CN205116030U - No. 0 three angle brackets of piece of box girder bridge have just been constructed in succession - Google Patents
No. 0 three angle brackets of piece of box girder bridge have just been constructed in succession Download PDFInfo
- Publication number
- CN205116030U CN205116030U CN201520826613.0U CN201520826613U CN205116030U CN 205116030 U CN205116030 U CN 205116030U CN 201520826613 U CN201520826613 U CN 201520826613U CN 205116030 U CN205116030 U CN 205116030U
- Authority
- CN
- China
- Prior art keywords
- fixed
- triangular bracket
- bar
- pier body
- box girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- 229920000742 Cotton Polymers 0.000 claims abstract description 5
- 239000002023 wood Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 23
- 238000000034 method Methods 0.000 abstract description 13
- 230000000694 effects Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
连续刚构箱梁桥0号块三角托架固定在墩身上,箱梁安装固定在墩身上;连续刚构箱梁桥0号块三角托架包括外三角托架、内三角托架、固定连接结构,外三角托架固定在墩身上,内三角托架固定在外三角托架内,外三角托架、内三角托架、墩身通过固定连接结构连接;第一精轧螺纹钢筋、第二精轧螺纹钢筋与墩身固定处的连接孔内填充有棉纱。本实用新型的三角托架能够有效地替代落传统落地支架法、钢管立柱法等施工方法,既节省了开支,又能取得相同的效果,同时又节省了时间,加快了施工进度。
The triangular bracket of block 0 of the continuous rigid frame box girder bridge is fixed on the pier body, and the box girder is installed and fixed on the pier body; the triangular bracket of block 0 of the continuous rigid frame box girder bridge includes the outer structure, the outer triangular bracket is fixed on the pier body, the inner triangular bracket is fixed in the outer triangular bracket, the outer triangular bracket, the inner triangular bracket, and the pier body are connected by a fixed connection structure; the first fine-rolled threaded steel bar, the second fine-rolled Cotton yarn is filled in the connection hole where the rolled threaded steel bar is fixed to the pier body. The triangular bracket of the utility model can effectively replace the construction methods such as the traditional floor support method and the steel pipe column method, which not only saves expenses, but also achieves the same effect, saves time and speeds up the construction progress.
Description
技术领域technical field
本实用新型连续钢构箱梁桥0号块三角托架,适用于铁路、公路悬臂浇筑梁桥的0#块和现浇段施工,尤其在山岭重丘地区、高墩、水上作业或地势陡峭、地基软弱等情况下,具有广泛的适用性。The utility model continuous steel box girder bridge No. 0 block triangular bracket is suitable for the construction of 0# block and cast-in-place section of cantilever pouring girder bridges on railways and highways, especially in mountainous and hilly areas, high piers, water operations or steep terrain It has wide applicability under conditions such as weak ground and weak ground.
背景技术Background technique
目前0号块段施工传统施工方法有落地支架法、钢管立柱法等施工方法,如现浇0#块在山岭重丘地区,山坡陡峭、山体稳定性差,墩身较高,采用落地支架法在山岭重丘地区施工存在较大的安全风险,同时由于墩身较高,落地支架弹性变形量大,不足以保证边跨现浇段混凝土浇筑质量。采用钢管立柱法同样存在基础难以处理、机械安装作业困难等施工难题,由于山体的不稳定性,施工中同样存在较大的安全风险。两种传统的施工方法在山岭重丘地区都存在着较大的安全风险,同时工作量大,操作困难,从工程进度及经济的角度也不宜山岭重丘地区0#块现浇段的施工。At present, the traditional construction methods of No. 0 block section include floor support method and steel pipe column method. Construction in mountainous and hilly areas presents greater safety risks. At the same time, due to the high pier body, the elastic deformation of the floor support is large, which is not enough to ensure the quality of concrete pouring for the side span cast-in-place section. The steel pipe column method also has construction problems such as difficult foundation handling and mechanical installation operations. Due to the instability of the mountain, there are also greater safety risks during construction. Both traditional construction methods have great safety risks in mountainous and hilly areas. At the same time, the workload is heavy and the operation is difficult. From the perspective of project progress and economy, they are not suitable for the construction of 0# block cast-in-place section in mountainous and hilly areas.
发明内容Contents of the invention
为了克服上述问题,本实用新型提出了一种安装便捷三角托架连接贝雷横梁的形式做支架平台施工连续刚构箱梁桥0号块,有效解决了上述问题,而且还能保施工质量,节省费用,缩短施工时间,加快施工进度。In order to overcome the above-mentioned problems, the utility model proposes a form of conveniently installing a triangular bracket connected to the Bailey beam as a support platform for construction of the No. 0 block of the continuous rigid box girder bridge, which effectively solves the above-mentioned problems, and can also ensure the construction quality. Save costs, shorten construction time, and speed up construction progress.
本实用新型托架解决其技术问题所采用的技术方案是:The technical scheme that the utility model bracket solves its technical problem adopts is:
墩身通过预埋构件安装三角托架,三角托架连接贝雷横梁的形式做支架平台施工,支撑挂篮底篮系统及翼缘板桁架。墩身部位翼缘板位置结构尺寸特殊部位,采用定型钢模,内顶模板支架采用钢管支架,砼采用一次浇筑成型的方法。The pier body is equipped with triangular brackets through pre-embedded components, and the triangular brackets are connected to Bailey beams as support platform construction, supporting the bottom basket system of the hanging basket and the flange plate truss. For the special part of the pier body flange plate position and structure size, the shaped steel mold is used, the inner roof formwork support is steel pipe support, and the concrete is cast in one time.
连续刚构箱梁桥0号块三角托架1固定在墩身3上,箱梁2安装固定在墩身3上;连续刚构箱梁桥0号块三角托架1包括外三角托架、内三角托架、固定连接结构,外三角托架固定在墩身3上,内三角托架固定在外三角托架内,外三角托架、内三角托架、墩身3通过固定连接结构连接;The triangular bracket 1 of block 0 of the continuous rigid frame box girder bridge is fixed on the pier body 3, and the box girder 2 is installed and fixed on the pier body 3; the triangular bracket 1 of block 0 of the continuous rigid frame box girder bridge includes the outer triangular bracket, The inner triangular bracket and the fixed connection structure, the outer triangular bracket is fixed on the pier body 3, the inner triangular bracket is fixed in the outer triangular bracket, the outer triangular bracket, the inner triangular bracket, and the pier body 3 are connected through a fixed connection structure;
所述外三角托架包括外竖直杆7、外水平杆8、外斜撑杆9;所述内三角托架包括内竖直杆11、内斜撑杆12、内水平杆13;固定连接结构包括第一连接节点4、第一精轧螺纹钢筋5、第一分配梁6、第二连接节点10、第三连接节点14、第二分配梁15、第三分配梁16、第二精轧螺纹钢筋17、方木18;Described outer triangular bracket comprises outer vertical bar 7, outer horizontal bar 8, outer slanting strut 9; Described inner triangular bracket includes inner vertical bar 11, inner slanting strut 12, inner horizontal bar 13; fixedly connected The structure includes a first connection node 4, a first finish-rolled rebar 5, a first distribution beam 6, a second connection node 10, a third connection node 14, a second distribution beam 15, a third distribution beam 16, a second finish-rolled Rebar 17, square wood 18;
外竖直杆7、外水平杆8、外斜撑杆9相互连接固定组成第一直角三角形,外竖直杆7、外水平杆8通过第一连接节点4固定,外斜撑杆9两端分别通过第二连接节点10、第三连接节点14与外水平杆8、外竖直杆7固定,该第一直角三角形的直角边上下两端通过第一精轧螺纹钢筋5、第二精轧螺纹钢筋17与墩身3固定;The outer vertical bar 7, the outer horizontal bar 8, and the outer slanting strut 9 are mutually connected and fixed to form a first right-angled triangle. The outer vertical bar 7 and the outer horizontal bar 8 are fixed through the first connecting node 4, and the two ends of the outer slanting strut 9 Respectively by the second connection node 10, the third connection node 14 and the outer horizontal bar 8, the outer vertical bar 7 are fixed, the upper and lower ends of the right-angled side of the first right-angled triangle pass through the first finish-rolled threaded steel bar 5, the second finish-rolled The threaded steel bar 17 is fixed to the pier body 3;
内竖直杆11、内斜撑杆12、内水平杆13相互连接固定组成第二直角三角形;第二直角三角形安装在第一直角三角形内,所述第二直角三角形的内斜撑杆12与外斜撑杆9相平行;内竖直杆11与外水平杆8、外斜撑杆9连接;内水平杆13与外竖直杆7、外斜撑杆9连接;内斜撑杆12与外竖直杆7、外水平杆8连接;The inner vertical bar 11, the inner slanting strut 12, and the inner horizontal bar 13 are connected and fixed to form a second right triangle; the second right triangle is installed in the first right triangle, and the inner slanting strut 12 of the second right triangle and The outer slanting struts 9 are parallel; the inner vertical bar 11 is connected with the outer horizontal bar 8 and the outer slanting strut 9; the inner horizontal bar 13 is connected with the outer vertical bar 7 and the outer slanting strut 9; the inner slanting strut 12 is connected with Outer vertical bar 7, outer horizontal bar 8 are connected;
外竖直杆7的底部通过第三分配梁16固定在方木18上;The bottom of the outer vertical bar 7 is fixed on the square timber 18 by the third distribution beam 16;
第一精轧螺纹钢筋5的端部穿过外竖直杆7且通过第一分配梁6固定;第二精轧螺纹钢筋17的端部穿过方木18且通过第二分配梁15固定;The end of the first finish-rolled rebar 5 passes through the outer vertical bar 7 and is fixed by the first distribution beam 6; the end of the second finish-rolled rebar 17 passes through the square log 18 and is fixed by the second distribution beam 15;
第一精轧螺纹钢筋5、第二精轧螺纹钢筋17与墩身3固定处的连接孔20内填充有棉纱19。Cotton yarn 19 is filled in the connection hole 20 where the first finish-rolled threaded steel bar 5 and the second finished-rolled threaded steel bar 17 are fixed to the pier body 3 .
本实用新型的有益效果是:The beneficial effects of the utility model are:
1、本实用新型的三角托架,材料简单、加工容易,只需要槽钢、工字钢、等,可现场就地取材,加工方式也只有铆接和焊接;1. The triangular bracket of the present invention has simple materials and is easy to process. It only needs channel steel, I-beam, etc., which can be obtained on site, and the processing methods are only riveting and welding;
2、本实用新型的三角托架连接贝雷横梁的形式做托架平台,一方面充分利用了高强材料,保证了工程质量;另一方面,降低了施工难度。工字钢则以伸臂梁的形式承受翼缘板相对较小荷载的同时,部分抵消了主跨内的正弯矩。2. The triangular bracket of the utility model is connected to the Bailey beam as the bracket platform. On the one hand, high-strength materials are fully utilized to ensure the quality of the project; on the other hand, the difficulty of construction is reduced. While the I-beam bears the relatively small load of the flange plate in the form of an outrigger beam, it partially offsets the positive bending moment in the main span.
3、本实用新型的三角托架,与落地支架及钢管立柱体系相比,大大降低了费用的投入,只投入了一些简单的材料费和人工费。3. Compared with the floor support and steel pipe column system, the triangular bracket of the present utility model greatly reduces the cost input, and only some simple material costs and labor costs are invested.
4、本实用新型的三角托架,通过预埋构件安装三角托架,取消了支架,解决了高墩和水上作业的施工难题。4. The triangular bracket of the present utility model installs the triangular bracket through pre-embedded components, cancels the bracket, and solves the construction problems of high piers and water operations.
5、本实用新型的三角托架,安装和拆除工序简单,而且拆除下来的材料可二次利用。5. The triangular bracket of the present invention has simple installation and removal procedures, and the removed materials can be reused.
6、本实用新型的三角托架,对环境、水土无污染,起到了节能减排的作用,取消了地基处理及搭设落地式支架工序,具有良好的经济效益及缩短施工工期。6. The triangular bracket of the utility model has no pollution to the environment, water and soil, plays the role of energy saving and emission reduction, cancels the process of foundation treatment and erecting floor support, has good economic benefits and shortens the construction period.
因此,本实用新型的三角托架能够有效地替代落传统落地支架法、钢管立柱法等施工方法,既节省了开支,又能取得相同的效果,同时又节省了时间,加快了施工进度。Therefore, the triangular bracket of the utility model can effectively replace the construction methods such as the traditional floor support method and the steel pipe column method, which not only saves expenses, but also achieves the same effect, saves time and speeds up the construction progress.
附图说明Description of drawings
图1为三角托架的正面结构示意图。Figure 1 is a schematic diagram of the front structure of the triangular bracket.
图2为三角托架的侧面结构示意图。Fig. 2 is a schematic diagram of the side structure of the triangular bracket.
图3为三角托架的结构示意图。Fig. 3 is a schematic diagram of the structure of the triangular bracket.
图4为精轧螺纹钢筋与墩身固定处的连接结构示意图。Fig. 4 is a schematic diagram of the connection structure between the finish-rolled threaded steel bar and the fixed part of the pier body.
图中:1、连续刚构箱梁桥0号块三角托架,2、箱梁,3、墩身,4、第一连接节点,5、第一精轧螺纹钢筋,6、第一分配梁,7、外竖直杆,8、外水平杆,9、外斜撑杆,10、第二连接节点,11、内竖直杆,12、内斜撑杆,13、内水平杆,14、第三连接节点,15、第二分配梁,16、第三分配梁,17、第二精轧螺纹钢筋,18、方木,19、棉纱,20、连接孔。In the figure: 1. The triangular bracket of No. 0 block of the continuous rigid frame box girder bridge, 2. The box girder, 3. The pier body, 4. The first connection node, 5. The first finish-rolled threaded steel bar, 6. The first distribution beam , 7, the outer vertical bar, 8, the outer horizontal bar, 9, the outer diagonal strut, 10, the second connecting node, 11, the inner vertical bar, 12, the inner diagonal strut, 13, the inner horizontal bar, 14, The third connection node, 15, the second distribution beam, 16, the third distribution beam, 17, the second finish-rolled threaded steel bar, 18, square wood, 19, cotton yarn, 20, connection hole.
具体实施方式detailed description
如图1-4所示,三角托架施工墩身预埋钢板安装、预留拉孔精轧螺纹钢穿设、分配梁安装整体式三角托架安装贝雷横梁安装支撑底模系统安装模板安装托架预压0号块段施工。本托架的结构尺寸是通过Midascivil软件的计算确定的,是满足受力要求的。As shown in Figure 1-4, the installation of pre-embedded steel plates for the pier body of the triangular bracket construction, the piercing of fine-rolled rebar with reserved holes, and the installation of distribution beams. Bracket preloading No. 0 block construction. The structural size of the bracket is determined by the calculation of Midascivil software, which meets the force requirements.
连续刚构箱梁桥0号块三角托架1固定在墩身3上,箱梁2安装固定在墩身3上;连续刚构箱梁桥0号块三角托架1包括外三角托架、内三角托架、固定连接结构,外三角托架固定在墩身3上,内三角托架固定在外三角托架内,外三角托架、内三角托架、墩身3通过固定连接结构连接;The triangular bracket 1 of block 0 of the continuous rigid frame box girder bridge is fixed on the pier body 3, and the box girder 2 is installed and fixed on the pier body 3; the triangular bracket 1 of block 0 of the continuous rigid frame box girder bridge includes the outer triangular bracket, The inner triangular bracket and the fixed connection structure, the outer triangular bracket is fixed on the pier body 3, the inner triangular bracket is fixed in the outer triangular bracket, the outer triangular bracket, the inner triangular bracket, and the pier body 3 are connected through a fixed connection structure;
所述外三角托架包括外竖直杆7、外水平杆8、外斜撑杆9;所述内三角托架包括内竖直杆11、内斜撑杆12、内水平杆13;固定连接结构包括第一连接节点4、第一精轧螺纹钢筋5、第一分配梁6、第二连接节点10、第三连接节点14、第二分配梁15、第三分配梁16、第二精轧螺纹钢筋17、方木18;Described outer triangular bracket comprises outer vertical bar 7, outer horizontal bar 8, outer slanting strut 9; Described inner triangular bracket includes inner vertical bar 11, inner slanting strut 12, inner horizontal bar 13; fixedly connected The structure includes a first connection node 4, a first finish-rolled rebar 5, a first distribution beam 6, a second connection node 10, a third connection node 14, a second distribution beam 15, a third distribution beam 16, a second finish-rolled Rebar 17, square wood 18;
外竖直杆7、外水平杆8、外斜撑杆9相互连接固定组成第一直角三角形,外竖直杆7、外水平杆8通过第一连接节点4固定,外斜撑杆9两端分别通过第二连接节点10、第三连接节点14与外水平杆8、外竖直杆7固定,该第一直角三角形的直角边上下两端通过第一精轧螺纹钢筋5、第二精轧螺纹钢筋17与墩身3固定;The outer vertical bar 7, the outer horizontal bar 8, and the outer slanting strut 9 are mutually connected and fixed to form a first right-angled triangle. The outer vertical bar 7 and the outer horizontal bar 8 are fixed through the first connecting node 4, and the two ends of the outer slanting strut 9 Respectively by the second connection node 10, the third connection node 14 and the outer horizontal bar 8, the outer vertical bar 7 are fixed, the upper and lower ends of the right-angled side of the first right-angled triangle pass through the first finish-rolled threaded steel bar 5, the second finish-rolled The threaded steel bar 17 is fixed to the pier body 3;
内竖直杆11、内斜撑杆12、内水平杆13相互连接固定组成第二直角三角形;第二直角三角形安装在第一直角三角形内,所述第二直角三角形的内斜撑杆12与外斜撑杆9相平行;内竖直杆11与外水平杆8、外斜撑杆9连接;内水平杆13与外竖直杆7、外斜撑杆9连接;内斜撑杆12与外竖直杆7、外水平杆8连接;The inner vertical bar 11, the inner slanting strut 12, and the inner horizontal bar 13 are connected and fixed to form a second right triangle; the second right triangle is installed in the first right triangle, and the inner slanting strut 12 of the second right triangle and The outer slanting struts 9 are parallel; the inner vertical bar 11 is connected with the outer horizontal bar 8 and the outer slanting strut 9; the inner horizontal bar 13 is connected with the outer vertical bar 7 and the outer slanting strut 9; the inner slanting strut 12 is connected with Outer vertical bar 7, outer horizontal bar 8 are connected;
外竖直杆7的底部通过第三分配梁16固定在方木18上;The bottom of the outer vertical bar 7 is fixed on the square timber 18 by the third distribution beam 16;
第一精轧螺纹钢筋5的端部穿过外竖直杆7且通过第一分配梁6固定;第二精轧螺纹钢筋17的端部穿过方木18且通过第二分配梁15固定;The end of the first finish-rolled rebar 5 passes through the outer vertical bar 7 and is fixed by the first distribution beam 6; the end of the second finish-rolled rebar 17 passes through the square log 18 and is fixed by the second distribution beam 15;
第一精轧螺纹钢筋5、第二精轧螺纹钢筋17与墩身3固定处的连接孔20内填充有棉纱19。Cotton yarn 19 is filled in the connection hole 20 where the first finish-rolled threaded steel bar 5 and the second finished-rolled threaded steel bar 17 are fixed to the pier body 3 .
因此,本实用新型的三角托架能够有效地替代落传统落地支架法、钢管立柱法等施工方法,既节省了开支,又能取得相同的效果,同时又节省了时间,加快了施工进度。Therefore, the triangular bracket of the utility model can effectively replace the construction methods such as the traditional floor support method and the steel pipe column method, which not only saves expenses, but also achieves the same effect, saves time and speeds up the construction progress.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520826613.0U CN205116030U (en) | 2015-10-21 | 2015-10-21 | No. 0 three angle brackets of piece of box girder bridge have just been constructed in succession |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520826613.0U CN205116030U (en) | 2015-10-21 | 2015-10-21 | No. 0 three angle brackets of piece of box girder bridge have just been constructed in succession |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205116030U true CN205116030U (en) | 2016-03-30 |
Family
ID=55571651
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520826613.0U Expired - Fee Related CN205116030U (en) | 2015-10-21 | 2015-10-21 | No. 0 three angle brackets of piece of box girder bridge have just been constructed in succession |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205116030U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105839540A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Arrangement method and composition structure for rigid frame bridge zero section non-welded support |
| CN108939825A (en) * | 2017-05-17 | 2018-12-07 | 大唐环境产业集团股份有限公司 | A kind of operating maintenance platform structure of desulfuration absorbing tower |
| CN111021266A (en) * | 2019-11-19 | 2020-04-17 | 中国铁建大桥工程局集团有限公司 | A bracket for assembling a large cantilever of a three-main truss double-layer steel truss arch bridge and an assembling method |
| CN113585082A (en) * | 2021-07-31 | 2021-11-02 | 陈霖 | Pier foundation bridge construction platform |
-
2015
- 2015-10-21 CN CN201520826613.0U patent/CN205116030U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105839540A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Arrangement method and composition structure for rigid frame bridge zero section non-welded support |
| CN108939825A (en) * | 2017-05-17 | 2018-12-07 | 大唐环境产业集团股份有限公司 | A kind of operating maintenance platform structure of desulfuration absorbing tower |
| CN111021266A (en) * | 2019-11-19 | 2020-04-17 | 中国铁建大桥工程局集团有限公司 | A bracket for assembling a large cantilever of a three-main truss double-layer steel truss arch bridge and an assembling method |
| CN113585082A (en) * | 2021-07-31 | 2021-11-02 | 陈霖 | Pier foundation bridge construction platform |
| CN113585082B (en) * | 2021-07-31 | 2023-04-28 | 浙江博时市政园林建设有限公司 | Pier foundation bridge construction platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN215254604U (en) | Template support system encorbelments | |
| CN103572708B (en) | Large-span concrete continuous girder bridge side span folding device and method | |
| CN204690605U (en) | The self-propelled triangular truss hanging basket of large span beam bridge | |
| CN102912738B (en) | Overall prepressing device for hanging basket | |
| CN105803947B (en) | A kind of cast-in-situ box girder gate-type full framing whole lateral moving system and method for traversing | |
| CN205116030U (en) | No. 0 three angle brackets of piece of box girder bridge have just been constructed in succession | |
| CN203923914U (en) | Solely stub bent cap support | |
| CN201762663U (en) | Reinforced concrete superposed beam wing board support | |
| CN107905124B (en) | A kind of symmetrical expression rigid frame-continuous girder construction technology | |
| CN210216163U (en) | Self-supporting cantilever formwork support system | |
| CN110409318A (en) | A kind of large span freely-supported steel reinforced concrete bondbeam assembling method | |
| CN203222738U (en) | Steel pipe latticed column temporary buttress supporting device | |
| CN103469735B (en) | The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation | |
| CN205242278U (en) | A triangle string basket method is hanged and is watered device for deck bridge construction | |
| CN105155428A (en) | Operating-railway-crossing construction method for large assembly-type prestress concrete continuous T beam | |
| CN207177255U (en) | The detachable suspension scaffold of concrete wall | |
| CN103510466B (en) | Wet joint construction method for T-shaped beam bridge deck system | |
| CN103866692A (en) | Novel assembling method for bent cap bearing frame | |
| CN106939557B (en) | A kind of pin-connected panel bracket casting platform of brace support | |
| CN204940861U (en) | Adjustable case beam side steel bracket | |
| CN102733599A (en) | Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam | |
| CN222990595U (en) | Multifunctional portal for suspension bridge construction | |
| CN205134192U (en) | Cast -in -place roof beam support frame of internal force balanced type is fallen to ground to non - | |
| RU146202U1 (en) | Dismountable flyovers for the quick arrangement of bridge crossings | |
| CN208009267U (en) | A kind of middle cross beam tensioning protective platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 Termination date: 20211021 |