CN205077864U - Unwrapping wire hole funnel mould - Google Patents
Unwrapping wire hole funnel mould Download PDFInfo
- Publication number
- CN205077864U CN205077864U CN201520753145.9U CN201520753145U CN205077864U CN 205077864 U CN205077864 U CN 205077864U CN 201520753145 U CN201520753145 U CN 201520753145U CN 205077864 U CN205077864 U CN 205077864U
- Authority
- CN
- China
- Prior art keywords
- unwrapping wire
- wire hole
- mould
- jack
- upper shed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides an unwrapping wire hole funnel mould to the confession sets up on every layer of concrete floor and then forms unwrapping wire hole, and unwrapping wire hole funnel mould includes: being the mould body of infundibulate, enclosing to close through the polylith template of mutual concatenation and form, the mould body includes upper shed and under shed, and the opening of upper shed is greater than the under shed, and the under shed is used for passing concrete floor, the jack is seted up in two arbitrary relative templates of mould body, insert and establish the piece, insert and locate on the jack and appear that this is external in the mould, the mould body through insert establish support spacing on concrete floor. The utility model provides a current keep somewhere that the unwrapping wire hole exists such as exchange the positioning, easily drop, reuse rate subalternation defect to the further efficiency and the quality of keeping somewhere the construction of unwrapping wire hole that improve.
Description
Technical field
The utility model is specifically related to a kind of unwrapping wire hole funnel mould had enough to meet the need.
Background technology
At present, building engineering structure survey mark position is vertically transmitted mainly through plumb aligner, and so, every one deck all will arrange unwrapping wire hole in permanent position.
Traditional equipment, method that stays adopts wooden model nail square box processed to be fixed on plate soffit formwork by nail, and adopting indwelling unwrapping wire hole in this way has following defect:
1) lumps of wood box is fixed insecure, easy positioning, indwelling position is caused to be forbidden, move because hole is biased after concreting is complete and also need to pick cutter reaming, time serious, even box is directly touched down, concreting is complete also will perforate again, later stage reaming and again to pick the concrete structure disturbance of open holes to firm final set larger;
2) tub is cube structure, stays the hole edge set as straight wall, and the later stage cap holes concrete restraint forces of building is less easily to drop, and is easy to cause security incident;
3) can not use be had enough to meet the need, all need during each formwork again to follow closely tub processed, lost labor, and different owing to making workman, and cause size to vary, hole excessive causes structural safety hidden danger, and two is be unfavorable for that later stage hole is closed.
Utility model content
For overcoming the defect existing for prior art, now providing a kind of unwrapping wire hole funnel mould, to solve such as easily positioning existing for existing indwelling unwrapping wire hole, easily drop, to reuse the defects such as rate variance, and improving efficiency and the quality of the construction of indwelling unwrapping wire hole further.
For achieving the above object, provide a kind of unwrapping wire hole funnel mould, for being arranged on every layer concrete floor and then forming unwrapping wire hole hole, unwrapping wire hole funnel mould comprises:
In funnel shaped die ontology, enclosed by the polylith template of mutually splicing and form, die ontology comprises upper shed and under shed, and the opening of upper shed is greater than under shed, and under shed is used for through concrete floor;
Jack, is opened in two pieces of templates of the Arbitrary Relative of die ontology;
Plug part, being inserted on jack and being revealed in outside die ontology, die ontology is by plugging part support limit on concrete floor.
The beneficial effect of the utility model unwrapping wire hole funnel mould is,
1) under shed of die ontology is through concrete floor, to realize accurate location, prevents the phenomenon of positioning;
2) infundibulate die ontology in shape with wide top and narrow bottom, the after-pouring concrete making to be positioned at unwrapping wire hole hole location can not slump downwards;
3) on die ontology, opening jack, arranged by this jack and plug part, plug part to be formed in die ontology outward, by plugging the effect of part to die ontology formation support limit, ensureing the stability of die ontology in concrete after-pouring process.
Preferably, upper shed is provided with lift-pull handle.
Preferably, the curved and two ends of lift-pull handle are fixed in two diagonal angles of upper shed respectively, and then lift-pull handle is located in upper shed.
Preferably, template is steel sheet and has four pieces, adjacent two pieces of templates welding splicing.
Preferably, upper shed and under shed are in square, and each length of side of upper shed is 200mm, and each length of side of under shed is 100mm.
Preferably, jack is vertically offered, and plugging part is wedge tabular, plugs part and comprises narrow end and wide end, and narrow end inserts in jack, wide end level be revealed in die ontology outer for vertical support on concrete floor.
Preferably, jack is pin hole, and plugging part is plug blades or pinboard.
Accompanying drawing explanation
Fig. 1 is the perspective view of the utility model unwrapping wire hole funnel mould;
Fig. 2 is that first of corresponding diagram 1 implements view;
Fig. 3 is that second of corresponding diagram 2 implements view;
Fig. 4 is that the 3rd of corresponding diagram 3 implements view;
Fig. 5 is that the 4th of corresponding diagram 4 implements view.
Detailed description of the invention
For the benefit of to the understanding of structure of the present utility model, be described below in conjunction with drawings and Examples.
With reference to Fig. 1, it is the perspective view of the utility model unwrapping wire hole funnel mould.As shown in Figure 1, the utility model provides a kind of unwrapping wire hole funnel mould, for being arranged on every layer concrete floor and then forming unwrapping wire hole hole, unwrapping wire hole funnel mould comprises: in funnel shaped die ontology 1, enclosed by the polylith template of mutually splicing and form, die ontology 1 comprises upper shed 10 and under shed 12, and the opening of upper shed 10 is greater than under shed 12, and under shed 12 is for passing concrete floor; Jack 2, is opened in two pieces of templates of the Arbitrary Relative of die ontology 1; Plug part 3, being inserted on jack 2 and being revealed in outside die ontology 1, die ontology 1 is by plugging part 3 support limit on concrete floor.
Particularly, upper shed 10 is provided with lift-pull handle 4, and the curved and two ends of lift-pull handle 4 are fixed in two diagonal angles of upper shed 10 respectively, and then lift-pull handle 4 is located in upper shed 10.In addition, jack 2 is vertically offered, and plug part 3 in wedge tabular, plug part 3 and comprise narrow end 30 and wide end 32, narrow end 30 inserts in jack 2, wide end 32 level be revealed in die ontology 1 outer for vertical support on concrete floor.
Comparatively preferably, the template of die ontology 1 is steel sheet and has four pieces, and adjacent two pieces of templates welding splicing, the height of die ontology 1 is 200mm.Upper shed 10 and under shed 12 are in square, and each length of side of upper shed 10 is 200mm, and each length of side of under shed 12 is 100mm.Jack 2 is the pin hole of the wide 4mm of long 20mm, and pin hole is positioned on the same straight line in the centre position of die ontology 1, and plugging part 3 is the plug blades or pinboard that 2mm is thick.
After having said structure feature, the utility model can by following implementation Process:
A. as shown in Figure 1, a complete unwrapping wire hole funnel mould is made by said structure feature;
B. as shown in Figure 2, in the unwrapping wire hole setting position perforate 90 treating formwork for placing 9 of floor, two are plugged part 3 and be seated both sides in die ontology 1 respectively, then under shed 12 correspondence of die ontology 1 is positioned over perforate 90 position for the treatment of formwork for placing 9;
C. as shown in Figure 3, by the under shed 12 of die ontology 1 by perforate 90 through treating formwork for placing 9, treat on formwork for placing 9 until plug part 3 against being supported in, and then stable being arranged at of funnel mould is treated on formwork for placing 9;
D. as shown in Figure 4, in treating concreting on formwork for placing 9 until reach the design thickness of floor, due to the existence of funnel mould, the inside of funnel mould hollow isolates from outside Concrete in Natural and forms unwrapping wire hole hole;
E. as shown in Figure 5, in floorslab concrete initial set before not solidifying completely, constructor will plug part 3 by under shed 12 and pound out socket from die ontology 1 inside, finally, by lift-pull handle 4, funnel mould is upwards mentioned, in the process that funnel mould is mentioned, funnel mould also can not destroy the concrete of unwrapping wire hole hole periphery, molding effect is better, with this, completes all construction sequences.
After completing above-mentioned implementation process, following characteristics of the present utility model should be able to be embodied:
The unwrapping wire hole funnel mould of the application is convenient to practice of construction application, and ensure that staying of unwrapping wire hole establishes position correct, regular, significantly improve operating efficiency, the Forming Quality of building rear unwrapping wire hole hole is high.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain.
Claims (7)
1. a unwrapping wire hole funnel mould, for being arranged on every layer concrete floor and then forming unwrapping wire hole hole, it is characterized in that, described unwrapping wire hole funnel mould comprises:
In funnel shaped die ontology, enclosed by the polylith template of mutually splicing and form, described die ontology comprises upper shed and under shed, and the opening of described upper shed is greater than described under shed, and described under shed is used for through described concrete floor;
Jack, is opened in two pieces of described templates of Arbitrary Relative;
Plug part, to be inserted on described jack and to be revealed in outside described die ontology, plugging part support limit described in described die ontology passes through on described concrete floor.
2. unwrapping wire hole according to claim 1 funnel mould, is characterized in that,
Described upper shed is provided with lift-pull handle.
3. unwrapping wire hole according to claim 2 funnel mould, is characterized in that,
Curved and the two ends of described lift-pull handle are fixed in two diagonal angles of described upper shed respectively, and then described lift-pull handle is located in described upper shed.
4. unwrapping wire hole according to claim 1 funnel mould, is characterized in that,
Described template is steel sheet and has four pieces, adjacent two pieces of described template welding splicings.
5. unwrapping wire hole according to claim 1 funnel mould, is characterized in that,
Described upper shed and described under shed are in square, and each length of side of described upper shed is 200mm, and each length of side of described under shed is 100mm.
6. unwrapping wire hole according to claim 1 funnel mould, is characterized in that,
Described jack is vertically offered, the described part that plugs is wedge tabular, the described part that plugs comprises narrow end and wide end, and described narrow end inserts in described jack, described wide end level be revealed in described die ontology outer for vertical support on described concrete floor.
7. unwrapping wire hole according to claim 6 funnel mould, is characterized in that,
Described jack is pin hole, described in plug part be plug blades or pinboard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520753145.9U CN205077864U (en) | 2015-09-25 | 2015-09-25 | Unwrapping wire hole funnel mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520753145.9U CN205077864U (en) | 2015-09-25 | 2015-09-25 | Unwrapping wire hole funnel mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205077864U true CN205077864U (en) | 2016-03-09 |
Family
ID=55430278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520753145.9U Expired - Fee Related CN205077864U (en) | 2015-09-25 | 2015-09-25 | Unwrapping wire hole funnel mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205077864U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110900797A (en) * | 2019-11-22 | 2020-03-24 | 湖南建工五建建筑工业化有限公司 | Manufacturing process of reserved PC wire pipe wiring hole of PC prefabricated part |
-
2015
- 2015-09-25 CN CN201520753145.9U patent/CN205077864U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110900797A (en) * | 2019-11-22 | 2020-03-24 | 湖南建工五建建筑工业化有限公司 | Manufacturing process of reserved PC wire pipe wiring hole of PC prefabricated part |
CN110900797B (en) * | 2019-11-22 | 2021-11-30 | 湖南建工五建建筑工业化有限公司 | Manufacturing process of reserved PC wire pipe wiring hole of PC prefabricated part |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205077864U (en) | Unwrapping wire hole funnel mould | |
CN105019651B (en) | Hollow brick fills wall into the efficient installation engineering method of winding box | |
CN216664115U (en) | A mould for constructing anti-floating anchor rod end stagnant water structure | |
CN207436490U (en) | A kind of wall column bracing means | |
CN204001722U (en) | A kind of pump line and unwrapping wire through-flooring reserved opening steel bushing mould | |
CN206230658U (en) | A kind of strip thickness control concrete pad mould | |
CN104074354A (en) | Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template | |
CN203924102U (en) | Building implements foundation bolt preformed hole construction mould | |
CN207499431U (en) | The making mold of hollow lintel | |
CN203429798U (en) | Embedded bar structure for horizontal secondary structure of super high-rise | |
CN207469596U (en) | A kind of beam column outer rim is exempted to tear concrete mold open | |
CN203347220U (en) | Double-screw aluminum alloy formwork | |
CN110387875A (en) | Connector cutting device and its construction method | |
CN203462591U (en) | Embedded type points warehouse seam | |
CN204626949U (en) | Shear wall formwork | |
CN203257091U (en) | Beam column joint concrete forming die | |
CN203808209U (en) | Shaping combined steel moulding plate for reinforced concrete building structure water draining side ditch | |
CN106193595A (en) | One can take out strip type stair formwork erecting method | |
CN205444643U (en) | Building garbage recovery's foraminiferous building block of four generating circle head crosss and brickwork thereof | |
CN203891474U (en) | Device for mounting rowed junction boxes on shear wall | |
CN206888513U (en) | A kind of corner constructional column based on the mixed structure of block | |
CN203795846U (en) | Construction die for making slopes on floor drain sides | |
CN108166753B (en) | Embedding device and method for steel ladder stand in slip form construction | |
CN204225752U (en) | The anti-error cat ladder of a kind of pre-buried type | |
CN204401858U (en) | V-arrangement exempts from building block of slotting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |