CN205150201U - Ballast pouring weight - Google Patents

Ballast pouring weight Download PDF

Info

Publication number
CN205150201U
CN205150201U CN201520821787.8U CN201520821787U CN205150201U CN 205150201 U CN205150201 U CN 205150201U CN 201520821787 U CN201520821787 U CN 201520821787U CN 205150201 U CN205150201 U CN 205150201U
Authority
CN
China
Prior art keywords
pouring weight
ballast
ballast pouring
weight
ballasting weights
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520821787.8U
Other languages
Chinese (zh)
Inventor
申淑静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Technology Co Ltd
Original Assignee
Qingdao Haier Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Technology Co Ltd filed Critical Qingdao Haier Technology Co Ltd
Priority to CN201520821787.8U priority Critical patent/CN205150201U/en
Application granted granted Critical
Publication of CN205150201U publication Critical patent/CN205150201U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Abstract

The utility model mainly aims at providing a ballast pouring weight to the ballast pouring weight that solves scuba among the prior art is convenient to detach's problem not. This ballast pouring weight includes: dive ballast pouring weight and come -up ballast pouring weight of each other independent, wherein, dive ballast pouring weight is including fastening ballast balancing weight and a plurality of ballast weight stack together, come -up ballast pouring weight includes the ballast weight stack that a plurality of fastenings are in the same place, this scheme make the scuba ballast pouring weight convenient to detach more.

Description

A kind of ballast pouring weight
Technical field
The utility model relates to diving outfit field, particularly relates to a kind of ballast pouring weight.
Background technology
Being carried out the adjustment of gravity size by ballast pouring weight, is that submersible enters deep-sea and carries out operation and float to the significant process that the water surface completes recovery.Whether alerting ability, convenience that ballast attachment is installed have related to submersible and can at sea efficiently prepare, particularly when the wave is high gush high uncertain factor more.Meanwhile, the stability of ballast pouring weight installing mechanism also determines the safety of submersible dive operation.To be that controlling and adjustment submersible weight and buoyancy are auxiliary arranged ballast pouring weight, by at the different two cover ballast weight blocks of submersible arranged on left and right sides erection weight, and abandon to meet the buoyancy requirement in submersible dive, coastal waters seabed operation, three processes that float in different phase, be ensure that unpowered dive floating type manned submersible realizes the important technical of under-water operation.The ballast the abandoned pouring weight that certain submersible uses at present is divided into two groups, and wherein: dive ballast pouring weight is of a size of 297mm × 197mm × 318mm, weight is about 140kg; Floating kentledge is of a size of 298mm × 298mm × 335mm, and weight is about 230kg, all needs to carry out prestowage according to different depth, personnel and equipment before each dive.
Existing submersible ballast pouring weight uses Integral-structure type, by the carrying of packaged type electri forklift, promotes and laterally adjustment, utilizes hydraulic pressure aid vehicle to submersible longitudinally adjustment, thus ballast pouring weight is sent into guiding mechanism, complete dive and prepare.Due to electri forklift structure bulky and erecting stage is fixed sturcture, position adjustment in horizontal surface cannot be realized.At least need 6-8 people ballast pouring weight could be mounted to when not having fixing during the installation of ballast pouring weight to be about on the submersible of 2.3m height from ship deck.When boats and ships gush out existing larger rolling, pitching due to stormy waves, bring considerable risk to operating personal and hydraulic pressure aid vehicle.
Utility model content
Main purpose of the present utility model is to provide a kind of ballast pouring weight, is not easy to the problem dismantled with the load-carrying block solving submersible pressure of the prior art.
According to an aspect of the present utility model, provide a kind of ballast pouring weight, comprising: mutual independently dive ballast pouring weight and floating ballast pouring weight; Wherein, dive ballast pouring weight comprises the ballasting weights block and multiple ballasting weights sheet that tighten together; Floating ballast pouring weight comprises multiple ballasting weights sheet tightened together.
Wherein, dive ballast pouring weight also comprises: install dull and stereotyped, framework, described ballasting weights block and multiple ballasting weights sheet are positioned in described framework; Two madial walls of described ballasting weights block and described framework are fitted, and described multiple ballasting weights sheet is stacked in described frame mid portion and fits with described ballasting weights block; Described installation flat board is fixed on described framework top.
Wherein, the dual-side of framework has rectangular recess.
Wherein, above-mentioned installation flat board has installation hook.
Wherein, multiple weight stack detouchables of floating ballast pouring weight are fixed on mounting rod both sides, mounting rod is provided with and installs hook.
Wherein, the weight stack being fixed on mounting rod both sides is fixed respectively by two bolts being arranged at diagonal.
The utility model beneficial effect is as follows:
Due to the weight of ballast pouring weight is decomposed into multiple part, substantially can remove the use of electrodynamic type fork truck from, eliminate the danger that ballast pouring weight is installed when roll and pitch is serious, improve processing safety.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide further understanding of the present utility model, and form a application's part, schematic description and description of the present utility model, for explaining the utility model, is not formed improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the structural representation of the dive ballast pouring weight that the utility model embodiment 1 provides;
Fig. 2 is the structural representation of the floating ballast pouring weight that the utility model embodiment 1 provides;
Fig. 3 is the installation relation schematic diagram of ballast pouring weight each several part of floating in the utility model embodiment 1.
Detailed description of the invention
In order to solve the problem that the ballast pouring weight of prior art on submersible is not easy to dismantle, the utility model provides a kind of ballast pouring weight, below in conjunction with accompanying drawing and embodiment, is further elaborated to the utility model.Should be appreciated that specific embodiment described herein only in order to explain the utility model, do not limit the utility model.
Embodiment 1
Present embodiments provide a kind of ballast pouring weight, this ballast weight comprises following component part:
Mutual independently dive ballast pouring weight and floating ballast pouring weight, particularly, dive ballast pouring weight and floating ballast pouring weight can be installed on submersible both sides respectively;
Wherein, dive ballast pouring weight comprises the ballasting weights block and multiple ballasting weights sheet that tighten together; Wherein, ballasting weights block can be divided into ballasting weights bulk and ballasting weights fritter, is provided with baffle plate between ballasting weights block and ballasting weights sheet, and floating ballast pouring weight comprises multiple ballasting weights sheet be stacked together.
As shown in Figure 1, dive ballast pouring weight specifically comprises:
Install dull and stereotyped, framework, wherein, ballasting weights block and multiple ballasting weights sheet are positioned in support; As shown in Figure 1, framework is square, and framework dual-side has rectangular recess; Fit and place in two sides of ballasting weights block and framework, multiple ballasting weights sheet is stacked in frame mid portion and fits with ballasting weights block; Flat board is installed and can be fixed on framework top by bolt and nut, install on flat board and there is installation hook/handle.
As shown in Figure 2, multiple weight stacks of floating ballast pouring weight are divided into two parts by four bolts and are separately fixed at mounting rod both sides, wherein, every two of four bolts of fixing two parts weight stack are arranged on two diagonal angles of weight stack, mounting rod is provided with installation hook/suspension ring, Fig. 3 particularly illustrates four bolts (pilot bar) and the position relationship of mounting rod and the position relationship of weight stack and bolt.
Embodiment 2
The present embodiment is further described the ballast pouring weight provided in above-described embodiment 1 by open more technical characteristic:
The dive ballast pouring weight of the present embodiment by top install flat board, mounting bracket, ballasting weights fritter 57mm × 49mm × 150mm, ballasting weights bulk 93mm × 49mm × 150mm, baffle plate and 189mm × 185mm × 9mm oblong weight stack form.
The installation process of dive ballast pouring weight: first the top structure connecting framework is fixed on submersible, then respectively ballasting weights fritter, ballasting weights bulk are placed in mounting bracket, finally weight stack slices are inserted in base frames, and with tightening screw, baffle plate is fixed on housing side, realize kentledge four sides totally-enclosed.
The floating ballast pouring weight of the present embodiment is made up of the clump weight of 298mm × 149mm × 10mm, the bottom ballast sheet of 298mm × 298mm × 20mm, 4 pilot bars, 1 mounting rod.
The installation process of dive ballast pouring weight: first 5 screw rods are arranged on the ballast sheet of bottom, wherein, one, central authorities are mounting rod, and all the other four, for fixed weight sheet, are mounted to submersible by fork lift truck, carry out the installation of clump weight subsequently, around 4 screw rods mainly play the guiding role, and hang ballast pouring weight by middle 1 screw rod, and whole ballast pouring weight weight can be regulated by the quantity of adjustment pressure weight stack, finally use nut Fixed Ballast sheet, complete installation.
The ballasting weights block of the present embodiment adopts sectional type mounting means, ensureing under the condition that oad is constant, certain submersible floating ballast pouring weight and dive are downloaded pouring weight and changes sectional type mounting structure into, realize the installation step by step of about 140kg and 230kg ballast pouring weight, and according to the difference of dive personnel and carrying equipment, flexible can be carried out to the weight of ballast pouring weight.Owing to have employed sectional type installation method, the integral installation of floating and ballast pouring weight has become installs step by step, is easy to carrying and can adjusts weight flexibly, greatly reduce installation personnel labour intensity in installation process.Meanwhile, due to the weight of about 140kg and 230kg is decomposed into multiple part, substantially can remove the use of electrodynamic type fork truck from, eliminate the danger that ballast pouring weight is installed when roll and pitch is serious, improve processing safety.
The foregoing is only embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within right of the present utility model.

Claims (6)

1. a ballast pouring weight, is characterized in that, comprising:
Mutual independently dive ballast pouring weight and floating ballast pouring weight;
Described dive ballast pouring weight comprises the ballasting weights block and multiple ballasting weights sheet that tighten together;
Described floating ballast pouring weight comprises multiple ballasting weights sheet tightened together.
2. ballast pouring weight according to claim 1, is characterized in that, described dive ballast pouring weight also comprises:
Install dull and stereotyped, framework, described ballasting weights block and multiple ballasting weights sheet are positioned in described framework;
Two madial walls of described ballasting weights block and described framework are fitted, and described multiple ballasting weights sheet is stacked in described frame mid portion and fits with described ballasting weights block;
Described installation flat board is fixed on described framework top.
3. ballast pouring weight according to claim 2, is characterized in that, the dual-side of described framework has rectangular recess.
4. ballast pouring weight according to claim 2, is characterized in that, described installation flat board has and installs hook.
5. ballast pouring weight according to claim 1, is characterized in that, multiple weight stack detouchables of described floating ballast pouring weight are fixed on mounting rod both sides, described mounting rod is provided with and installs hook.
6. ballast pouring weight according to claim 5, is characterized in that, the weight stack being fixed on described mounting rod both sides is fixed respectively by two bolts being arranged at diagonal.
CN201520821787.8U 2015-10-22 2015-10-22 Ballast pouring weight Expired - Fee Related CN205150201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520821787.8U CN205150201U (en) 2015-10-22 2015-10-22 Ballast pouring weight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520821787.8U CN205150201U (en) 2015-10-22 2015-10-22 Ballast pouring weight

Publications (1)

Publication Number Publication Date
CN205150201U true CN205150201U (en) 2016-04-13

Family

ID=55685919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520821787.8U Expired - Fee Related CN205150201U (en) 2015-10-22 2015-10-22 Ballast pouring weight

Country Status (1)

Country Link
CN (1) CN205150201U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108725718A (en) * 2018-05-03 2018-11-02 上海交通大学 Mixed type, which is thrown, carries device
CN109080797A (en) * 2018-08-16 2018-12-25 东莞市凯勒帝数控科技有限公司 A kind of underwater robot device for being convenient for adjusting gravity and buoyancy
CN109466728A (en) * 2018-11-07 2019-03-15 上海海洋大学 Unpowered dive floating movement technique and system applied to deep-submarine
CN112977767A (en) * 2021-02-05 2021-06-18 中国船舶科学研究中心 Emergency discarding box device and method for full-sea deep manned submersible
CN114633860A (en) * 2022-03-31 2022-06-17 山西汾西重工有限责任公司 Counter weight adjusting device and navigation ware

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108725718A (en) * 2018-05-03 2018-11-02 上海交通大学 Mixed type, which is thrown, carries device
CN109080797A (en) * 2018-08-16 2018-12-25 东莞市凯勒帝数控科技有限公司 A kind of underwater robot device for being convenient for adjusting gravity and buoyancy
CN109080797B (en) * 2018-08-16 2020-12-08 新沂市锡沂高新材料产业技术研究院有限公司 Device convenient for adjusting gravity and buoyancy for underwater robot
CN109466728A (en) * 2018-11-07 2019-03-15 上海海洋大学 Unpowered dive floating movement technique and system applied to deep-submarine
CN112977767A (en) * 2021-02-05 2021-06-18 中国船舶科学研究中心 Emergency discarding box device and method for full-sea deep manned submersible
CN114633860A (en) * 2022-03-31 2022-06-17 山西汾西重工有限责任公司 Counter weight adjusting device and navigation ware
CN114633860B (en) * 2022-03-31 2024-11-01 山西汾西重工有限责任公司 Counterweight adjusting device and aircraft

Similar Documents

Publication Publication Date Title
CN205150201U (en) Ballast pouring weight
WO2012103796A1 (en) Vessel for transporting and installing wind turbine equipment and use of vessel
CN104443260B (en) A kind of all-direction propeller underwater portion erecting device and method
CN104903187A (en) Hoisting system and accompanying connector catch assembly
CN105059489B (en) A kind of marine nuclear power platform of constant
JP2007523011A (en) Lateral launching method and equipment for ships built on land
CN204895792U (en) Marine buffer that supports of platform chunk
CN104032718B (en) A kind of light-duty, have from floating function and can the elevated structure of manpower erection
CN106926996A (en) The portable small-sized underwater robot of closed shelves
GB2359058A (en) Vessel
CN102464088A (en) Method for installing thruster at bottom of drilling platform
CN104540767A (en) Method for lowering and hoisting of a load to or from an ocean floor
CN103883273A (en) Method for utilizing two cranes on saturation diving support vessel to mount vertical pipe
CN104816795A (en) One-base multi-body floating type wave-energy converting device
CN210734460U (en) Ship stern shaft mounting device
CN205952298U (en) Marine unmanned aerial vehicle device that takes off and land
CN207049435U (en) Siphon piping water intake transporting and hoisting is with regard to bit platform
CN103552655B (en) A kind of 400 tons of lifting pipe laying vessel stinger installation methods waterborne
CN109533220B (en) Combined floating assisting device for large semi-submersible ship and construction method thereof
CN201596891U (en) Tooling for mounting and positioning rudder propeller
CN105644713B (en) Propeller mounting process method
GB2434341A (en) A method and vessel for removing offshore structures
CN204916101U (en) Jack -up construction platform of fixed point floating
CN104802925B (en) The method for dismounting of ocean platform propeller
CN208278276U (en) A kind of floating body, which is stepped on, multiplies stage apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170208

Address after: 100086 Beijing, Zhichun Road, Zhongguancun, No. 106 crown office building, layer, layer 15

Patentee after: BEIJING HAIER GUANGKE DIGITAL TECHNOLOGY Co.,Ltd.

Address before: 266101 Haier Industrial Park, Haier Road, Laoshan District, Shandong, Qingdao, China

Patentee before: Qingdao Haier Technology Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180824

Address after: 266101 Haier Industrial Park, 1 Haier Road, Laoshan District, Qingdao, Shandong.

Patentee after: Qingdao Haier Technology Co., Ltd.

Address before: 100086 Beijing Haidian District Zhichun Road 106 Zhongguancun Crown Plaza office 15 Floor

Patentee before: BEIJING HAIER GUANGKE DIGITAL TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413