CN205035811U - Concrete temporary storage ware that drilled pile was pour - Google Patents
Concrete temporary storage ware that drilled pile was pour Download PDFInfo
- Publication number
- CN205035811U CN205035811U CN201520820779.1U CN201520820779U CN205035811U CN 205035811 U CN205035811 U CN 205035811U CN 201520820779 U CN201520820779 U CN 201520820779U CN 205035811 U CN205035811 U CN 205035811U
- Authority
- CN
- China
- Prior art keywords
- concrete
- drilled pile
- cuboid
- accumulator
- discharge nozzle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Concrete temporary storage ware that drilled pile was pour, it relates to building construction field. Thereby the continuous stirring at stirring station and the problem of construction continuity have been influenced for solving the stirring work that to suspend the concrete when current drilled pile is pour, the utility model discloses a concrete temporary storage ware that drilled pile was pour, open the top of cuboid workbin has into the concrete mouth, and the stocker setting is in the inside below of cuboid workbin, and the four positive terrace with edge structures of stocker for invering, four positive terrace with edge structures are open structure, and open the bottom of stocker has the defective material export, discharging pipe one end and stocker intercommunication, the other end of discharging pipe passes the outside that the cuboid workbin was arranged in to the cuboid workbin, is provided with ejection of compact switch on the discharging pipe. The utility model discloses a continuous stirring at stirring station has been guaranteed to the structure to and concreting construction's continuity, improved the efficiency of construction greatly.
Description
Technical field
The utility model relates to a kind of concrete temporary storage, is specifically related to the concrete temporary store that a kind of drilled pile is built, belongs to concrete construction technical field.
Background technology
Establish concrete pump to carry out drilled pile at agitator to build, need when drilled pile is built to pull out conduit, pull out in the process of conduit, need to stop concrete-agitating work, conduit recovers concrete stirring and transport after extracting again, and during early stage construction, unit in charge of construction all adopts two tons of dumper truck transport concretes, more very difficult guarantee perfusion continuity, drilled pile builds continuous stirring and the construction continuity that ubiquity in work affects agitator, extends the duration, increases the problem of time cost.
Utility model content
The utility model is solve when existing drilled pile is built must stop concrete stirring work thus have impact on the continuous stirring of agitator and successional problem of constructing, and then provides a kind of concrete temporary storage that agitator and the successional drilled pile of construction are built that can ensure.
The utility model for solving the problems of the technologies described above taked technical scheme is:
The concrete temporary store that drilled pile of the present utility model is built, it is characterized in that: comprise cuboid hopper and accumulator, the top of cuboid hopper has into concrete mouth, accumulator is arranged on the below of cuboid hopper inside, described accumulator is inverted positive truncated rectangular pyramids structure, described positive truncated rectangular pyramids structure is upper uncovered structure, described accumulator comprises residue outlet, discharge nozzle and discharging switch, the bottom of described accumulator has residue outlet, described residue outlet is provided with defective material mouth switch, described discharge nozzle one end is communicated with accumulator, the other end of described discharge nozzle is placed in the outside of cuboid hopper through cuboid hopper, discharge nozzle is provided with discharging switch.
The concrete temporary store that the drilled pile of such scheme is built, be communicated with the ground pump of transport concrete by the concrete mouth that enters above cuboid hopper, the accumulator that below is arranged is coordinated with the work plane of drilled pile by discharge nozzle, discharge nozzle is provided with switch, the confined space formed between cuboid hopper and accumulator, temporarily store concrete in the construction can built at drilled pile, thus ensure the continuity of construction.
Design further scheme: coordinate to build work plane with drilled pile better, discharge nozzle is connected with lengthening chute in one end of cuboid hopper outside.
Design further scheme: in order to ensure the storage area of accumulator, the foursquare length of side of the opening end of positive truncated rectangular pyramids structure is 2m, and the foursquare length of side of the bottom surface of described positive truncated rectangular pyramids structure is 1m.
Design further scheme: in order to ensure concrete freight volume, the caliber of discharge nozzle is 30cm.
The beneficial effects of the utility model: the concrete temporary store that drilled pile of the present utility model is built is by building the interim accumulator increasing cuboid bin structure between work plane and concrete mixing plant at drilled pile, interim accumulator connects the concrete ground pump transport pipeline of agitator, when building drilled pile and pulling out conduit, can by closing the discharging switch on discharge nozzle, the concrete that agitator transport comes is stored temporarily, after completing the work of pulling out conduit, can continue after opening switch to carry out building work, ensure that the continuous stirring of agitator, and the continuity of pouring construction, substantially increase efficiency of construction.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is the top view of accumulator;
Fig. 3 adopts Construction technology of bored pile figure of the present utility model;
In figure: 1-cuboid hopper, 2-accumulator, 3-enters concrete mouth, 4-residue outlet, 5-discharge nozzle, 6-discharging switch, and 7-lengthens chute, 8-ground pump input pipe, 9-hopper, 10-drilled pile, 11-defective material mouth switch.
Detailed description of the invention
The detailed description of the invention that the utility model provides is as follows:
Detailed description of the invention: as depicted in figs. 1 and 2, the concrete temporary store that drilled pile of the present utility model is built, comprise cuboid hopper 1 and accumulator 2, the top of cuboid hopper 1 has into concrete mouth 3, accumulator 2 is arranged on the below of cuboid hopper 1 inside, described accumulator 2 is inverted positive truncated rectangular pyramids structure, the foursquare length of side of the opening end of described positive truncated rectangular pyramids structure is 2m, the foursquare length of side of the bottom surface of described positive truncated rectangular pyramids structure is 1m, described positive truncated rectangular pyramids structure is upper uncovered structure, described accumulator 2 comprises residue outlet 4, discharge nozzle 5 and discharging switch 6, the bottom of described accumulator 2 has residue outlet 4, described residue outlet 4 is provided with defective material mouth switch 11, described discharge nozzle 5 one end is communicated with accumulator 2, the caliber of discharge nozzle 5 is 30cm, the other end of described discharge nozzle 5 is placed in the outside of cuboid hopper 1 through cuboid hopper 1, discharge nozzle 5 is provided with discharging switch 6, discharge nozzle 5 is connected with in one end of cuboid hopper 1 outside and lengthens chute 7.
As shown in Figure 3,2 meters, the pile foundation stake footpath of this drilled pile, stake is long 80 meters, design concrete amount 251.2m
3, therefore for ensureing that concrete construction continuity ensures pile foundation pouring quality, concrete transfer pump is adopted to coordinate the utility model to construct during construction, the ground pump input pipe 8 of agitator with enter concrete mouth 3 and be communicated with, the concrete temporary store of being built by the drilled pile that the concrete of agitator is input to utility model is inner, concrete is transported to 9 li, the hopper of drilled pile 10 by the discharge nozzle 5 of accumulator 2, thus carry out building of drilled pile 10, when needs pull out conduit time, discharging switch 6 on discharge nozzle 5 cuts out, the stirring work of agitator proceeds, concrete can store in the confined space that accumulator 2 and cuboid hopper 1 are formed temporarily, after the size of this confined space can ensure and pull out the completing of conduit work, after discharging switch 6 is opened, proceed the construction of drilled pile 10.
The exemplary illustration of present embodiment just to this patent, does not limit its protection domain, and those skilled in the art can also change, as long as no the Spirit Essence exceeding this patent, in the protection domain of this patent its local.
Claims (4)
1. the drilled pile concrete temporary store of building, it is characterized in that: comprise cuboid hopper (1) and accumulator (2), the top of cuboid hopper (1) has into concrete mouth (3), accumulator (2) is arranged on the inner below of cuboid hopper (1), described accumulator (2) is inverted positive truncated rectangular pyramids structure, described positive truncated rectangular pyramids structure is upper uncovered structure, described accumulator (2) comprises residue outlet (4), discharge nozzle (5) and discharging switch (6), the bottom of described accumulator (2) has residue outlet (4), described residue outlet (4) is provided with defective material mouth switch (11), described discharge nozzle (5) one end is communicated with accumulator (2), the other end of described discharge nozzle (5) is placed in the outside of cuboid hopper (1) through cuboid hopper (1), discharge nozzle (5) is provided with discharging switch (6).
2. the drilled pile according to claim 1 concrete temporary store of building, is characterized in that: described discharge nozzle (5) is connected with in one end that cuboid hopper (1) is outside and lengthens chute (7).
3. the drilled pile according to claim 1 concrete temporary store of building, it is characterized in that: the foursquare length of side of the opening end of described positive truncated rectangular pyramids structure is 2m, the foursquare length of side of the bottom surface of described positive truncated rectangular pyramids structure is 1m.
4. the drilled pile according to claim 1 concrete temporary store of building, is characterized in that: the caliber of described discharge nozzle (5) is 30cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520820779.1U CN205035811U (en) | 2015-10-21 | 2015-10-21 | Concrete temporary storage ware that drilled pile was pour |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520820779.1U CN205035811U (en) | 2015-10-21 | 2015-10-21 | Concrete temporary storage ware that drilled pile was pour |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205035811U true CN205035811U (en) | 2016-02-17 |
Family
ID=55294723
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520820779.1U Active CN205035811U (en) | 2015-10-21 | 2015-10-21 | Concrete temporary storage ware that drilled pile was pour |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205035811U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107364009A (en) * | 2017-07-28 | 2017-11-21 | 芜湖富创新型建材有限公司 | A kind of concrete dispenses storage device |
CN108487921A (en) * | 2018-04-28 | 2018-09-04 | 淮北矿业股份有限公司 | One kind being used for underground coal mine large-section underground continuous concrete device and its casting method |
CN108820944A (en) * | 2018-06-15 | 2018-11-16 | 上海建工七建集团有限公司 | A kind of concrete transfer platform and its application method |
CN108825266A (en) * | 2018-08-29 | 2018-11-16 | 丹东丹银矿冶有限责任公司 | A kind of mating integrated apparatus constructed for the artificial concrete pillar in underground |
-
2015
- 2015-10-21 CN CN201520820779.1U patent/CN205035811U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107364009A (en) * | 2017-07-28 | 2017-11-21 | 芜湖富创新型建材有限公司 | A kind of concrete dispenses storage device |
CN108487921A (en) * | 2018-04-28 | 2018-09-04 | 淮北矿业股份有限公司 | One kind being used for underground coal mine large-section underground continuous concrete device and its casting method |
CN108820944A (en) * | 2018-06-15 | 2018-11-16 | 上海建工七建集团有限公司 | A kind of concrete transfer platform and its application method |
CN108825266A (en) * | 2018-08-29 | 2018-11-16 | 丹东丹银矿冶有限责任公司 | A kind of mating integrated apparatus constructed for the artificial concrete pillar in underground |
CN108825266B (en) * | 2018-08-29 | 2024-03-01 | 丹东丹银矿冶有限责任公司 | Matched integrated device for underground artificial concrete ore pillar construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205035811U (en) | Concrete temporary storage ware that drilled pile was pour | |
CN204960332U (en) | Conveyer pipe is pour perpendicularly to concrete | |
CN203019538U (en) | Secondary buffer hopper at discharge port of mixing station | |
CN204238562U (en) | Concreting hopper | |
CN104018515B (en) | A kind of desert area transmission line of electricity assembling type steel structure sandbox gravity type foundation | |
CN202417520U (en) | Concrete pumping distribution device used in construction of secondary linings of tunnel | |
CN201863289U (en) | Equipment integration for producing baking-free bricks by utilizing construction waste as well as earth and stone on site | |
CN201794594U (en) | Concrete delivery device | |
CN206329043U (en) | A kind of concrete shunts slot device | |
CN203319268U (en) | Pneumatic taking-out device for powder warehouse | |
CN207121243U (en) | A kind of open feed bin | |
CN201971429U (en) | Automatic metering and conveying system for sand material | |
CN212773523U (en) | Vertical downward concrete conveying device | |
CN204716289U (en) | The on-site control device of Tight filling in a kind of closed partition wall | |
CN203383190U (en) | Blocking system of tailing pond spilling tower | |
CN203620744U (en) | Coarse coal ash grinding device | |
CN203004045U (en) | Hopper for concrete falling | |
CN206597626U (en) | A kind of pouring out concrete groove | |
CN204751554U (en) | Broken dustless grey device of putting of hydraulic pressure contact pin at bottom of tower | |
CN205112091U (en) | Do benefit to mortar exhaust mortar jar | |
CN206395497U (en) | A kind of particle with blanking system or powder container | |
CN202640563U (en) | Opening reducing device for stirring host material discharge hopper | |
CN211737152U (en) | Portable patching machine feedway | |
CN204054318U (en) | A kind of self-compacting concrete storing blanking device of concrete duct vertical forming | |
CN204433552U (en) | Self-chambering is filled out and is closed scraper-type torque arm compartment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |