Connecting device and steel construction building Download PDFInfo
- Publication number
- CN205024883U CN205024883U CN201520663333.2U CN201520663333U CN205024883U CN 205024883 U CN205024883 U CN 205024883U CN 201520663333 U CN201520663333 U CN 201520663333U CN 205024883 U CN205024883 U CN 205024883U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- plate body
- connecting device
- plate
- steel construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 21
- 239000010959 steel Substances 0.000 title claims abstract description 21
- 238000010276 construction Methods 0.000 title abstract description 11
- 230000000087 stabilizing effect Effects 0.000 claims description 13
- 230000003019 stabilising effect Effects 0.000 claims 2
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 13
- 238000000034 method Methods 0.000 description 12
- 230000008569 process Effects 0.000 description 11
- 239000004567 concrete Substances 0.000 description 5
- 238000007789 sealing Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a connecting device and steel construction building has solved among the prior art problem that main part structural distortion caused the wallboard to damage, this connecting device is connected with the wallboard including being used for carrying out the plate body be connected with the wallboard, the installation is colluded, sets up on the plate body, a connecting hole sets up on the plate body that is used for and is connected plate body and wallboard to it is together articulated with plate body and wallboard to pass the connecting hole through the bolt, this steel construction building still includes connecting device including support body and wallboard, and the connecting hole colludes the joint with the wallboard on the support body through bolted splice, installation, the utility model provides a connecting device and steel construction building causes the wallboard to damage when having avoided main part structural distortion.
Description
Technical Field
The utility model relates to a steel construction building field especially indicates a connecting device and steel construction building.
Background
In a steel structure building, reinforced concrete is replaced by the wall plates or the section steel, so that the strength is higher and the shock resistance is better; the components can be manufactured in factories and installed on site; therefore, the construction period is greatly reduced, and the construction waste can be greatly reduced due to the reutilization of steel, so that the construction method is more environment-friendly;
in the multi-story high-rise steel structure building in the prior art, a main structure formed by a framework supporting system consisting of steel members and cast-in-place concrete floors bears all loads of the whole building, and an outer wall is connected to the periphery of the main structure to form an outer enclosure structure without participating in the stress of the main structure. The main structure frame is made of steel with high strength and high toughness, the outer protective structure is made of light inorganic brittle materials with high refractoriness, good heat preservation and heat insulation performance but low strength, the steel structure can continuously generate large deformation under the action of an external environment, the wall board and the main structure belong to a rigid connection mode of multi-point fixation, and when the main structure deforms, the wall board is made of brittle materials without deformation capacity and low strength, so that the wall board is damaged in the process when the structure deforms continuously.
SUMMERY OF THE UTILITY MODEL
The utility model provides a connecting device and steel construction building has solved the problem that the major structure warp and causes the wallboard to damage among the prior art.
The technical scheme of the utility model is realized like this:
a connection device, comprising:
the board body is used for being connected with the wallboard and is connected with the wallboard;
the mounting hook is arranged on the plate body;
the connecting holes for connecting the plate body and the wallboard are arranged on the plate body and penetrate through the connecting holes through bolts to hinge the plate body and the wallboard together.
As a further technical scheme, a connecting port is arranged on the plate body.
As a further technical solution, the method further comprises: and the hoisting stabilizing arm is arranged on the plate body.
Preferably, one end of the hoisting stabilizing arm is provided with a stabilizing part.
As a further technical scheme, one end of the mounting hook is provided with a guide part.
The utility model also discloses a steel construction building, including support body and wallboard, still include connecting device, the connecting hole passes through the bolt with the wallboard and articulates, and the installation colludes the joint on the support body.
The technical scheme of the utility model is that the plate body is installed with the wallboard before installation, the wallboard is arranged at the appointed position of the steel structure building frame body, and the wallboard is clamped with the frame body through the installation hook, so that the connection between the wallboard and the frame body is realized, the frame body is deformed in the subsequent use process, and the wallboard can rotate by taking a bolt connected with the wallboard through a connecting hole as a circle center, thereby avoiding the damage of the wallboard when the frame body is deformed;
and after the wallboard is arranged on the support body through the connecting device, the position adjustment of the wallboard on the support body can be realized, so that the wallboard can be ensured to be in a reasonable position, and the problem of untight sealing after installation is avoided.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is an enlarged schematic view of a connecting device according to the present invention;
FIG. 2 is a schematic structural view of a steel structure building;
FIG. 3 is an enlarged view of the structure of portion A in FIG. 2;
fig. 4 is an enlarged schematic view of a portion B in fig. 2.
In the figure:
1. a plate body; 2. installing a hook; 3. hoisting a stabilizing arm; 4. connecting holes; 5. a connecting port; 6. a guide portion; 7. a stabilizing section; 8. a frame body; 9. a wall panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1, the utility model provides a connecting device, include:
the plate body 1 is connected with the wall plate 9 before the wall plate 9 is installed, the connecting holes 4 are arranged on the plate body 1, the plate body 1 is hinged with the wall plate 9 by bolts passing through the connecting holes 4, wherein, the number of the connecting holes 4 is 1 in the technical scheme of the utility model, thus, when the frame body 8 is deformed in the using process, the wall plate 9 can rotate by taking the bolts connecting the wall plate 9 and the connecting holes 4 as the circle center, and further the damage of the wall plate 9 is avoided;
certainly, in the actual use process, a plurality of wallboards 9 are needed to be combined for use, and at this time, in order to increase the stability of the wallboards 9 after being arranged, the connecting port 5 is preferably arranged on the board body 1, the connecting port 5 is connected with the other ends of the wallboards 9 through connecting pieces such as bolts, so that one end of each wallboard 9 is provided with a connecting device, and the other end of each wallboard 9 is further fixed through the connecting port 5 on the board body 1, so that the stability of the wallboards 9 after being arranged is improved, and meanwhile, the sealing strength between the wallboards 9 is improved; of course, the connection port 5 is also connected to the wall plate 9 in an articulated manner, so that when the wall plate 9 is rotated by the bolts connecting the wall plate 9 and the connection holes 4, the other end of the wall plate 9 is rotated at the connection port 5; in addition, during subsequent use, the wall plate 9 is accompanied by expansion or contraction, the lower end of the wall plate 9 moves downwards in the connecting hole 5 when expanded, and moves upwards in the connecting hole 5 when contracted; thus, the wall board 9 can be supported, and meanwhile, the change space of the wall board 9 in the change process can be ensured;
the plurality of mounting hooks 2 are arranged on the plate body 1, the number of the mounting hooks 2 in the utility model is set according to the size and the weight of different plate bodies 1, the preferred mounting hooks 2 in the utility model are 2, and are arranged on the plate body 1 in parallel, as shown in figure 1, the mounting hooks 2 are arranged behind the plate body 1 and form a certain space with the plate body 1, the space is set according to the thickness of the frame body 8, when the mounting hooks 2 are arranged on the frame body 8, the frame body 8 is just arranged in the space, wherein,
one end of the mounting hook 2 is provided with a guide part 6, the direction of the guide part 6 is opposite to the direction of the position of the plate body 1, so that the opening of the space between the mounting hook 2 and the plate body 1 is enlarged, the mounting hook can be easily arranged on the frame body 8 in the mounting process, and the accuracy in the mounting process is improved;
a plurality of hoist and mount firm arm 3 set up on plate body 1, the quantity of hoist and mount firm arm 3 is set for according to the actual condition, the utility model discloses in the preferred quantity of hoist and mount firm arm 3 is preferred 2, and parallel setting is on plate body 1, when carrying out the installation of wallboard 9, be connected with hoist and mount firm arm 3 through equipment such as crane, and then lift up wallboard 9 through hoist and mount firm arm 3, and place in the assigned position, installation hook 2 joint is on support body 8 this moment, of course, in the actual operation process, the place position of wallboard 9 can deviate from the assigned position, continue to drive hoist and mount firm arm 3 through equipment such as crane this moment and move, and then make installation hook 2 move on support body 8, realize adjusting wallboard 9 to the assigned position; wherein,
after the wall plate 9 is placed at the designated position, concrete pouring is needed, and the stability and strength of the wall plate 9 after being placed are further ensured, so that in the utility model, one end of the hoisting stabilizing arm 3 is provided with a stabilizing part 7; the stabilizing part 7 is vertically arranged on the hoisting stabilizing arm 3, so that when concrete is poured, the stabilizing part 7 is positioned in the concrete, the adhesive force with the concrete can be increased in the using process, and the stability and the strength of the wallboard 9 after being arranged are improved;
as shown in fig. 2-4, the utility model also discloses a steel structure building, including support body 8 and wallboard 9, still include connecting device, connecting hole 4 is articulated through the bolt with wallboard 9, and 2 joints are colluded in a plurality of installations on support body 8.
The plate body 1 is installed with the wall plate 9 before installation, and is connected to the hoisting stabilizing arm 3 through equipment such as a crane in the process of installing the wall plate 9, the wall plate 9 is arranged at a designated position of the steel structure building frame body 8, and is connected with the frame body 8 through the installation hook 2 in a clamping manner, so that the connection between the wall plate 9 and the frame body 8 is realized, and after the wall plate 9 is arranged on the frame body 8 through the connecting device, the hoisting stabilizing arm 3 can be driven by the crane and the like to act, so that the position adjustment of the wall plate 9 on the frame body 8 is realized, the wall plate 9 can be ensured to be in a reasonable position, and the problem of untight sealing after installation is; when the frame body 8 deforms in the subsequent using process, the wall plate 9 can rotate by taking the bolt connected with the connecting hole 4 and the wall plate 9 as the center of circle, so that the wall plate 9 is prevented from being damaged when the frame body 8 deforms;
the above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. A connection device, comprising:
the plate body (1) is used for being connected with the wall plate (9) and is connected with the wall plate (9);
the mounting hook (2) is arranged on the plate body (1);
the connecting hole (4) is used for connecting the plate body (1) and the wallboard (9) and is arranged on the plate body (1), and the connecting hole (4) is penetrated through a bolt to hinge the plate body (1) and the wallboard (9).
2. A connecting device according to claim 1, characterised in that the plate body (1) is provided with a connecting opening (5).
3. The connecting device of claim 1, further comprising: and the hoisting stabilizing arm (3) is arranged on the plate body (1).
4. A connecting device according to claim 3, characterised in that the hoisting stabilising arm (3) is provided with a stabilising portion (7) at one end.
5. A coupling device according to claim 1, characterized in that the mounting hook (2) is provided with a guide (6) at one end.
6. The steel structure building comprises a frame body (8) and a wallboard (9), and is characterized by further comprising a connecting device according to any one of claims 1-5, wherein the connecting hole (4) is hinged to the wallboard (9) through a bolt, and the mounting hook (2) is clamped on the frame body (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520663333.2U CN205024883U (en) | 2015-08-31 | 2015-08-31 | Connecting device and steel construction building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520663333.2U CN205024883U (en) | 2015-08-31 | 2015-08-31 | Connecting device and steel construction building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205024883U true CN205024883U (en) | 2016-02-10 |
Family
ID=55257427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520663333.2U Expired - Fee Related CN205024883U (en) | 2015-08-31 | 2015-08-31 | Connecting device and steel construction building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205024883U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763677A (en) * | 2019-01-28 | 2019-05-17 | 广东领和复合材料有限公司 | A kind of connector and integral bathroom mechanism for integral bathroom wallboard |
-
2015
- 2015-08-31 CN CN201520663333.2U patent/CN205024883U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763677A (en) * | 2019-01-28 | 2019-05-17 | 广东领和复合材料有限公司 | A kind of connector and integral bathroom mechanism for integral bathroom wallboard |
CN109763677B (en) * | 2019-01-28 | 2023-11-10 | 广东领和复合材料有限公司 | Connecting piece for integral bathroom wallboard and integral bathroom mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108049628B (en) | Assembled building outer wall frame-free rapid installing and dismantling formwork system and construction method | |
CN106644488B (en) | Large rocket engine and support integral overturning clamp | |
CN204001652U (en) | The portable exterior wall operating platform of fabricated shear wall structure | |
CN110512766B (en) | Fabricated structure system of steel plate concrete shear wall and construction method thereof | |
CN205024883U (en) | Connecting device and steel construction building | |
CN207879008U (en) | Diameter Silo structure roof support system | |
CN108894329B (en) | Overhanging type pipe truss and mounting method of supporting rod thereof | |
CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
CN109989590B (en) | Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam | |
CN110043035B (en) | Post-cast strip construction supporting method | |
CN206070598U (en) | A kind of poured band of outer wall of basement outboard template and its fixed structure | |
CN215368358U (en) | Balcony faces limit protective structure convenient to installation | |
CN208137132U (en) | Steel building beam and column connected node | |
CN204960324U (en) | Suspension type floor formwork support device | |
CN211647379U (en) | Interim device of dysmorphism component installation | |
CN114673191A (en) | Attached steel structure construction elevator foundation capable of rotating in week and using method thereof | |
JP2019112904A (en) | Building construction method | |
CN211775988U (en) | Steel construction high-rise tower high altitude protector | |
JP2019002140A (en) | Steel form for constructing base mortar and construction method of base mortar using the same | |
CN107780644B (en) | Operation platform for elevator shaft construction and use method thereof | |
CN110950254A (en) | Quick mounting and dismounting type tower crane attachment operation platform and manufacturing method thereof | |
CN108316475A (en) | Steel building beam and column connected node | |
CN210710489U (en) | AAC panel auxiliary mounting tool | |
CN212897588U (en) | Adjustable thickness template for narrow space | |
CN207878927U (en) | Shellfish thunder hoisting frame at the top of diameter Silo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 Termination date: 20200831 |
|
CF01 | Termination of patent right due to non-payment of annual fee |