CN205036103U - 一种用于混凝土楼板的顶紧加固装置 - Google Patents

一种用于混凝土楼板的顶紧加固装置 Download PDF

Info

Publication number
CN205036103U
CN205036103U CN201520743758.4U CN201520743758U CN205036103U CN 205036103 U CN205036103 U CN 205036103U CN 201520743758 U CN201520743758 U CN 201520743758U CN 205036103 U CN205036103 U CN 205036103U
Authority
CN
China
Prior art keywords
assembly
steel pipe
subassembly
steel sheet
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520743758.4U
Other languages
English (en)
Inventor
李元武
徐彬
杨笑非
杜轶贇
捷捷
张纯为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanjian Construction Group Co Ltd
Original Assignee
Great Wall Zhejiang Province Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Wall Zhejiang Province Construction Group Co Ltd filed Critical Great Wall Zhejiang Province Construction Group Co Ltd
Priority to CN201520743758.4U priority Critical patent/CN205036103U/zh
Application granted granted Critical
Publication of CN205036103U publication Critical patent/CN205036103U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种用于混凝土楼板的顶紧加固装置,包括第一组件、受力钢管、起重设备和第二组件,第一组件包括两块方形钢板和短钢管,在短钢管的横截面两端分别焊接方形钢板,以方形钢板为底面竖直放置;第二组件包括一块方形钢板、一块圆形钢板和一短钢管,在短钢管横截面两端分别焊接方形钢板和圆形钢板,以圆形钢板为底面竖直放置;所述起重设备位于第二组件和第一组件之间,第二组件的圆形钢板和起重设备顶端相抵触,所述第一组件的方形钢板和起重设备底面相抵触;所述起重设备外围还设有受力钢管,所述受力钢管上端和第二组件的短钢管焊接成型,受力钢管下端和第一组件的方形钢板焊接成型。当使用完毕后拆除,可以再次使用。

Description

一种用于混凝土楼板的顶紧加固装置
技术领域
本实用新型属于建筑工程领域,尤其涉及一种用于混凝土楼板的顶紧加固装置。
背景技术
在建筑房屋时,通常需要在楼板和支撑构件之间进行支撑和加固,但现有技术中,多是采用直接浇筑的支撑柱或是暂用的支撑脚手架,但是两者都具有缺陷:前者固定而无法简易拆卸,虽然牢固但是后期麻烦,无法重复利用;后者虽然结构简单,但是可靠性不高,对于楼板间的强大压力无法承受,有一定的危险性。
发明内容
为了解决上述问题,本实用新型提供一种用于混凝土楼板的顶紧加固装置,能够易于安装、拆卸,并能够重复使用。
为此采用如下的技术方案:一种用于混凝土楼板的顶紧加固装置,其特征在于:所述装置包括第一组件、受力钢管、起重设备和第二组件,第一组件包括两块方形钢板和短钢管,在短钢管的横截面两端分别焊接方形钢板,以方形钢板为底面竖直放置构成第一组件;第二组件包括一块方形钢板、一块圆形钢板和一短钢管,在短钢管横截面两端分别焊接方形钢板和圆形钢板,以圆形钢板为底面竖直放置构成第二组件;所述起重设备位于第二组件和第一组件之间,第二组件的圆形钢板和起重设备顶端相抵触,所述第一组件的方形钢板和起重设备底面相抵触;所述起重设备外围还设有受力钢管,所述受力钢管上端和第二组件的短钢管焊接成型,受力钢管下端和第一组件的方形钢板焊接成型。
进一步地,所述受力钢管由两片横截面呈半圆形的钢管组成。
工作时,首先以从上到下顺序依次放置第二组件、起重设备和第一组件,然后调整起重设备,当第二组件顶紧楼板后安装受力钢管,可以在安装一片半圆形钢管后继续调整起重设备,当第二组件顶紧楼板后,再次安装第二片半圆形钢管完成密封,最后焊接成型。当使用完毕后拆除,可以再次使用。
附图说明
图1为本实用新型的示意图。
具体实施方式
参见附图。本实施例包括第一组件3、受力钢管1、起重设备2和第二组件4,第一组件3包括两块方形钢板5和短钢管6,在短钢管的横截面两端分别焊接方形钢板,以方形钢板为底面竖直放置构成第一组件3;第二组件4包括一块方形钢板5、一块圆形钢板7和一短钢管6,在短钢管横截面两端分别焊接方形钢板和圆形钢板,以圆形钢板7为底面竖直放置构成第二组件4;所述起重设备2位于第二组件4和第一组件3之间,第二组件的圆形钢板和起重设备顶端相抵触,所述第一组件的方形钢板和起重设备底面相抵触;所述起重设备外围还设有受力钢管1,所述受力钢管由两片横截面呈半圆形的钢管组成,所述受力钢管上端和第二组件的短钢管焊接成型,受力钢管下端和第一组件的方形钢板焊接成型。
工作时,首先以从上到下顺序依次放置第二组件4、起重设备2和第一组件3,然后调整起重设备2,当第二组件4顶紧楼板后安装受力钢管1,可以在安装一片半圆形钢管后继续调整起重设备,当第二组件顶紧楼板后,再次安装第二片半圆形钢管完成密封,最后焊接成型,焊接采用电弧焊,焊缝均满焊,焊缝高度为6mm。当使用完毕后拆除,可以再次使用。

Claims (2)

1.一种用于混凝土楼板的顶紧加固装置,其特征在于:所述装置包括第一组件、受力钢管、起重设备和第二组件,第一组件包括两块方形钢板和短钢管,在短钢管的横截面两端分别焊接方形钢板,以方形钢板为底面竖直放置构成第一组件;第二组件包括一块方形钢板、一块圆形钢板和一短钢管,在短钢管横截面两端分别焊接方形钢板和圆形钢板,以圆形钢板为底面竖直放置构成第二组件;所述起重设备位于第二组件和第一组件之间,第二组件的圆形钢板和起重设备顶端相抵触,所述第一组件的方形钢板和起重设备底面相抵触;所述起重设备外围还设有受力钢管,所述受力钢管上端和第二组件的短钢管焊接成型,受力钢管下端和第一组件的方形钢板焊接成型。
2.按照权利要求1所述的一种用于混凝土楼板的顶紧加固装置,其特征在于:所述受力钢管由两片横截面呈半圆形的钢管组成。
CN201520743758.4U 2015-09-24 2015-09-24 一种用于混凝土楼板的顶紧加固装置 Expired - Fee Related CN205036103U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520743758.4U CN205036103U (zh) 2015-09-24 2015-09-24 一种用于混凝土楼板的顶紧加固装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520743758.4U CN205036103U (zh) 2015-09-24 2015-09-24 一种用于混凝土楼板的顶紧加固装置

Publications (1)

Publication Number Publication Date
CN205036103U true CN205036103U (zh) 2016-02-17

Family

ID=55295012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520743758.4U Expired - Fee Related CN205036103U (zh) 2015-09-24 2015-09-24 一种用于混凝土楼板的顶紧加固装置

Country Status (1)

Country Link
CN (1) CN205036103U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397199A (zh) * 2019-07-31 2019-11-01 安徽鼎峰钢结构科技有限公司 一种h型钢梁楼板支撑结构
CN111305596A (zh) * 2019-11-28 2020-06-19 上海泾东建筑发展有限公司 地下室无梁楼板快速拆装加固结构及其施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397199A (zh) * 2019-07-31 2019-11-01 安徽鼎峰钢结构科技有限公司 一种h型钢梁楼板支撑结构
CN111305596A (zh) * 2019-11-28 2020-06-19 上海泾东建筑发展有限公司 地下室无梁楼板快速拆装加固结构及其施工方法

Similar Documents

Publication Publication Date Title
CN101537564B (zh) 特大型吊车梁h型钢组对方法
CN202139833U (zh) 一种用于在用房屋建筑施工的悬挑脚手架
CN201786041U (zh) 一种钢支撑
CN105971272A (zh) 装配式铝模板砌块填充墙钢筋混凝土构造柱及施工方法
CN105696747A (zh) 高空大跨度钢筋混凝土梁的施工方法
CN104070316B (zh) 一种焊接h型钢拼装组对装置及其使用方法
CN206625428U (zh) 一种管井后浇楼板封闭体系
CN205036103U (zh) 一种用于混凝土楼板的顶紧加固装置
CN203403670U (zh) 无支撑模板系统
CN102518300A (zh) 预埋锥形承载接头式钢结构支座及其施工方法
CN203701136U (zh) 一种预埋钢板调平装置
CN202745355U (zh) 提升式电梯井操作平台
CN110893520A (zh) 一种储罐倒装方法
CN106958313A (zh) 一种管井后浇楼板封闭体系及其施工方法
CN206397136U (zh) 装配式铝模板砌块填充墙钢筋混凝土构造柱
CN210597794U (zh) 一种预制板的连接装置
CN209792950U (zh) 一种不锈钢复合钢板无码组拼焊接胎架装置
CN203701597U (zh) 一种外墙模板支撑承托装置
CN203380228U (zh) 一种用于压力钢管制造的内支撑装置
CN202447878U (zh) 可拆卸式设备安装中心线的简易找正线架
CN201339320Y (zh) 高空悬挑悬空钢筋混凝土吊架
CN202544399U (zh) 钢结构悬挑楼板支撑架
CN202913423U (zh) 设备底座的预埋式连接装置
CN204413464U (zh) 一种箱型柱组立装置
CN104153386B (zh) 桩基承台周边立面垫层工具式钢模及其施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 310016 Great Wall Building, No. 60 Leiting Road, Shangcheng District, Hangzhou City, Zhejiang Province

Patentee after: ZHEJIANG PROVINCE SANJIAN CONSTRUCTION GROUP CO.,LTD.

Address before: 310016 Great Wall Building, Wangjiang East Road, Shangcheng District, Hangzhou City, Zhejiang Province

Patentee before: ZHEJIANG GREAT WALL CONSTRUCTION GROUP CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

Termination date: 20210924