CN205100991U - Ann tears simple and convenient tunnel support mount open - Google Patents

Ann tears simple and convenient tunnel support mount open Download PDF

Info

Publication number
CN205100991U
CN205100991U CN201520897099.XU CN201520897099U CN205100991U CN 205100991 U CN205100991 U CN 205100991U CN 201520897099 U CN201520897099 U CN 201520897099U CN 205100991 U CN205100991 U CN 205100991U
Authority
CN
China
Prior art keywords
fixed mount
mount
support frame
support
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520897099.XU
Other languages
Chinese (zh)
Inventor
赵顺义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Technology and Business Institute
Original Assignee
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Technology and Business Institute filed Critical Chongqing Technology and Business Institute
Priority to CN201520897099.XU priority Critical patent/CN205100991U/en
Application granted granted Critical
Publication of CN205100991U publication Critical patent/CN205100991U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an ann tears simple and convenient tunnel support mount open, including base, support frame, mount, screw, drill bit and stand, the base top is provided with support frame and mount, the support frame sets up the periphery at the mount, be provided with steel bar support between support frame and the mount, the mount is provided with a plurality of screws through bolted connection, and the screw top is provided with the drill bit, be provided with the stand on the frame, the stand top links to each other with the mount. The utility model discloses simple structure, convenient operation, the inside concrete watering layer that is provided with of support frame and mount is provided with a plurality of screws through setting up the mount through bolted connection, and the screw top is provided with the drill bit, is provided with the stand on the frame, the stand top links to each other with the mount, and the practicality is strong.

Description

A kind of peace tears easy support of tunnel fixed mount open
Technical field
The utility model relates to building field, is specifically related to a kind of peace and tears easy support of tunnel fixed mount open.
Background technology
Tunnel portal excavation is intended adopting mechanical execution, and tunnel cutting uses simple and easy from assembly jig wagon drill eye, and multistage millisecond detonator is ignited, and in order to improve the Smooth Blasting Effects of periphery hole, periphery hole uses special detonator to ignite.Tunnel haulage adopts loader dress quarrel, and dump truck coordinates fortune quarrel.The secondary lining concrete placings in tunnel uses the monolithic large form chassis that length is 12m, and concrete is in blending station centralized mixing, and concrete transport vehicle transports, and is pumped into mould.The construction of avris ditch adopts combined steel formwork.And the layout of usual constructing tunnel temporory structure: owing to planning the single-ended driving at tunnel entrance, the temporory structure of constructing tunnel is arranged on the right side of tunnel exit.Be arranged in outside the right side roadbed of outlet according to hole orographic condition by air feed plant equipment, reservoir is located at the Dong Ding left side is about 80m position far from hole.After machinery is marched into the arena, carry out hole earthwork evacuation immediately, construction Ding Yang slope, hole catchwater and carry out facing upward slope shotcrete slope reinforcing, carry out into wide open preparation of digging.Hole excavation and reinforcing: adopt mechanical execution, excavating by Construction of roadway method, when digging to hole cubic meter of stone section, in order to reduce the disturbance of hole being faced upward to slope and roadbed side slope as far as possible, the method for weak blast or presplit blasting must be adopted to excavate.Hole is faced upward slope and is adopted shotcrete with wire mesh to reinforce, and enters hole in order to safety.The excavation and support of the shallow reason section of hole country rock: construction method adopts benching tunnelling method construction, top bar and adopt advanced hollow grouting anchor, upper arc guide hole circle-digging stays core local method, excavate every cyclic advance identical with shaped steel arch spacing, preliminary bracing is applied in time after excavation, excavation of getting out of a predicament or an embarrassing situation lags behind the 8 ~ 10m that tops bar, and applies preliminary bracing and inverted arch in time after excavation, then carries out grouting and reinforcing to interval pillar.
The fixing pre-buried type that usually adopts at present for the support frame in tunnel portal digging process is fixed, and is exactly first excavate hole then fluid concrete, and in concrete embedded anchor bar, implement construction after then waiting concrete setting.This traditional scheme is time-consuming quite serious, and construction cost is not low yet.
Utility model content
For solving the problem, the utility model provides a kind of peace and tears easy support of tunnel fixed mount open.
For achieving the above object, the technical scheme that the utility model is taked is:
A kind of peace tears easy support of tunnel fixed mount open, operate specific as follows: comprise pedestal, bracing frame, fixed mount, screw, drill bit and column, bracing frame and fixed mount is provided with above described pedestal, support frame as described above is arranged on the periphery of fixed mount, Steel bar rack is provided with between support frame as described above and fixed mount, described fixed mount is bolted and is provided with multiple screw, screw head is provided with drill bit, described support is provided with column, described column top is connected with fixed mount, and described column is provided with reinforcing rib.
As preferably, support frame as described above and fixed mount inside are provided with concrete casting layer.
As preferably, described fixed mount and column detachable.
As preferably, described fixed mount is provided with curved baffle.
The utility model structure is simple, and easy to operate, bracing frame and fixed mount inside are provided with concrete casting layer, be bolted be provided with multiple screw by arranging fixed mount, screw head is provided with drill bit, and support is provided with column, described column top is connected with fixed mount, practical.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings;
Fig. 1 is structural representation of the present utility model;
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, to make advantage of the present utility model and feature can be easier to be readily appreciated by one skilled in the art, thus more explicit defining is made to protection domain of the present utility model.
As shown in Figure 1, a kind of peace of the utility model is torn easy support of tunnel fixed mount open and is comprised pedestal 1, bracing frame 2, fixed mount 3, screw 4, drill bit 5 and column 6, bracing frame 2 and fixed mount 3 is provided with above described pedestal 1, support frame as described above 2 is arranged on the periphery of fixed mount 3, Steel bar rack is provided with between support frame as described above 2 and fixed mount 3, described fixed mount 3 is bolted and is provided with multiple screw 4, screw 4 top is provided with drill bit 5, described support 1 is provided with column 6, described column 6 top is connected with fixed mount 3, and described column 6 is provided with reinforcing rib.
It should be noted that support frame as described above 2 and fixed mount 3 inside are provided with concrete casting layer.
It should be noted that described fixed mount 3 and column 6 detachable.
It should be noted that and described fixed mount 3 is provided with curved baffle.
The utility model structure is simple, and easy to operate, bracing frame and fixed mount inside are provided with concrete casting layer, be bolted be provided with multiple screw by arranging fixed mount, screw head is provided with drill bit, and support is provided with column, described column top is connected with fixed mount, practical.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (4)

1. a peace tears easy support of tunnel fixed mount open, it is characterized in that: comprise pedestal (1), bracing frame (2), fixed mount (3), screw (4), drill bit (5) and column (6), described pedestal (1) top is provided with bracing frame (2) and fixed mount (3), support frame as described above (2) is arranged on the periphery of fixed mount (3), Steel bar rack is provided with between support frame as described above (2) and fixed mount (3), described fixed mount (3) is bolted and is provided with multiple screw (4), screw (4) top is provided with drill bit (5), described pedestal (1) is provided with column (6), described column (6) top is connected with fixed mount (3), (6) are provided with reinforcing rib to described column.
2. peace as claimed in claim 1 tears easy support of tunnel fixed mount open, it is characterized in that: support frame as described above (2) and fixed mount (3) inside are provided with concrete casting layer.
3. peace as claimed in claim 1 tears easy support of tunnel fixed mount open, it is characterized in that: described fixed mount (3) and column (6) are detachably.
4. peace as claimed in claim 1 tears easy support of tunnel fixed mount open, it is characterized in that: (3) are provided with curved baffle to described fixed mount.
CN201520897099.XU 2015-11-04 2015-11-04 Ann tears simple and convenient tunnel support mount open Expired - Fee Related CN205100991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520897099.XU CN205100991U (en) 2015-11-04 2015-11-04 Ann tears simple and convenient tunnel support mount open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520897099.XU CN205100991U (en) 2015-11-04 2015-11-04 Ann tears simple and convenient tunnel support mount open

Publications (1)

Publication Number Publication Date
CN205100991U true CN205100991U (en) 2016-03-23

Family

ID=55516777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520897099.XU Expired - Fee Related CN205100991U (en) 2015-11-04 2015-11-04 Ann tears simple and convenient tunnel support mount open

Country Status (1)

Country Link
CN (1) CN205100991U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350525A (en) * 2020-03-09 2020-06-30 何泉 Underground bridge and tunnel construction supporting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350525A (en) * 2020-03-09 2020-06-30 何泉 Underground bridge and tunnel construction supporting method
CN111350525B (en) * 2020-03-09 2021-08-24 何泉 Underground bridge and tunnel construction supporting method

Similar Documents

Publication Publication Date Title
CN101408106B (en) Small tube shed pre-grouting method
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN109139104B (en) Drainage construction method for tunnel penetrating through clastic rock steep-dip reverse-thrust water-rich fault
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN107387084A (en) A kind of gob side entry retaining reduces the construction method for cutting top depth
CN102865092B (en) U+U type laneway ventilating system of coalface
CN106593497B (en) A kind of coal working face crosses crossheading caving place supporting processing method
CN106437741B (en) A kind of New Austrian Tunneling Method rock tunnel(ling) machine
CN113153308B (en) Construction method for collapse section of double-arch tunnel
CN101545376A (en) Execution method for feeding tiny tunnel into ultra heavy section tunnel transversally
CN104831733A (en) Arch bridge abutment tunnel type large-angle inclined pile construction method
CN110455140B (en) Cutting construction method for high-strength rock stratum mountain tunnel
CN111594185B (en) Construction method for mechanically excavating CRD (cross section) of tunnel under loess stratum condition
CN103321235A (en) Composite soil nailing wall slope support method
CN105019924A (en) Strong roof support pier column and method for protecting section coal pillar
CN104632227A (en) Subway station excavation technology of single-layer beam arch structure
CN102400689A (en) Convoluted excavation method for undermined tunnel with extra-large cross section
CN111472801A (en) Construction method for passing existing line under shallow-buried underground excavation drainage gallery
CN103244127A (en) Method for quickening construction of multiple-arch tunnel
CN205100991U (en) Ann tears simple and convenient tunnel support mount open
CN108222945A (en) Utilize the construction method of main and auxiliary layering sap excavating extra-large cross-section Underground Subway Station
CN105937400B (en) It is a kind of once to tunnel Liu Sheshuan lanes digging operation production line
CN203822316U (en) Tunnel support steel bar row mounting device based on tunnelling machine
CN208252120U (en) A kind of shaft of vertical well and shaft station interconnecting piece
CN103628903B (en) Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

Termination date: 20161104

CF01 Termination of patent right due to non-payment of annual fee