CN205095480U - Take horizontal flow sedimentation tank of mud pump house - Google Patents

Take horizontal flow sedimentation tank of mud pump house Download PDF

Info

Publication number
CN205095480U
CN205095480U CN201520865516.2U CN201520865516U CN205095480U CN 205095480 U CN205095480 U CN 205095480U CN 201520865516 U CN201520865516 U CN 201520865516U CN 205095480 U CN205095480 U CN 205095480U
Authority
CN
China
Prior art keywords
mud
pump house
sedimentation tank
sludge
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520865516.2U
Other languages
Chinese (zh)
Inventor
张显忠
黄瑾
谢勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Co ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN201520865516.2U priority Critical patent/CN205095480U/en
Application granted granted Critical
Publication of CN205095480U publication Critical patent/CN205095480U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model discloses a take horizontal flow sedimentation tank of mud pump house, including a plurality of group precipitation ponds unit, each group set gradually in the sedimentation tank unit: district, settling zone, the pai ni district that is used for row mud and the play pool that is used for discharging sediment water intake, be formed with the mud fill in the settling zone, still be equipped with the sludge discharging groove that one end and mud were fought and is fed through in the pai ni district, sludge discharging groove's an other end rethread mud pipe connects respectively to a mud exteenal reflux pump house and an excess sludge pump house that is used for discharging unnecessary heavy mud that is used for the exteenal reflux, mud exteenal reflux pump house and excess sludge pump house are laid respectively the district's front end of intaking, in the sludge discharging groove and entry both sides are equipped with the mud scraper that is used for scraping mud respectively. The utility model discloses a take horizontal flow sedimentation tank of mud pump house can satisfy the change and the various operating mode that surmounts of the quality of water of intaking, the water yield to furthest has practiced thrift engineering land used and operating expenses.

Description

With the horizontal sedimentation tank of mud pump house
Technical field
The utility model relates to a kind for the treatment of tank, particularly a kind of horizontal sedimentation tank with mud pump house.
Background technology
Sedimentation basin is a kind of structures that application precipitation removes suspension in water.Sedimentation basin widely uses in the treatment of waste water.Its pattern is a lot, can be divided into flat flow, vertical-flow and radial-flow three kinds by pool inner water flow path direction.
In recent years, because environmental protection standard is to the raising of sewage effluents index request, and Sewage Plant occupation of land controls more and more tighter, how to ensure sedimentation basin effect and sludge reflux concentration, to Sewage Plant, more stably reaching standard operation is most important, if design unreasonable, require and energy saving requirement with regard to being difficult to reach present water outlet.
In addition, Radial Flow Secondary Sedimentation Tank (namely so-called second pond refers to realize the sedimentation basin of secondary precipitation) is taked according to more current Large Sewage Treatment Plants, take up an area larger, management operating is more complicated, especially be more difficult to during maintenance switch, identical for ensureing each pool water level height, to construction and foundation requirement also very high, and the instability of sludge discharging period also causes the shock resistance of each pond poor.Consider the impact of wind direction, the weir load of traditional second pond also can be caused different, thus affect sedimentation basin outlet effect.
Domestic and international many water treatment research institutions have carried out a large amount of research work to second pond specially, have developed some second ponds that are novel, that be suitable for.But along with the maximization of sewage disposal planning, it is intensive that process is taken up an area, the automation for the treatment of process, tradition second pond group number gets more and more, and floor space is increasing, due to factors such as settlement of foundation, can not ensure often to organize that treating capacity is impartial and weir load is consistent, treatment effect can not ensure.In a lot of city, soil has become the bottleneck of various facility development, and a lot of equipment and technology cannot be implemented because floor space is excessive.
Therefore, those skilled in the art be devoted to develop a kind of take up an area compact, energy consumption is low, be convenient to adapt to water yield change, anti-shock loading is strong, grouping maintenance flexibly, the horizontal sedimentation tank of the high band mud pump house of effluent quality requirement.
Utility model content
Because the above-mentioned defect of prior art, the utility model provides a kind of horizontal sedimentation tank taking up an area compact, that energy consumption is low, the adaptation water yield changes, anti-shock loading is strong, grouping maintenance is flexible, effluent quality is high band mud pump house, it is characterized in that, it comprises some group precipitation pool units, sets gradually in the described sedimentation basin unit of each group: for inputting the inhalant region of the sewage treating after-treatment, the settling zone for mud and water sedimentation layering, the sludge discharging area for spoil disposal and the exhalant region for discharging precipitation water; Sludge bucket is formed in described settling zone, the mud drainage slot that one end is communicated with sludge bucket is also provided with in described sludge discharging area, the other end of described mud drainage slot is connected to one for the mud exteenal reflux pump house and of exteenal reflux for discharging the excess sludge pump house of unnecessary heavy mud respectively by a discharge pipeline again, and described mud exteenal reflux pump house and excess sludge pump house are laid in described inhalant region front end (mud exteenal reflux pump house and excess sludge pump house are respectively arranged with mud external reflux pump and residual sludge pump) respectively; In described mud drainage slot and entrance both sides are respectively equipped with the mud scraper (such as chain slat type mud scraper) for scraping mud.Discharge pipeline in the present embodiment is used for static pressure spoil disposal, and chain slat type mud scraper is commercially.In addition, described mud exteenal reflux pump house and excess sludge pump house are laid in described inhalant region front end respectively, heavy mud can be made to drain with the shortest Distance geometry time on the one hand, the chain slat type mud scraper arranged by sludge discharging area on the other hand, can by mud after discharge pipeline static pressure spoil disposal, scrape into excess sludge pump house with the shortest time, thus decrease operation energy consumption and floor space, mud exteenal reflux and excess sludge discharge can better be realized.
In certain embodiments, described inhalant region is provided with the perforation tracery wall for rectification.By the setting of tracery wall of boring a hole, can control hole mouth flow velocity, thus prevent uneven into water and to the disturbance between settling zone, and then ensure sedimentation effect, avoid short stream and water distribution problem of non-uniform.
In certain embodiments, described exhalant region is provided with effluent weir and outlet conduit, and described outlet conduit porch is provided with and rotates skimming tool and/or slag trap.Be provided with in outlet conduit porch and rotate skimming tool and/or slag trap, scum silica frost that can be floating by the sewage surface after layering is removed, and obtains better second pond treatment effect.
In certain embodiments, described rotation skimming tool is for rotating skimming pipe.Rotation skimming pipe in the present embodiment is commercially.
In certain embodiments, in each described sedimentation basin unit, some partition walls are set, for making every two group of one partition of described sludge bucket.This sedimentation basin can be named like this to realize the grouping maintenance of full pond, thus ensure the normal operation of Sewage Plant.
In certain embodiments, the back-shaped layout of the effluent trough of described exhalant region.Even if back-shaped for effluent trough layout can be realized taking minimum area, also all water outlets can be drawn fast.Can not only lower the bearing load of effluent weir like this, and water outlet is more stable, can not disturbance be produced.
In certain embodiments, the pond type of described sedimentation basin is rectangular configuration.Be more conducive to mud-water separation like this, the adaptation water yield and sludge concentration change feature greatly, make effluent index all stably reach discharging standards.
On the basis meeting this area general knowledge, above-mentioned each optimum condition, can be combined, and obtains each preferred embodiment of the utility model.
The beneficial effects of the utility model:
1, the design of the utility model second pond, to the intensive layout in Sewage Plant general layout, can save floor space, has reduced construction cost greatly; And can according to the change of amount of inlet water, water quality characteristic and environmental condition, flexible adjust operation pattern, can divide into groups to run, overhaul, on raising treatment effect basis, ensure reliability of technology.
2, in addition, the utility model is particularly useful for the conceptual design of Large Sewage Treatment Plant.Large and the shortcoming that energy consumption is high of floor space existing when being dispersed placement that the utility model changes traditional point of many group structures, the uniform water distribution of second pond can not only be played with less floor space, also be convenient to operational management, raw anti-pond sludge reflux more evenly can be configured, greatly reduce the loss of head.
3, the utility model adopts static pressure spoil disposal, and sludge discharge effects is stable, contaminant removal effectiveness is high.In addition, the water inlet of sedimentation basin adopts large resistance water distribution, can evenly realize sedimentation effect.Meanwhile, pool inner water position is constant, and settling zone is in free sedimentation state, adds utilization rate of tank volume, improves utilization rate of equipment and installations.
Be described further below with reference to the technique effect of accompanying drawing to design of the present utility model, concrete structure and generation, to understand the purpose of this utility model, characteristic sum effect fully.
Accompanying drawing explanation
Fig. 1 is the understructure plane of the horizontal sedimentation tank of the utility model band mud pump house.
Fig. 2 is the view along A-A line in Fig. 1.
Fig. 3 is the view along B-B line in Fig. 1.
Fig. 4 is the effluent trough plane structure chart of the back-shaped laying of the utility model.
Description of reference numerals: inlet channel 1, perforation tracery wall 2, sludge bucket 3, discharge pipeline 4, mud drainage slot 5, chain slat type mud scraper 6, gate 7, outlet conduit 8, effluent trough 9, rotation skimming pipe 10, mud exteenal reflux pump house 11, excess sludge pump house 12, effluent weir 13, intercommunicating pore 14, slag trap 15, steel deck-plate 16
Detailed description of the invention
Lift preferred embodiment below, and come by reference to the accompanying drawings clearlyer intactly the utility model to be described.
Embodiment
The purpose of this utility model is achieved through the following technical solutions: as shown in Figure 1 to 4, the horizontal sedimentation tank grouping of the band mud pump house that the present embodiment provides arranges some sedimentation basin unit that mutually can be communicated with, can cut off, often organize described sedimentation basin unit be provided with inhalant region for inputting the sewage treating after-treatment successively, for the settling zone of mud, water sedimentation layering, for discharging the sludge discharging area of heavy mud, and the exhalant region of precipitation water for obtaining after discharging layering; Sludge discharging area is provided with the mud drainage slot 5 that one end is communicated with sludge bucket 3, and the other end of mud drainage slot 5 is connected to one for the mud exteenal reflux pump house 11 and of exteenal reflux for discharging the excess sludge pump house 12 of unnecessary heavy mud respectively by discharge pipeline 4 again; The entrance both sides of mud drainage slot 5 be provided with for heavy mud is scraped into chain slat type mud scraper 6, meanwhile, in mud drainage slot 5, be respectively provided with the chain slat type mud scraper 6 for being scraped by heavy mud into discharge pipeline 4.
Inhalant region is also the hybrid reaction district of horizontal sedimentation tank, and former water mixes at this with coagulant, and reacts, and forms floccule body, then enters settling zone.
Due to heavy pond water inlet flow velocity and uniform water distribution, most important to its sedimentation effect, therefore, as shown in FIG. 1 to 3, in order to make to become a mandarin, sewage evenly enters sedimentation basin with stable, and the perforation tracery wall 2 be provided with for rectification at the water inlet end of inhalant region carries out large resistance water distribution.
By the setting of tracery wall 2 of boring a hole, control aperture flow velocity and be not more than 0.15m/s, thus prevent uneven into water and to the disturbance between settling zone, and then ensure sedimentation effect, avoid short stream and water distribution problem of non-uniform.
Each district is provided with the gate 7 for gauge tap.Inhalant region is provided with inlet channel 1, and exhalant region is provided with effluent weir 13 and outlet conduit 8, and outlet conduit 8 porch is provided with and rotates skimming tool (such as rotating skimming pipe 10) and slag trap 15, for removing the floating scum silica frost of the sewage surface after layering.
In addition, the top of sedimentation basin is provided with steel deck-plate 16, such as, and galvanizing clad can steel deck-plate.When Specific construction is laid, mud exteenal reflux pump house 11 and excess sludge pump house 12 can be laid in inhalant region front end.Such one side can make heavy mud drain with the shortest Distance geometry time, the chain slat type mud scraper 6 arranged by sludge discharging area on the other hand, can by mud after discharge pipeline 4 static pressure spoil disposal, scrape into excess sludge pump house 12 with the shortest time, thus decrease operation energy consumption and floor space, mud exteenal reflux and excess sludge discharge can better be realized.
In order to make this sedimentation basin realize the grouping maintenance of full pond and run, some partition walls can be set in each sedimentation basin unit, make every 2 group one partitions of sludge bucket, to realize dividing into groups to close separately.In addition, each partition wall is also provided with the intercommunicating pore 14 for being communicated with current.Even if maintenance, more exchange device, do not affect the normal operation of other sludge discharging area groups yet like this, thus ensure the normal operation of Sewage Plant.
The utility model adopts many triangle effluent weirs, and back-shapedly lays out tank 9.Even if back-shaped for effluent trough 9 layout can be realized taking minimum area, also all water outlets can be drawn fast.Can not only lower the bearing load of effluent weir like this, and water outlet is more stable, can not disturbance be produced.
In addition, each sedimentation basin and water distribution, spoil disposal etc. all adopt the combining form sharing channel, greatly reduce the loss of flood peak, floor space and house-service gas pipe.
Further, the pond type of sedimentation basin also can be designed to rectangular configuration by the utility model.Be more conducive to mud-water separation like this, the adaptation water yield and sludge concentration change feature greatly, and effluent index is all stably up to state standards.
The settlement of sewage handling process of the horizontal sedimentation tank of band mud pump house of the present utility model is as follows:
As shown in FIG. 1 to 3, first the operation group number of sedimentation basin unit is regulated according to water yield change, make former water by inlet channel 1 and inlet gate, pass through perforation tracery wall 2 uniform water distribution of irrigation channel distribution and setting again, impartial to ensure often to organize the water yield, thus obtain stable, better sedimentation effect; Then the precipitation water after layering is through outlet conduit 8 and rotate skimming pipe 10, is removed easily by the scum silica frost of precipitation water surface; Finally, all the other deposits such as heavy mud are by own precipitation, scrape into mud drainage slot 5 through chain slat type mud scraper 6, and after discharge pipeline 4 static pressure spoil disposal, be connected to the exteenal reflux sludge pump in mud exteenal reflux pump house 11 and the residual sludge pump in excess sludge pump house 12 respectively through sludge pump, realize the outer row of sludge reflux and unnecessary heavy mud respectively.
The utility model can realize integrated sewage precipitation, sludge reflux, excess sludge discharge, water outlet etc. in one; And can according to the change of amount of inlet water, water quality characteristic and environmental condition, flexible adjust operation pattern, can divide into groups to run, overhaul, on raising treatment effect basis, ensure reliability of technology.
Therefore, the horizontal sedimentation tank of band mud pump house of the present utility model, can meet influent quality, the water yield change and variously surmount operating mode, and farthest saved engineering land used and engineering cost.
And the utility model adopts static pressure spoil disposal, sludge discharge effects is stable, contaminant removal effectiveness is high.In addition, the water inlet of sedimentation basin adopts large resistance water distribution, can evenly realize sedimentation effect.Meanwhile, pool inner water position is constant, and settling zone is in free sedimentation state, adds utilization rate of tank volume, improves utilization rate of equipment and installations.
More than describe each preferred embodiment of the present utility model in detail.Should be appreciated that those of ordinary skill in the art just can make many modifications and variations according to design of the present utility model without the need to creative work.Therefore, all technical staff in the art according to design of the present utility model on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment, all should by the determined protection domain of claims.

Claims (7)

1. the horizontal sedimentation tank with mud pump house, it is characterized in that, it comprises some group precipitation pool units, sets gradually in the described sedimentation basin unit of each group: for inputting the inhalant region of the sewage treating after-treatment, the settling zone for mud and water sedimentation layering, the sludge discharging area for spoil disposal and the exhalant region for discharging precipitation water; Sludge bucket is formed in described settling zone, the mud drainage slot that one end is communicated with sludge bucket is also provided with in described sludge discharging area, the other end of described mud drainage slot is connected to one for the mud exteenal reflux pump house and of exteenal reflux for discharging the excess sludge pump house of unnecessary heavy mud respectively by a discharge pipeline again, and described mud exteenal reflux pump house and excess sludge pump house are laid in described inhalant region front end respectively; In described mud drainage slot and entrance both sides are respectively equipped with the mud scraper for scraping mud.
2. horizontal sedimentation tank as claimed in claim 1, it is characterized in that, described inhalant region is provided with the perforation tracery wall for rectification.
3. horizontal sedimentation tank as claimed in claim 1, it is characterized in that, described exhalant region is provided with effluent weir and outlet conduit, and described outlet conduit porch is provided with and rotates skimming tool and/or slag trap.
4. horizontal sedimentation tank as claimed in claim 3, is characterized in that, described rotation skimming tool is for rotating skimming pipe.
5. horizontal sedimentation tank as claimed in claim 1, is characterized in that, arrange some partition walls in each described sedimentation basin unit, for making every two group of one partition of described sludge bucket.
6. horizontal sedimentation tank as claimed in claim 1, is characterized in that, the back-shaped layout of effluent trough of described exhalant region.
7. as the horizontal sedimentation tank in claim 1 ~ 6 as described in any one, it is characterized in that, the pond type of described sedimentation basin is rectangular configuration.
CN201520865516.2U 2015-11-03 2015-11-03 Take horizontal flow sedimentation tank of mud pump house Active CN205095480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520865516.2U CN205095480U (en) 2015-11-03 2015-11-03 Take horizontal flow sedimentation tank of mud pump house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520865516.2U CN205095480U (en) 2015-11-03 2015-11-03 Take horizontal flow sedimentation tank of mud pump house

Publications (1)

Publication Number Publication Date
CN205095480U true CN205095480U (en) 2016-03-23

Family

ID=55511292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520865516.2U Active CN205095480U (en) 2015-11-03 2015-11-03 Take horizontal flow sedimentation tank of mud pump house

Country Status (1)

Country Link
CN (1) CN205095480U (en)

Similar Documents

Publication Publication Date Title
CN104174191B (en) Integrated grit chamber for treating rainwater and treatment method
CN201848131U (en) Table-flap type multi-stage mud-discharge settling tank applied to sewage treatment
CN102505728A (en) Complete technology for resource utilization of rainwater
CN102583759B (en) Cascaded combined-flow artificial wetland system and sewage ecological purifying method thereof
CN203269659U (en) High-efficiency nitrogen removal three-stage composite constructed wetland
CN205222960U (en) Residence community rainwater processing system
CN205222816U (en) City river says that quick oneself of rainwater purifies combination dam system
CN107806062B (en) Construction method of biological filtration slope protection for riverway restoration
CN204193579U (en) A kind of sedimentation basin for sewage disposal
CN105233535A (en) Horizontal sedimentation tank with sludge pump house
CN201971694U (en) Flotation-sedimentation tank with sideward flow inclined plate
CN205095480U (en) Take horizontal flow sedimentation tank of mud pump house
CN218146053U (en) Container type sewage treatment equipment complete system
CN218146051U (en) A2O integration sewage treatment pond complete set system
CN217757087U (en) Sewage treatment pool
CN216170167U (en) Peripherally-entering and peripherally-exiting rectangular sedimentation tank with improved water inlet mode
CN203060904U (en) Improved advection setting device
CN203256065U (en) Storage regulation tank
CN103195019B (en) A kind of river purifying system and the method by this system purification water quality
CN210505954U (en) Hydrolysis acidification bidirectional inclined plate sedimentation combined tank
CN211912833U (en) Water outlet equipment for removing floating mud in upflow water treatment structure
CN204162504U (en) A kind of outlet system of denitrification filter pool
CN204401774U (en) Underground open type storage pond
CN220530750U (en) Folding shallow radial sedimentation tank
CN205296381U (en) Multi -functional mud pump house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant