CN205062655U - Bridge deck structure - Google Patents

Bridge deck structure Download PDF

Info

Publication number
CN205062655U
CN205062655U CN201520765837.5U CN201520765837U CN205062655U CN 205062655 U CN205062655 U CN 205062655U CN 201520765837 U CN201520765837 U CN 201520765837U CN 205062655 U CN205062655 U CN 205062655U
Authority
CN
China
Prior art keywords
weighbridge
bridge
deck structure
control room
bridge deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520765837.5U
Other languages
Chinese (zh)
Inventor
肖云聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing University Yuanpei College
Original Assignee
Shaoxing University Yuanpei College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing University Yuanpei College filed Critical Shaoxing University Yuanpei College
Priority to CN201520765837.5U priority Critical patent/CN205062655U/en
Application granted granted Critical
Publication of CN205062655U publication Critical patent/CN205062655U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the technical field of the civil engineering technique and specifically relates to a bridge deck structure. A bridge deck structure, is including setting up the abutment at the bridge both ends, the abutment links up with the embankment mutually, with above -mentioned embankment junction straight go up set up on the bridge road fluted, it has weighbridge to settle in the recess, be equipped with the infrared detector around the weighbridge, weighbridge one end, be equipped with camera and banister machine along the straight direction that goes up the bridge road in, weighbridge one side is equipped with the control room, weighbridge, infrared detector, camera and banister machine electrical connection to control room. The utility model has the advantages of simple structure, reasonable in design can detect vehicle weight and can carry out real time control, prevents that the limit of the super bridge of vehicle from heavily passing a bridge and leading to the destruction to the bridge, has eliminated the potential safety hazard.

Description

Bridge deck structure
Technical field
The utility model relates to technical field of civil engineering, especially a kind of bridge deck structure.
Background technology
Bridge is a kind of macrostructure thing being used for leaping over obstacles, is specifically used to structure traffic route (as road, railway, water channel etc.) or other facilities (as pipeline, cable etc.) being crossed over natural obstacle (as river, straits, valley etc.) or artificial barrier (speedway, railway line).The object of bridge allows people, vehicle, train or boats and ships through obstacle.All bridges have a maximum holding capacity, and for vehicle, the vehicle exceeding how many tons can not go up bridge, or on the vehicle of many high tonnages continuously, bridge is confined.At present, do not have special facility, equipment to control such vehicle, this is the thing of danger close.
Utility model content
The technical problems to be solved in the utility model is: based on the problems referred to above, provides a kind of and can detect vehicle weight and can carry out the real-time bridge deck structure controlled.
The utility model solves the technical scheme that its technical problem adopts: a kind of bridge deck structure, comprise the abutment being arranged on bridge two ends, described abutment is connected mutually with embankment, groove is offered with on the straight upper bridge road of above-mentioned embankment junction, weighbridge is mounted with in described groove, the surrounding of described weighbridge is provided with infrared detector, described weighbridge one end, be provided with camera and barrier gate device along the direction of straight upper bridge road, weighbridge side is provided with control room, and described weighbridge, infrared detector, camera and barrier gate device are electrically connected to control room.
Further, described control room is provided with LED display and speech horn towards a side of weighbridge.LED display can show the weight of weighbridge vehicle, and when vehicle is overweight or front has the vehicle of many identical weight, speech horn can be pointed out forbidden or be waited to go.
Further, be provided with basis in described groove, described weighbridge is placed on basis.Due to pit scale is all the upper vehicle to ton, and general ground holds to can't stand weight long-term like this, is necessary so arrange basis.
Further, in such scheme, described weighbridge is made up of weighing platform, junction box and sensor, and described junction box is positioned at weighing platform middle position, and described sensor is positioned at below weighing platform.
The beneficial effects of the utility model are, structure of the present utility model is simple, reasonable in design, can detect vehicle weight and can control in real time, and the freight weight limit preventing vehicle from surpassing bridge is passed a bridge and causes the destruction to bridge, eliminates potential safety hazard.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of weighbridge in the utility model.
1. grooves, 2. weighbridge, 3. infrared detector, 4. camera, 5. barrier gate device, 6. control room in figure, 7.LED display screen, 8. speech horn, 11. bases, 21. weighing platforms, 22. junction boxes, 23. sensors.
Detailed description of the invention
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
A kind of bridge deck structure as shown in Fig. 1 ~ 2, comprise the abutment being arranged on bridge two ends, abutment is connected mutually with embankment, groove 1 is offered with on the straight upper bridge road of above-mentioned embankment junction, weighbridge 2 is mounted with in groove 1, the surrounding of weighbridge 2 is provided with infrared detector 3, weighbridge 2 one end, direction along straight upper bridge road is provided with camera 4 and barrier gate device 5, weighbridge 2 side is provided with control room 6, weighbridge 2, infrared detector 3, camera 4 and barrier gate device 5 are electrically connected to control room 6, control room 6 is provided with LED display 7 and speech horn 8 towards a side of weighbridge 2.Wherein, be provided with basis 11 in groove 1, weighbridge 2 is placed on basis 11.Weighbridge 2 is made up of weighing platform 21, junction box 22 and sensor 23, and junction box 22 is positioned at weighing platform 21 middle position, and sensor 23 is positioned at below weighing platform 21.
During concrete operations, on vehicle before bridge, can first arrive on the straight upper bridge road with embankment junction, infrared detector 3 pairs of vehicles detect, guarantee that vehicle is in the working range of weighbridge 2, LED display 7 shows the data of weighbridge 2, if data are less than setting, controller 6 controls barrier gate device 5 and opens, and makes vehicle pass-through; If data exceed setting, barrier gate device 5 is not first opened, and speech horn 8 can remind vehicle overload can not go up bridge, then opens barrier gate device 5 and allows head end operation leave; If there are the data that continuous print is higher in the stipulated time, controller 6 can control to open after barrier gate device 5 crosses certain hour again.Meanwhile, camera 4 can real time record gap bridge vehicle, for the Order control on bridge brings convenience.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to right.

Claims (4)

1. a bridge deck structure, comprise the abutment being arranged on bridge two ends, described abutment is connected mutually with embankment, it is characterized in that: offer groove (1) with on the straight upper bridge road of above-mentioned embankment junction, weighbridge (2) is mounted with in described groove (1), the surrounding of described weighbridge (2) is provided with infrared detector (3), described weighbridge (2) one end, direction along straight upper bridge road is provided with camera (4) and barrier gate device (5), weighbridge (2) side is provided with control room (6), described weighbridge (2), infrared detector (3), camera (4) and barrier gate device (5) are electrically connected to control room (6).
2. bridge deck structure according to claim 1, is characterized in that: described control room (6) are provided with LED display (7) and speech horn (8) towards a side of weighbridge (2).
3. bridge deck structure according to claim 1, is characterized in that: be provided with basis (11) in described groove (1), and described weighbridge (2) is placed on basis (11).
4. the bridge deck structure according to claim 1 or 3, it is characterized in that: described weighbridge (2) is made up of weighing platform (21), junction box (22) and sensor (23), described junction box (22) is positioned at weighing platform (21) middle position, and described sensor (23) is positioned at weighing platform (21) below.
CN201520765837.5U 2015-09-30 2015-09-30 Bridge deck structure Expired - Fee Related CN205062655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520765837.5U CN205062655U (en) 2015-09-30 2015-09-30 Bridge deck structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520765837.5U CN205062655U (en) 2015-09-30 2015-09-30 Bridge deck structure

Publications (1)

Publication Number Publication Date
CN205062655U true CN205062655U (en) 2016-03-02

Family

ID=55389232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520765837.5U Expired - Fee Related CN205062655U (en) 2015-09-30 2015-09-30 Bridge deck structure

Country Status (1)

Country Link
CN (1) CN205062655U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111707340A (en) * 2020-07-02 2020-09-25 黑龙江科技大学 Detection device based on thing networking

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111707340A (en) * 2020-07-02 2020-09-25 黑龙江科技大学 Detection device based on thing networking

Similar Documents

Publication Publication Date Title
CN204589858U (en) A kind of nonmotorized vehicle lane automatic lifting hurdle
CN103481892A (en) Urban traffic system with self-driven monorail hoist
CN108196497A (en) A kind of Bridge Erector real-time security monitoring system
CN204551393U (en) Winding type gate pulling force protective device
CN104328745B (en) Across the rotary body device of the little bridge beam of high ferro and construction method thereof on a kind of low-angle
CN104709828A (en) Safety monitoring management system for hoisting equipment
CN114261431B (en) Single track crane turnout control safety management system for underground coal mine transportation
CN204315088U (en) System and device is persuaded to return in the pressure of transfiniting of a kind of expressway access
CN205062655U (en) Bridge deck structure
CN206267063U (en) One kind does not influence machinery plant's road lowering or hoisting gear
CN208818207U (en) A kind of lightning protection hydrometric cableway current surveying device
CN205295967U (en) Large -span continuous beam bridge strides existing station midspan closure section locking structure for rotation construction
CN203902575U (en) Inclined roadway signal comprehensive intelligent sliding-down-proof device
CN204112239U (en) Across the rotary body device of the little bridge beam of high ferro on a kind of low-angle
CN206396678U (en) A kind of safety barrier for intersection
CN204823586U (en) Online safety inspection device of mine hoisting wire rope
CN202023167U (en) Improved movable anti-collision steel pipe cable barrier
CN205775849U (en) A kind of automatic-lifting type is opened the navigation or air flight heavy-duty steel trestle temporarily
CN208646843U (en) A kind of concealed platform safety door gear
CN204151675U (en) The bogie of earth anchored suspension bridge cat road track cable
CN105527114B (en) Crane wind load measurement method
CN203681536U (en) Self-driven monorail hoist urban transport system
CN208413689U (en) A kind of installation maintenance system of highway bridge
CN107761561A (en) A kind of bridge inspection vehicle system
CN203175596U (en) Air door locking device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20170930

CF01 Termination of patent right due to non-payment of annual fee