CN205062673U8 - A kind of bridge construction drilling platform - Google Patents
A kind of bridge construction drilling platform Download PDFInfo
- Publication number
- CN205062673U8 CN205062673U8 CN201520822550.1U CN201520822550U CN205062673U8 CN 205062673 U8 CN205062673 U8 CN 205062673U8 CN 201520822550 U CN201520822550 U CN 201520822550U CN 205062673 U8 CN205062673 U8 CN 205062673U8
- Authority
- CN
- China
- Prior art keywords
- drilling
- makeup
- platform
- sleeve
- bridge construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 74
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 239000002023 wood Substances 0.000 claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 claims description 4
- 239000004927 clay Substances 0.000 claims description 3
- 230000013011 mating Effects 0.000 abstract 1
- 238000001556 precipitation Methods 0.000 abstract 1
- 238000004537 pulping Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 101100194817 Caenorhabditis elegans rig-6 gene Proteins 0.000 description 1
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Earth Drilling (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
[0001] 本实用新型涉及建筑施工设备领域,特别涉及一种桥梁施工钻孔平台。The utility model relates to the field of building construction equipment, particularly a kind of bridge construction drilling platform.
背景技术Background technique
[0002] 跨河桥梁水中墩施工,一般根据水深情况采用筑岛施工、围堰、钢板粧、浮箱平台、钢套箱、沉井等施工技术,这些施工方法适用于大型桥梁的施工,然而对于市政桥梁,由于道路路幅较宽,承台小而长,或者是单粧单柱,土质较软,不适合采用以上类型的施工方法。The construction of piers in the water of the bridge across the river generally adopts the construction techniques such as island construction, cofferdam, steel plate makeup, floating box platform, steel casing box, caisson according to the water depth situation, these construction methods are applicable to the construction of large-scale bridges, yet For municipal bridges, the above types of construction methods are not suitable due to the wide road width, small and long caps, or single-column single-column and soft soil.
实用新型内容Utility model content
[0003] 本实用新型所要解决的技术问题是提供一种桥梁施工钻孔平台,采用在河道中打入木粧平台进行水中钻孔粧、墩柱以及盖梁,以达到能够高效、快捷、低成本地在市政桥梁情况下施工的目的。The technical problem to be solved by this utility model is to provide a kind of bridge construction drilling platform, adopt to drive into the wooden makeup platform in the river channel to carry out water drilling, pier column and cover beam, to achieve high efficiency, fast, low For the purpose of local construction in the case of municipal bridges.
[0004] 为实现上述目的,本实用新型提供以下的技术方案:一种桥梁施工钻孔平台,其特征在于:所述桥梁施工钻孔平台包括木粧排架,木粧排架由若干打入钻孔粧两侧的圆木粧组成,且每侧两排,排与排之间横向间距0.8米,纵向间距I米,木粧排架顶部设有横梁,横梁为6米木粧,横梁与木粧排架采用4-6颗扒钉连接,木粧排架避开钻孔粧的位置每3米左右对称打斜撑,横梁上方设有钻机平台,钻机平台由横向搭设的方木组成,且相邻方木间距为0.8米,钻孔粧上方不设方木,并在粧位两侧加固,钻机平台上方通过扒钉固定有钻机行走杠,钻孔粧上方设有套筒,套筒呈上大下小的两同轴圆管形,套筒与钻孔粧有5厘米的缝隙,且缝隙使用麻布和粘土填塞。For achieving the above object, the utility model provides following technical scheme: a kind of bridge construction drilling platform, it is characterized in that: described bridge construction drilling platform comprises wooden makeup racks, and wooden makeup racks are driven into by some The log makeup on both sides of the drilling makeup is formed, and two rows on each side, the horizontal spacing between the row and the row is 0.8 meters, and the longitudinal spacing is 1 meter. The wooden makeup racks are connected by 4-6 nails. The wooden makeup racks avoid the position of drilling makeup and are symmetrically braced every 3 meters. There is a drilling rig platform above the beam, and the drilling rig platform is composed of horizontally erected square wood. And the distance between the adjacent square wood is 0.8 meters, there is no square wood above the drilling makeup, and it is reinforced on both sides of the makeup position. The drilling rig walking bar is fixed on the top of the drilling rig platform by the nails, and there is a sleeve above the drilling makeup. It is in the shape of two coaxial circular tubes, the upper and the lower. There is a 5 cm gap between the sleeve and the drilling makeup, and the gap is filled with burlap and clay.
[0005] 优选的,所述制造木粧排架的圆木粧为5-7米长,小头直径不小于10厘米。Preferably, the log makeup of the described manufacturing wooden makeup rack is 5-7 meters long, and the small head diameter is not less than 10 centimeters.
[0006] 优选的,所述制造钻机平台的方木的截面为20X20厘米的正方形。Preferably, the section of the square wood of the described manufacturing drilling rig platform is the square of 20 * 20 centimeters.
[0007] 优选的,所述套筒由厚度为0.4厘米的钢板制造,且套筒的上部高度是下部高度的两倍以上。[0007] Preferably, the sleeve is made of a steel plate with a thickness of 0.4 centimeters, and the upper height of the sleeve is more than twice the height of the lower part.
[0008] 采用以上技术方案的有益效果是:该桥梁施工钻孔平台的木粧排架由若干打入钻孔粧两侧的圆木粧组成,木粧排架顶部设有横梁,横梁为6米木粧,横梁与木粧排架采用4-6颗扒钉连接,横梁上方设有钻机平台,钻机平台由横向搭设的方木组成,且相邻方木间距为0.8米,钻机平台上方通过扒钉固定有钻机行走杠,钻孔粧上方设有套筒,套筒呈上大下小的两同轴圆管形,该钻孔平台创造性地采用了木粧排架作为支架,搭建钻机平台,并配合套筒,在钻机平台上安装钻机,对钻孔粧进行施工作业,钻孔时,先进行慢速造浆,然后使用小泥浆栗抽出泥浆,再使用大泥浆栗将经过沉淀的泥浆打入钻孔中进行循环,工作效率高,安全性好。The beneficial effect of adopting above technical scheme is: the wooden makeup rack of this bridge construction drilling platform is made up of some log makeups that are driven into both sides of the drilling hole, and the top of the wooden makeup rack is provided with a beam, and the beam is 6 For rice wooden makeup, the beam and the wooden makeup rack are connected by 4-6 nails. There is a drilling rig platform above the beam. The drilling rig platform is composed of square wood erected horizontally, and the distance between adjacent square wood is 0.8 meters. The drilling rig is fixed with the walking bar of the drilling rig, and there is a sleeve above the drilling makeup. The sleeve is in the shape of two coaxial circular tubes, the upper and the lower. The drilling platform creatively uses the wooden makeup rack as a bracket to build the drilling rig platform , and cooperate with the sleeve, install the drilling rig on the drilling rig platform, and carry out construction work on the drilling makeup. When drilling, first make slurry at a slow speed, then use a small mud pump to extract the mud, and then use a large mud pump to remove the sedimented mud. It is driven into the drilling hole for circulation, with high work efficiency and good safety.
附图说明Description of drawings
[0009] 下面结合附图对本实用新型的具体实施方式作进一步详细的描述。Embodiment Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in further detail.
[0010] 图1是本实用新型一种桥梁施工钻孔平台的结构示意图;Fig. 1 is the structural representation of a kind of bridge construction drilling platform of the present utility model;
[0011] 图2是图1所示套筒的结构示意图。Fig. 2 is the structural representation of the sleeve shown in Fig. 1.
[0012] 其中,1-木粧排架、2-横梁、3-钻机平台、4-钻机行走杠、5-套筒、6_钻孔粧。Wherein, 1-wooden rack, 2-beam, 3-drilling rig platform, 4-drilling rig walking bar, 5-sleeve, 6-drilling rig.
具体实施方式detailed description
[0013] 下面结合附图详细说明本实用新型一种桥梁施工钻孔平台的优选实施方式。Below in conjunction with accompanying drawing, the preferred embodiment of a kind of bridge construction drilling platform of the present utility model is described in detail.
[0014] 图1和图2出示本实用新型一种桥梁施工钻孔平台的具体实施方式:该桥梁施工钻孔平台包括木粧排架1,木粧排架I由若干打入钻孔粧6两侧的圆木粧组成,且每侧两排,排与排之间横向间距0.8米,纵向间距I米,木粧排架I顶部设有横梁2,横梁2为6米木粧,横梁2与木粧排架I采用4-6颗扒钉连接,木粧排架I避开钻孔粧6的位置每3米左右对称打斜撑,横梁2上方设有钻机平台3,钻机平台3由横向搭设的方木组成,且相邻方木间距为0.8米,钻孔粧6上方不设方木,并在粧位两侧加固,钻机平台3上方通过扒钉固定有钻机行走杠4,钻孔粧6上方设有套筒5,套筒5呈上大下小的两同轴圆管形,套筒5与钻孔粧6有5厘米的缝隙,且缝隙使用麻布和粘土填塞。Fig. 1 and Fig. 2 show the specific embodiment of a kind of bridge construction drilling platform of the present utility model: this bridge construction drilling platform comprises wooden makeup rack 1, and wooden makeup rack 1 is driven into drilling makeup 6 by some The log makeup on both sides forms, and each side two rows, the horizontal spacing 0.8 meters between the row and the row, the longitudinal spacing 1 meter, the wooden makeup rack 1 top is provided with the beam 2, and the beam 2 is 6 meters of wooden makeup, and the beam 2 With the wooden makeup rack 1, 4-6 nails are used to connect, and the wooden makeup rack 1 avoids the position of the drilling makeup 6 and is symmetrical about every 3 meters, and is provided with a drilling rig platform 3 above the beam 2, and the drilling rig platform 3 is formed by It is composed of square wood erected horizontally, and the distance between adjacent square wood is 0.8 meters. There is no square wood above the drilling makeup 6, and it is reinforced on both sides of the makeup position. Above the drilling rig platform 3, the drilling rig walking bar 4 is fixed by nails. There is a sleeve 5 above the hole makeup 6, the sleeve 5 is in the shape of two coaxial circular tubes, the upper and the lower, the sleeve 5 and the hole makeup 6 have a gap of 5 cm, and the gap is filled with linen and clay.
[0015] 结合图1和图2,制造木粧排架I的圆木粧为5-7米长,小头直径不小于10厘米。制造钻机平台3的方木的截面为20X20厘米的正方形。套筒5由厚度为0.4厘米的钢板制造,且套筒5的上部高度是下部高度的两倍以上。In conjunction with Fig. 1 and Fig. 2, the log makeup of making wooden makeup rack 1 is 5-7 meters long, and the small head diameter is not less than 10 centimeters. The cross section of the square wood for making the drilling platform 3 is a square of 20×20 cm. The sleeve 5 is made of a steel plate with a thickness of 0.4 cm, and the upper part of the sleeve 5 is more than twice as high as the lower part.
[0016] 该钻孔平台创造性地采用了木粧排架I作为支架,搭建钻机平台3,并配合套筒5,在钻机平台3上安装钻机,对钻孔粧6进行施工作业,钻孔时,先进行慢速造浆,然后使用小泥浆栗抽出泥浆,再使用大泥浆栗将经过沉淀的泥浆打入钻孔中进行循环,工作效率高,安全性好。This drilling platform creatively adopts the wooden makeup rack 1 as a support, builds the drilling rig platform 3, and cooperates with the sleeve 5, installs the drilling rig on the drilling rig platform 3, and carries out the construction operation to the drilling rig 6, when drilling. , First make slow slurry, then use a small mud pump to extract the mud, and then use a large mud pump to drive the sedimented mud into the borehole for circulation, with high work efficiency and good safety.
[0017] 以上的仅是本实用新型的优选实施方式,应当指出,对于本领域的普通技术人员来说,在不脱离本实用新型创造构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。Above is only the preferred embodiment of the present utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the inventive concept of the present utility model, some distortions and improvements can also be made, these All belong to the protection scope of the present invention.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520822550.1U CN205062673U8 (en) | 2015-10-19 | 2015-10-19 | A kind of bridge construction drilling platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520822550.1U CN205062673U8 (en) | 2015-10-19 | 2015-10-19 | A kind of bridge construction drilling platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN205062673U CN205062673U (en) | 2016-03-02 |
CN205062673U8 true CN205062673U8 (en) | 2016-10-26 |
Family
ID=55389249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520822550.1U Active CN205062673U8 (en) | 2015-10-19 | 2015-10-19 | A kind of bridge construction drilling platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205062673U8 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110748303A (en) * | 2018-07-24 | 2020-02-04 | 长沙望轶机械科技有限公司 | Drilling equipment is used in bridge construction |
-
2015
- 2015-10-19 CN CN201520822550.1U patent/CN205062673U8/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN205062673U (en) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104404861A (en) | Steel trestle provided with steel anchor pile and construction method of steel trestle | |
CN107675713B (en) | Pattern foundation pit supporting structure Larsen steel sheet pile system and construction method | |
CN110409281B (en) | Deepwater bare rock steel trestle | |
CN203795446U (en) | Steel-plate concrete caisson | |
CN102677592A (en) | Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea | |
CN201660892U (en) | Static-pressure pile planting hole leading machine | |
CN206204986U (en) | A kind of civil construction retaining wall structure | |
CN104863177A (en) | Composite retaining wall structure and construction method thereof | |
CN205062673U8 (en) | A kind of bridge construction drilling platform | |
CN203960921U (en) | A kind of existing cut slope stake board wall ruggedized construction | |
CN203654196U (en) | Guide apparatus for large and multifunctional over-water construction platform | |
CN204780990U (en) | Combined type retaining wall structure | |
CN206816180U (en) | A kind of boring three wings drag bit | |
CN205444232U (en) | Stock - gravity type infiltration retaining wall | |
CN201943073U (en) | Middle digging and pile-sinking device of large-caliber pipe pile | |
CN206015511U (en) | One implant post steel pipe column | |
CN106245668A (en) | A kind of truss-like pile foundation and construction method thereof | |
CN203716126U (en) | Chimney type jacket | |
CN204436263U (en) | The double-deck diameter-enlarging drill bit of a kind of civil engineering pile foundation construction | |
CN213508535U (en) | Reinforcement type civil engineering pile foundation construction structures | |
CN201671103U (en) | Integral construction forming platform of underwater pier cap drilled pile | |
CN103835240A (en) | Buoyancy tank type deepwater pile group bridge abutment construction platform and construction method thereof | |
CN210031669U (en) | Water conservancy retaining wall | |
CN203924043U (en) | A kind of bamboo concrete stake | |
CN207348055U (en) | A kind of casing external member for Bridge Pile Foundation Construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CGPU | Change to patent or to utility model | ||
CU01 | Correction of utility model |
Correction item: Patentee Correct: HUIZHOU DAYAWAN MUNICIPAL INFRASTRUCTURE CO., LTD. False: HUIZHOU DAYAWAN MUNICIPAL INFRASTRUCTURE CO., LTD. Number: 09 Page: The title page Volume: 32 |
|
CU03 | Publication of corrected utility model |
Correction item: Patentee Correct: HUIZHOU DAYAWAN MUNICIPAL INFRASTRUCTURE CO., LTD. False: HUIZHOU DAYAWAN MUNICIPAL INFRASTRUCTURE CO., LTD. Number: 09 Volume: 32 |
|
ERR | Gazette correction |