CN205091195U - Can apply model test device that movable fracture belt tunnel changing of relative positions of passing through of triaxial stress destroyed - Google Patents

Can apply model test device that movable fracture belt tunnel changing of relative positions of passing through of triaxial stress destroyed Download PDF

Info

Publication number
CN205091195U
CN205091195U CN201520639558.4U CN201520639558U CN205091195U CN 205091195 U CN205091195 U CN 205091195U CN 201520639558 U CN201520639558 U CN 201520639558U CN 205091195 U CN205091195 U CN 205091195U
Authority
CN
China
Prior art keywords
test chamber
side wall
framework
horizontal
lifting jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520639558.4U
Other languages
Chinese (zh)
Inventor
周辉
沈峥
朱国金
张传庆
胡大伟
卢景景
渠成堃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201520639558.4U priority Critical patent/CN205091195U/en
Application granted granted Critical
Publication of CN205091195U publication Critical patent/CN205091195U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a can apply model test device that movable fracture belt tunnel changing of relative positions of passing through of triaxial stress destroyed, through first horizontal loading device, first vertical loading device and first vertical loading device carry out the triaxial loading to the indoor sample of first test cavity, through the vertical loading device of second, horizontal loading device of third and the vertical loading device of third to the third test cavity indoor experiment the triaxial loading carries out, through first vertical loading device and vertical loading device power output of second and the horizontal loading device of second, the vertical loading device of second to the second test cavity indoor experiment the triaxial loading carries out, realize through a drive arrangement and the 2nd drive arrangement that the experimental cavity misorientation of first experimental cavity and third moves to the simulation of realization relative changing of the relative positions between the weak geologic body in to the activity upper and lower dish of fracture belt and fracture belt, the displacement allocation schema and the evolution law of geologic body in the fracture belt responds for disclosing tunnel (hole) country rock when obtaining the changing of the relative positions of activity fracture belt, and scientific design struts the system and provides reliable laboratory facilities.

Description

A kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress
Technical field
The utility model relates to mechanical models for rock mass rig for testing technical field, refers to a kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress particularly.
Background technology
In order to adapt to Chinese national economy fast development, need in the field such as traffic, water conservancy to build the engineerings such as a large amount of tunnel (hole).China belongs to earthquake-prone countries, and moving fault band extensively distributes, and has inevitably passed through active breaking belt in recent years at the many traffic tunnels of construction of the West Region, hydraulic tunnel.The interface of active breaking belt has wriggling and the changing of the relative positions two kinds of forms of motion: wriggling displacement is general less, generally direct and instant destruction can not be caused to engineering structure, but larger wriggling displacement also can affect to job facilities, engineering can be considered by the mode of prearrangement of deformation amount; The changing of the relative positions often can cause earthquake, not only produces permanent ground displacement but also can produce violent earthquake motion, and this function influence is very large, the engineering structure near interface and facility generally can be made to produce unrepairable and destroy.Therefore, the Response Mechanism in tomography tunnel (hole) is passed through under research zone of fracture changing of the relative positions effect, the damage failure mode of research tunnel structure, and study the impact effect of the correlative factors such as zone of fracture changing of the relative positions mode, changing of the relative positions speed, changing of the relative positions distance, Tunnel footpath size, there is important practical value and future in engineering applications widely, to advancing the research of Discontinuous Rock Mass mechanics, there is great scientific meaning.
Model test is visual in image, can the qualitative or reflection natural rock mass mechanical characteristic relevant with underground works quantitatively, and the influencing each other of the underground engineering structure that is associated with it, and mutually can verify with mathematical model; The particularly important is physical simulation can more all sidedly, Simulation of Complex underground engineering structure, complex geological structure, complicated subterranean strata syntagmatic truly.Therefore model test be widely used in tunnel (hole) construction and research in.
At present, the model test both at home and abroad about active breaking belt changing of the relative positions pattern has carried out extensive work, but model test equipment and method there are the following problems:
1) complete often through simple shearing equipment in model test, stress be applied for single shaft or twin shaft, lack the tunnel changing of the relative positions failure mechanism research considered under condition of triaxial stress;
2) in model test sample, the shear layer thickness of the weak band of simulation is less, because stress such as to concentrate at the factor, cannot go out the truth of the interface place changing of the relative positions of flabbily plastid and the upper and lower dish of zone of fracture by real simulation.
3) model test equipment is after stress applies, and cannot carry out tunnel excavation to model sample.
Can the tunnel changing of the relative positions destroys in the active breaking belt of feasible simulation model test equipment owing to lacking, the research of problems is carried out mainly through numerical simulation, and this is disadvantageous for the tunnel support construction of passing through active breaking belt.
Utility model content
The purpose of this utility model is exactly the deficiency that will solve above-mentioned background technology, a kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress is provided, to carry out three axle loadings to test specimen, simulation tunnel and active breaking belt, to realize the simulation of the upper and lower dish of active breaking belt with the flabbily relative changing of the relative positions between plastid in zone of fracture.
The technical solution of the utility model is: changing of the relative positions damage model test device in tunnel in a kind of active breaking belt, comprise base, described base top is longitudinally set side by side with rectangular and for loading sample the first test chamber successively, second test chamber and the 3rd test chamber, the longitudinal rear wall of described first test chamber, horizontal left side wall and vertical upper side wall corresponding and first longitudinal charger respectively, first horizontal charger is connected with the output terminal of the first vertical loading device, the horizontal left side wall of described second test chamber is connected with the output terminal of the second horizontal charger and the second vertical loading device with vertical upper side wall is corresponding respectively, the longitudinal front side wall of described 3rd test chamber, horizontal left side wall and vertical upper side wall be corresponding and second longitudinal charger respectively, 3rd horizontal charger is connected with the output terminal of the 4th vertical loading device, described base top is longitudinally disposed with and described first test chamber, the second test chamber and the 3rd test chamber is coated on interior and longitudinally through the first framework, the second framework and the 3rd framework, described first framework and the 3rd base of frame respectively corresponding the first slide rail by transversely arranging, the second slide rail are connected with described base sliding, and described base both sides are corresponding to be provided with and to drive the first framework and the 3rd framework transversely the first drive unit of movement and the second drive unit respectively, described second base of frame is fixedly installed on described base.
In such scheme:
Described base top is longitudinally disposed with the first force bearing plate be positioned at outside the first test chamber and the second force bearing plate be positioned at outside the 3rd test chamber, described first longitudinal charger and second longitudinal charger include several longitudinal lifting jack, the holder correspondence of described longitudinal lifting jack is fixedly installed on the medial surface of described first force bearing plate and the second force bearing plate, the output terminal of described longitudinal lifting jack is corresponding and be provided with the first steel ball plate and the first fixed head between the longitudinal rear wall of the first test chamber and the 3rd test chamber longitudinal direction front side wall, described first steel ball plate is fixedly connected on the output terminal of described longitudinal lifting jack, described first fixed head correspondence is fixedly installed on outside the longitudinal front side wall of the longitudinal rear wall of described first test chamber and the 3rd test chamber.
Described first horizontal charger, second horizontal charger and the 3rd horizontal charger include several horizontal lifting jack, the equal correspondence of holder of described horizontal lifting jack is fixedly installed on described first framework, inside the horizontal left side wall of the second framework and the 3rd framework, the output terminal of described horizontal lifting jack is corresponding and be provided with the second steel ball plate and the second fixed head between the first test chamber and the 3rd test chamber transverse direction left side wall, described second steel ball plate is fixedly connected on the output terminal of described horizontal lifting jack, described second fixed head correspondence is fixedly installed on outside the horizontal left side wall of described first test chamber and the 3rd test chamber, high-pressure gasbag is provided with between the output terminal correspondence of described horizontal lifting jack and the horizontal left side wall of the second test chamber.
Described first vertical loading device, second vertical loading device and the 3rd vertical loading device include several vertical lifting jack, the equal correspondence of holder of described vertical lifting jack is fixedly installed on described first framework, inside the vertical upper side wall of the second framework and the 3rd framework, the output terminal of described vertical lifting jack is corresponding and be provided with the 3rd steel ball plate and the 3rd fixed head between the first test chamber and the 3rd vertical upper side wall of test chamber, described 3rd steel ball plate is fixedly connected on the output terminal of described vertical lifting jack, described 3rd fixed head correspondence is fixedly installed on outside described first test chamber and the 3rd vertical upper side wall of test chamber, high-pressure gasbag is provided with between outside the corresponding and second test chamber's upper side wall of the output terminal of described vertical lifting jack.
The 4th steel ball plate and the 4th fixed head is provided with between the horizontal right side wall correspondence of described first framework and the 3rd framework and the horizontal right side wall of described first test chamber and the 3rd test chamber, described 4th steel ball plate correspondence is fixedly installed on inside the horizontal right side wall of described first framework and the 3rd framework, and described 4th fixed head correspondence is fixedly located at outside the horizontal right side wall of described first test chamber and the 3rd test chamber; High-pressure gasbag is provided with between the horizontal right side wall of described second framework and described second test chamber.
Described first drive unit and the second drive unit include load stake and drive lifting jack, described load stake is fixedly installed on described base both lateral sides, the holder of described driving lifting jack is fixedly installed on described load stake inside portion, described driving lifting jack output shaft is transversely arranged, and described driving lifting jack output terminal correspondence is connected with described first framework and the 3rd framework lateral sidewalls.
The utility model at the trial, sample is placed on the first test chamber respectively, in second test chamber and the 3rd test chamber, by the first horizontal charger, first longitudinal charger and the first vertical loading device carry out three axle loadings to the sample in the first test chamber, by second longitudinal charger, 3rd horizontal charger and the 3rd vertical loading device carry out three axle loadings to the test in the 3rd test chamber, by first longitudinal charger and second longitudinal charger power output and the second horizontal charger, second vertical loading device carries out three axle loadings to the test in the second test chamber, and realize the first test chamber to horizontal side by the first drive unit and move, realize the 3rd test chamber by the second drive unit to move to horizontal opposite side, first test chamber and the 3rd test chamber move round about, to realize the simulation of the upper and lower dish of active breaking belt with the flabbily relative changing of the relative positions between plastid in zone of fracture, the Displacements Distribution pattern of geologic body and Evolution thereof in zone of fracture during to obtain the active breaking belt changing of the relative positions, for disclosing the response of tunnel (hole) country rock, scientific design support system provides reliable laboratory facilities.
Accompanying drawing explanation
Fig. 1 is structure front elevation of the present utility model;
Fig. 2 is the schematic top plan view of Fig. 1;
Fig. 3 is the A-A schematic cross-section of Fig. 1;
Fig. 4 is the B-B schematic cross-section of Fig. 1.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
A kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress of the present embodiment, comprise base 1, base 1 can be set up in parallel by two and the spaced guide rail of tool is formed; Base 1 top of the present embodiment is longitudinally set side by side with rectangular and for first test chamber 3 of test chamber 2, second of loading sample and the 3rd test chamber 4 successively, the first longitudinal rear wall of test chamber 2, horizontal left side wall are connected with the output terminal of first longitudinal charger, the first horizontal charger and the first vertical loading device with vertical upper side wall is corresponding respectively, to realize carrying out three axle loadings to the sample 5 in the first test chamber 2; The 3rd longitudinal front side wall of test chamber 4, horizontal left side wall are connected with the output terminal of second longitudinal charger, the 3rd horizontal charger and the 3rd vertical loading device with vertical upper side wall is corresponding respectively, to realize carrying out three axle loadings to the sample 7 in the 3rd test chamber 4; And the second horizontal left side wall of test chamber 3 is connected with the output terminal of the second horizontal charger and the second vertical loading device with vertical upper side wall is corresponding respectively, realize carrying out transverse direction and vertical loading to the sample 6 in the second test chamber 3 by the second horizontal charger and the second vertical loading device, it is longitudinally loaded as first longitudinal charger and second longitudinal charger power output is passed to sample 6 by sample 5, sample 7.
The present embodiment is longitudinally disposed with the first test chamber 2 on base 1 top, second test chamber 3 and the 3rd test chamber 4 are coated on the first interior and longitudinally through framework 8, second framework 9 and the 3rd framework 10, corresponding the first slide rail 11 by transversely arranging respectively bottom first framework 8 and the 3rd framework 10, second slide rail 12 is slidably connected with base 1, and the second framework 9 bottom welding is fixedly installed on base 1, the present embodiment is provided with in base 1 both sides correspondence and drives the first framework 8 and the 3rd framework 10 transversely the first drive unit of movement and the second drive unit respectively, realize the first test chamber 2 by the first drive unit to move to horizontal side, realize the 3rd test chamber 4 by the second drive unit to move to horizontal opposite side, first test chamber 2 and the 3rd test chamber 4 move round about, to realize on active breaking belt, the simulation of lower wall and the flabbily relative changing of the relative positions between plastid in zone of fracture, geologic body Displacements Distribution pattern and Evolution thereof in zone of fracture during to obtain the active breaking belt changing of the relative positions, for disclosing the response of tunnel (hole) country rock, scientific design support system provides reliable laboratory facilities.
The present embodiment is longitudinally disposed with the first force bearing plate 13 be positioned at outside the first test chamber 2 and the second force bearing plate 14 be positioned at outside the 3rd test chamber 4 on base 1 top, first longitudinal charger and second longitudinal charger include several longitudinal lifting jack 15, the holder correspondence of longitudinal lifting jack 15 is fixedly installed on the medial surface of the first force bearing plate 13 and the second force bearing plate 14, the output terminal of longitudinal lifting jack 15 is corresponding and be provided with the first steel ball plate 16 and the first fixed head 17 between the first longitudinal rear wall of test chamber 2 and the 3rd longitudinal front side wall of test chamber 4, first steel ball plate 16 is fixedly connected on the output terminal of longitudinal lifting jack 15, first fixed head correspondence is fixedly installed on outside the first longitudinal rear wall of test chamber 7 and the 3rd longitudinal front side wall of test chamber 12.
The first horizontal charger of the present embodiment, second horizontal charger and the 3rd horizontal charger include several horizontal lifting jack 18, the equal correspondence of holder of horizontal lifting jack 18 is fixedly installed on the first framework 8, inside the horizontal left side wall of the second framework 9 and the 3rd framework 10, the output terminal of horizontal lifting jack 18 is corresponding and be provided with the second steel ball plate 19 and the second fixed head 20 between the first test chamber 2 and the 3rd horizontal left side wall of test chamber 4, second steel ball plate 19 is fixedly connected on the output terminal of horizontal lifting jack 18, second fixed head 20 correspondence is fixedly installed on outside the first test chamber 2 and the 3rd horizontal left side wall of test chamber 4, high-pressure gasbag 29 is provided with between the output terminal correspondence of horizontal lifting jack 18 and the horizontal left side wall of the second test chamber.
First vertical loading device of the present embodiment, second vertical loading device and the 3rd vertical loading device include several vertical lifting jack 21, the equal correspondence of holder of vertical lifting jack 21 is fixedly installed on the first framework 8, inside the vertical upper side wall of the second framework 9 and the 3rd framework 10, the 3rd steel ball plate 22 and the 3rd fixed head 23 is provided with between the vertical upper side wall of the output terminal correspondence of vertical lifting jack 21 and the first test chamber 2 and the 3rd test chamber 4, 3rd steel ball plate 22 is fixedly connected on the output terminal of vertical lifting jack 21, 3rd fixed head 23 correspondence is fixedly installed on outside the vertical upper side wall of the first test chamber 2 and the 3rd test chamber 4, high-pressure gasbag 29 is provided with between outside corresponding and the second test chamber 3 upper side wall of the output terminal of vertical lifting jack 21.
The 4th steel ball plate 24 and the 4th fixed head 25 is provided with between the horizontal right side wall correspondence of the present embodiment first framework 8 and the 3rd framework 10 and the horizontal right side wall of the first test chamber 2 and the 3rd test chamber 4,4th steel ball plate 24 correspondence is fixedly installed on inside the horizontal right side wall of the first framework 8 and the 3rd framework 10, and the 4th fixed head 25 correspondence is fixedly located at outside the horizontal right side wall of the first test chamber 2 and the 3rd test chamber 4; High-pressure gasbag 29 is provided with between the horizontal right side wall of the second framework 9 and the second test chamber 3.
In the present embodiment, the lifting jack of each charger in loading procedure, the power of applying non-perpendicular to steel ball plate, by using steel ball plate, the power in parallel steel ball plate face can be eliminated, only retain the power perpendicular to steel ball plate face, and by fixed head, power is passed to sample; Simultaneously can also ensure that the first framework 8 and the 3rd framework 10 are when transverse shifting, specimen surface by the force moment perpendicular to specimen surface.
In addition, the present embodiment is the sample in the first test chamber 2 and the 3rd test chamber 4 is hard rock test, and the sample 6 in the second test chamber 3 is soft rock sample, because the elastic modulus of soft rock sample is less, stress deformation amount is larger, therefore the fixed head not adopting rigidity larger transmits, and be provided with high-pressure gasbag 29 by the vertical upper side wall of the second test chamber 3, horizontal left side wall and horizontal right side wall.
First drive unit of the present embodiment and the second drive unit include load stake 26 and drive lifting jack 27, load stake 26 is fixedly installed on base 1 both lateral sides, the holder of lifting jack 27 is driven to be fixedly installed on load stake 27 inside portion, drive lifting jack 27 output shaft transversely to arrange, drive lifting jack 27 output terminal correspondence to be connected with the first framework 8 and the 3rd framework 10 lateral sidewalls.
The process of the test of the present embodiment is:
1, before using, the excavation hole 28 of multiple coaxial setting need be reserved with on the first force bearing plate 13, second force bearing plate 14, first steel ball plate 16, first fixed head 17 longitudinally arranged;
2, sample is put into test chamber respectively;
3, each steel ball plate, fixed head are in place;
4, each charger is in place, simultaneously prestrain, applies a less power, make sample, steel ball plate, fixed head, sample chambers close contact;
5, start each charger, load by the stress condition of design, arrive stress condition, stop loading and keeping stress constant;
6, by corresponding excavation equipment, by reserved excavation hole 28, Excavation simulation tunnel;
7, start the first drive unit and the second drive unit, according to the speed of test design, slowly promote the first framework 8, the 3rd framework 10, make the first sample chambers 2 and the 3rd test chamber 4 relative to the changing of the relative positions of the second test chamber 3;
8, test figure is recorded, analyzing and processing test findings.
The above is only preferred embodiment of the present utility model, not does any pro forma restriction to structure of the present utility model.Every above embodiment is done according to technical spirit of the present utility model any simple modification, equivalent variations and modification, all still belong in the scope of the technical solution of the utility model.

Claims (6)

1. one kind can apply the model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction of triaxial stress, comprise base (1), described base (1) top is longitudinally set side by side with rectangular and for loading sample the first test chamber (2) successively, second test chamber (3) and the 3rd test chamber (4), the longitudinal rear wall of described first test chamber (2), horizontal left side wall and vertical upper side wall corresponding and first longitudinal charger respectively, first horizontal charger is connected with the output terminal of the first vertical loading device, the horizontal left side wall of described second test chamber (3) is connected with the output terminal of the second horizontal charger and the second vertical loading device with vertical upper side wall is corresponding respectively, described 3rd test chamber (4) longitudinal front side wall, horizontal left side wall and vertical upper side wall be corresponding and second longitudinal charger respectively, 3rd horizontal charger is connected with the output terminal of the 3rd vertical loading device, described base (1) top is longitudinally disposed with described first test chamber (2), second test chamber (2) and the 3rd test chamber (4) are coated on interior and longitudinally through the first framework (8), second framework (9) and the 3rd framework (10), described first framework (8) and the 3rd framework (10) bottom corresponding the first slide rail (11) by transversely arranging respectively, second slide rail (12) and described base (1) are slidably connected, described base (1) both sides correspondence is provided with and drives the first framework (8) and the 3rd framework (10) transversely the first drive unit of movement and the second drive unit respectively, described second framework (9) bottom is fixedly installed on described base (1).
2. a kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress according to claim 1, it is characterized in that: described base (1) top is longitudinally disposed with the first force bearing plate (13) being positioned at the first test chamber (2) outside and the second force bearing plate (14) being positioned at the 3rd test chamber (4) outside, described first longitudinal charger and second longitudinal charger include several longitudinal lifting jack (15), the holder correspondence of described longitudinal lifting jack (15) is fixedly installed on the medial surface of described first force bearing plate (13) and the second force bearing plate (14), the output terminal of described longitudinal lifting jack (15) is corresponding and be provided with the first steel ball plate (16) and the first fixed head (17) between the first test chamber (2) longitudinal rear wall and the 3rd test chamber (4) longitudinal front side wall, described first steel ball plate (16) is fixedly connected on the output terminal of described longitudinal lifting jack (15), described first fixed head (17) correspondence is fixedly installed on outside the longitudinal rear wall of described first test chamber (2) and the 3rd test chamber (4) longitudinal front side wall.
3. a kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress according to claim 1, it is characterized in that: described first horizontal charger, second horizontal charger and the 3rd horizontal charger include several horizontal lifting jack (18), the equal correspondence of holder of described horizontal lifting jack (18) is fixedly installed on described first framework (8), inside the horizontal left side wall of the second framework (9) and the 3rd framework (10), the output terminal of described horizontal lifting jack (18) is corresponding and be provided with the second steel ball plate (19) and the second fixed head (20) between the first test chamber (2) and the 3rd test chamber (4) horizontal left side wall, described second steel ball plate (19) is fixedly connected on the output terminal of described horizontal lifting jack (18), described second fixed head (20) correspondence is fixedly installed on outside described first test chamber (2) and the 3rd test chamber (4) horizontal left side wall, high-pressure gasbag (29) is provided with between the output terminal correspondence of described horizontal lifting jack (18) and the horizontal left side wall of the second test chamber.
4. a kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress according to claim 1, it is characterized in that: described first vertical loading device, second vertical loading device and the 3rd vertical loading device include several vertical lifting jack (21), the equal correspondence of holder of described vertical lifting jack (21) is fixedly installed on described first framework (8), inside the vertical upper side wall of the second framework (9) and the 3rd framework (10), the 3rd steel ball plate (22) and the 3rd fixed head (23) is provided with between the vertical upper side wall of the output terminal correspondence of described vertical lifting jack (21) and the first test chamber (2) and the 3rd test chamber (4), described 3rd steel ball plate (22) is fixedly connected on the output terminal of described vertical lifting jack (21), described 3rd fixed head (23) correspondence is fixedly installed on outside the vertical upper side wall of described first test chamber (2) and the 3rd test chamber (4), high-pressure gasbag (29) is provided with between outside corresponding and the second test chamber (3) upper side wall of the output terminal of described vertical lifting jack (21).
5. a kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress according to claim 1, it is characterized in that: between the horizontal right side wall correspondence of described first framework (8) and the 3rd framework (10) and the horizontal right side wall of described first test chamber (2) and the 3rd test chamber (4), be provided with the 4th steel ball plate (24) and the 4th fixed head (25), described 4th steel ball plate (24) correspondence is fixedly installed on inside the horizontal right side wall of described first framework (8) and the 3rd framework (10), described 4th fixed head (25) correspondence is fixedly located at outside the horizontal right side wall of described first test chamber (2) and the 3rd test chamber (4), high-pressure gasbag (29) is provided with between the horizontal right side wall of described second framework (9) and described second test chamber (3).
6. a kind of model test apparatus passing through active breaking belt tunnel changing of the relative positions destruction applying triaxial stress according to claim 1, it is characterized in that: described first drive unit and the second drive unit include load stake (26) and drive lifting jack (27), described load stake (26) is fixedly installed on described base (1) both lateral sides, the holder of described driving lifting jack (27) is fixedly installed on described load stake (26) inside portion, described driving lifting jack (27) output shaft is transversely arranged, described driving lifting jack (27) output terminal correspondence is connected with described first framework (8) and the 3rd framework (10) lateral sidewalls.
CN201520639558.4U 2015-08-21 2015-08-21 Can apply model test device that movable fracture belt tunnel changing of relative positions of passing through of triaxial stress destroyed Expired - Fee Related CN205091195U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520639558.4U CN205091195U (en) 2015-08-21 2015-08-21 Can apply model test device that movable fracture belt tunnel changing of relative positions of passing through of triaxial stress destroyed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520639558.4U CN205091195U (en) 2015-08-21 2015-08-21 Can apply model test device that movable fracture belt tunnel changing of relative positions of passing through of triaxial stress destroyed

Publications (1)

Publication Number Publication Date
CN205091195U true CN205091195U (en) 2016-03-16

Family

ID=55481870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520639558.4U Expired - Fee Related CN205091195U (en) 2015-08-21 2015-08-21 Can apply model test device that movable fracture belt tunnel changing of relative positions of passing through of triaxial stress destroyed

Country Status (1)

Country Link
CN (1) CN205091195U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067438A (en) * 2015-08-21 2015-11-18 中国科学院武汉岩土力学研究所 Model testing device capable of applying three-axis stress for tunnel dislocation destruction when movable fault zone is penetrated
CN108982219A (en) * 2018-08-01 2018-12-11 北方工业大学 Tunnel fault dislocation model test device and dislocation model test system
CN113189302A (en) * 2021-04-20 2021-07-30 山东大学 Dynamic disaster testing system and method for water and mud inrush caused by deep tunnel crossing active fracture
CN114136793A (en) * 2021-10-19 2022-03-04 中国铁路设计集团有限公司 Experimental method and experimental device for tunnel crossing double fault

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067438A (en) * 2015-08-21 2015-11-18 中国科学院武汉岩土力学研究所 Model testing device capable of applying three-axis stress for tunnel dislocation destruction when movable fault zone is penetrated
CN105067438B (en) * 2015-08-21 2017-10-27 中国科学院武汉岩土力学研究所 A kind of model test apparatus for passing through the changing of the relative positions destruction of active breaking belt tunnel for applying triaxial stress
CN108982219A (en) * 2018-08-01 2018-12-11 北方工业大学 Tunnel fault dislocation model test device and dislocation model test system
CN113189302A (en) * 2021-04-20 2021-07-30 山东大学 Dynamic disaster testing system and method for water and mud inrush caused by deep tunnel crossing active fracture
CN113189302B (en) * 2021-04-20 2023-06-02 山东大学 System and method for testing dynamic disasters caused by water and mud burst during crossing of movable fracture of deep buried tunnel
CN114136793A (en) * 2021-10-19 2022-03-04 中国铁路设计集团有限公司 Experimental method and experimental device for tunnel crossing double fault
CN114136793B (en) * 2021-10-19 2024-01-12 中国铁路设计集团有限公司 Experimental method and experimental device for tunnel crossing double faults

Similar Documents

Publication Publication Date Title
CN105067438A (en) Model testing device capable of applying three-axis stress for tunnel dislocation destruction when movable fault zone is penetrated
US10969314B2 (en) Device and method for anchor bolt (cable) supporting structure test and anchoring system performance comprehensive experiment
US11048002B1 (en) Visualization system for simulating excavation of fluid-structure interaction tunnel
CN207198149U (en) One kind is based on numerical simulation study close-in seamses group's water-retaining production experimental provision
CN110243701B (en) Torsion shear test device and method for anchored rock mass
CN205091195U (en) Can apply model test device that movable fracture belt tunnel changing of relative positions of passing through of triaxial stress destroyed
CN110346216B (en) Coal rock triaxial loading test device and method under condition of simulated tunneling disturbance
CN201352179Y (en) Integral testing apparatus of shield tunnel structural model
CN105865820B (en) A kind of laboratory testing rig and method for simulating deep tunnel excavation
CN210775067U (en) True triaxial test system for simulating different temperature influences of deep rock mass
CN112461670B (en) Static and dynamic loading experiment machine and method for simulating underground roadway tunneling and drilling operation
CN110261234B (en) Fractured rock mass separation layer anchoring control simulation test device and method
CN101435746A (en) Comprehensive test system of shield tunnel construction model
CN102944665A (en) Shear box applicable to rock joint shearing, seepage and coupling tests and test method
US11835431B1 (en) True three-dimensional physical simulation system for influence of fault movement on tunnel operation and test method
CN103076128A (en) Tunnel three-dimensional stress field simulator
CN110595909A (en) True triaxial test system and method for simulating influence of different temperatures of deep rock mass
CN108519293A (en) A kind of true triaxial rock shearing seepage experimental apparatus
CN202994353U (en) Tunnel three dimensional stress field stimulation system
CN104089822B (en) Deep mining stress field evolution process test method
CN104535413B (en) A kind of seepage field temperature field simulation coupling material bin and TBM cutting test platforms
CN112881188B (en) Laboratory three-dimensional dynamic rock breaking test system and method
CN112098221B (en) Analog simulation device and experimental method for stability of coal pillar of mine underground reservoir
CN105952445A (en) Boring test method under high ground stress condition based on mathematical and physical model
CN103760096A (en) Lateral pressurizing similar stimulation experiment device and experiment method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160316

Termination date: 20200821