CN205116877U - Transmission line iron tower rag bolt protective cap - Google Patents

Transmission line iron tower rag bolt protective cap Download PDF

Info

Publication number
CN205116877U
CN205116877U CN201520965330.4U CN201520965330U CN205116877U CN 205116877 U CN205116877 U CN 205116877U CN 201520965330 U CN201520965330 U CN 201520965330U CN 205116877 U CN205116877 U CN 205116877U
Authority
CN
China
Prior art keywords
nut
protective cap
transmission line
containment vessel
fixed cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520965330.4U
Other languages
Chinese (zh)
Inventor
徐世泽
卞荣
刘燕平
丁小蔚
章李刚
周文俊
王一枫
郑枫婷
董斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Electric Power Engineering Design Consulting Co
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520965330.4U priority Critical patent/CN205116877U/en
Application granted granted Critical
Publication of CN205116877U publication Critical patent/CN205116877U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a transmission line iron tower rag bolt protective cap. Because the improper more potential safety hazard that exists is cast to the protective cap, very big degree ground is influencing transmission line's safe operation at present. The utility model discloses a characterized in that, connect one in rag bolt's the screw thread section and press the fixed cover of central point on the second nut, the fixed cover of central point, second nut, first nut and flat pad overcoat have a protective housing, the open -top of this protective housing, press on the tower base board bottom, there is 2 -10mm's space between the outer end of the fixed cover of central point and the inner wall of protective housing, is full of in the interior cavity of protective housing and solidifies the filler fast. The utility model discloses a protective cap has the bolt waterproofly, and isolated air prevents the effect of bolt oxidation, and the protective cap solidifies the back, also possesses the function that prevents the rag bolt upper cap nut and lose.

Description

A kind of iron tower of power transmission line anchor bolt protective cap
Technical field
The utility model belongs to the anticorrosion of iron tower of power transmission line stone bolt and antitheft field, especially a kind of iron tower of power transmission line anchor bolt protective cap.
Background technology
Protective cap cast by stone bolt is after losing stone bolt or nut long-play, loosen the accident of falling tower caused in order to preventing, is to the important flow process that shaft tower tower boots are protected after electric power line pole tower group is stood.
According to the storehouse requirement of State Grid Corporation of China's project of transmitting and converting electricity technological standards, cast in process at protective cap, have very high requirement to protective cap with water, sand, stone, cement.And prevention & protection crown portion construction technology is especially added to the strict demand of " protective cap end face should leave drainage grade, end face must not ponding ".Protective cap upper surface should carry out receipts light 3-4 time before solidifying, and casts end and need receive light 2 times, receives once after 2 hours thin.Rear striking time cast by protective cap must not be less than 8 hours.Protective cap should carry out maintenance on request.These requirements, main purpose prevents from casting in process at protective cap, selects not pass a test and construction technology is not in place causes protective cap main body ponding due to raw material, causes the corrosion of tower material, affect circuit security of operation.
The ratio that transmission line of electricity due to current erection is positioned at mountain region is higher, casts protective cap in mountain region, and raw material transport inconvenient and duration is nervous to cause part unit in charge of construction to adopt undesirable rubble, silt particle to fill casting protective cap.And to the technological standards that various needs " slow work fine work " just can reach; part unit in charge of construction especially with after building initial set namely form removal go to the village fair processing, do not note protective cap end face discharge structure; for these newly-built transmission lines of electricity leave potential safety hazard, the corrosion of generation can have a strong impact on the application life of transmission line of electricity.
These potential safety hazards casting improper existence due to protective cap have:
1, protective cap body material is inferior, causes protective cap to ftracture, infiltration, and then causes tower material and stone bolt corrosion.
2, protective cap construction technology operating difficulties, due to the limitation of field construction, is difficult to reach the requirements such as the wiping one's face of technological requirement, maintenance, causes protective cap total quality can not meet technological requirement, affect the protective cap life-span.
3, because the technique level of constructor exists deviation, relevant criterion requires to be difficult to realize, and part protective cap top and the oblique material of side, main volume of timber water, cause because constructor's technological level is low substantially.
4, construction process is improper.Namely department's circuit carries out the phenomenon of protective cap construction after there is tower erection, after shaft tower is stressed, bottom column boots local torsion, causes the avalanche of protective cap cracking.
The existence of these potential safety hazards, affects the safe operation of transmission line of electricity dramatically.
Utility model content
Technical problem to be solved in the utility model is the defect overcoming the existence of above-mentioned prior art; the iron tower of power transmission line anchor bolt protective cap that a kind of structure is improved is provided, to simplify the construction technology that it is cast, convenient construction; and guarantee construction quality, meet protection requirement.
For this reason; the utility model adopts following technical scheme: a kind of iron tower of power transmission line anchor bolt protective cap; comprise tower base plate and the stone bolt running through tower base plate; described stone bolt overlaps the second nut having the circular plain cushion be pressed on tower base plate, be pressed in the first nut on plain cushion and be pressed on the first nut; the thread segment of stone bolt is positioned at above plain cushion; it is characterized in that
On the thread segment of described stone bolt, connection one is pressed in the central point fixed cover on the second nut, and described central point fixed cover, the second nut, the first nut and plain cushion overcoat have a containment vessel, the open top of this containment vessel, and bottom is pressed on tower base plate; There is the space of 2-10mm between the outermost end of described central point fixed cover and the inwall of containment vessel, in the cavity in containment vessel, be full of rapid solidification filler.Center fixed cover is consistent for the center at the center with stone bolt that make containment vessel, avoids containment vessel eccentric.Containment vessel plays mould action when pouring into a mould rapid solidification filler, makes rapid solidification filler rapid solidification in containment vessel, casts and plays some protective effects to filler afterwards.The space of 2-10mm can be avoided containment vessel to be enclosed within stone bolt Shang Shiyu center fixed cover and produce friction, also within the scope of the allowable error that the center of guarantee containment vessel is consistent with the center of stone bolt.
Further, described central point fixed cover comprises cylindrical body and many circumferences and is distributed in positioning strip on body periphery wall, there is the space of 2-10mm between the outer end of described positioning strip and the inwall of containment vessel.Body is used for being connected with stone bolt, and positioning strip is consistent for the center at the center with stone bolt that make containment vessel, avoids containment vessel eccentric.
Further, many described positioning strips are symmetric, and make the center uniformity of the center of containment vessel and stone bolt high.
Further, the external diameter of described body, the first nut and the second nut is all consistent, and is less than the external diameter of plain cushion.
Further, described containment vessel foot bolt above Ground, the top of rapid solidification filler mulched ground foot bolt, uses rapid solidification filler coated completely by stone bolt.
Further, the material of described containment vessel is plastics, because containment vessel mainly plays mould action, therefore to the not too large requirement of the intensity of containment vessel, can reduce construction cost and easy to make with plastics.
Further, the material of central point fixed cover is metal, and after rapid solidification filler solidifies, central point fixed cover also plays booster action to the structure of stone bolt, therefore adopts metal to make.
Protective cap of the present utility model has bolt waterproof, and isolated air, prevents the effect that bolt is oxidized, after protective cap solidifies, also possess the function preventing stone bolt upper cap nut from losing.
Accompanying drawing explanation
Fig. 1-2 is the structural representation of the utility model iron tower of power transmission line anchor bolt protective cap.
Fig. 3 is the top view (not filling rapid solidification filler) of Fig. 2.
In figure, 1-tower base plate, 2-plain cushion, 3-first nut, 4-second nut, 5-body, 6-positioning strip, 7-containment vessel, 8-rapid solidification filler, 9-stone bolt, 10-column foot.
Detailed description of the invention
Below in conjunction with specification drawings and specific embodiments, the utility model is described in more detail.
Iron tower of power transmission line anchor bolt protective cap as shown in the figure; stone bolt 9 runs through tower base plate 1; stone bolt 9 overlaps the second nut 4 having the circular plain cushion 2 be pressed on tower base plate, be pressed in the first nut 3 on plain cushion and be pressed on the first nut; the thread segment of stone bolt 9 is positioned at above plain cushion 2, and the bottom of stone bolt 9 is placed in column foot 10.
On the thread segment of described stone bolt 9, connection one is pressed in the central point fixed cover on the second nut; described central point fixed cover, the second nut 4, first nut 3 and plain cushion 2 overcoat have containment vessel 7; the open top of this containment vessel 7, bottom is pressed on tower base plate 1.
The positioning strip 6 that described central point fixed cover is distributed on body periphery wall by cylindrical body 5 and many circumferences forms, and there is the space of 2-10mm between the outer end of positioning strip 6 and the inwall of containment vessel 7.Rapid solidification filler 8 is full of in cavity in containment vessel 7.The external diameter of body 5, first nut 3 and the second nut 4 is all consistent, and is less than the external diameter of plain cushion 2.
Described containment vessel 7 foot bolt 9 above Ground, the top of rapid solidification filler 8 mulched ground foot bolt 9.The material of containment vessel 7 is plastics, and the material of central point fixed cover is metal.
The casting processes of iron tower of power transmission line anchor bolt protective cap is as follows: on stone bolt, 1) overlap plain cushion, the first nut, the second nut and center fixed cover successively; 2) prefabricated containment vessel is enclosed within outside stone bolt, avoids containment vessel eccentric by center fixed cover, make the center of containment vessel consistent with the center of stone bolt; 3) rapid solidification filler mixes with the ratio of 1:1 with water, then pours into fast in the cavity in containment vessel, is full of whole containment vessel, and compacting.Rapid solidification filler can solidify after 30 minutes substantially, within 7 days, can reach maximum intensity.

Claims (7)

1. an iron tower of power transmission line anchor bolt protective cap; comprise tower base plate (1) and run through the stone bolt (9) of tower base plate; described stone bolt (9) above overlaps the second nut (4) having the circular plain cushion (2) be pressed on tower base plate, be pressed in the first nut (3) on plain cushion and be pressed on the first nut; the thread segment of stone bolt (9) is positioned at plain cushion (2) top; it is characterized in that
On the thread segment of described stone bolt (9), connection one is pressed in the central point fixed cover on the second nut, described central point fixed cover, the second nut (4), the first nut (3) and plain cushion (2) overcoat have a containment vessel (7), the open top of this containment vessel (7), bottom is pressed on tower base plate (1); There is the space of 2-10mm between the outermost end of described central point fixed cover and the inwall of containment vessel (7), in the cavity in containment vessel (7), be full of rapid solidification filler (8).
2. iron tower of power transmission line anchor bolt protective cap according to claim 1; it is characterized in that; described central point fixed cover comprises cylindrical body (5) and many circumferences and is distributed in positioning strip (6) on body periphery wall, there is the space of 2-10mm between the outer end of described positioning strip (6) and the inwall of containment vessel (7).
3. iron tower of power transmission line anchor bolt protective cap according to claim 2, is characterized in that, described many positioning strips (6) are symmetric.
4. iron tower of power transmission line anchor bolt protective cap according to claim 2; it is characterized in that; the external diameter of described body (5), the first nut (3) and the second nut (4) is all consistent, and is less than the external diameter of plain cushion (2).
5. iron tower of power transmission line anchor bolt protective cap according to claim 1; it is characterized in that; described containment vessel (7) foot bolt (9) above Ground, the top of rapid solidification filler (8) mulched ground foot bolt (9).
6. iron tower of power transmission line anchor bolt protective cap according to claim 1, is characterized in that, the material of described containment vessel (7) is plastics.
7. iron tower of power transmission line anchor bolt protective cap according to claim 1, is characterized in that, the material of described central point fixed cover is metal.
CN201520965330.4U 2015-11-27 2015-11-27 Transmission line iron tower rag bolt protective cap Withdrawn - After Issue CN205116877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520965330.4U CN205116877U (en) 2015-11-27 2015-11-27 Transmission line iron tower rag bolt protective cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520965330.4U CN205116877U (en) 2015-11-27 2015-11-27 Transmission line iron tower rag bolt protective cap

Publications (1)

Publication Number Publication Date
CN205116877U true CN205116877U (en) 2016-03-30

Family

ID=55572496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520965330.4U Withdrawn - After Issue CN205116877U (en) 2015-11-27 2015-11-27 Transmission line iron tower rag bolt protective cap

Country Status (1)

Country Link
CN (1) CN205116877U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401777A (en) * 2015-11-27 2016-03-16 浙江浙电经济技术研究院 Foundation bolt protective cap for power transmission line iron tower and casting method of foundation bolt protective cap
CN109826224A (en) * 2019-03-08 2019-05-31 中国能源建设集团安徽省电力设计院有限公司 A kind of sinking well protection wall digging foundation and its construction method for desert region iron tower of power transmission line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401777A (en) * 2015-11-27 2016-03-16 浙江浙电经济技术研究院 Foundation bolt protective cap for power transmission line iron tower and casting method of foundation bolt protective cap
CN105401777B (en) * 2015-11-27 2018-07-03 浙江华云电力工程设计咨询有限公司 A kind of iron tower of power transmission line anchor bolt protective cap and its casting processes
CN109826224A (en) * 2019-03-08 2019-05-31 中国能源建设集团安徽省电力设计院有限公司 A kind of sinking well protection wall digging foundation and its construction method for desert region iron tower of power transmission line

Similar Documents

Publication Publication Date Title
CN205298222U (en) Rust -resistant metal protection cap of transmission line iron tower rag bolt
CN205116877U (en) Transmission line iron tower rag bolt protective cap
CN105178349B (en) A kind of iron tower foundation
CN209509012U (en) It is a kind of for connecting the suspension column structure of concrete foundation and steel column
CN206830383U (en) Tower barrel of wind generating set basis
CN206815199U (en) A kind of Bridge Crack bracing means
CN105401777B (en) A kind of iron tower of power transmission line anchor bolt protective cap and its casting processes
CN210558914U (en) Inspection shaft hoisting assembly
CN209369826U (en) A kind of shield duct piece ruggedized construction
CN208982078U (en) A kind of mining anchor dispensing device
CN202506811U (en) Mould for casting locking ring
CN203140716U (en) Centrifugal roller core punching hopper
CN103817316B (en) Cast iron quantitative seat bag cast pushing off the slag circle and preparation method thereof
CN203034484U (en) Novel anti-floating locking apparatus for inspection well cover
CN207727606U (en) A kind of wind driven generator base anchor bolt ruggedized construction
CN220687808U (en) Power transmission line protective cap
CN206500616U (en) It is a kind of to reduce the remaining ladle of molten steel note
CN203625915U (en) Embedded creeping formwork structure in caisson prefabrication construction
CN214497232U (en) Novel public road bridge roof beam foundation pile is consolidated device
CN205530248U (en) Retrieve anchor rope device of uninstalling outward
CN203891052U (en) Novel electric transmission line pole and tower anchor bolt protective cover
CN203466550U (en) Novel epoxy pouring protective casing of cable intermediate joint
CN206716963U (en) A kind of button bucket type sprue cup, the casting mould of rising head
CN106639610A (en) Iron tower tail edge continuous leveling method
CN202741691U (en) Planar sand bottom box for casting resin sand

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Hangzhou City, Zhejiang province 310014 City Huadian Zhaohui Lane 1, a 6 storey building, 7 floor

Patentee after: Zhejiang Huayun Electric Power Engineering Design Consulting Co., Ltd.

Patentee after: State Power Networks Co

Patentee after: State Grid Zhejiang Electric Power Company Economic Technical Institute

Address before: Hangzhou City, Zhejiang province 310014 City Huadian Zhaohui Lane 1, a 6 storey building, 7 floor

Patentee before: Zhejiang Zhedian Economic Technology Research Institute

Patentee before: State Power Networks Co

Patentee before: State Grid Zhejiang Electric Power Company Economic Technical Institute

AV01 Patent right actively abandoned

Granted publication date: 20160330

Effective date of abandoning: 20180703

AV01 Patent right actively abandoned