Prior art keywords
steel strand
strand wires
curved arc
arc
bended
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520822315.4U
Other languages
Chinese (zh)
Inventor
刘孝朋
郭文涛
武海涛
葛剑
徐晓先
李振全
魏亚丽
王莎
姜乃洁
孟德治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID SHANDONG CHANGYI POWER SUPPLY Co
State Grid Corp of China SGCC
Original Assignee
STATE GRID SHANDONG CHANGYI POWER SUPPLY Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID SHANDONG CHANGYI POWER SUPPLY Co, State Grid Corp of China SGCC filed Critical STATE GRID SHANDONG CHANGYI POWER SUPPLY Co
Priority to CN201520822315.4U priority Critical patent/CN205043042U/en
Application granted granted Critical
Publication of CN205043042U publication Critical patent/CN205043042U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses an end processing apparatus is used in guy strand installation, including the base, to rotate on the base and install steel strand wires bended -arc pincers, the binding clip both sides that lie in steel strand wires bended -arc pincers on the base are equipped with two bended -arc guide roller relatively, lie in the operation notch that is equipped with the U -shaped on the base between two bended -arc guide roller, the seat is detained to the tractive that still includes two symmetry settings, and two tractives knot seat upward corresponds has arranged that bended -arc fixes the screw, and each bended -arc is fixed, and the screw fit in is equipped with the locking bolt, the utility model discloses utilizing steel strand wires bended -arc pincers to vise steel strand wires, upwards lifting the pincers handle with strength, the binding clip partially will push down steel strand wires, under two bended -arc guide roller's effect, makes steel strand wires form the arc structure, with two tractives detain the seat locate the both sides of steel strand wires detain right, then utilize the locking bolt installation fix can, this device can easily make the installation end of steel strand wires form curved installation bended -arc, uses laborsaving, safety, the installation effectiveness has still been improved to the while.

Description

Guy strand installation handling arrangement of end head
Technical field
The utility model relates to a kind of guy strand erection unit technical field, particularly relates to a kind of guy strand installation handling arrangement of end head.
Background technology
In electrical equipment technical field, often need to utilize steel strand wires to carry out tractive to electric pole and fix, therefore need the steel strand wires of certain length.Utilize steel strand wires carry out tractive fix time, first need the bottom of steel strand wires to carry out curved arc, after curved arc, utilize tractive seat to be fixed.Prior art is when the installation end of steel strand wires carries out installing fixing, the curved arc of its end is by manually bending, because steel strand wires toughness and rigidity are all larger, therefore artificial bend ratio is more difficult, steel strand wires also have stronger ejection force, if slightly do not note just easily making its end rebound and cause human injury, therefore manually bending not only efficiency is low, the labour intensity paid is large, and there is higher security risk.
Utility model content
Technical problem to be solved in the utility model is to provide laborsaving, safety, volume little, the portable guy strand installation handling arrangement of end head of a kind of use.
For solving the problems of the technologies described above, the technical solution of the utility model is: guy strand installation handling arrangement of end head, comprise pedestal, described pedestal is rotatablely equipped with steel strand wires curved arc pincers, the binding clip both sides that described pedestal is positioned at described steel strand wires curved arc pincers are provided with two curved arc guide rollers relatively, and the described pedestal described in two between curved arc guide roller is provided with the operation recess of U-shaped; Also comprise two symmetrically arranged tractive Button Blocks, on tractive Button Block described in two, correspondence is furnished with curved arc fixing threaded hole, coordinates and be provided with clamping screw in each described curved arc fixing threaded hole.
As preferred technical scheme, the jaw both sides of described steel strand wires curved arc pincers be relatively provided with the use of anti-skidding latch.
As preferred technical scheme, be positioned at the pedal that side relative with described operation recess on described pedestal is provided with two handled easilies.
As preferred technical scheme, described pedestal is provided with relatively two supporting vertical plate, is provided with connecting axle described in two between supporting vertical plate, described steel strand wires curved arc pincers turning set is loaded on described connecting axle.
As the improvement to technique scheme, described tractive Button Block is provided with relatively two for holding the arc groove of steel strand wires.
Owing to have employed technique scheme, guy strand installation handling arrangement of end head, comprise pedestal, described pedestal is rotatablely equipped with steel strand wires curved arc pincers, the binding clip both sides that described pedestal is positioned at described steel strand wires curved arc pincers are provided with two curved arc guide rollers relatively, and the described pedestal described in two between curved arc guide roller is provided with the operation recess of U-shaped; Also comprise two symmetrically arranged tractive Button Blocks, on tractive Button Block described in two, correspondence is furnished with curved arc fixing threaded hole, coordinates and be provided with clamping screw in each described curved arc fixing threaded hole; The beneficial effects of the utility model are: utilize steel strand wires curved arc to clamp and vised by steel strand wires, upwards lift clamp handle with strength, steel strand wires will press down by binding clip part, under the effect of two curved arc guide rollers, steel strand wires are made to form arcuate structure, it is right that button is carried out in the both sides two tractive Button Blocks being located at steel strand wires, then utilize clamping screw to install to fix, this device can make the installation end of steel strand wires form the installation curved arc of arc like a cork, use laborsaving, safety, also improve installation effectiveness simultaneously.
Accompanying drawing explanation
The following drawings is only intended to schematically illustrate the utility model and explain, does not limit scope of the present utility model.Wherein:
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the structural representation of the utility model embodiment pedestal, pedal and curved arc guide roller;
Fig. 3 is the side view of the utility model embodiment pedestal and curved arc guide roller;
Fig. 4 be the utility model embodiment steel strand wires curved arc shaping after structural representation;
Fig. 5 is the side view of the utility model embodiment tractive Button Block;
In figure: 1-pedestal; 2-steel strand wires curved arc clamps; 3-supporting vertical plate; 4-connecting axle; The anti-skidding latch of 5-; 6-pedal; 7-curved arc guide roller; 8-operates recess; 9-tractive Button Block; 10-clamping screw; 11-steel strand wires.
Detailed description of the invention
Below in conjunction with drawings and Examples, set forth the utility model further.In the following detailed description, the mode only by illustrating describes some one exemplary embodiment of the present utility model.Undoubtedly, those of ordinary skill in the art can recognize, when not departing from spirit and scope of the present utility model, can revise by various different mode to described embodiment.Therefore, accompanying drawing is illustrative with being described in essence, instead of for limiting the protection domain of claim.
As depicted in figs. 1 and 2, guy strand installation handling arrangement of end head, comprise pedestal 1, described pedestal 1 is rotatablely equipped with steel strand wires curved arc pincers 2, described pedestal 1 is provided with relatively two supporting vertical plate 3, connecting axle 4 is provided with between supporting vertical plate 3 described in two, described steel strand wires curved arc clamps 2 turning sets and is loaded on described connecting axle 4, and in use, described steel strand wires curved arc pincers 2 can with described connecting axle 4 for fulcrum, rotate up and down, the curved arc realizing steel strand wires 11 is arranged.The jaw both sides of described steel strand wires curved arc pincers 2 be relatively provided with the use of anti-skidding latch 5, pincers can be carried out to steel strand wires 11 and hold fixing, prevent steel strand wires 11 from curved arc process, producing slip.Being positioned at the pedal 6 that side relative with described operation recess 8 on described pedestal 1 is provided with two handled easilies, in use, with riding on described pedal 6, to facilitate, described steel strand wires curved arc pincers 2 can being exerted a force.
As shown in Figure 1, Figure 2 and Figure 3, the binding clip both sides that the present embodiment is being positioned at described steel strand wires curved arc pincers 2 on described pedestal 1 are provided with two curved arc guide rollers 7 relatively, described pedestal 1 is provided with two groups of installation riser groups be oppositely arranged, often organize in described installation riser group and be provided with two installation risers be oppositely arranged, described curved arc guide roller 7 rotate be provided with and be oppositely arranged two described in install on riser.Described curved arc guide roller 7 can make generation rotate when described steel strand wires curved arc pincers 2 are installed with steel strand wires 11 downwards, to reduce the frictional force between described curved arc guide roller 7 and steel strand wires 11, to avoid the waste of power energy.Described pedestal 1 described in two between curved arc guide roller 7 is provided with the operation recess 8 of U-shaped, is that steel strand wires 11 curved arc is shaping to facilitate described steel strand wires curved arc pincers 2 to press down.
As shown in Figure 4 and Figure 5, also comprise two symmetrically arranged tractive Button Blocks 9, on tractive Button Block 9 described in two, correspondence is furnished with curved arc fixing threaded hole, coordinate in each described curved arc fixing threaded hole and be provided with clamping screw 10, described tractive Button Block 9 is provided with relatively two for holding the arc groove of steel strand wires 11, after two described tractive Button Blocks 9 are oppositely arranged, two arc grooves are around forming the manhole holding steel strand wires 11.After curved arc is shaping, two described tractive Button Blocks 9 are located at respectively the both sides in steel strand wires 11 arc portion, then utilize described clamping screw 10 to be connected and fixed by tractive Button Block 9 described in two, can be shaped, to facilitate subsequent installation in the arc portion of steel strand wires 11.
The utility model utilizes steel strand wires curved arc to clamp 2 and is vised by steel strand wires 11, upwards lift clamp handle with strength, steel strand wires 11 will press down by binding clip part, under the effect of two curved arc guide rollers 7, steel strand wires 11 are made to form arcuate structure, it is right that button is carried out in the both sides two tractive Button Blocks 9 being located at steel strand wires 11, then utilize clamping screw 10 to install to fix, this device can make the installation end of steel strand wires 11 form the installation curved arc of arc like a cork, use laborsaving, safety, also improve installation effectiveness simultaneously.
Description of the present utility model provides for the purpose of example and description, and is not exhaustively or by the utility model be limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Selecting and describing embodiment is in order to principle of the present utility model and practical application are better described, and enables those of ordinary skill in the art understand the utility model thus design the various embodiments with various amendment being suitable for special-purpose.

Claims (5)

1. guy strand installation handling arrangement of end head, it is characterized in that: comprise pedestal, described pedestal is rotatablely equipped with steel strand wires curved arc pincers, the binding clip both sides that described pedestal is positioned at described steel strand wires curved arc pincers are provided with two curved arc guide rollers relatively, and the described pedestal described in two between curved arc guide roller is provided with the operation recess of U-shaped; Also comprise two symmetrically arranged tractive Button Blocks, on tractive Button Block described in two, correspondence is furnished with curved arc fixing threaded hole, coordinates and be provided with clamping screw in each described curved arc fixing threaded hole.
2. guy strand installations handling arrangement of end head as claimed in claim 1, is characterized in that: the jaw both sides that described steel strand wires curved arc clamps relatively be provided with the use of anti-skidding latch.
3. guy strand installation handling arrangement of end head as claimed in claim 1, is characterized in that: be positioned at the pedal that side relative with described operation recess on described pedestal is provided with two handled easilies.
4. the guy strand installation handling arrangement of end head as described in claim 1,2 or 3, it is characterized in that: described pedestal is provided with relatively two supporting vertical plate, be provided with connecting axle between supporting vertical plate described in two, described steel strand wires curved arc pincers turning set is loaded on described connecting axle.
5. guy strand installation handling arrangement of end head as claimed in claim 4, is characterized in that: described tractive Button Block is provided with relatively two for holding the arc groove of steel strand wires.
CN201520822315.4U 2015-10-22 2015-10-22 End processing apparatus is used in guy strand installation Expired - Fee Related CN205043042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520822315.4U CN205043042U (en) 2015-10-22 2015-10-22 End processing apparatus is used in guy strand installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520822315.4U CN205043042U (en) 2015-10-22 2015-10-22 End processing apparatus is used in guy strand installation

Publications (1)

Publication Number Publication Date
CN205043042U true CN205043042U (en) 2016-02-24

Family

ID=55336660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520822315.4U Expired - Fee Related CN205043042U (en) 2015-10-22 2015-10-22 End processing apparatus is used in guy strand installation

Country Status (1)

Country Link
CN (1) CN205043042U (en)

Similar Documents

Publication Publication Date Title
CN204649955U (en) The special external voltage pincers of tester
CN202418127U (en) Bundling fixing device for tail wire and main wire of stay wire of power transmission line poles
CN102974717A (en) Wire straightener
CN104555633A (en) Double-jaw steel wire rope clamping device
CN103618258B (en) A kind of electric transmission line erection tightener
CN202265308U (en) Combined hoisting device for pipeline steel plate hoisting
CN103311847A (en) High-voltage cable clamper
CN205043042U (en) End processing apparatus is used in guy strand installation
CN202023497U (en) Special rope ladder between tower and lead
CN201159339Y (en) Novel street code
CN105133613B (en) A kind of guard rail breakdown van anti-slip cramping apparatus
CN105251906A (en) End socket processing device for installation of steel strand stay wire
CN203345975U (en) Hoisting steel wire rope mounting device and tower crane
CN204096800U (en) A kind of two jaw clamping device for steel cable
CN202701699U (en) Reinforced bar clamping device for wire mesh welding machine
CN201711393U (en) Straightening equipment
CN104016220A (en) Adjustable loading and unloading hanging bracket of waste heat boiler module
CN203989578U (en) A kind of along wire operation safety belt shoe
CN208986495U (en) Cylindrical ceramic cross-arm double hook press-down type wire fixing device
CN204068021U (en) Line of power wedge line arc device
CN221201543U (en) Grounding device for overhead line
CN202651698U (en) Line stay wire tightener
CN201890688U (en) Arrangement structure for trailing cable on lift
CN204019439U (en) Combination rope clamp for elevator reparing
CN201853985U (en) Wire clamping buckle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160224

Termination date: 20161022

CF01 Termination of patent right due to non-payment of annual fee