CN205088833U - Laboratory is with suspension type water, electricity, gas, air pipe system device - Google Patents

Laboratory is with suspension type water, electricity, gas, air pipe system device Download PDF

Info

Publication number
CN205088833U
CN205088833U CN201520906936.0U CN201520906936U CN205088833U CN 205088833 U CN205088833 U CN 205088833U CN 201520906936 U CN201520906936 U CN 201520906936U CN 205088833 U CN205088833 U CN 205088833U
Authority
CN
China
Prior art keywords
water
pipeline
gas
laboratory
electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520906936.0U
Other languages
Chinese (zh)
Inventor
季祥义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI EAST TEACHING CO Ltd
Original Assignee
SHANGHAI EAST TEACHING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EAST TEACHING CO Ltd filed Critical SHANGHAI EAST TEACHING CO Ltd
Priority to CN201520906936.0U priority Critical patent/CN205088833U/en
Application granted granted Critical
Publication of CN205088833U publication Critical patent/CN205088833U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model provides a laboratory is with suspension type water, electricity, gas, air pipe system device, includes suspension type duct assembly and ground unit, suspension type duct assembly passes through the jib to be fixed on the crossbeam and roof in laboratory, suspension type duct assembly includes keel frame, waste gas air pipe, drainage pipe, water supply pipe, gas pipeline and waste gas recovery unit for the experiment, waste gas air pipe locates inside keel frame's the upper frame, drainage pipe, water supply pipe and for the experiment gas pipeline all locate inside lower floor's frame of keel frame, the top of ground unit is located to the waste gas recovery unit, this laboratory is with suspension type water, electricity, gas, air pipe system device is equipped with suspension type duct assembly and a plurality of ground unit, has realized the integrated planning and the overall layout of laboratory water supply, power supply, drainage, does not bury the formula construction with not needing, and it is simple and convenient to be under construction, and it is strong to design pleasing to the eye wholeness.

Description

A kind of use for laboratory ceiling mounting type water, electricity, gas, ventiduct system device
Technical field
The utility model relates to laboratory corollary equipment, is specifically related to a kind of use for laboratory ceiling mounting type water, electricity, gas, ventiduct system device.
Background technology
At present, laboratory draining substantially: 1, adopt ditching cover plate on floor, there is the problem underground construction modes such as effusions; 2, floor value is buried, needs when a problem occurs to chisel examine and replace, and impact around.General employing of supplying water is buried, needs to chisel examine and replace when there is seepage, and impact around.Faculty and Students' experiment electricity consumption is also that employing is buried, once occur that leaky has great potential safety hazard and needs to chisel maintenance, long construction period, cost are high.What traditional experiment room adopted is buried or the toxic emission mode of suspension, and the buried toxic emission Embedment Construction cycle is long, and cost is high; When occurring that Leakage Gas is repaired cumbersome.Existing traditional experiment room experiment gas needs construction separately, lays special pipeline; Be unfavorable for the integrated planning in laboratory, affect integral layout.
Utility model content
The technical problems to be solved in the utility model is to provide that a kind of construction cost is low, short construction period, maintenance are convenient, safe and reliable, be designed beautifully, globality is strong, scalability good, can expand use for laboratory ceiling mounting type water, electricity, gas, the ventiduct system device of integrated multiple supply except plumbing, power supply and discharge function.
For achieving the above object, the utility model provides following technical scheme: a kind of use for laboratory ceiling mounting type water, electricity, gas, ventiduct system device, comprise ceiling pipeline assembly and surface units, on the crossbeam that described ceiling pipeline assembly is fixed on laboratory by suspension rod and top board, described ceiling pipeline assembly comprises keel shoe, waste-gas ventilation duct, drainage pipe, water supply line, experiment gas pipeline, experimental power supply circuit, illuminating line, waste heat recovery unit, drainage interface, water supply interface and air feed interface, described waste-gas ventilation duct is located at the upper strata lower portion of keel shoe, described drainage pipe, water supply line and experiment gas pipeline are all located at lower floor's lower portion of keel shoe, described drainage pipe is provided with drainage interface, and water supply line is provided with water supply interface, experiment gas pipeline is provided with air feed interface, described experimental power supply circuit and illuminating line are located at the outside of keel shoe, described waste heat recovery unit is located at the top of surface units, and this waste heat recovery unit comprises suspended hood and Universal arm, and wherein suspended hood is connected with Universal arm by pipeline, and described Universal arm is communicated with waste-gas ventilation duct by pipeline, described surface units comprises testing counter, tank, water tap, the dewatering installation that catchments, experimental power supply plate and illuminating lamp, and wherein tank is located at the top of testing counter, and water tap is located at above testing counter, and water tap is connected with water supply interface by pipeline, the described dewatering installation that catchments comprises water tank, water pump, level control switch for water, wherein water tank is located at below tank, is connected with tank by water pipe, and water tank inside is provided with level control switch for water, this level control switch for water is by connection water pump, and this water pump is located in ceiling pipeline assembly, described experimental power supply plate connects experimental power supply circuit by electric wire, and illuminating lamp connects illuminating line by electric wire.
As further scheme of the present utility model: described keel shoe is double-layer frame structure, its material is aluminium, and cross section is convex shape.
As further scheme of the present utility model: described drainage pipe connects purification tank for liquid waste, waste-gas ventilation duct connects exhaust processor.
As further scheme of the present utility model: the outside of described keel shoe is provided with cover plate.
As further scheme of the present utility model: described water supply interface is provided with ball valve, is connected between pipeline with water tap by snap joint.
As further scheme of the present utility model: the water inlet of described water pump connects water tank by pipeline, and delivery port connects drainage interface by pipeline.
As further scheme of the present utility model: described surface units is provided with several, waste heat recovery unit is identical with surface units with the number of water pump, corresponding setting.
Compared with prior art, the beneficial effects of the utility model are: this use for laboratory ceiling mounting type water, electricity, gas, ventiduct system device, is provided with ceiling pipeline assembly and multiple surface units, on the crossbeam that keel shoe is fixed on laboratory by multiple hanger erection and top board, is respectively equipped with drainage pipe in keel shoe, water supply line, experimental power supply circuit and illuminating line, surface units comprises testing counter, and testing counter is provided with tank, water tap, experimental power supply plate and illuminating lamp, experimental power supply plate is communicated with experimental power supply line electricity, illuminating lamp and illuminating line electric connection, water pump and water tank is provided with in testing counter, water tank is connected with the outfall of tank, and the water inlet pipe of water pump is inserted in water tank, and the delivery port of water pump is communicated with drainage pipe, water tap is communicated with water supply line, achieves laboratory water, power supply, the integrated planning of draining and integral layout, desirably buried construction, does not construct simple and convenient, has construction cost low, short construction period, maintenance is convenient, safe and reliable, be designed beautifully, globality is strong, the advantage that scalability is good, can expand integrated except plumbing, multiple supply beyond power supply and discharge function, do not need independent construction during expansion, lays special pipeline, can overcome the toxic emission of traditional experiment room, plumbing, experimental power supply, experiment gas, it is long that combustion gas etc. separate the construction cost height cycle, inconvenience maintenance, the defects such as potential safety hazard, can realize collection laboratory exhaust gas and put, supply water, draining, combustion gas, experiment gas supplies, illumination, experiment power supply etc., to the comprehensive system of experiment waste gas, Wastewater Concentrated, the globality that is designed beautifully is strong.
Accompanying drawing explanation
Fig. 1 is scheme of installation of the present utility model;
Fig. 2 is lateral view of the present utility model;
Fig. 3 is the sectional view of keel shoe;
Fig. 4 is connection diagram of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1-4, in the utility model embodiment, a kind of use for laboratory ceiling mounting type water, electricity, gas, ventiduct system device, comprises ceiling pipeline assembly 1 and surface units 2, and on the crossbeam that described ceiling pipeline assembly 1 is fixed on laboratory by hanger erection and top board, described ceiling pipeline assembly 1 comprises keel shoe 3, waste-gas ventilation duct 4, drainage pipe 5, water supply line 6, experiment gas pipeline 7, experimental power supply circuit 8, illuminating line 9, waste heat recovery unit 10, drainage interface 13, water supply interface 14 and air feed interface 15, described keel shoe 3 is adopt the cross section made of aluminium to be the double-layer frame of convex shape, and described waste-gas ventilation duct 4 is located at the upper strata lower portion of keel shoe 3, described drainage pipe 5, water supply line 6 and experiment gas pipeline 7 are all located at lower floor's lower portion of keel shoe 3, wherein drainage pipe 5 connects purification tank for liquid waste, and waste-gas ventilation duct 4 connects exhaust processor, processes respectively to waste gas and waste water, prevent environment, environment friendly and pollution-free, described drainage pipe 5 is provided with drainage interface 13, and water supply line 6 is provided with water supply interface 14, experiment gas pipeline 7 is provided with air feed interface 15, and wherein air feed interface 15 conduit connectable carries out experiment air feed, described experimental power supply circuit 8 and illuminating line 9 are located at the outside of keel shoe 3, and the outside of described keel shoe 3 is provided with cover plate, described waste heat recovery unit 10 is located at the top of surface units 2, and this waste heat recovery unit 10 comprises suspended hood 11 and Universal arm 12, and wherein suspended hood 11 is connected with Universal arm 12 by pipeline, and described Universal arm 12 is communicated with waste-gas ventilation duct 4 by pipeline, described surface units 2 comprises testing counter 201, tank 202, water tap 203, the dewatering installation 204 that catchments, experimental power supply plate and illuminating lamp, wherein tank 202 is located at the top of testing counter 201, water tap 203 is located at above testing counter 201, water tap 203 is connected with water supply interface 14 by pipeline, this water supply interface 14 is provided with ball valve, is connected between pipeline with water tap 203 by repeatedly fastening snap joint, the described dewatering installation 204 that catchments comprises water tank 205, water pump 206, level control switch for water 207, wherein water tank 205 is located at below tank 202, connected with tank 202 by water pipe, water tank 205 inside is provided with level control switch for water 207, this level control switch for water 207 is by connection water pump 206, this water pump 206 is located in ceiling pipeline assembly 1, and the water inlet of water pump 206 connects water tank 205 by pipeline, and delivery port connects drainage interface 13 by pipeline, described experimental power supply plate connects experimental power supply circuit 8 by electric wire, and illuminating lamp connects illuminating line 9 by electric wire, described surface units 2 is provided with several, two one group, is symmetrical arranged, arrangement in column, corresponding waste heat recovery unit 10 is identical with surface units 2 with the number of water pump 206, corresponding setting.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any Reference numeral in claim should be considered as the claim involved by limiting.
In addition, be to be understood that, although this manual is described according to embodiment, but not each embodiment only comprises an independently technical scheme, this narrating mode of manual is only for clarity sake, those skilled in the art should by manual integrally, and the technical scheme in each embodiment also through appropriately combined, can form other embodiments that it will be appreciated by those skilled in the art that.

Claims (7)

1. a use for laboratory ceiling mounting type water, electricity, gas, ventiduct system device, comprise ceiling pipeline assembly (1) and surface units (2), it is characterized in that, on the crossbeam that described ceiling pipeline assembly (1) is fixed on laboratory by suspension rod and top board, described ceiling pipeline assembly (1) comprises keel shoe (3), waste-gas ventilation duct (4), drainage pipe (5), water supply line (6), experiment gas pipeline (7), experimental power supply circuit (8), illuminating line (9), waste heat recovery unit (10), drainage interface (13), water supply interface (14) and air feed interface (15), described waste-gas ventilation duct (4) is located at the upper strata lower portion of keel shoe (3), described drainage pipe (5), water supply line (6) and experiment gas pipeline (7) are all located at lower floor's lower portion of keel shoe (3), described drainage pipe (5) is provided with drainage interface (13), and water supply line (6) is provided with water supply interface (14), experiment gas pipeline (7) is provided with air feed interface (15), described experimental power supply circuit (8) and illuminating line (9) are located at the outside of keel shoe (3), described waste heat recovery unit (10) is located at the top of surface units (2), this waste heat recovery unit (10) comprises suspended hood (11) and Universal arm (12), wherein suspended hood (11) is connected with Universal arm (12) by pipeline, and described Universal arm (12) is communicated with waste-gas ventilation duct (4) by pipeline, described surface units (2) comprises testing counter (201), tank (202), water tap (203), the dewatering installation that catchments (204), experimental power supply plate and illuminating lamp, wherein tank (202) is located at the top of testing counter (201), testing counter (201) top is located at by water tap (203), and water tap (203) is connected with water supply interface (14) by pipeline, the described dewatering installation that catchments (204) comprises water tank (205), water pump (206), level control switch for water (207), wherein tank (202) below is located at by water tank (205), connected with tank (202) by water pipe, water tank (205) inside is provided with level control switch for water (207), this level control switch for water (207) is by connection water pump (206), and this water pump (206) is located in ceiling pipeline assembly (1), described experimental power supply plate connects experimental power supply circuit (8) by electric wire, and illuminating lamp connects illuminating line (9) by electric wire.
2. a kind of use for laboratory ceiling mounting type water, electricity, gas according to claim 1, ventiduct system device, is characterized in that, described keel shoe (3) is double-layer frame structure, and its material is aluminium, and cross section is convex shape.
3. a kind of use for laboratory ceiling mounting type water, electricity, gas according to claim 1, ventiduct system device, is characterized in that, described drainage pipe (5) connects purification tank for liquid waste, and waste-gas ventilation duct (4) connects exhaust processor.
4. a kind of use for laboratory ceiling mounting type water, electricity, gas according to claim 1, ventiduct system device, it is characterized in that, the outside of described keel shoe (3) is provided with cover plate.
5. a kind of use for laboratory ceiling mounting type water, electricity, gas according to claim 1, ventiduct system device, it is characterized in that, described water supply interface (14) is provided with ball valve, is connected between pipeline with water tap (203) by snap joint.
6. a kind of use for laboratory ceiling mounting type water, electricity, gas according to claim 1, ventiduct system device, it is characterized in that, the water inlet of described water pump (206) connects water tank (205) by pipeline, and delivery port connects drainage interface (13) by pipeline.
7. a kind of use for laboratory ceiling mounting type water, electricity, gas according to claim 1, ventiduct system device, it is characterized in that, described surface units (2) is provided with several, waste heat recovery unit (10) is identical with surface units (2) with the number of water pump (206), corresponding setting.
CN201520906936.0U 2015-11-13 2015-11-13 Laboratory is with suspension type water, electricity, gas, air pipe system device Expired - Fee Related CN205088833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520906936.0U CN205088833U (en) 2015-11-13 2015-11-13 Laboratory is with suspension type water, electricity, gas, air pipe system device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520906936.0U CN205088833U (en) 2015-11-13 2015-11-13 Laboratory is with suspension type water, electricity, gas, air pipe system device

Publications (1)

Publication Number Publication Date
CN205088833U true CN205088833U (en) 2016-03-16

Family

ID=55479534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520906936.0U Expired - Fee Related CN205088833U (en) 2015-11-13 2015-11-13 Laboratory is with suspension type water, electricity, gas, air pipe system device

Country Status (1)

Country Link
CN (1) CN205088833U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106493142A (en) * 2016-10-21 2017-03-15 北京中教开源数码科技有限公司 Ventilation casing intelligence system and experimental provision
CN106978918A (en) * 2017-05-31 2017-07-25 中船第九设计研究院工程有限公司 A kind of biocontainment laboratory process layout design
CN108331230A (en) * 2018-03-20 2018-07-27 上海中科现代实验室设备有限公司 A kind of novel chemical laboratory Lift-on/Lift-off System
CN109750783A (en) * 2018-12-29 2019-05-14 天津永利达盛实验室设备有限公司 A kind of physical and chemical raw laboratory integration Lift-on/Lift-off System
CN110145135A (en) * 2019-06-21 2019-08-20 吉林建筑大学 A kind of public restroom
CN110180853A (en) * 2019-06-21 2019-08-30 广东天智实业有限公司 A kind of ventilation tower crane
CN114592635A (en) * 2022-03-01 2022-06-07 山东龙腾天实验室科技有限公司 Laboratory is with furred ceiling mould side

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106493142A (en) * 2016-10-21 2017-03-15 北京中教开源数码科技有限公司 Ventilation casing intelligence system and experimental provision
CN106978918A (en) * 2017-05-31 2017-07-25 中船第九设计研究院工程有限公司 A kind of biocontainment laboratory process layout design
CN106978918B (en) * 2017-05-31 2023-06-20 中船第九设计研究院工程有限公司 Biological safety laboratory process layout design
CN108331230A (en) * 2018-03-20 2018-07-27 上海中科现代实验室设备有限公司 A kind of novel chemical laboratory Lift-on/Lift-off System
CN109750783A (en) * 2018-12-29 2019-05-14 天津永利达盛实验室设备有限公司 A kind of physical and chemical raw laboratory integration Lift-on/Lift-off System
CN110145135A (en) * 2019-06-21 2019-08-20 吉林建筑大学 A kind of public restroom
CN110180853A (en) * 2019-06-21 2019-08-30 广东天智实业有限公司 A kind of ventilation tower crane
CN110145135B (en) * 2019-06-21 2023-11-03 吉林建筑大学 Public toilet
CN114592635A (en) * 2022-03-01 2022-06-07 山东龙腾天实验室科技有限公司 Laboratory is with furred ceiling mould side

Similar Documents

Publication Publication Date Title
CN205088833U (en) Laboratory is with suspension type water, electricity, gas, air pipe system device
CN202252596U (en) Quickly-assembled water valve device
CN205445978U (en) Automatic water level control switch of water supply system
CN202755380U (en) Tee joint working well for long-distance large-pipe-diameter underground water delivery main pipe system
CN205742269U (en) A kind of segmented electro-thermal road being applied in piping lane
CN204919607U (en) City is prefab for underpass
CN106381904A (en) Variable frequency deep well pump
CN207582572U (en) A kind of convenient buried fire plant
CN204987229U (en) Construct intelligent indoor apparatus of oxygen supply
CN205102053U (en) Novel atomizing removes haze street lamp
CN209312529U (en) A kind of supply and drain water system of buried box type transformer
CN204662557U (en) Portable pressurize pumping plant
CN103074916A (en) Ultra-quiet air-control automatic variable-frequency high-rise building water supply system
CN204212219U (en) Network pressure superposition water supply system is share in life fire-fighting
CN202703095U (en) 3D (three-dimensional) plant wall
CN208486311U (en) A kind of wall-mounted mute supply equipment
CN205839878U (en) Fire water source station
CN203139711U (en) Gas distributing system of filter chamber
CN204958141U (en) Air conditioner on -hook installation elevating gear
CN206174045U (en) Frequency conversion deep -well pump
CN201412764Y (en) 7-shaped outdoor solar lamp
CN205666646U (en) Fill electric pile with multi -functional communication that utility tunnel built jointly
CN204082511U (en) Air compressor automatic control water is stewed
CN208293669U (en) A kind of telescopic fire hydrant
CN209310215U (en) Heat pump factory gas-liquid handles pipe laying system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160316

Termination date: 20211113

CF01 Termination of patent right due to non-payment of annual fee