CN205102142U - Take pneumatic rapping device's boiler equipment - Google Patents
Take pneumatic rapping device's boiler equipment Download PDFInfo
- Publication number
- CN205102142U CN205102142U CN201520809448.8U CN201520809448U CN205102142U CN 205102142 U CN205102142 U CN 205102142U CN 201520809448 U CN201520809448 U CN 201520809448U CN 205102142 U CN205102142 U CN 205102142U
- Authority
- CN
- China
- Prior art keywords
- heating
- chamber
- heater
- positioning
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Air Supply (AREA)
Abstract
The utility model discloses a take pneumatic rapping device's boiler equipment, including heating device and rapping device, the heating device both sides are equipped with rapping device respectively, in operation, heating device heats the gas that heats in the cavity through being responsible for the heating branch pipe that communicates with the heating, simultaneously, rapping device strikes the heating and is responsible for the tip, rocking of heating branch pipe tube bank arouse, , on one han, heating device rocks the deposition that makes attached to a heating tube -surface and drops, prevent that the deposition from adhering to on the heating device surface for a long time, influence effect of thermal conductivity, increase the through -flow cross -section of heating flue gas, on the other hand, vibrations take place for heating device in the heating process, improve and the friction of flue gas on every side, further improve heat exchange efficiency. The utility model provides a take pneumatic rapping device's boiler equipment, simple structure, reasonable in design increases heating device's coefficient of heat transfer to increase the through -flow cross -section of flue gas, thereby improve heat exchange efficiency, reduce the draught fan power consumption.
Description
Technical field
The utility model relates to technical field of heating, particularly relates to a kind of boiler plant with pneumatic vibrator device.
Background technology
When boiler normally runs, the high-temperature flue gas in stove carries out heat exchange through evaporating heating surface, three-stagesuperheater, two-stage superheater, primary superheater, evaporation heating and economizer successively.Due to the complicated component of rubbish, contain a large amount of dusts in flue gas, in long heat exchanging process, dust can attach on tube wall simultaneously.Time is longer attach more, the dust stratification of tube wall is more and more thicker, and heat transfer coefficient reduces, and causes vapor (steam) temperature low, and flue gas cross-sectional flow area reduces, and air-introduced machine power is large, power consumption is high.
Utility model content
For solving the technical problem existed in background technology, the utility model proposes a kind of boiler plant with pneumatic vibrator device.
A kind of boiler plant with pneumatic vibrator device that the utility model proposes, comprising: casing, at least one heater, at least one rapping apparatus;
Box house is provided with dividing plate, and the space in described casing is divided into the first chamber and the second chamber by dividing plate, and dividing plate is provided with at least one positioning through hole, and the sidewall of the second chamber is provided with air inlet and gas outlet, is provided with heater installing rack in the second chamber;
Heater is positioned at the second chamber of casing, it comprises heating supervisor and multiplely adds hot leg pipe, heating supervisor is axial arranged and be arranged on heater installing rack along positioning through hole, add hot leg pipe and be vertically arranged on heating supervisor top, multiple add hot leg pipe along heating supervisor length direction distribution and bottom be responsible for be communicated with heating respectively;
Rapping apparatus comprises driving mechanism and vibrating rod, and driving mechanism is positioned at the first chamber, and vibrating rod one end is connected with driving mechanism, and the other end is responsible near dividing plate one end against heating through positioning through hole.
Preferably, the first dividing plate and second partition is provided with in casing, space in described casing is divided into the first chamber arranged successively by the first dividing plate and second partition, second chamber, 3rd chamber, first dividing plate is provided with multiple first positioning through hole, second partition is provided with multiple second positioning through hole, multiple first heater and multiple secondary heating mechanism is provided with in second chamber, each first heater is positioned on the axis of first positioning through hole, each secondary heating mechanism is positioned on the axis of second positioning through hole, multiple first rapping apparatus is provided with in first chamber, each first rapping apparatus is by a corresponding first heater of the first positioning through hole rapping, multiple second rapping apparatus is provided with in 3rd chamber, each second rapping apparatus is by a corresponding secondary heating mechanism of the second positioning through hole rapping.
Preferably, first heater comprise horizontally disposed first heating supervisor and vertically arrange on the first heating supervisor multiple first add hot leg pipe, secondary heating mechanism comprise horizontally disposed second heating supervisor and vertically arrange on the second heating supervisor multiple second add hot leg pipe, the first heating supervisor and second heats supervisor and is arranged in parallel.
Preferably, driving mechanism adopts pneumatic drive mechanism.
Preferably, be provided with ash groove in the second chamber, it is positioned at below heater.
In the utility model, the boiler plant of the band pneumatic vibrator device proposed, comprise heater and rapping apparatus, heater both sides are respectively equipped with rapping apparatus, during work, heater heats the gas in heated chamber by being responsible for heating the hot leg pipe that adds be communicated with, while heating, rapping apparatus knocks heating supervisor end, cause and add rocking of hot leg pipe tube bank, on the one hand, heater rocks and makes to be attached to the dust stratification adding hot leg pipe surface and drop, prevent dust stratification from adhering to for a long time at heating device surface, affect heat-conducting effect, add heat smoke passage section, on the other hand, heater shakes in heating process, improve the friction with surrounding flue gas, further raising heat exchanger effectiveness.By the boiler plant of the band pneumatic vibrator device of above-mentioned optimal design, structure is simple, reasonable in design, prevent dust stratification from adhering on the heating, thus increase the heat transfer coefficient of heater, and increase flue gas passage section, thus raising heat exchanger effectiveness, reduce air-introduced machine power consumption.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of boiler plant with pneumatic vibrator device that the utility model proposes.
Fig. 2 is the side-looking structural representation of a kind of boiler plant with pneumatic vibrator device of Fig. 1.
Detailed description of the invention
As illustrated in fig. 1 and 2, Fig. 1 is the structural representation of a kind of boiler plant with pneumatic vibrator device that the utility model proposes, and Fig. 2 is the side-looking structural representation of a kind of boiler plant with pneumatic vibrator device of Fig. 1.
With reference to Fig. 1 and 2, a kind of boiler plant with pneumatic vibrator device that the utility model proposes, comprising: casing 1, multiple first heater 2, multiple secondary heating mechanism 3, multiple first rapping apparatus 4, multiple second rapping apparatus 5, ash groove 6;
The first dividing plate 11 and second partition 12 is provided with in casing 1, space in described casing 1 is divided into the first chamber, the second chamber, the 3rd chamber arranged successively by the first dividing plate 11 and second partition 12, first dividing plate 11 is provided with multiple first positioning through hole, second partition 12 is provided with multiple second positioning through hole, the sidewall of the second chamber is provided with air inlet and gas outlet, is provided with heater installing rack 13 in the second chamber;
In the second chamber that first heater 2 and secondary heating mechanism 3 are horizontally set on casing 1 and the two interval is arranged, first heater 2 comprises the first heating supervisor 21 and multiple first and adds hot leg pipe 22, first heating supervisor 21 is axial arranged and be arranged on heater installing rack 13 along the first positioning through hole, first adds hot leg pipe 22 is vertically arranged on above the first heating supervisor 21, multiple first add hot leg pipe 22 along the first heating supervisor 21 length direction distribution and bottom heat supervisor 21 with first respectively and be communicated with, secondary heating mechanism 3 comprises the second heating supervisor 31 and multiple second and adds hot leg pipe 32, second heating supervisor 31 is axial arranged and be arranged on heater installing rack 13 along the second positioning through hole, second adds hot leg pipe 32 is vertically arranged on above the second heating supervisor 31, multiple second add hot leg pipe 32 along the second heating supervisor 31 length direction distribution and bottom heat supervisor 31 with second respectively and be communicated with,
First rapping apparatus 4 comprises the first driving mechanism 41 and the first vibrating rod 42, first driving mechanism 41 is positioned at the first chamber, it adopts pneumatic drive mechanism, first vibrating rod 42 one end is connected with the first driving mechanism 41, the other end heats supervisor 21 near first dividing plate 11 one end through the first positioning through hole against first, second rapping apparatus 5 comprises the second driving mechanism 51 and the second vibrating rod 52, second driving mechanism 51 is positioned at the 3rd chamber, it adopts pneumatic drive mechanism, second vibrating rod 52 one end is connected with the second driving mechanism 51, the other end heats supervisor 31 near second partition 12 one end through the second positioning through hole against second,
Ash groove 6 is positioned at the second chamber, and it is positioned at below first heater 2 and secondary heating mechanism 3.
The boiler plant of the band pneumatic vibrator device of the present embodiment in the course of the work, gas to be heated enters in the second chamber from air inlet, by carrying out heat exchange heat with the hot leg pipe that adds of heater, then discharge from gas outlet, simultaneously, rapping apparatus knock heating supervisor end, cause add hot leg pipe tube bank along heating charge shaft to shake, make the dust stratification adding hot leg pipe surface drop to below ash groove in; In the process, on the one hand, heater rocks and makes to be attached to the dust stratification adding hot leg pipe surface and drop, prevent dust stratification from adhering to for a long time at heating device surface, affect heat-conducting effect, add heat smoke passage section, on the other hand, heater shakes in heating process, improves the friction with surrounding flue gas, improves heat exchanger effectiveness further.
In the present embodiment, the boiler plant of the band pneumatic vibrator device proposed, comprise heater and rapping apparatus, heater both sides are respectively equipped with rapping apparatus, and structure is simple, reasonable in design, prevent dust stratification from adhering on the heating, thus increase the heat transfer coefficient of heater, and increase flue gas passage section, thus raising heat exchanger effectiveness, reduce air-introduced machine power consumption.
In a specific embodiment, in the second chamber both sides, the first rapping apparatus and the second rapping apparatus are set respectively, respectively rapping is carried out to first heater and secondary heating mechanism from both sides, make heating chamber room air movable violent, improve heat exchanger effectiveness further.
The above; be only the utility model preferably detailed description of the invention; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; be equal to according to the technical solution of the utility model and utility model design thereof and replace or change, all should be encompassed within protection domain of the present utility model.
Claims (5)
1. the boiler plant with pneumatic vibrator device, is characterized in that, comprising: casing (1), at least one heater, at least one rapping apparatus;
Casing (1) inside is provided with dividing plate, space in described casing is divided into the first chamber and the second chamber by dividing plate, dividing plate is provided with at least one positioning through hole, and the sidewall of the second chamber is provided with air inlet and gas outlet, is provided with heater installing rack (13) in the second chamber;
Heater is positioned at the second chamber of casing, it comprises heating supervisor and multiplely adds hot leg pipe, heating supervisor is axial arranged and be arranged on heater installing rack (13) along positioning through hole, add hot leg pipe and be vertically arranged on heating supervisor top, multiple add hot leg pipe along heating supervisor length direction distribution and bottom be responsible for be communicated with heating respectively;
Rapping apparatus comprises driving mechanism and vibrating rod, and driving mechanism is positioned at the first chamber, and vibrating rod one end is connected with driving mechanism, and the other end is responsible near dividing plate one end against heating through positioning through hole.
2. the boiler plant of band pneumatic vibrator device according to claim 1, it is characterized in that, the first dividing plate (11) and second partition (12) is provided with in casing (1), space in described casing (1) is divided into the first chamber arranged successively by the first dividing plate (11) and second partition (12), second chamber, 3rd chamber, first dividing plate (11) is provided with multiple first positioning through hole, second partition (12) is provided with multiple second positioning through hole, multiple first heater (2) and multiple secondary heating mechanism (3) is provided with in second chamber, each first heater (2) is positioned on the axis of first positioning through hole, each secondary heating mechanism (3) is positioned on the axis of second positioning through hole, multiple first rapping apparatus (4) is provided with in first chamber, each first rapping apparatus (4) is by the corresponding first heater of a first positioning through hole rapping (2), multiple second rapping apparatus (5) is provided with in 3rd chamber, each second rapping (5) device is by the corresponding secondary heating mechanism of a second positioning through hole rapping (3).
3. the boiler plant of band pneumatic vibrator device according to claim 2, it is characterized in that, first heater (2) comprises the first horizontally disposed heating to be responsible for (21) and to add hot leg pipe (22) in multiple first of the upper vertically layout of the first heating supervisor (21), secondary heating mechanism (3) comprise horizontally disposed second heating supervisor (31) and the second heating supervisor (31) upper vertically arrange multiple second add hot leg pipe (32), the first heating supervisor (21) and second is heated and is responsible for (31) and is arranged in parallel.
4. the boiler plant of band pneumatic vibrator device according to claim 1, is characterized in that, driving mechanism adopts pneumatic drive mechanism.
5. the boiler plant of band pneumatic vibrator device according to claim 1, is characterized in that, be provided with ash groove (6) in the second chamber, it is positioned at below heater.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520809448.8U CN205102142U (en) | 2015-10-15 | 2015-10-15 | Take pneumatic rapping device's boiler equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520809448.8U CN205102142U (en) | 2015-10-15 | 2015-10-15 | Take pneumatic rapping device's boiler equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205102142U true CN205102142U (en) | 2016-03-23 |
Family
ID=55517923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520809448.8U Active CN205102142U (en) | 2015-10-15 | 2015-10-15 | Take pneumatic rapping device's boiler equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205102142U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111664575A (en) * | 2020-06-17 | 2020-09-15 | 谢天 | High-efficient burning heating stove as an organic whole is burnt with gasification directly to collection |
CN113217926A (en) * | 2021-05-19 | 2021-08-06 | 项渝富 | Steam-water dual-purpose boiler cleaning mechanism |
-
2015
- 2015-10-15 CN CN201520809448.8U patent/CN205102142U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111664575A (en) * | 2020-06-17 | 2020-09-15 | 谢天 | High-efficient burning heating stove as an organic whole is burnt with gasification directly to collection |
CN113217926A (en) * | 2021-05-19 | 2021-08-06 | 项渝富 | Steam-water dual-purpose boiler cleaning mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103940087A (en) | Narrow gap flat round double-coil-pipe integral condensation boiler | |
CN202452810U (en) | Device for baking waste silk by using smoke gas afterheat of steam boiler | |
CN205102142U (en) | Take pneumatic rapping device's boiler equipment | |
RU2011127533A (en) | WATER BOILER | |
CN202133096U (en) | Energy-saving low pressure hot water boiler | |
CN104501397B (en) | A kind of compound backwater condensing natural gas hot water's boiler of fin panel casing | |
CN202442318U (en) | Vacuum tube heat exchanger | |
CN105570918A (en) | Energy-saving boiler | |
CN104676621A (en) | Directly-heated type boiler | |
CN202599172U (en) | Waste heat recovery device for heat pipes | |
CN206094536U (en) | Middle and high voltage single -drum structure fast -assembling water tube boiler | |
CN202328141U (en) | Oil gas fired shell type superheated steam boiler | |
CN103499141A (en) | Top air suction type heat exchange structure | |
CN209101568U (en) | A kind of energy-saving, environmental protection boiler | |
CN206410119U (en) | High-efficiency environment friendly gas fired-boiler | |
CN105650661A (en) | Novel boiler heat pipe waste heat recovery equipment | |
CN203323093U (en) | Energy-saving fuel gas wall-mounted high-efficiency steam oven | |
CN103557590B (en) | A kind of normal-pressure hot-water boiler | |
CN201819587U (en) | Flue heat exchanger of cremator | |
CN202002080U (en) | Combined phase-change heat exchanger | |
CN204478465U (en) | Fin panel casing compound backwater condensing natural gas hot water boiler | |
CN201335536Y (en) | Boiler waste heat recovery device | |
CN204478001U (en) | A kind of biomass steam generator | |
CN204963225U (en) | Vacuum hot water boiler's heat transfer device | |
CN105588137A (en) | Heat pipe waste heat recovery device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |