CN205078287U - Shield tunnel lining segment waterproof construction - Google Patents

Shield tunnel lining segment waterproof construction Download PDF

Info

Publication number
CN205078287U
CN205078287U CN201520845123.5U CN201520845123U CN205078287U CN 205078287 U CN205078287 U CN 205078287U CN 201520845123 U CN201520845123 U CN 201520845123U CN 205078287 U CN205078287 U CN 205078287U
Authority
CN
China
Prior art keywords
jurisdiction
section
shield tunnel
waterproof construction
lining segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520845123.5U
Other languages
Chinese (zh)
Inventor
顾金兴
李达
黄贻近
刘佳
郑杨锐
谢远云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guotun Group Co ltd
State Tunnel Intelligent Equipment Group Guangdong Co ltd
Original Assignee
Guangzhou Guangsui Electromechanical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Guangsui Electromechanical Equipment Co Ltd filed Critical Guangzhou Guangsui Electromechanical Equipment Co Ltd
Priority to CN201520845123.5U priority Critical patent/CN205078287U/en
Application granted granted Critical
Publication of CN205078287U publication Critical patent/CN205078287U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a shield tunnel lining segment waterproof construction, including section of jurisdiction (1) and sealed fill up (3), section of jurisdiction (1) is the arc, the outside of section of jurisdiction (1) is that upstream face (11), inboard back side (12), the arc both sides of being are for face (13) is connected to the piece, the axial both sides connect face (14) for the linkage, the piece of section of jurisdiction (1) is connected face (13) and linkage and is connect and be provided with recess (2) on (14), sealed pad (3) is fixed to set up in recess (2) its characterized in that: the piece of section of jurisdiction (1) is connected face (13) and linkage and is connect on the face (14) still fixed being provided with to meet the water sealing rod (4) that expands. This shield tunnel lining segment waterproof construction has that water -proof effects is good, strong adaptability, efficiency of construction height, construction convenience, characteristics such as with low costs, can ensure the shield tunnel quality, reduces tunnel mending -leakage cost, guarantee subway operation safety and guarantee tunnel life.

Description

Shield tunnel lining segment waterproof construction
Technical field
The utility model belongs to shield tunnel waterproof construction, particularly shield tunnel lining segment waterproof construction.
Background technology
Shield-bored tunnels adopts staggered joint erection to form by lining segment, there is longitudinal joint, there is circumferential weld between section of jurisdiction ring and ring between section of jurisdiction block and block.Segment joint (longitudinal joint, circumferential weld) position water-proof system waterproof ability is poor, and easy percolating water, affects shield tunnel metro operation and application life.There is more defect in existing segments' joints waterproofing method, there is no the segments' joints waterproofing structure of a kind of economy, efficient, easy construction.
Application number be 200920086262.9 Chinese utility model patent disclose a kind of waterproof structure of shield-structured tunnel segment, joint face between the prefabricated lining segment of shield tunnel is provided with at least twice waterproof sealing gasket, wherein one sealing mat position is near upstream face side, another road is near back side side, and above-mentioned sealing mat is installed in the sealing mat groove be located on segment joint face.The method need change lining segment structure, and increase by least one sealing mat groove in lining segment back side side, the method cannot meet the diversity of lining segment, and the scope of application is restricted; If section of jurisdiction is damaged in assembled or next ring progradation, the waterproof sealing gasket of increase is easily destroyed, and does not reach waterproof effect; In the manufacturing process of section of jurisdiction, cannot vibrate in sealing mat groove position, easily occur voids and pits, easily occur percolating water.
Application number be 201210011127.4 Chinese invention patent disclose a kind of waterproof construction of duct pieces of shield tunnel, the circumferential weld water blocking tape that twice are parallel is provided with between the inside and outside wall of shield duct piece, be provided with the vertical water blocking tape of several circumferential welds vertical with circumferential weld water blocking tape between twice circumferential weld water blocking tape, twice circumferential weld water blocking tape is separated into several waterproof subregions by the vertical water blocking tape of circumferential weld.During use, the present invention is duct pieces of shield tunnel water-proof system by expanding to the parallel waterproof of two pass together, and between the circumferential weld water blocking tape that twice are parallel, arranges the vertical water blocking tape of some circumferential welds perpendicular to circumferential weld water blocking tape, forms some waterproof subregions.The method consumptive material is more, and difficulty of construction is large, and efficiency of construction is low.
Utility model content
For the deficiencies in the prior art, problem to be solved in the utility model is to provide a kind of shield tunnel lining segment waterproof construction of general, economic, efficient, easy construction, ensure shield tunnel quality, reduce tunnel mending-leakage cost, ensure safety of subway operation and ensure tunnel application life.
In order to solve the technical problem that the utility model proposes, the utility model discloses a kind of shield tunnel lining segment waterproof construction, comprise section of jurisdiction and sealing mat, described section of jurisdiction is arc, the outside of described section of jurisdiction is upstream face, inner side is back side, arc both sides are sheet joint face, axial both sides are ring joint face, the sheet joint face of described section of jurisdiction and ring joint face are provided with groove, described sealing mat is fixedly installed in groove, it is characterized in that: the sheet joint face of described section of jurisdiction and ring joint face are also fixedly installed water expandable waterstop.
Improve as one of the present utility model, described water expandable waterstop respective slot is arranged and close back side.
Improve as one of the present utility model, described water expandable waterstop is that hydro-expansive rubber material is made.
Improve as one of the present utility model, described water expandable waterstop is fixed on section of jurisdiction by waterproofing materials alite paste.
Improve as one of the present utility model, the groove on the sheet joint face of described section of jurisdiction is the rectangular recess arranged vertically, and the groove on the ring joint face of described section of jurisdiction is arc groove.
Improve as one of the present utility model, described sealing mat is fixed in groove by alite paste.
Generally speaking the utility model has following beneficial effect:
(1) good water-proof effect
Adopt this waterproof construction, can effectively avoid causing the breakage of section of jurisdiction to cause waterproof construction to lose efficacy in section of jurisdiction transport, assembled process.Effectively can enrich lining segment gaping of joints, reach waterproof effect, effectively can avoid the waterproof construction disabler that situation such as section of jurisdiction sealing mat class extruding leakiness, section of jurisdiction faulting of slab ends etc. causes;
(2) applicability is strong
Adopt this waterproof construction, shield tunnel lining segment does not need change structure can reach waterproof object, does not need design water expandable waterstop to install groove;
(3) efficiency of construction is high
Adopt this waterproof construction, only need paste one water-swellable watertight rubber bar, easy construction, can use after can on-the-spot having pasted;
(4) effectively reduce costs
Adopt this waterproof construction, only need set up one water-swellable watertight rubber bar, effectively reduce construction material cost.Adopt this waterproof construction, shield tunnel lining segment breakthrough is few, effectively can reduce subsequent tunnel mending-leakage cost.
Accompanying drawing explanation
Fig. 1 the utility model shield tunnel lining segment waterproof construction circumferential weld plan view;
Fig. 2 the utility model shield tunnel lining segment waterproof construction longitudinal joint plan view;
Fig. 3 the utility model shield tunnel lining segment waterproof construction does not meet schematic diagram under regimen condition;
Schematic diagram under Fig. 4 the utility model shield tunnel lining segment waterproof construction chance regimen condition;
Wherein: 1-section of jurisdiction, 11-upstream face, 12-back side, 13-sheet joint face, 14-ring joint face; 2-groove; 3-sealing mat; 4-water expandable waterstop.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As Fig. 1, Fig. 2, shown in Fig. 3 and Fig. 4, shield tunnel lining segment waterproof construction, comprise section of jurisdiction 1 and sealing mat 3, described section of jurisdiction 1 is arc, the outside of described section of jurisdiction 1 is upstream face 11, inner side is back side 12, arc both sides are sheet joint face 13, axial both sides are ring joint face 14, the sheet joint face 13 of described section of jurisdiction 1 and ring joint face 14 are provided with groove 2, groove 2 on the sheet joint face 13 of described section of jurisdiction 1 is the rectangular recess arranged vertically, groove 2 on the ring joint face 14 of described section of jurisdiction 1 is arc groove, described sealing mat 3 is fixedly installed in groove 2 by alite paste, the sheet joint face 13 of section of jurisdiction 1 and ring joint face 14 are fixedly installed water expandable waterstop 4, wherein on the water expandable waterstop 4 sheet joint face 13 that is fixed on section of jurisdiction 1 by waterproofing materials alite paste and ring joint face 14, described water expandable waterstop 4 respective slot 2 is arranged and close back side 12, wherein water expandable waterstop 4 is made for hydro-expansive rubber material.
Below implementation process of the present utility model is illustrated:
When splicing between section of jurisdiction 1, water expandable waterstop 4 is cut out suitable length, then water expandable waterstop 4 is fixed on the sheet joint face 13 of section of jurisdiction 1 by waterproofing materials alite paste, afterwards section of jurisdiction 1 is mutually permanently connected.
Before the ring that section of jurisdiction 1 forms is mutually assembled, water expandable waterstop 4 is cut out suitable length, adopt 30 ° of grooves connections to become closed circle.With water expandable waterstop 4 inner face brushing waterproofing materials alite paste on the ring joint face 14 of section of jurisdiction 1, then water expandable waterstop 4 is pasted onto on section of jurisdiction 1, during stickup, adopts rubber hammer to beat to guarantee to paste firmly not come off.Lining segment seam is as percolating water, and water-swellable watertight rubber bar gets final product water-swellable, enriches lining segment seam gap, arrives stagnant water effect.
By taking the shaping tunnel of common waterproof construction waterproof and the shaping tunnel contrast that have employed the utility model waterproof construction, the waterproof effect that have employed the utility model waterproof construction is higher than ordinary construction waterproof effect by more than 30%.
By the reading comprehension of above-mentioned detailed description of the invention, those skilled in the art easily can realize the utility model.Content in above-mentioned detailed description of the invention is only schematic, is not to provide for restriction object.Although be described in detail in conjunction with the specific embodiments and illustrated, to one skilled in the art, obviously under the prerequisite not departing from the utility model spirit, various modifications and variations can be made to the utility model.For making the utility model be effectively protected, the utility model appending claims will attempt the technical scheme covering all various modifications and variations fallen within the utility model spirit.

Claims (6)

1. shield tunnel lining segment waterproof construction, comprise section of jurisdiction (1) and sealing mat (3), described section of jurisdiction (1) is arc, the outside of described section of jurisdiction (1) is upstream face (11), inner side is back side (12), arc both sides are sheet joint face (13), axial both sides are ring joint face (14), the sheet joint face (13) of described section of jurisdiction (1) and ring joint face (14) are provided with groove (2), described sealing mat (3) is fixedly installed in groove (2), it is characterized in that: the sheet joint face (13) of described section of jurisdiction (1) and ring joint face (14) are also fixedly installed water expandable waterstop (4).
2. shield tunnel lining segment waterproof construction according to claim 1, is characterized in that: described water expandable waterstop (4) respective slot (2) is arranged and close back side (12).
3. shield tunnel lining segment waterproof construction according to claim 2, is characterized in that: described water expandable waterstop (4) is made for hydro-expansive rubber material.
4. shield tunnel lining segment waterproof construction according to claim 2, is characterized in that: described water expandable waterstop (4) is fixed on section of jurisdiction (1) by waterproofing materials alite paste.
5. shield tunnel lining segment waterproof construction according to claim 1, it is characterized in that: the groove (2) on the sheet joint face (13) of described section of jurisdiction (1) is the rectangular recess arranged vertically, and the groove (2) on the ring joint face (14) of described section of jurisdiction (1) is arc groove.
6. shield tunnel lining segment waterproof construction according to claim 1, is characterized in that: described sealing mat (3) is fixed in groove (2) by alite paste.
CN201520845123.5U 2015-10-27 2015-10-27 Shield tunnel lining segment waterproof construction Active CN205078287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520845123.5U CN205078287U (en) 2015-10-27 2015-10-27 Shield tunnel lining segment waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520845123.5U CN205078287U (en) 2015-10-27 2015-10-27 Shield tunnel lining segment waterproof construction

Publications (1)

Publication Number Publication Date
CN205078287U true CN205078287U (en) 2016-03-09

Family

ID=55430701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520845123.5U Active CN205078287U (en) 2015-10-27 2015-10-27 Shield tunnel lining segment waterproof construction

Country Status (1)

Country Link
CN (1) CN205078287U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150518A (en) * 2016-07-29 2016-11-23 浙江广天构件股份有限公司 A kind of simulation assembling method of duct pieces of shield tunnel
CN106168135A (en) * 2016-09-23 2016-11-30 沈阳建筑大学 Impermeabilisation subway segment
CN106193121A (en) * 2016-08-30 2016-12-07 中铁隧道勘测设计院有限公司 A kind of immersed tube tunnel tube coupling antipriming
CN110017151A (en) * 2019-03-29 2019-07-16 长安大学 A kind of high waterproof shield duct piece of H-shaped that can quickly fix
CN112360517A (en) * 2020-10-16 2021-02-12 中铁十四局集团有限公司 Tunnel lining pipe sheet ring, construction method and tunnel lining

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150518A (en) * 2016-07-29 2016-11-23 浙江广天构件股份有限公司 A kind of simulation assembling method of duct pieces of shield tunnel
CN106150518B (en) * 2016-07-29 2018-02-27 浙江广天构件股份有限公司 A kind of simulation assembling method of duct pieces of shield tunnel
CN106193121A (en) * 2016-08-30 2016-12-07 中铁隧道勘测设计院有限公司 A kind of immersed tube tunnel tube coupling antipriming
CN106168135A (en) * 2016-09-23 2016-11-30 沈阳建筑大学 Impermeabilisation subway segment
CN110017151A (en) * 2019-03-29 2019-07-16 长安大学 A kind of high waterproof shield duct piece of H-shaped that can quickly fix
CN112360517A (en) * 2020-10-16 2021-02-12 中铁十四局集团有限公司 Tunnel lining pipe sheet ring, construction method and tunnel lining
CN112360517B (en) * 2020-10-16 2021-08-03 中铁十四局集团有限公司 Tunnel lining pipe sheet ring, construction method and tunnel lining

Similar Documents

Publication Publication Date Title
CN205078287U (en) Shield tunnel lining segment waterproof construction
CN203161245U (en) Tunnel waterproof duct piece connection structure
CN106988440A (en) A kind of waterproof construction and its construction method at subway station main body and accessory interface
CN110185468A (en) A kind of duct pieces of shield tunnel contact surface bolt hole package water-tight device
CN210033476U (en) Waterproof structure for shield tunnel segment joint
CN110005438A (en) A kind of design of large deformation tunnel cast-in-place structural and construction method for passing through active fault
CN206428674U (en) A kind of hydraulic engineering water dam
CN208763072U (en) A kind of submerged tunnel side wall waterproof structure for deformation seams
CN205243534U (en) Shield tunnel segment ring stitches waterproof construction
CN208884583U (en) A kind of submerged tunnel bottom deformation seam waterproof construction
CN202644587U (en) Subway station main body structure plate deformation gap water-proof structure
CN206360713U (en) A kind of two pass seam waterproof device with segment bolt connector box duct pieces of shield tunnel
CN208982887U (en) Industrial equipment combination type heat insulating component
CN106759521B (en) A kind of underground project waterproof processing structure
CN103742167B (en) Possesses the Structural Test of Tunnel Segments of difference waterproof ability
CN203755469U (en) Waterproof concrete wall combined water stopping system
CN204547227U (en) Carry the waterproof thermal-insulated composite sheet material of self-adhesion of welding edge
CN210217778U (en) Extrusion seal type sealing gasket for caulking of shield tunnel segment
CN203807940U (en) Bridge expansion device
CN204311408U (en) The low temperature resistant corresponding shape rubber fastening band of high-elastic tension
CN203175581U (en) Water-proof structure on shield segment joint of power cable tunnel
CN209555986U (en) A kind of Super-long Basement exterior wall induction crack structure
CN208691851U (en) A kind of bilayer skeleton structure greenhouse
CN106193121A (en) A kind of immersed tube tunnel tube coupling antipriming
CN205976159U (en) Curtain expansion joint waterproof construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160721

Address after: 510000 layer 1-3, No. 23, No. 96, No. twelve new road, Yongning Street, Guangzhou, Guangdong, Zengcheng

Patentee after: GUANGZHOU JIANHENG MECHANICAL AND ELECTRICAL EQUIPMENT INSTALLATION CO.,LTD.

Address before: Zengcheng Yongning Street twelve Guangdong province Lai new road 510000 Guangzhou City No. 96 building 23, No. 112 1-3 layer (the core area of Zengcheng economic and Technological Development Zone)

Patentee before: GUANGZHOU GUANGSUI ELECTROMECHANICAL EQUIPMENT Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170912

Address after: 511300, No. 112, No. 23, No. 1-3, Lai twelve Road, 96 Yongning Road, Guangdong, Guangzhou, Zengcheng (Zengcheng economic and Technological Development Zone, core area)

Patentee after: Guangdong Guang Suijianheng mechanical & electronic equipment corporation, Ltds

Address before: 510000 layer 1-3, No. 23, No. 96, No. twelve new road, Yongning Street, Guangzhou, Guangdong, Zengcheng

Patentee before: GUANGZHOU JIANHENG MECHANICAL AND ELECTRICAL EQUIPMENT INSTALLATION CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200521

Address after: 529728 5th floor, block F3, 068 Jianshe Road, Heshan Gonghe Town, Jiangmen City, Guangdong Province (for office use only)

Patentee after: Heshan guangtun tunnel intelligent technology equipment Co.,Ltd.

Address before: 511300 23, 112, Lixin twelve Road, Yongning Street, Zengcheng, Guangzhou, Guangdong, 112, 1-3 (Zengcheng economic and Technological Development Zone core area)

Patentee before: Guangdong Guang Suijianheng mechanical & electronic equipment corporation, Ltds

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room B02, building 2, No.11, Yutang Road, Gonghe Town, Heshan City, Jiangmen City, Guangdong Province 529700

Patentee after: Guotun Group Co.,Ltd.

Address before: Room B02, building 2, No.11, Yutang Road, Gonghe Town, Heshan City, Jiangmen City, Guangdong Province 529700

Patentee before: State tunnel intelligent equipment group (Guangdong) Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room B02, building 2, No.11, Yutang Road, Gonghe Town, Heshan City, Jiangmen City, Guangdong Province 529700

Patentee after: State tunnel intelligent equipment group (Guangdong) Co.,Ltd.

Address before: 529728 5th floor, block F3, no.068, Gonghe Road, Heshan Town, Jiangmen City, Guangdong Province (only for office use)

Patentee before: Heshan guangtun tunnel intelligent technology equipment Co.,Ltd.