CN205024962U - High strength steel bone double T type post - Google Patents

High strength steel bone double T type post Download PDF

Info

Publication number
CN205024962U
CN205024962U CN201520760982.4U CN201520760982U CN205024962U CN 205024962 U CN205024962 U CN 205024962U CN 201520760982 U CN201520760982 U CN 201520760982U CN 205024962 U CN205024962 U CN 205024962U
Authority
CN
China
Prior art keywords
high strength
plate
unit
junction plate
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520760982.4U
Other languages
Chinese (zh)
Inventor
王晓波
甘国军
李水明
李强
樊兆月
谈晓晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201520760982.4U priority Critical patent/CN205024962U/en
Application granted granted Critical
Publication of CN205024962U publication Critical patent/CN205024962U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a high strength steel bone double T type post, include: bottom plate, scaffold, backup pad, upper cover plate, supporting the tire RACK, T type unit, connecting plate and cant chisei, the bottom plate locate on the scaffold, the backup pad locate on the bottom plate, the top that the backup pad was located to the upper cover plate constitutes H type unit, a high strength steel bone double T type post, its combination through with H type unit and T type unit is used, formation high strength steel bone double T type post, great optimization the structure of reinforcing bar post, increased the connectivity between each steel construction to make the improvement that its holding power can be great, and then improved the security that whole steel construction building was used, and then better satisfied the construction demand, simultaneously, supporting the tire RACK constitute by 3 group's bed -jigs, and its mode setting in order to scale up one by one lets its better needs that erect that have satisfied the steel construction to effectually guarantee the assembly welding that whole high strength steel bone double T type post can be better, guaranteed this high strength steel bone double T type post's quality.

Description

The double-T shaped post of a kind of high strength reinforcing bar
Technical field
The utility model relates to a kind of electric wire field, specifically the double-T shaped post of a kind of high strength reinforcing bar.
Background technology
Steel building is a kind of novel building system, and it relates to the industry boundary line between realty industry, builing industry, Metallurgy Industry, and set becomes a new industrial system, steel building system that insider generally has an optimistic view of that Here it is.Steel building compares traditional concrete construction, and instead of steel concrete with steel plate or shaped steel, intensity is higher, and shock resistance is better, and can batch production make due to component, and in-site installation, thus substantially reduces the duration.Formally due to it, there is many characteristics, be thus subject to the favor of all multiple enterprises gradually.
Steel building is while having above-mentioned many merits, very large difficulty is there is in it in the process of construction, ratio in current building field shared by steel building is little, its technology of building is ripe not enough, thus be no matter the design from designer, or all can some problems of existence more or less in the work progress of reality.Existing reinforced concrete column is all that steel pipe is carried out common being connected and fixed mostly, and its enabling capabilities is poor, the potential safety hazard existed in the process used, and the structure of each parts thus in steel work and preparation method all need to improve.
Utility model content
Utility model object: the purpose of this utility model is to solve the deficiencies in the prior art, provides the double-T shaped post of a kind of high strength reinforcing bar and processing and fabricating method thereof.
Technical scheme: in order to realize above object, the double-T shaped post of a kind of high strength reinforcing bar described in the utility model, comprise: base plate, scaffold, gripper shoe, upper cover plate, support jig, T-shaped unit, junction plate and peg, described base plate is located on scaffold, described gripper shoe is located on base plate, the top that gripper shoe is located at by described upper cover plate forms H type unit, described support jig is fixed on the job location of specifying, described H type unit is fixed on support jig, described T-shaped unit is vertical on H type unit, and H type unit is divided into two T-shaped unit, described junction plate is located between two T-shaped unit, described peg is located on each plate face of each T-shaped unit.
Support jig described in the utility model is made up of 3 groups of moulding beds, be respectively the first moulding bed, the second moulding bed and the 3rd moulding bed, the first described moulding bed is made up of the first support column, the first junction plate and the first fixed head, the first described junction plate is located between two first support columns, and described first fixed head is through in each first junction plate; Described second moulding bed is by the second support column, the second junction plate and the second fixed head, the second described junction plate is located between two second support columns, described second fixed head is through in each second junction plate, described 3rd moulding bed is made up of the 3rd support column, the 4th support column, the 3rd junction plate and the 3rd fixed head, described 3rd junction plate is located between the 3rd support column and the 4th support column, described 3rd fixed head is through between the 3rd junction plate, and the 3rd described support column is higher than the second support column, described 4th support column is higher than the 3rd support column.
The double-T shaped post of a kind of high strength reinforcing bar described in the utility model and processing and fabricating method thereof, comprise following concrete steps:
(1): first according to the requirement of constructure scheme, material is carried out to the cutting of part blanking;
(2): after required part blanking has been cut, carry out the location assembling of H type unit, first ready base plate location is assembled on scaffold, then gripper shoe is fixed on base plate, and it is welded;
(3): after plate to be supported welds, then upper cover plate location is assembled into the top of gripper shoe, and it is welded and fixed;
(4): after H type element solder completes, establish component position baseline at the construction ground dot-dash of specifying, then start the erection of support jig according to drawing, and it is welded and fixed;
(5): after support jig has welded, single H type cell location good for assembly welding on support jig;
(6): then set the T-shaped unit in position in the middle groups of H type unit, and be welded and fixed it, now, H type unit is divided into two T-shaped unit by T-shaped unit;
(7): more ready junction plate assembling is navigated between two T-shaped unit, and connecting portion is each other welded and fixed;
(8): after plate to be connected has welded, ready peg is fixedly soldered on the plate face of each T-shaped unit;
(9): then identical with above steps, that carries out another unit arranges welding;
(10) first ready base plate location is assembled on scaffold, then gripper shoe is fixed on base plate, and it is welded;
(11): after plate to be supported welds, then upper cover plate location is assembled into the top of gripper shoe, and it is welded and fixed;
(12): after H type element solder completes, establish component position baseline at the construction ground dot-dash of specifying, then start the erection of support jig according to drawing, and it is welded and fixed;
(13): after support jig has welded, single H type cell location good for assembly welding on support jig;
(14): then set the T-shaped unit in position in the middle groups of H type unit, and be welded and fixed it, now, H type unit is divided into two T-shaped unit by T-shaped unit;
(15): more ready junction plate assembling is navigated between two T-shaped unit, and connecting portion is each other welded and fixed;
(16): after plate to be connected has welded, be fixedly soldered to by ready peg on the plate face of each T-shaped unit, so far second unit has welded;
(17): after the peg on second unit has also welded, the welding of whole component is namely completed;
(18): draw at the port of component and establish control point and control line, then utilize milling machine to carry out end mill processing at the port of component, the so far processing of whole component all completes;
(19): finally just by detector, detection is carried out to whole component and check and accept, if it is all qualified to detect, so this component is then considered as certified products, if once pinpoint the problems in the process detected, then immediately it is overhauled, and maintenance after must again detect, until detect qualified after can come into operation.
Beneficial effect: the double-T shaped post of high strength reinforcing bar described in the utility model and processing and fabricating method thereof, have the following advantages:
1, the double-T shaped post of high strength reinforcing bar described in the utility model and processing and fabricating method thereof, it is by the Combination application by H type unit and T-shaped unit, form the double-T shaped post of high strength reinforcing bar, optimize the structure of reinforced concrete column greatly, add the connectivity between each steel work, thus its support force is improved greatly, and then improve the safety of whole steel building use, and then better met construction demand.
,support jig described in the utility model is made up of 3 groups of moulding beds, be respectively the first moulding bed, the second moulding bed and the 3rd moulding bed, in the process of construction, 3 groups of moulding beds are arranged in the mode increased progressively one by one, the erection needs of the steel work that allowed it better meet, thus effectively ensure that the double-T shaped post of whole high strength reinforcing bar can better assembly welding, ensure that the quality of the double-T shaped post of this high strength reinforcing bar.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of H type unit described in the utility model;
Fig. 3 is the structural representation of support jig described in the utility model.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, illustrate the utility model further.
Embodiment
As Fig. 1, the double-T shaped post of a kind of high strength reinforcing bar shown in Fig. 2 and Fig. 3, comprise: base plate 2, scaffold 3, gripper shoe 4, upper cover plate 5, support jig 6, T-shaped unit 7, junction plate 8 and peg 9, described base plate 2 is located on scaffold 3, described gripper shoe 4 is located on base plate 2, the top that gripper shoe 4 is located at by described upper cover plate 5 forms H type unit 1, described support jig 6 is fixed on the job location of specifying, described H type unit 1 is fixed on support jig 6, described T-shaped unit 7 is vertical on H type unit 1, and H type unit 1 is divided into two T-shaped unit 7, described junction plate 8 is located between two T-shaped unit 7, described peg 9 is located on each plate face of each T-shaped unit 7.
Support jig described in the present embodiment is made up of 3 groups of moulding beds, be respectively the first moulding bed, the second moulding bed and the 3rd moulding bed, the first described moulding bed is made up of the first support column, the first junction plate and the first fixed head, the first described junction plate is located between two first support columns, and described first fixed head is through in each first junction plate; Described second moulding bed is made up of the second support column, the second junction plate and the second fixed head, the second described junction plate is located between two second support columns, described second fixed head is through in each second junction plate, described 3rd moulding bed is made up of the 3rd support column, the 4th support column, the 3rd junction plate and the 3rd fixed head, described 3rd junction plate is located between the 3rd support column and the 4th support column, described 3rd fixed head is through between the 3rd junction plate, and the 3rd described support column is higher than the second support column, described 4th support column is higher than the 3rd support column.
The double-T shaped post of a kind of high strength reinforcing bar described in the present embodiment and processing and fabricating method thereof, comprise concrete preparation method as follows:
(1): first according to the requirement of constructure scheme, material is carried out to the cutting of part blanking;
(2): after required part blanking has been cut, carry out the location assembling of H type unit 1, first ready base plate 2 location is assembled on scaffold 3, then gripper shoe 4 is fixed on base plate 2, and it is welded;
(3): plate 4 to be supported welds well, then upper cover plate 5 location is assembled into the top of gripper shoe 4, and it is welded and fixed;
(4): after H type unit 1 has welded, establish component position baseline at the construction ground dot-dash of specifying, then start the erection of support jig 6 according to drawing, and it is welded and fixed;
(5): after support jig 6 has welded, single H type unit 1 good for assembly welding is navigated on support jig 6;
(6): then set the T-shaped unit 7 in position in the middle groups of H type unit 1, and be welded and fixed it, now, H type unit 1 is divided into two T-shaped unit 7 by T-shaped unit 7;
(7): more ready junction plate 8 assembling is navigated between two T-shaped unit 7, and connecting portion is each other welded and fixed;
(8): after plate 8 to be connected has welded, ready peg 9 is fixedly soldered on the plate face of each T-shaped unit 7;
(9): then identical with above steps, that carries out another unit arranges welding;
(10) first ready base plate 2 location is assembled on scaffold 3, then gripper shoe 4 is fixed on base plate 2, and it is welded;
(11): plate 4 to be supported welds well, then upper cover plate 5 location is assembled into the top of gripper shoe 4, and it is welded and fixed;
(12): after H type unit 1 has welded, establish component position baseline at the construction ground dot-dash of specifying, then start the erection of support jig 6 according to drawing, and it is welded and fixed;
(13): after support jig 6 has welded, single H type unit 1 good for assembly welding is navigated on support jig 6;
(14): then set the T-shaped unit 7 in position in the middle groups of H type unit 1, and be welded and fixed it, now, H type unit 1 is divided into two T-shaped unit 7 by T-shaped unit 7;
(15): more ready junction plate 8 assembling is navigated between two T-shaped unit 7, and connecting portion is each other welded and fixed;
(16): after plate 8 to be connected has welded, be fixedly soldered to by ready peg 9 on the plate face of each T-shaped unit (7), so far second unit has welded;
(17): after the peg on second unit has also welded, the welding of whole component is namely completed;
(18): draw at the port of component and establish control point and control line, then utilize milling machine to carry out end mill processing at the port of component, the so far processing of whole component all completes;
(19): finally just by detector, detection is carried out to whole component and check and accept, if it is all qualified to detect, so this component is then considered as certified products, if once pinpoint the problems in the process detected, then immediately it is overhauled, and maintenance after must again detect, until detect qualified after can come into operation.
Embodiment is only not used in restriction scope of the present utility model for illustration of the utility model, after having read the utility model, the amendment of those skilled in the art to the various equivalent form of value of the present utility model has all fallen within the application's claims limited range.

Claims (2)

1. the double-T shaped post of reinforcing bar, it is characterized in that: comprising: base plate (2), scaffold (3), gripper shoe (4), upper cover plate (5), support jig (6), T-shaped unit (7), junction plate (8) and peg (9), described base plate (2) is located on scaffold (3), described gripper shoe (4) is located on base plate (2), the top that gripper shoe (4) is located at by described upper cover plate (5) forms H type unit (1), described support jig (6) is fixed on the job location of specifying, described H type unit (1) is fixed on support jig (6), described T-shaped unit (7) is vertical on H type unit (1), and H type unit (1) is divided into two T-shaped unit (7), described junction plate (8) is located between two T-shaped unit (7), described peg (9) is located on each plate face of each T-shaped unit (7).
2. the double-T shaped post of a kind of reinforcing bar according to claim 1, it is characterized in that: described support jig is made up of 3 groups of moulding beds, be respectively the first moulding bed, the second moulding bed and the 3rd moulding bed, the first described moulding bed is made up of the first support column, the first junction plate and the first fixed head, the first described junction plate is located between two first support columns, and described first fixed head is through in each first junction plate; Described second moulding bed is made up of the second support column, the second junction plate and the second fixed head, the second described junction plate is located between two second support columns, described second fixed head is through in each second junction plate, described 3rd moulding bed is made up of the 3rd support column, the 4th support column, the 3rd junction plate and the 3rd fixed head, described 3rd junction plate is located between the 3rd support column and the 4th support column, described 3rd fixed head is through between the 3rd junction plate, and the 3rd described support column is higher than the second support column, described 4th support column is higher than the 3rd support column.
CN201520760982.4U 2015-09-29 2015-09-29 High strength steel bone double T type post Active CN205024962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520760982.4U CN205024962U (en) 2015-09-29 2015-09-29 High strength steel bone double T type post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520760982.4U CN205024962U (en) 2015-09-29 2015-09-29 High strength steel bone double T type post

Publications (1)

Publication Number Publication Date
CN205024962U true CN205024962U (en) 2016-02-10

Family

ID=55257505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520760982.4U Active CN205024962U (en) 2015-09-29 2015-09-29 High strength steel bone double T type post

Country Status (1)

Country Link
CN (1) CN205024962U (en)

Similar Documents

Publication Publication Date Title
CN105155775A (en) Twisted combined steel pipe column and manufacturing method thereof
CN105155777A (en) Steel rib double-T-shaped column and manufacturing method thereof
CN205024962U (en) High strength steel bone double T type post
CN203484844U (en) Welding tool for assembling special-shaped steel pipe truss structure
CN104668873A (en) Processing die for reinforcement cage
CN203160428U (en) Connecting structure of beam steel and steel rib at node position of framework beam column
CN207749839U (en) A kind of detachable five feet support jig
CN205063180U (en) Box reinforcing bar combination column with strong holding power
CN205476407U (en) Building construction beam frame
CN202849949U (en) Auxiliary frame adopting sleeve to connect straight thread reinforcing steel bar
CN203701702U (en) Splicing type dustproof shed
CN105155776B (en) A kind of box reinforcing bar coupled column and its processing method
CN204470896U (en) Silo support welding tooling
CN204621468U (en) The workpiece slew gear of chuck Double-station welding machine
CN204035432U (en) A kind of Figure of eight grid steel frame processing mold
CN103236426A (en) Equal-directional array type rectifier bridge stack
CN203304840U (en) Assembly mould for triangular support of pumping unit
CN204940805U (en) Large-sized unit flue support
CN211948841U (en) Tower outer frame column structure
CN104148467B (en) A kind of seal head necking machine
CN204418535U (en) Strengthening beam steel cushion block
CN216130333U (en) Precast element based on concrete
CN206839303U (en) A kind of tilting saws beam fixation base structure
CN107700662A (en) A kind of reinforcing formed steel construction for building
CN201660434U (en) Machine frame of high-speed mattress edge machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 214200 Baijia village, Zhangzhu Town, Yixing City, Wuxi City, Jiangsu Province

Patentee after: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

Address before: 214200 Zhang Zhu Zhen Bai Jia Cun, Yixing City, Wuxi City, Jiangsu Province

Patentee before: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

CP02 Change in the address of a patent holder