CN205116904U - Can build strutting arrangement and large tracts of land tent of large tracts of land tent fast - Google Patents
Can build strutting arrangement and large tracts of land tent of large tracts of land tent fast Download PDFInfo
- Publication number
- CN205116904U CN205116904U CN201520684907.4U CN201520684907U CN205116904U CN 205116904 U CN205116904 U CN 205116904U CN 201520684907 U CN201520684907 U CN 201520684907U CN 205116904 U CN205116904 U CN 205116904U
- Authority
- CN
- China
- Prior art keywords
- tent
- strutting arrangement
- bracing
- large area
- fast construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model provides a can build strutting arrangement and large tracts of land tent of large tracts of land tent fast, includes more than two or two, and the stay tube that is connected through intermediate junction spare, the tip that lies in bottom stay tube be equipped with be used for with the fixed base of surface phase, be fixed with the connector at the top that lies in stay tube topmost. The utility model discloses can select strutting arrangement's quantity to install according to the size of tent area, quick convenient, during the dismouting, it can to go on according to opposite step.
Description
Technical field
The utility model relates to building of outdoor tent, be specifically related to a kind of can the bracing or strutting arrangement of fast construction large area tent and large area tent.
Background technology
In the prior art, because of the needs of various outdoor activity, usual needs build the tent of different area in outdoor or field, particularly some large-area tents, the existing skeleton for building large area tent will adopt multiple mechanical component to be connected with multiple securing member and fetch formation, adopt the quantity of component and securing member many, when building, instrument also will be used to operate, and waste time and energy, dismounting is also inconvenient.
Utility model content
The purpose of this utility model is, for the above-mentioned defect of prior art, provides a kind of and fast construction can build bracing or strutting arrangement and the large area tent of large area tent, adopt this device to build large area tent, just can complete dismounting fast without instrument.
There is provided a kind of can the bracing or strutting arrangement of fast construction large area tent, comprise more than two or two, and by stay pipe that intermediate connector is connected, being provided with the base for fixing with ground in the end being positioned at nethermost stay pipe, being fixed with connector at the top being positioned at uppermost stay pipe.
Above-mentioned can in the bracing or strutting arrangement of fast construction large area tent, the length of described every root stay pipe is equal or unequal, described intermediate connector is a pipe fitting, the centre of its cylindrical is provided with an annular stopper, the body of annular stopper both sides has the lockhole running through body, have at the corresponding position of described stay pipe and corresponding with described lockhole run through through hole, in described lockhole and through hole, be inserted with steady pin.
Above-mentioned can in the bracing or strutting arrangement of fast construction large area tent, a screw member is fixed with at the top being positioned at uppermost stay pipe, described connector comprises a square plate, the center of square plate has the hole that can be enclosed within described screw rod, and the periphery of described square plate is provided with at least one or more for the circular hole that is connected with other component or square hole.
In the bracing or strutting arrangement of fast construction large area tent, two stay pipes be connected to each other can be provided with above-mentioned.
In the bracing or strutting arrangement of fast construction large area tent, three stay pipes be connected to each other can be provided with above-mentioned.
In the bracing or strutting arrangement of fast construction large area tent, four stay pipes be connected to each other can be provided with above-mentioned.
A kind of large area tent adopting above-mentioned bracing or strutting arrangement to build is provided, comprise the quadrate support framework surrounded by many bracing or strutting arrangement intervals, it is characterized in that, also comprise two pieces or polylith tent body, the both sides of the edge of tent body are interval with multiple buttonhole for adopting rope to be connected between two adjacent tent bodies; Covering on above quadrate support framework by the tent connected body, be provided with two or many height higher than support frame in the midfeather of described quadrate support framework, and by the bracing or strutting arrangement of described tent body jack-up.
In above-mentioned large area tent, in the hole of the square plate at the bracing or strutting arrangement top of the described quadrate support framework of formation, be provided with a drawstring, the other end of described drawstring is strained mutually with the angle steel being fixed on ground and is connected.
The utility model tool has the following advantages: the size of the pavilion area that can build as required, select the quantity of bracing or strutting arrangement, first fix the bracing or strutting arrangement of tent periphery, the bracing or strutting arrangement height of tent periphery can adopt the equal structure of stay pipe to support, bracing or strutting arrangement inside tent can select the bracing or strutting arrangement of differing heights to support as required, namely select the quantity of stay pipe, during operation, first the connector at the bracing or strutting arrangement top of the edge of tent and periphery is connected, and stretchingly to fix, multiple bracing or strutting arrangements upwards jack-up inside tent will be positioned at again, thus tent body is tightened, form a large-area tent, again these bracing or strutting arrangements and ground are fixed, the utility model can select the quantity of bracing or strutting arrangement to install according to the size of tent area, quick and convenient, during dismounting, undertaken by contrary step.
Accompanying drawing explanation
Fig. 1 is the utility model support device structure stereogram;
Fig. 2 is the utility model support device structure front view;
Fig. 3 is the enlarged partial sectional view of stay pipe in bracing or strutting arrangement and intermediate attachment member;
Fig. 4 is the stereogram of intermediate attachment member shown in Fig. 3;
Fig. 5 is the sectional view of intermediate attachment member shown in Fig. 4;
Fig. 6 is the square plate structural representation in bracing or strutting arrangement shown in Fig. 1;
Fig. 7 is skeleton drawing when adopting the utility model device to build large area tent;
Fig. 8 is the large area tent schematic diagram adopting the utility model device to put up.
Detailed description of the invention
With reference to shown in Fig. 1-Fig. 6: design a kind of can the bracing or strutting arrangement of fast construction large area tent, comprise more than two or two, and by stay pipe 3 that intermediate connector 2 is connected, being provided with the base 1 for fixing with ground in the end being positioned at nethermost stay pipe 3, being fixed with connector 5 at the top being positioned at uppermost stay pipe 3.
Above-mentioned can in the bracing or strutting arrangement of fast construction large area tent, the length of every root stay pipe 3 can be equal, also can be unequal, described intermediate connector 2 is pipe fittings, the centre of its cylindrical is provided with a upper and lower annular stopper 202,203 for being connected with stay pipe 3 phase plug-in mounting, the body of annular stopper both sides has the lockhole 201 running through body, have at the corresponding position of described stay pipe and corresponding with described lockhole 201 run through through hole, in described lockhole 201 and through hole, be inserted with steady pin, do not illustrate in figure.
Above-mentioned can in the bracing or strutting arrangement of fast construction large area tent, a screw member is fixed with at the top being positioned at uppermost stay pipe 3, described connector comprises a square plate 5, the center of square plate 5 has the hole that can be enclosed within described screw rod, and the periphery of described square plate 5 is provided with at least one or more for the circular hole that is connected with other component or square hole 501,502.
In the bracing or strutting arrangement of fast construction large area tent, two stay pipes be connected to each other 3 can be provided with above-mentioned.
In the bracing or strutting arrangement of fast construction large area tent, three stay pipes be connected to each other 3 can be provided with above-mentioned.
In the bracing or strutting arrangement of fast construction large area tent, four stay pipes be connected to each other 3 can be provided with above-mentioned.
With reference to shown in Fig. 7, Fig. 8: design a kind of large area tent adopting above-mentioned bracing or strutting arrangement to build, comprise the quadrate support framework surrounded by many bracing or strutting arrangements 101 interval, also comprise two pieces or polylith tent body 102,104, the both sides of the edge of tent body are interval with multiple buttonhole 103 for adopting rope to be connected between two adjacent tent bodies; The tent body connected is covered on above quadrate support framework, is provided with two or many height higher than support frame in the midfeather of described quadrate support framework, and by the bracing or strutting arrangement 101 of described tent body 102,104 jack-up.
In above-mentioned large area tent, in the hole of the square plate at the bracing or strutting arrangement top of the described quadrate support framework of formation, be provided with a drawstring 105, the other end of described drawstring is strained with angle steel 106 phase being fixed on ground and is connected.
With reference to Fig. 7, shown in Fig. 8: the tent size that can build as required, select the quantity of bracing or strutting arrangement 101, first fix the bracing or strutting arrangement 101 of tent periphery, the device height of tent periphery can adopt the equal structure of stay pipe to support, bracing or strutting arrangement 101 inside tent can select the bracing or strutting arrangement of differing heights to support as required, namely select the quantity of stay pipe 3, during operation, first by tent body 102, the connector at the edge of 104 and the bracing or strutting arrangement top of periphery connects, and stretchingly to fix, multiple bracing or strutting arrangements 101 upwards jack-up inside tent will be positioned at again, thus can by tent body 102, 104 tighten, form a large-area tent, again the multiple bracing or strutting arrangement inside tent and ground are fixed, the utility model can select the quantity of bracing or strutting arrangement to install according to the size of tent area, quick and convenient, during dismounting, undertaken by contrary step.
The utility model can as required, adopts polylith tent body 102,104 as shown in the figure to carry out assembling into length and the larger tent of area.
Claims (8)
1. one kind can the bracing or strutting arrangement of fast construction large area tent, it is characterized in that, comprise more than two or two, and by stay pipe that intermediate connector is connected, being provided with the base for fixing with ground in the end being positioned at nethermost stay pipe, being fixed with connector at the top being positioned at uppermost stay pipe.
2. according to claim 1 can the bracing or strutting arrangement of fast construction large area tent, it is characterized in that: the length of described every root stay pipe is equal or unequal, described intermediate connector is a pipe fitting, the centre of its cylindrical is provided with an annular stopper, the body of annular stopper both sides has the lockhole running through body, have at the corresponding position of described stay pipe and corresponding with described lockhole run through through hole, in described lockhole and through hole, be inserted with steady pin.
3. according to claim 2 can the bracing or strutting arrangement of fast construction large area tent, it is characterized in that: be fixed with a screw member at the top being positioned at uppermost stay pipe, described connector comprises a square plate, the center of square plate has the hole that can be enclosed within described screw rod, and the periphery of described square plate is provided with at least one or more for the circular hole that is connected with other component or square hole.
4. according to claim 3 can the bracing or strutting arrangement of fast construction large area tent, it is characterized in that: be provided with two stay pipes be connected to each other.
5. according to claim 3 can the bracing or strutting arrangement of fast construction large area tent, it is characterized in that: be provided with three stay pipes be connected to each other.
6. according to claim 3 can the bracing or strutting arrangement of fast construction large area tent, it is characterized in that: be provided with four stay pipes be connected to each other.
7. one kind adopts the large area tent that bracing or strutting arrangement is built as described in claim 1-6, comprise the quadrate support framework surrounded by many bracing or strutting arrangement intervals, it is characterized in that, also comprise two pieces or polylith tent body, the both sides of the edge of tent body are interval with multiple buttonhole for adopting rope to be connected between two adjacent tent bodies; The tent body connected is covered on above quadrate support framework, is provided with two or many height higher than support frame in the midfeather of described quadrate support framework, and by the bracing or strutting arrangement of described tent body jack-up.
8. large area tent according to claim 7, is characterized in that, in the hole of the square plate at the bracing or strutting arrangement top of the described quadrate support framework of formation, be provided with a drawstring, the other end of described drawstring is strained mutually with the angle steel being fixed on ground and is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520684907.4U CN205116904U (en) | 2015-09-07 | 2015-09-07 | Can build strutting arrangement and large tracts of land tent of large tracts of land tent fast |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520684907.4U CN205116904U (en) | 2015-09-07 | 2015-09-07 | Can build strutting arrangement and large tracts of land tent of large tracts of land tent fast |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205116904U true CN205116904U (en) | 2016-03-30 |
Family
ID=55572523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520684907.4U Expired - Fee Related CN205116904U (en) | 2015-09-07 | 2015-09-07 | Can build strutting arrangement and large tracts of land tent of large tracts of land tent fast |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205116904U (en) |
-
2015
- 2015-09-07 CN CN201520684907.4U patent/CN205116904U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204139593U (en) | A kind of Combined cylindrical steel form | |
CN201581631U (en) | Supporting structure of disc locking type scaffold | |
CN205116904U (en) | Can build strutting arrangement and large tracts of land tent of large tracts of land tent fast | |
CN201573769U (en) | Total assembly-piggybacking combined type adjustable support frock | |
CN207749850U (en) | A kind of level(l)ing device of elevator steel structure frame | |
CN202363866U (en) | Tunnel able joint supporting device | |
CN203346897U (en) | Foundation raft embedded steel column positioning support | |
CN202850515U (en) | Regulating-type temporary supporting rod for inclined steel column installation | |
JP5499194B1 (en) | Solar panel mounting base | |
CN202969897U (en) | Ringlock type scaffold joist system | |
CN203373771U (en) | Split tower crane foundation transforming steel bearing platform | |
CN203129565U (en) | Floor connecting device of external scaffolding rigid wall connecting piece | |
CN203201015U (en) | Combined type I-shaped steel component | |
CN201830543U (en) | Combined support device of industrial radiation accelerator | |
CN202104594U (en) | Upright post sleeve fixing structure and child play bed formed by same | |
CN201604937U (en) | Anti-segregability dry-mixed mortar storage tank | |
CN207245046U (en) | A kind of guardrail | |
CN203984320U (en) | A kind of earth anchor photovoltaic bracket | |
CN103832600A (en) | Connection device used for hanging | |
CN206337575U (en) | A kind of basic preburied component applied to greenhouse | |
CN205805131U (en) | A kind of sandy beach tent bracket | |
CN203905020U (en) | Supporting rod connecting piece of foundation pit diagonal brace device | |
CN210531767U (en) | Natural gas conveying pipeline fixing pipe clamp | |
CN201458090U (en) | Spherical water box with round support square steel foot stand | |
CN201458089U (en) | Spherical water box with round support round steel foot stand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 Termination date: 20180907 |
|
CF01 | Termination of patent right due to non-payment of annual fee |