CN205096591U - Installation engineering support device of drilling - Google Patents

Installation engineering support device of drilling Download PDF

Info

Publication number
CN205096591U
CN205096591U CN201520922958.6U CN201520922958U CN205096591U CN 205096591 U CN205096591 U CN 205096591U CN 201520922958 U CN201520922958 U CN 201520922958U CN 205096591 U CN205096591 U CN 205096591U
Authority
CN
China
Prior art keywords
vertical supports
engineering support
drilling device
vertical support
installing engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520922958.6U
Other languages
Chinese (zh)
Inventor
常红霞
周相友
刘相法
籍成建
崔焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG SHOUGUANG FIRST BUILDING CO Ltd
Original Assignee
SHANDONG SHOUGUANG FIRST BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG SHOUGUANG FIRST BUILDING CO Ltd filed Critical SHANDONG SHOUGUANG FIRST BUILDING CO Ltd
Priority to CN201520922958.6U priority Critical patent/CN205096591U/en
Application granted granted Critical
Publication of CN205096591U publication Critical patent/CN205096591U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses an installation engineering support device of drilling, including first vertical support and the vertical support of second that sets up side by side, the upper end of first vertical support is provided with and can be used to the fixed locking device who bores that strikes of installation, through a plurality of linking bridge swing joint between the vertical support of first vertical support and second, install on one of them linking bridge and can be used to promote the thrust unit that first vertical support reciprocated for the vertical support of second, the construction of drilling that adoption the device hung the support, compare with traditional construction method, operating personnel does not need high altitude construction, it is guaranteed to keep the safety in production, be favorable to the safe civilization construction of job site, saves the labor, and material resources, and the material is got at the scene, machining is convenient, the instrument of drilling can have enough to meet the need the use, the present invention has preferable economic benefits.

Description

A kind of installing engineering support drilling device
Technical field
The utility model relates to a kind of drilling device, specifically, relates to a kind of installing engineering support drilling device, belongs to construction and installation technical field of tools.
Background technology
The horizontal pipeline such as water, electricity, fire-fighting, central air-conditioning of architectural engineering is all be suspended in below ceiling by hanging support, and then cover with fine fitment, traditional stand construction method of hanging is: first on flooring, set up movable floor scaffold, then personnel stand on scaffold board and hang support with percussion drill perforating on ceiling, installation, perforating in this way, workmen's work high above the ground, is unfavorable for safe construction, operation inconvenience, adds the lease expenses of scaffold.
Utility model content
Problem to be solved in the utility model is to solve the problem of hanging support perforating difficulty, a kind of installing engineering support drilling device is provided, compared with traditional construction method, operating personnel do not need work high above the ground, keep the safety in production guaranteed, be conducive to the safety construction of job site, save human and material resources, and on-the-spot feeding, easy to process.
In order to solve the problem, the utility model by the following technical solutions:
A kind of installing engineering support drilling device, comprise the first vertical supports and the second vertical supports that are arranged side by side, the upper end of the first vertical supports is provided with the locking device that can be used for installing fixing percussion drill, be flexibly connected by several connection brackets between first vertical supports and the second vertical supports, wherein a connection bracket be provided with the thrust unit that can be used for promotion first vertical supports and move up and down relative to the second vertical supports.
Below the further optimization of the utility model to such scheme:
Connection bracket is three of setting side by side up and down, the two ends of two connection brackets in top and between the first vertical supports and the second vertical supports respectively by bolted splice.
Further optimization: by bolted splice between wherein one end of the connection bracket in bottom and the first vertical supports, hinged by turning cylinder between the other end and the second vertical supports.
Further optimization: thrust unit comprises depression bar, one end of described depression bar is fixedly connected with near an end of turning cylinder with the connection bracket being positioned at bottom.
Further optimization: locking device comprises the baffle plate being arranged on the first side, vertical supports top, and the two ends up and down of described baffle plate are connected to U-shaped card, can be used for fixing percussion drill.
Further optimization: the first vertical supports is fixedly installed the supporting plate for lifting percussion drill near the position of U-shaped card below.
Further optimization: the top of the first vertical supports and the opposing side of baffle plate are fixedly welded with several nuts, the Limit screw of less than nut internal diameter No. one is penetrated in nut, Limit screw has respectively near the position of upper/lower terminal can freely regulated limit screw cap, prevents Limit screw from deviating from from nut.Before perforating, freely can adjust the spacing length of Limit screw according to the perforating degree of depth.
Drilling device is assembled complete at the scene, before perforating, percussion drill is fastened at the top of the first vertical supports by U-shaped, regulate Limit screw, reserve perforating position, second vertical supports is erected at the below needing perforating, open percussion drill electricity-getting switch, the perforating of hanging support can be realized with Manpower dynamic pressure bar.
This device is adopted to carry out hanging the perforating construction of support, compared with traditional construction method, operating personnel do not need work high above the ground, keep the safety in production guaranteed, be conducive to the safety construction of job site, save human and material resources, and on-the-spot feeding, easy to process, drilling tool can have enough to meet the need use, has good economic benefit.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of the utility model embodiment;
Accompanying drawing 2 is the rearview of accompanying drawing 1.
In figure: 1-U type card; 2-baffle plate; 3-limit screw cap; 4-Limit screw; 5-nut; 6-first vertical supports; 7-supporting plate; 8-bolt; 9-connection bracket; 10-depression bar; 11-second vertical supports; 12-percussion drill; 13-turning cylinder.
Detailed description of the invention
Embodiment, as shown in Figure 1 and Figure 2, a kind of installing engineering support drilling device, comprise the first vertical supports 6 and the second vertical supports 11 be arranged side by side, the upper end of the first vertical supports 6 is provided with the locking device that can be used for installing fixing percussion drill, be flexibly connected by several connection brackets 9 between first vertical supports 6 and the second vertical supports 11, wherein a connection bracket 9 be provided with the thrust unit that can be used for promotion first vertical supports 6 and move up and down relative to the second vertical supports 11.
First vertical supports 6 and the second vertical supports 11 adopt the galvanizing square steel tube of 50 × 50 to make;
Connection bracket 9 is three of being arranged side by side, and two of top makes with the galvanizing square steel tube of 25 × 25;
The two ends of two connection brackets 9 in top and hinged respectively by bolt 8 between the first vertical supports 6 and the second vertical supports 11.
The connection bracket 9 being positioned at bottom adopts angle steel to make; Hinged by bolt 8 between wherein one end of the connection bracket 9 of bottom and the first vertical supports 6, hinged by turning cylinder 13 between the other end and the second vertical supports 11.
Thrust unit comprises depression bar 10, and one end of described depression bar 10 is fixedly connected with near an end of turning cylinder 13 with the connection bracket 9 being positioned at bottom.Depression bar 10 adopts the coating steel pipe of the DN25 of long 50cn to make.
Locking device comprises the baffle plate 2 being arranged on the first side, vertical supports 6 top, and the two ends up and down of described baffle plate 2 are connected to U-shaped card 1, can be used for fixing percussion drill 12.Baffle plate 2 adopts the angle steel of L40 × 3 to make.
Position in first vertical supports 6 below U-shaped card 1 is fixedly installed the supporting plate 7 for lifting percussion drill 12, and supporting plate 7 adopts the angle steel of L40 × 3 to make.
The top of the first vertical supports 6 and the opposing side of baffle plate 2 are fixedly welded with several nuts 5, the Limit screw 4 of less than nut No. one is penetrated in nut 5, Limit screw 4 has respectively near the position of upper/lower terminal can freely regulated limit screw cap 3, prevents Limit screw 4 from deviating from from nut 5.Limit screw 4 is the full silk screw rod of φ 12.Before perforating, freely can adjust the spacing length of Limit screw 4 according to the perforating degree of depth.
Drilling device is assembled complete at the scene, before perforating, percussion drill 12 is fixed on the top of the first vertical supports 6 by U-shaped card 1, regulate Limit screw 4, reserve perforating position, second vertical supports 11 is erected at the below needing perforating, open percussion drill electricity-getting switch, the perforating of hanging support can be realized with Manpower dynamic pressure bar 10.
Compared with traditional construction method, operating personnel do not need work high above the ground, keep the safety in production guaranteed, be conducive to the safety construction of job site, save human and material resources, and on-the-spot feeding, easy to process, drilling tool can have enough to meet the need use, has good economic benefit.

Claims (7)

1. an installing engineering support drilling device, comprise the first vertical supports (6) and the second vertical supports (11) that are arranged side by side, it is characterized in that: the upper end of the first vertical supports (6) is provided with the locking device that can be used for installing fixing percussion drill, be flexibly connected by several connection brackets (9) between first vertical supports (6) and the second vertical supports (11), wherein a connection bracket (9) be provided with the thrust unit that can be used for promotion first vertical supports (6) and move up and down relative to the second vertical supports (11).
2. a kind of installing engineering support drilling device according to claim 1, is characterized in that:
Three that connection bracket (9) is setting side by side up and down, be positioned at the two ends of two connection brackets (9) of top and hinged respectively by bolt (8) between the first vertical supports (6) and the second vertical supports (11).
3. a kind of installing engineering support drilling device according to claim 2, is characterized in that:
Be positioned between wherein one end of the connection bracket (9) of bottom and the first vertical supports (6) hinged by bolt (8), hinged by turning cylinder (13) between the other end and the second vertical supports (11).
4. a kind of installing engineering support drilling device according to claim 3, is characterized in that:
Thrust unit comprises depression bar (10), and one end of described depression bar (10) is fixedly connected with near an end of turning cylinder (13) with the connection bracket (9) being positioned at bottom.
5. a kind of installing engineering support drilling device according to claim 1, is characterized in that:
Locking device comprises the baffle plate (2) being arranged on the first vertical supports (6) side, top, and the two ends up and down of described baffle plate (2) are connected to U-shaped card (1).
6. a kind of installing engineering support drilling device according to claim 5, is characterized in that:
The upper position near U-shaped card (1) below of first vertical supports (6) is fixedly installed the supporting plate (7) for lifting percussion drill.
7. a kind of installing engineering support drilling device according to claim 6, is characterized in that:
The top of the first vertical supports (6) and the opposing side of baffle plate (2) are fixedly welded with several nuts (5), Limit screw (4) is connected with at nut (5) internal thread, the upper position near upper/lower terminal of Limit screw (4) has respectively can freely regulated limit screw cap (3), prevents Limit screw (4) from deviating from from nut (5).
CN201520922958.6U 2015-11-19 2015-11-19 Installation engineering support device of drilling Expired - Fee Related CN205096591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520922958.6U CN205096591U (en) 2015-11-19 2015-11-19 Installation engineering support device of drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520922958.6U CN205096591U (en) 2015-11-19 2015-11-19 Installation engineering support device of drilling

Publications (1)

Publication Number Publication Date
CN205096591U true CN205096591U (en) 2016-03-23

Family

ID=55512402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520922958.6U Expired - Fee Related CN205096591U (en) 2015-11-19 2015-11-19 Installation engineering support device of drilling

Country Status (1)

Country Link
CN (1) CN205096591U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105665784A (en) * 2016-03-31 2016-06-15 中铁十九局集团电务工程有限公司 Special upward drilling bracket and special drilling equipment
CN107717011A (en) * 2017-10-16 2018-02-23 中国十七冶集团有限公司 A kind of new suspension rod drilling equipment
CN110064777A (en) * 2018-01-22 2019-07-30 五冶集团上海有限公司 A kind of bracket and production method for interior decoration day frame perforating

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105665784A (en) * 2016-03-31 2016-06-15 中铁十九局集团电务工程有限公司 Special upward drilling bracket and special drilling equipment
CN107717011A (en) * 2017-10-16 2018-02-23 中国十七冶集团有限公司 A kind of new suspension rod drilling equipment
CN110064777A (en) * 2018-01-22 2019-07-30 五冶集团上海有限公司 A kind of bracket and production method for interior decoration day frame perforating

Similar Documents

Publication Publication Date Title
CN205096591U (en) Installation engineering support device of drilling
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN204416913U (en) A kind of shaped steel stone tongs
CN204492134U (en) Be convenient to the height scaffolding installed
CN201176703Y (en) Tripod for construction of hyperbola cooling tower cylinder
CN202000651U (en) Adjustable wall-mounted supporting device for reinforcing upright columns
CN102926554A (en) Steel hanging seat formwork support and construction method thereof
CN210195016U (en) Suspended ceiling reverse support bracket
CN202767547U (en) Nuclear plant construction safety rope fixing clamping rod
CN207110442U (en) The connector that a kind of scaffold uses
CN203475809U (en) Scaffold supporting structure convenient to mount and dismount
CN204252496U (en) Convenient installation device for constructional engineering suspender
CN202706308U (en) Clamping slot type light steel keel suspension structure
CN205791216U (en) A kind of fixing temporary electricity line metal supporting frames
CN205276653U (en) Furred ceiling jib installation device
CN202556295U (en) Lengthened wrench
CN204139570U (en) Containing the pre-buried fastening devices of detachable overhanging type steel beam of horizontal fixation kit
CN204754225U (en) Can have enough to meet need a support
CN203555690U (en) Fence-sitting suspension bracket
CN207086976U (en) A kind of architectural engineering drilling bracket
CN217924340U (en) Novel suspended ceiling conversion layer system
CN102623930A (en) Combination tool for changing suspension insulator
CN214590292U (en) Angle steel stand bracket sectional fixture
CN212002398U (en) Safety belt suspension device for high-altitude operation in building engineering
CN205153569U (en) Building engineering warp formula protector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

Termination date: 20161119