CN205060605U - A make up and put things in good order frame for forklift speed changing box transportation - Google Patents

A make up and put things in good order frame for forklift speed changing box transportation Download PDF

Info

Publication number
CN205060605U
CN205060605U CN201520648911.5U CN201520648911U CN205060605U CN 205060605 U CN205060605 U CN 205060605U CN 201520648911 U CN201520648911 U CN 201520648911U CN 205060605 U CN205060605 U CN 205060605U
Authority
CN
China
Prior art keywords
strut bar
intubate
spacing
locating piece
pallet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520648911.5U
Other languages
Chinese (zh)
Inventor
余双前
王庆华
司育进
郑吉先
王多双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Heli Co Ltd
Original Assignee
Anhui Heli Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Heli Co Ltd filed Critical Anhui Heli Co Ltd
Priority to CN201520648911.5U priority Critical patent/CN205060605U/en
Application granted granted Critical
Publication of CN205060605U publication Critical patent/CN205060605U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a make up and put things in good order frame for forklift speed changing box transportation, including vertically putting things in good order the transportation frame more than the one deck, the transportation is put up including the outlying main frame, is established the spacing subassembly in the main frame, the main frame is upper and lower two -layer rectangular frame, two last longerons of the upper rectangle frame of main frame, two equal rigid couplings of entablature again will by the isolation crossbeam more than two in the upper end of intubate upper rectangle frame separate into the spacing district more than three that the width equals, all concrete on last longeron at the both ends that keep apart the crossbeam, all be equipped with spacing subassembly in the spacing district, and the spacing subassembly in the adjacent two spacing districts is rotatory 180 central symmetry setting, spacing subassembly includes the bracing piece more than three, and one of them spinal branch vaulting pole is located the one end in spacing district, remains the other end that the bracing piece is located spacing district, the bracing piece is all parallel with last longeron.

Description

For the combination stand for piling up of forklift gear-box transport
Technical field
The utility model belongs to the production logistics field that industrial vehicle manufactures, and is specifically related to the combination stand for piling up for forklift gear-box transport.
Background technology
Modern industry manufacture is progressively to modularization, Virtual production development, and parts are produced and generally manufactured in professional production base, then provides and delivers to each complete machine manufacturing company.Forklift gear-box is fork truck core component, after professional manufactured place completes production, needs to be transported to fork truck car load manufacture base and assembles.
Current forklift gear-box transport courses is as follows: first the change speed gear box rolled off the production line from change speed gear box portion wiring is hung to pallet, then pallet scraper is passed through to delivery place, then in delivery place, every platform change speed gear box is hung on truck successively, and cut off with sleeper between every layer of change speed gear box and connect with iron wire.After transported on trucks to system maker man, again according to part sling change speed gear box, be unloaded on pallet, last scraper pallet is to fork truck general assembly line.
There is following defect in existing forklift gear-box transportation: (1), repeatedly sling workpiece time workpiece between easily collide with, contact with multiple pallet and also easily collide with and pollute, in pallet transport process, workpiece also easily damages gear owing to not locating simultaneously, have impact on the quality of change speed gear box; (2), change speed gear box by truck transport, every part all needs to hang successively on truck, sleeper cuts off, lower part of slinging successively after arrival, entrucking and efficiency of unloading extremely low, labour intensity is large; (3), change speed gear box transhipment flow process loaded down with trivial details, after being transported to complete machine manufacturer, directly can not go up general assembly line, have impact on the organization of production of manufacture, be unfavorable for production control.
Utility model content
Easily collide for solving the workpiece existed in existing forklift gear-box transportation, sling workpiece time easily with the defect such as pallet collides, conveying efficiency is low, the utility model devises the combination stand for piling up transported for forklift gear-box.
For the combination stand for piling up of forklift gear-box transport, comprise the pallet longitudinally piling up more than one deck; Described pallet comprises peripheral main frame 1, the limit assembly be located in main frame; Described main frame 1 is upper and lower two-layer rectangular frame, and four corners of lower floor's rectangle frame of main frame 1 are the intubate 5 vertically arranged, and the two ends of intubate 5 are uncovered; Two longerons of lower floor's rectangle frame and two crossbeams are all fixed in the bottom of intubate 5;
Two upper longeron 2, two entablatrances of the upper strata rectangle frame of described main frame 1 are all fixed in the upper end of intubate 5, by the isolation crossbeam 3 of more than two, described upper strata rectangle frame is separated into the equal spacing zone of more than three of width again, the two ends of described isolation crossbeam 3 are all cemented on longeron 2;
Be equipped with limit assembly in described spacing zone, and the Central Symmetry that the limit assembly in adjacent two spacing zones is rotation 180 ° is arranged;
Described limit assembly comprises the strut bar of more than three, and wherein strut bar is positioned at one end of spacing zone, and residue strut bar is positioned at the other end of spacing zone, and described strut bar is all parallel with upper longeron 2.
Described limit assembly comprises three strut bars, wherein strut bar be fixed in spacing zone one end, be the first strut bar 4, remain two strut bars be fixed in spacing zone the other end, be respectively the second strut bar 20 and the 3rd strut bar 21, second strut bar 20 is positioned at inside the 3rd strut bar 21;
The top that the end face two ends of described first strut bar 4 are respectively equipped with two adjacent side of the first locating piece 9, second locating piece 8, first locating piece 9 is vertical the first block 91, two piece of first block 91 and forms the positioning port of cross-sectional plane in " L " shape; Described second locating piece 8 is identical with the first locating piece 9 structure, and the second locating piece 8 and the first locating piece 9 are symmetrical set; The positioning port of the first locating piece 9 and the positioning port of the second locating piece 8 are all in the middle part of spacing zone;
The end face two ends of described second strut bar 20 are equipped with vertical section in falling second limiting stopper 10 of " V " shape, and the second strut bar 20 between two second side limiting stoppers 10 is vertically provided with end limiting stopper 11;
The end face two ends of described 3rd strut bar 21 are equipped with the 3rd limiting stopper 12 that vertical section is " V " shape.
Be provided with three isolation crossbeams 3 in the upper strata rectangle frame of described main frame 1, described upper strata rectangle frame is separated into four spacing zones by described three isolation crossbeams 2, is equipped with limit assembly in each spacing zone; Described limit assembly comprises three strut bars, is respectively the first described strut bar 4, the second described strut bar 20, the 3rd described strut bar 21.
All coordinate in upper and lower two intubate 5 of adjacent two layers pallet correspondence position and be inserted with inserted link 13; The upper end 15 of described inserted link 13 is in quadrangular frustum pyramid shaped, and the equal fixed cover of upper/lower terminal of inserted link 13 is provided with pipe box 14;
The pipe box 14 of described inserted link 13 upper/lower terminal is connected with the port contact of upper and lower two intubate 5 of correspondence position, the longitudinal spacing that realizes adjacent two layers pallet respectively.
All coordinate in four intubate 5 upper port of top layer pallet and be inserted with inserted link 13, between two inserted links 13 of Width, be all connected with lateral connecting rod 16, the first pipe box 161 engagement sleeves that lateral connecting rod 16 is provided with by two ends is located on inserted link 13;
Between two intubate 5 of length direction, be all connected with longitudinal tie 17, the second pipe box 171 engagement sleeves that longitudinal tie 17 is provided with by two ends is located on inserted link 13, and two lateral connecting rods 16 and two longitudinal ties 17 form oblong and protect and block.
The outside upright of described intubate 5 upper end is connected with in falling the suspension hook 6 of " U " shape.
The end of lower floor's rectangle frame two longeron of described main frame 1 is all fitted with cushion block 7.
Advantageous Effects of the present utility model:
(1), the utility model devise change speed gear box transport Special transportation rack, realize change speed gear box added from portion's wiring, tape holder transports directly to complete machine general assembly line, assembles at general assembly line undercarriage.The utility model simplifies transhipment flow process, reduces lifting number of times, avoids colliding with and polluting, ensure change speed gear box quality, enhance productivity; The guaranteeing the quality of simultaneous adaptation forklift gear-box, efficient and specialized transport.
(2), pallet of the present utility model adopts frame-type rectangular tube structure, first strut bar arranges the first locating piece, the second locating piece, second strut bar and the 3rd strut bar are also equipped with limiting stopper, realize spacing to the change speed gear box be placed in each spacing zone of pallet, widely different multiclass change speed gear box can be realized deposit, realize a frame multiplex.
(3) limit assembly, in the adjacent spacing zone of the utility model two be 180 rotational offset arrange, the change speed gear box in adjacent spacing zone can stagger placement, occupies little space; The top of the change speed gear box in lower floor's pallet is positioned at the framework of upper strata pallet, decreases the height that pallet is piled up, and improves space degree of utilization.
(4), the utility model is designed to layered stacked unitized design, adopts inserting type inserted link to carry out spacing connection, be all connected with suspension hook outside the intubate of every layer of pallet between every layer of pallet, makes the attended operation between pallet simple, convenient; When transporting built on stilts frame and piling up, do not connected by inserted link between adjacent pallet, between adjacent pallet, carry out cross spacing by the suspension hook in four intubate.
(5), the utility model once can carry the upper and lower truck of change speed gear box of more than ten, and the single-piece before comparing lifts one by one, greatly improves entrucking and rate of discharging, reduces labour intensity; After pallet combination is piled up, the change speed gear box of more than three times can be placed in same level space, therefore can overall unloading deliver on fork truck general assembly line, has adapted to the region restriction of complete machine general assembly line, thus has facilitated organization management.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model individual layer pallet structural representation.
Fig. 3 is the utility model hinge pedestal structure schematic diagram.
Fig. 4 is the utility model individual layer pallet Cargo Plan.
Fig. 5 is that figure is piled up in the loading of the utility model pallet.
Fig. 6 is that figure piled up by the built on stilts frame of the utility model transport.
Fig. 7 is the utility model combination stand for piling up application drawing.
Sequence number in upper figure: main frame 1, upper longeron 2, isolation crossbeam 3, first strut bar 4, intubate 5, suspension hook 6, cushion block 7, second locating piece 8, first locating piece 9, first block 91, second limiting stopper 10, end limiting stopper 11, the 3rd limiting stopper 12, inserted link 13, pipe box 14, upper end 15, lateral connecting rod 16, first pipe box 161, longitudinal tie 17, second pipe box 171, mechanical gear box 18, hydraulic transmission box 19, second strut bar 20, the 3rd strut bar 21.
Detailed description of the invention
See Fig. 1, for the combination stand for piling up of forklift gear-box transport, comprise the pallet longitudinally piling up three layers; See Fig. 2, described pallet comprises peripheral main frame 1, the limit assembly be located in main frame; Described main frame 1 is upper and lower two-layer rectangular frame, and four corners of lower floor's rectangle frame of main frame 1 are the intubate 5 vertically arranged, and the two ends of intubate 5 are uncovered, and the outside upright of intubate 5 upper end is connected with in falling the suspension hook 6 of " U " shape; Two longerons of lower floor's rectangle frame and two crossbeams are all fixed in the bottom of intubate 5, and the end of lower floor's rectangle frame two longeron of main frame 1 is all fitted with cushion block 7;
Two upper longeron 2, two entablatrances of the upper strata rectangle frame of described main frame 1 are all fixed in the upper end of intubate 5, by three isolation crossbeams 3, described upper strata rectangle frame is separated into four equal spacing zones of width again, the two ends of described isolation crossbeam 3 are all cemented on longeron 2;
Be equipped with limit assembly in described spacing zone, and the Central Symmetry that the limit assembly in adjacent two spacing zones is rotation 180 ° is arranged;
Described limit assembly comprises three strut bars, wherein strut bar be fixed in spacing zone one end, be the first strut bar 4, remain two strut bars be fixed in spacing zone the other end, be respectively the second strut bar 20 and the 3rd strut bar 21, second strut bar 20 is positioned at inside the 3rd strut bar 21, and described strut bar is all parallel with upper longeron 2;
The top that the end face two ends of described first strut bar 4 are respectively equipped with two adjacent side of the first locating piece 9, second locating piece 8, first locating piece 9 is vertical the first block 91, two piece of first block 91 and forms the positioning port of cross-sectional plane in " L " shape; Described second locating piece 8 is identical with the first locating piece 9 structure, and the second locating piece 8 and the first locating piece 9 are symmetrical set; The positioning port of the first locating piece 9 and the positioning port of the second locating piece 8 are all in the middle part of spacing zone;
The end face two ends of described second strut bar 20 are equipped with vertical section in falling second limiting stopper 10 of " V " shape, and the second strut bar 20 between two second side limiting stoppers 10 is vertically provided with end limiting stopper 11;
The end face two ends of described 3rd strut bar 21 are equipped with the 3rd limiting stopper 12 that vertical section is " V " shape.
All coordinate in upper and lower two intubate 5 of adjacent two layers pallet correspondence position and be inserted with inserted link 13; See Fig. 3, the upper end 15 of described inserted link 13 is in quadrangular frustum pyramid shaped, and the equal fixed cover of upper/lower terminal of inserted link 13 is provided with pipe box 14; The pipe box 14 of described inserted link 13 upper/lower terminal is connected with the port contact of upper and lower two intubate 5 of correspondence position, the longitudinal spacing that realizes adjacent two layers pallet respectively.
All coordinate in four intubate 5 upper port of top layer pallet and be inserted with inserted link 13, between two inserted links 13 of Width, be all connected with lateral connecting rod 16, the first pipe box 161 engagement sleeves that lateral connecting rod 16 is provided with by two ends is located on inserted link 13; Between two intubate 5 of length direction, be all connected with longitudinal tie 17, the second pipe box 171 engagement sleeves that longitudinal tie 17 is provided with by two ends is located on inserted link 13, and two lateral connecting rods 16 and two longitudinal ties 17 form oblong and protect and block.
Concrete use procedure of the present utility model is as follows.
(1), see Fig. 4, bottom pallet is on the ground by cushion block 7, and lifting forklift gear-box is positioned on bottom pallet, and wherein change speed gear box one end is dropped on the first locating piece 9 and the second locating piece 8 and supported, end face and side automatic spacing.The change speed gear box other end drops on the second strut bar 20, the 3rd strut bar 21, and spacing by the second limiting stopper 10, the 3rd limiting stopper 12;
Repeat above step, lift other three change speed gear boxs and be placed in other three spacing zones of pallet, wherein each spacing zone had both been applicable to mechanical gear box 18, was applicable to again hydraulic transmission box 19, and the change speed gear box in adjacent spacing zone becomes 180 degree of placements of staggering.
(2), see Fig. 5, after bottom pallet has been freighted, manually getting four portable inserted links 13 is inserted in the intubate 5 of bottom pallet four corners respectively, then utilize suspension hook 6 to lift another pallet to pile up, the lower port of another pallet intubate 5 is inserted into four inserted link 13 upper ends, and process of piling up leads by the truncated rectangular pyramids 15 on inserted link 13 top.Repeat step (1), change speed gear box is placed on successively on another pallet described.
(3), according to actual needs, repeat step (2), the longitudinal direction realizing multilayer pallet is piled up and the lifting of change speed gear box is placed.
(4), see Fig. 7, in four intubate of top layer pallet, be all inserted with inserted link 13, two pieces longitudinal tie 17 and lateral connecting rod 16 be connected on the inserted link 13 of top layer pallet, form oblong guardrail.By the space between the upper and lower crossbeam of bottom pallet, the stand for piling up scraper longitudinally connected by multilayer pallet is on truck.
(5), see Fig. 6, after change speed gear box is transported to complete system plant, change speed gear box pallet need return recycling, for improving the space occupancy rate that empty frame returns, individual layer pallet is directly piled up, the intubate 5 of upper strata pallet is directly fallen in the intubate 5 of lower floor's pallet, and by intubate 5 with suspension hook 6 realize the spacing of the unloaded pallet of adjacent two layers.Pile up six layers of rear shovel to transport on truck transport and return.

Claims (6)

1. for the combination stand for piling up of forklift gear-box transport, it is characterized in that: comprise the pallet longitudinally piling up more than one deck; Described pallet comprises peripheral main frame (1), the limit assembly be located in main frame;
Described main frame (1) is upper and lower two-layer rectangular frame, and four corners of lower floor's rectangle frame of main frame (1) are the intubate (5) vertically arranged, and the two ends of intubate (5) are uncovered; Two longerons of lower floor's rectangle frame and two crossbeams are all fixed in the bottom of intubate (5);
Two upper longerons (2) of the upper strata rectangle frame of described main frame (1), two entablatrances are all fixed in the upper end of intubate (5), by the isolation crossbeam (3) of more than two, described upper strata rectangle frame is separated into the equal spacing zone of more than three of width again, the two ends of described isolation crossbeam (3) are all cemented on longeron (2);
Be equipped with limit assembly in described spacing zone, and the Central Symmetry that the limit assembly in adjacent two spacing zones is rotation 180 ° is arranged;
Described limit assembly comprises the strut bar of more than three, and wherein strut bar is positioned at one end of spacing zone, and residue strut bar is positioned at the other end of spacing zone, and described strut bar is all parallel with upper longeron (2).
2. the combination stand for piling up for forklift gear-box transport according to claim 1, it is characterized in that: described limit assembly comprises three strut bars, wherein strut bar be fixed in spacing zone one end, be the first strut bar (4), remain two strut bars be fixed in spacing zone the other end, be respectively the second strut bar (20) and the 3rd strut bar (21), the second strut bar (20) be positioned at the 3rd strut bar (21) inner side;
The end face two ends of described first strut bar (4) are respectively equipped with the first locating piece (9), the second locating piece (8), the top of two adjacent side of the first locating piece (9) is vertical the first block (91), and two piece of first block (91) forms the positioning port of cross-sectional plane in " L " shape; Described second locating piece (8) is identical with the first locating piece (9) structure, and the second locating piece (8) and the first locating piece (9) are symmetrical set; The positioning port of the first locating piece (9) and the positioning port of the second locating piece (8) are all in the middle part of spacing zone;
The end face two ends of described second strut bar (20) are equipped with vertical section in falling second limiting stopper (10) of " V " shape, and the second strut bar (20) between two second side limiting stoppers (10) is vertically provided with end limiting stopper (11);
The end face two ends of described 3rd strut bar (21) are equipped with the 3rd limiting stopper (12) that vertical section is " V " shape.
3. the combination stand for piling up for forklift gear-box transport according to claim 1, is characterized in that: all coordinate in upper and lower two intubate (5) of adjacent two layers pallet correspondence position and be inserted with inserted link (13); The upper end (15) of described inserted link (13) is in quadrangular frustum pyramid shaped, and the equal fixed cover of upper/lower terminal of inserted link (13) is provided with pipe box (14);
The pipe box (14) of described inserted link (13) upper/lower terminal is connected with the port contact of upper and lower two intubate (5) of correspondence position, the longitudinal spacing that realizes adjacent two layers pallet respectively.
4. the combination stand for piling up for forklift gear-box transport according to claim 1, it is characterized in that: all coordinate in four intubate (5) upper port of top layer pallet and be inserted with inserted link (13), all be connected with lateral connecting rod (16) between two inserted links (13) being positioned at Width, lateral connecting rod (16) is located on inserted link (13) by the first pipe box (161) engagement sleeves that two ends are provided with;
Longitudinal tie (17) is all connected with between two intubate (5) of length direction, longitudinal tie (17) is located on inserted link (13) by the second pipe box (171) engagement sleeves that two ends are provided with, and two lateral connecting rods (16) and two longitudinal ties (17) form oblong and protect and block.
5. the combination stand for piling up for forklift gear-box transport according to claim 1, is characterized in that: the outside upright of described intubate (5) upper end is connected with in falling the suspension hook (6) of " U " shape.
6. the combination stand for piling up for forklift gear-box transport according to claim 1, is characterized in that: the end of lower floor's rectangle frame two longeron of described main frame (1) is all fitted with cushion block (7).
CN201520648911.5U 2015-08-26 2015-08-26 A make up and put things in good order frame for forklift speed changing box transportation Withdrawn - After Issue CN205060605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520648911.5U CN205060605U (en) 2015-08-26 2015-08-26 A make up and put things in good order frame for forklift speed changing box transportation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520648911.5U CN205060605U (en) 2015-08-26 2015-08-26 A make up and put things in good order frame for forklift speed changing box transportation

Publications (1)

Publication Number Publication Date
CN205060605U true CN205060605U (en) 2016-03-02

Family

ID=55387188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520648911.5U Withdrawn - After Issue CN205060605U (en) 2015-08-26 2015-08-26 A make up and put things in good order frame for forklift speed changing box transportation

Country Status (1)

Country Link
CN (1) CN205060605U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105083829A (en) * 2015-08-26 2015-11-25 安徽合力股份有限公司 Combined stacking frame for forklift gearbox transport
CN110171456A (en) * 2019-05-28 2019-08-27 江苏长协工业设备有限公司 A kind of automobile tube beam pallet

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105083829A (en) * 2015-08-26 2015-11-25 安徽合力股份有限公司 Combined stacking frame for forklift gearbox transport
CN110171456A (en) * 2019-05-28 2019-08-27 江苏长协工业设备有限公司 A kind of automobile tube beam pallet

Similar Documents

Publication Publication Date Title
CN109689545A (en) Automatic cargo handling system and method
CN202411412U (en) Box-available double-layer sand mould casting and cooling transporter
US20180002119A1 (en) Method and container transfer installation for placing containers into and removing containers from container storare areas
CN205060605U (en) A make up and put things in good order frame for forklift speed changing box transportation
CN107416406A (en) A kind of Multilayer shuttle car vertical library
EP2454177A1 (en) Method and loading system for order-picking articles onto destination load carriers
CN104986401A (en) Glass tube product conveying and packaging line and conveying method
CN202518712U (en) Warehousing device for cigarette piece warehouse
CN110758964A (en) Automatic furniture finished product logistics stereoscopic warehouse and operation method thereof
CN103964144B (en) A kind of pallet Automatic-descending cyclic code stack machine
CN207275504U (en) A kind of Multilayer shuttle car vertical library
CN210527183U (en) Platform device for storing and transporting steel bar pieces
CN105083829A (en) Combined stacking frame for forklift gearbox transport
CN102366831A (en) Box dual-layer sand mould pouring and cooling conveying device
WO2014189896A1 (en) Cambered frame system for intermodal rail cars
CN103318588A (en) Storage method of cigarette case warehouse and used cigarette case warehouse entering device
WO2014193242A1 (en) Container terminal
CN204660391U (en) Column detachable metal turnover rack
CN211365837U (en) Automatic change furniture finished product commodity circulation stereoscopic warehouse
CN212862675U (en) Storage and sorting integrated equipment and full-link storage integrated equipment
CN113001741B (en) Prefabricated component production line
CN102642793B (en) Baking-free green brick loading and unloading and transporting device matched with fork lift truck
CN206088196U (en) Bumper automatic feed equipment
CN102795423B (en) Container for transportation of bricks and building blocks
CN102556681B (en) System and method for unloading rough boards of artificial boards

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160302

Effective date of abandoning: 20171121

AV01 Patent right actively abandoned

Granted publication date: 20160302

Effective date of abandoning: 20171121