary to equip support rods of various sizes during the construction period, and the configuration of support rods is cumbersome and expensive; secondly, due to The support bar and the beam are fastened with fasteners. When changing the height, each fastener needs to be unfastened, and then the beam moves along the support to the height required for construction, and the support bar and the beam are fastened again with the fastener. Due to the large number of fasteners in the process, the workload becomes very large and laborious; in addition, the fastening work of the fasteners is also easily affected by artificial uncertain factors, which affects the reliability and bearing capacity.
实用新型内容Utility model content
为了克服现有技术中存在的缺点和不足,本实用新型提供了一种脚手架。In order to overcome the shortcomings and deficiencies in the prior art, the utility model provides a scaffold.
本实用新型是通过以下技术方案实现的:一种脚手架,包括至少两组上下平行设置的脚手架单元;所述每组脚手架单元包括围成方形的四根立杆、连接在各相邻立杆之间的横杆以及连接在两根横杆之间的斜拉杆,所述每组脚手架单元的斜拉杆为两个,两个斜拉杆位置相对且方向交叉设置;所述相邻两组脚手架单元之间通过立杆连接。The utility model is realized through the following technical solutions: a scaffold, comprising at least two sets of scaffold units arranged in parallel up and down; each set of scaffold units includes four vertical poles surrounded by a square, connected between adjacent vertical poles The crossbars and the diagonal stays connected between the two crossbars, each set of scaffold units have two diagonal stays, and the two diagonal stays are opposite to each other and arranged in cross directions; between the two adjacent sets of scaffolding units Connected via a pole.
进一步地,还包括安装在最上层脚手架单元顶部的顶托以及安装在底部的底座。Further, it also includes a jacking bracket installed on the top of the uppermost scaffolding unit and a base installed on the bottom.
进一步地,所述立杆上设置有多个圆盘连接件,所述圆盘连接件上设置有多个插孔。Further, the pole is provided with a plurality of disc connectors, and the disc connectors are provided with a plurality of sockets.
进一步地,所述立杆的两端设置有连接套管。Further, connecting sleeves are provided at both ends of the pole.
进一步地,所述横杆的两端固定有横杆接头部,所述横杆接头部中穿插设置有插销。Further, the two ends of the cross bar are fixed with cross bar joints, and the cross bar joints are interspersed with bolts.
进一步地,所述斜拉杆的两端固定有斜拉杆接头部,所述斜拉杆接头部前端穿插设置有插销。Further, the two ends of the diagonal stay rod are fixed with a joint part of the diagonal stay rod, and the front end of the joint part of the diagonal stay rod is interspersed with a latch.
进一步地,所述底座上设置有用于固定立杆的插接管,插接管上设置有螺纹。Further, the base is provided with a socket for fixing the pole, and the thread is provided on the socket.
进一步地,所述顶托下部设置有支撑件及支撑插管,所述支撑插管上设置有螺纹,所述支撑插管与立杆顶端连接。Further, the lower part of the jacking bracket is provided with a support member and a support insertion tube, the support insertion tube is provided with threads, and the support insertion tube is connected to the top end of the vertical pole.
进一步地,所述横杆的两端固定在立杆的圆盘连接件上。Further, both ends of the cross bar are fixed on the disc connectors of the upright bar.
进一步地,所述斜拉杆的两端固定在立杆的圆盘连接件的外侧。Further, both ends of the diagonal stay rods are fixed on the outer sides of the disc connectors of the vertical rods.
相对于现有技术,本实用新型的脚手架通过在立杆上设置圆盘连接件,使得横杆和斜拉杆的固定连接变得简单快捷,同时增强了影响结构的稳定性和承载能力。立杆可以根据需要设置为一标准件,可以通过设置多个脚手架单元来满足不同高度的需求,通过手柄螺母来对脚手架高度进行微调,从而满足施工对各个高度的需求。本实用新型的脚手架简单紧凑、拆装容易、作业时间短、安全系数高,具有很强的实用性和推广前景。Compared with the prior art, the scaffolding of the utility model makes the fixed connection of the horizontal bar and the diagonal stay simple and fast by providing the disc connector on the vertical bar, and at the same time enhances the stability and bearing capacity of the affected structure. The pole can be set as a standard part according to the needs, and the needs of different heights can be met by setting multiple scaffold units, and the height of the scaffold can be fine-tuned through the handle nut, so as to meet the needs of construction for various heights. The scaffold of the utility model is simple and compact, easy to assemble and disassemble, short working time, high safety factor, and has strong practicability and popularization prospect.
为了更好地理解和实施,下面结合附图详细说明本实用新型。For better understanding and implementation, the utility model will be described in detail below in conjunction with the accompanying drawings.
附图说明Description of drawings
图1是本实用新型的脚手架的立体结构示意图。Fig. 1 is a three-dimensional structural schematic diagram of the scaffolding of the present invention.
图2是本实用新型的脚手架的正视图。Fig. 2 is a front view of the scaffolding of the present invention.
图3是立杆和横杆的立体结构示意图。Fig. 3 is a three-dimensional structural schematic diagram of the vertical bar and the horizontal bar.
图4是立杆和横杆的正视图。Figure 4 is a front view of the uprights and crossbars.
图5是横杆和圆盘连接件的结构示意图。Fig. 5 is a structural schematic diagram of a crossbar and a disc connector.
图6是立杆和圆盘连接件的正视图。Figure 6 is a front view of the rod and disk connector.
图7是顶托的局部结构示意图。Fig. 7 is a partial structural schematic diagram of the jacking bracket.
图8是底座的局部结构示意图。Fig. 8 is a schematic diagram of a partial structure of the base.
图9是横杆的连接关系示意图。Fig. 9 is a schematic diagram of the connection relationship of the cross bar.
图10是圆盘连接件的结构示意图。Fig. 10 is a structural schematic diagram of a disc connector.
图11是斜拉杆的连接关系示意图。Fig. 11 is a schematic diagram of the connection relationship of the diagonal stay rods.
具体实施方式detailed description
请参阅图1-图11。图1是本实用新型的脚手架的立体结构示意图。图2是本实用新型的脚手架的正视图。图3是立杆和横杆的立体结构示意图。图4是立杆和横杆的正视图。图5是横杆和圆盘连接件的结构示意图。图6是立杆和圆盘连接件的正视图。图7是顶托的局部结构示意图。图8是底座的局部结构示意图。图9是横杆的连接关系示意图。图10是圆盘连接件的结构示意图。图11是斜拉杆的连接关系示意图。See Figures 1-11. Fig. 1 is a three-dimensional structural schematic diagram of the scaffolding of the present invention. Fig. 2 is a front view of the scaffolding of the present invention. Fig. 3 is a three-dimensional structural schematic diagram of the vertical bar and the horizontal bar. Figure 4 is a front view of the uprights and crossbars. Fig. 5 is a structural schematic diagram of a crossbar and a disc connector. Figure 6 is a front view of the rod and disk connector. Fig. 7 is a partial structural schematic diagram of the jacking bracket. Fig. 8 is a schematic diagram of a partial structure of the base. Fig. 9 is a schematic diagram of the connection relationship of the cross bar. Fig. 10 is a structural schematic diagram of a disc connector. Fig. 11 is a schematic diagram of the connection relationship of the diagonal stay rods.
本实用新型的脚手架,包括至少两组上下平行设置的脚手架单元10;每组脚手架单元10包括围成方形的四根立杆11、连接在各相邻立杆11之间的横杆12以及连接在两根横杆12之间的斜拉杆13,每组脚手架单元10的斜拉杆13为两个,两个斜拉杆13位置相对且方向交叉设置;相邻两组脚手架单元10之间通过立杆11连接。The scaffolding of the present utility model comprises at least two groups of scaffolding units 10 arranged in parallel up and down; each group of scaffolding units 10 comprises four uprights 11 surrounded by a square, crossbars 12 connected between adjacent uprights 11 and connections between There are two diagonal stay rods 13 between the two cross bars 12. There are two diagonal stay rods 13 for each group of scaffold units 10, and the two diagonal stay rods 13 are located opposite to each other and arranged in cross directions; connect.
具体地,本实用新型的脚手架还包括安装在最上层脚手架单元10顶部的顶托20以及安装在底部的底座30。本实施例优选地在立杆11上设置有多个圆盘连接件14,多个圆盘连接件14之间可以固定多排横杆,这样可以起到增加结构的稳定性的作用。圆盘连接件14上设置有多个插孔141。立杆11的两端设置有连接套管15,上下相邻的脚手架单元10之间通过使用连接套管15固定连接。横杆12的两端固定在立杆11的圆盘连接件14上,本实施例的横杆12的两端固定有横杆接头部16,横杆接头部16中穿插设置有插销18,横杆12通过插销18固定在圆盘连接件14的插孔141上。斜拉杆13的两端固定在立杆11的圆盘连接件14的外侧。本实施例的斜拉杆13的两端固定有斜拉杆接头部17,斜拉杆接头部17前端穿插设置有插销18,斜拉杆13通过插销18固定在圆盘连接件14的外侧。底座30上设置有用于固定立杆11的插接管31,插接管31上设置有螺纹,通过手柄螺母将插接管31与立杆11的底端连接。顶托20下部设置有支撑件21及支撑插管22,支撑插管22上设置有螺纹,支撑插管22通过手柄螺母与立杆11顶端连接。顶托20和底座30都可以通过调整手柄螺母来实现对脚手架高度的调整。Specifically, the scaffold of the present invention also includes a jacking 20 installed on the top of the scaffold unit 10 on the uppermost floor and a base 30 installed on the bottom. In this embodiment, a plurality of disc connectors 14 are preferably arranged on the pole 11, and multiple rows of cross bars can be fixed between the plurality of disc connectors 14, which can increase the stability of the structure. A plurality of insertion holes 141 are disposed on the disc connector 14 . Both ends of the pole 11 are provided with connecting sleeves 15 , and the upper and lower adjacent scaffold units 10 are fixedly connected by using the connecting sleeves 15 . The two ends of the cross bar 12 are fixed on the disc connectors 14 of the vertical bar 11. The two ends of the cross bar 12 in this embodiment are fixed with a cross bar joint part 16, and a latch 18 is interspersed in the cross bar joint part 16. The rod 12 is fixed on the insertion hole 141 of the disk connector 14 through the latch 18 . Both ends of the diagonal stay rod 13 are fixed on the outer side of the disc connector 14 of the vertical rod 11 . Both ends of the diagonal stay rod 13 in this embodiment are fixed with a diagonal stay rod joint portion 17 , the front end of the diagonal stay rod joint portion 17 is interspersed with a bolt 18 , and the diagonal stay rod 13 is fixed on the outside of the disc connector 14 through the bolt 18 . The base 30 is provided with an insertion pipe 31 for fixing the vertical rod 11, and the insertion pipe 31 is provided with threads, and the insertion pipe 31 is connected with the bottom end of the vertical rod 11 through a handle nut. The lower part of the jacking bracket 20 is provided with a support member 21 and a support cannula 22, the support cannula 22 is provided with threads, and the support cannula 22 is connected to the top of the vertical rod 11 through a handle nut. Both the jacking 20 and the base 30 can be adjusted to the height of the scaffold by adjusting the handle nut.
相对于现有技术,本实用新型的脚手架通过在立杆上设置圆盘连接件,使得横杆和斜拉杆的固定连接变得简单快捷,同时增强了影响结构的稳定性和承载能力。立杆可以根据需要设置为一标准件,可以通过设置多个脚手架单元来满足不同高度的需求,通过手柄螺母来对脚手架高度进行微调,从而满足施工对各个高度的需求。本实用新型的脚手架简单紧凑、拆装容易、作业时间短、安全系数高,具有很强的实用性和推广前景。Compared with the prior art, the scaffolding of the utility model makes the fixed connection of the horizontal bar and the diagonal stay simple and fast by providing the disc connector on the vertical bar, and at the same time enhances the stability and bearing capacity of the affected structure. The pole can be set as a standard part according to the needs, and the needs of different heights can be met by setting multiple scaffold units, and the height of the scaffold can be fine-tuned through the handle nut, so as to meet the needs of construction for various heights. The scaffold of the utility model is simple and compact, easy to assemble and disassemble, short working time, high safety factor, and has strong practicability and popularization prospect.
本实用新型并不局限于上述实施方式,如果对本实用新型的各种改动或变形不脱离本实用新型的精神和范围,倘若这些改动和变形属于本实用新型的权利要求和等同技术范围之内,则本实用新型也意图包含这些改动和变形。The utility model is not limited to the above-mentioned embodiment, if the various modifications or deformations of the utility model do not depart from the spirit and scope of the utility model, if these changes and deformations belong to the claims of the utility model and within the equivalent technical scope, Then the utility model is also intended to include these modifications and variations.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520807334.XU CN205153495U (en) | 2015-10-16 | 2015-10-16 | Scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520807334.XU CN205153495U (en) | 2015-10-16 | 2015-10-16 | Scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205153495U true CN205153495U (en) | 2016-04-13 |
Family
ID=55689207
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520807334.XU Expired - Lifetime CN205153495U (en) | 2015-10-16 | 2015-10-16 | Scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205153495U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106193562A (en) * | 2016-08-29 | 2016-12-07 | 上海捷超脚手架有限公司 | A kind of environment protection type multifunctional knockdown a new generation scaffold |
| CN106917497A (en) * | 2017-04-13 | 2017-07-04 | 天津鼎维固模架工程股份有限公司 | A kind of socket joint disk button-type frame set |
| CN108086662A (en) * | 2017-12-28 | 2018-05-29 | 开封宜家建筑材料有限公司 | A kind of scaffold for building |
| CN115973371A (en) * | 2022-12-03 | 2023-04-18 | 江苏速捷模架科技有限公司 | Frame upright post unit of construction platform module of enclosure system |
-
2015
- 2015-10-16 CN CN201520807334.XU patent/CN205153495U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106193562A (en) * | 2016-08-29 | 2016-12-07 | 上海捷超脚手架有限公司 | A kind of environment protection type multifunctional knockdown a new generation scaffold |
| CN106917497A (en) * | 2017-04-13 | 2017-07-04 | 天津鼎维固模架工程股份有限公司 | A kind of socket joint disk button-type frame set |
| CN108086662A (en) * | 2017-12-28 | 2018-05-29 | 开封宜家建筑材料有限公司 | A kind of scaffold for building |
| CN115973371A (en) * | 2022-12-03 | 2023-04-18 | 江苏速捷模架科技有限公司 | Frame upright post unit of construction platform module of enclosure system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204024004U (en) | A kind of scaffold take dismantling device fast | |
| CN206319609U (en) | A kind of adjustable molding bed for making steel reinforcement cage | |
| CN205153495U (en) | Scaffold | |
| CN204418660U (en) | Cast-in-situ concrete beam and slab structure form bracing system | |
| CN206800949U (en) | Operating platform for construction work high above the ground | |
| CN202544376U (en) | Telescopic disc supporting system | |
| CN211173080U (en) | Early-dismantling formwork support frame connecting device for building construction | |
| CN207829505U (en) | A kind of pin-connected panel floor edge protective fence | |
| CN204876613U (en) | Guardrail bar is prevented to concertina type | |
| CN206376507U (en) | Prefabrication outrigger | |
| CN202899588U (en) | Assembling scaffold structure | |
| CN204139631U (en) | Quick-release protective railings for construction sites | |
| CN216276814U (en) | Building machine walkway plate connecting assembly | |
| CN108252569B (en) | Rapid combined enclosure and construction method | |
| CN207245243U (en) | Prefabricated superimposed sheet vertical supporting device | |
| CN209114850U (en) | Magnesium alloy hanging basket basket body inserts connection structure | |
| CN216276813U (en) | Building machine walkway plate connecting assembly | |
| TWM650256U (en) | Support frame for racking | |
| CN205282953U (en) | Assembled goods shelves of spatial structure of transformer substation | |
| CN203977833U (en) | A kind of wall-attached builder's jack | |
| CN210947630U (en) | Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble | |
| CN201486160U (en) | Assembled construction safety channel | |
| CN204139719U (en) | A kind of regularization guard rail | |
| CN209228112U (en) | One discharge plate button exit passageway frame | |
| CN204590563U (en) | A kind of Novel dismountable scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160413 |